HomeMy WebLinkAbout4.07 Dougherty Hills Pk Slope RepairG~~,t OF DpB~~
~
19`~;~~, STAFF REPORT C I T Y C L E R K
``c~,,,.~ ~~ DUBLIN CITY COUNCIL File #^ 6^0 O^-0^~
DATE: August 16, 2011
TO: Honorable Mayor and City Councilmembers
FROM: Joni Pattillo, City Manager
SUBJEC : Award of Bid for Contract No. 11-09 to Evans Brothers Inc. (Dougherty Hills Park
Slope and Drainage Repair) and Approval of Budget Adjustment
Prepared By: Mark Lander, City Engineer
EXECUTIVE SUMMARY:
The Dougherty Hills Park Slope and Drainage Repair Project (CIP No. 950017) includes slope
stabilization and drainage repair and improvements on a hillside within Dougherty Hills Park
immediately above Topaz Circle. The project will restore an area of the hillside damaged during
intense rain storms in March of this year and offer protection for the homes on Topaz Circle and
the DSRSD access road from future storm events. Based on bid results received on July 28,
2011, a budget adjustment is needed to increase the funding available for improvements due to
additional repairs measures identified during design.
FINANCIAL IMPACT:
The total project cost identified for the Dougherty Hills Park Slope and Drainage Repair Project
(CIP No. 950017) in the adopted Capital Improvement Program is $110,000. This project is
funded by the General Fund. The project budget includes $23,000 was appropriated for project
design, inspection, administration and related costs and the remaining $87,000 for
improvements to be completed as part of the proposed contract with Evans Brothers Inc.
Based on the bids received a budget adjustment of $19,146 is recommended to provide
adequate funds for the contract for improvements plus a contingency of 10%.
Page 1 of 3 ITEM NO. ~. /
Budget For Improvements With Contingency Compared To Low Bid
RECOMMENDATION:
Staff recommends that the City Council adopt the Resolution awarding Contract No. 11-09,
Dougherty Hills Park Slope and Drainage Repair Project Village Parkway Stormwater Treatment
Improvem t Project to Ev ns Brothers, Inc. and approve a budget adjustment.
~ . ~ (/'
~
.
ub tted By Reviewed By Revi ed By
Public Works Director Administrative Services Director Assistant Ci M nager
DESCRIPTION:
On May 17, 2011, the City Council approved the appropriation of funds for Citywide Storm
Repairs, which included funding for the Dougherty Hills Park Slope and Draining Repair project
(Attachment 1). On June 21, 2011, the City Council approved the Fiscal Year 2011-12 Update
to the Five-Year Capital Improvement Program (CIP) for Fiscal Years 2010-2015, which
included the Dougherty Hills Park Slope and Drainage Repair Project (CIP No. 950017). Staff
has included a map showing the location of the proposed work (Attachment 2).
A total of four (4) bids were received on July 28, 2011. Bid results are as follows:
Bidder Bid
Evans Brothers, Inc.. $96,496.50
G.N. Henle $103,140.00
Bruce Carone $143,578.00
Thunder Mountain $160,649.90
The low bid of $96,496.50 was submitted by Evans Brothers, Inc. Staff has checked references
and necessary licenses, and recommends that the City Council adopt the Resolution
(Attachment 3) awarding Contract No. 11-09, Dougherty Hills Park Slope and Drainage Repair
Project (CIP No. 950017) to Evans Brothers, Inc. as the lowest responsive bidder.
The project budget included a total of $87,000 for improvements. The budget was based on the
likely scope of work expected when the budget was developed last April. During final design,
additional work was identified, including replacement of an existing drain line that was displaced
by soil erosion. Staff is recommending a budget adjustment (Attachment 4) to increase the
budget for improvements from $87,000 to $106,146 (an increase of $19,146). This will provide
an approximate allowance of 10% for contingencies during construction. The additional funding
is proposed to be a transfer from the budgeted contingency account.
Staff expects the project to begin early September and anticipates completion of the
improvements by late October 2011.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
1) The City will mail notices to residents and businesses
improvements following award of the construction contract.
2) As required by the specification, the Contractor will notify
businesses one week in advance of the improvements.
affected by the upcoming
all affected residents and
Page 2 of 3
ATTACHMENTS:
1. Location Map
2. Resolution Awarding
Slope and Drainage
Evans Brothers, Inc.
3. Budget Change Form
Contract 11-09, Dougherty Hills Park
Repair Project (CIP No. 950017), to
Page3of3
~ ~~
Dougherty Hills Park Slope and Drainage Repair
I1c~alin Hi~:(~ ~~c:l~cr~l
~
c_o~'c
~
PROJECT SITE
c~'
~
~
z
~
~~
~
~
~ ra r~c
N
~~ 7 ~ ~ ~~ " ~/
ATTACHMENT /
~~~
RESOLUTION NO. -11
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
AWARDING CONTRACT NO. 11-09,
DOUGHERTY HILLS PARK SLOPE AND DRAINAGE TO EVANS BROTHERS, INC.
WHEREAS, the City of Dublin did, on July 28, 2011, publicly open, examine, and declare
all sealed bids for doing the work described in the approved Plans, Specifications, and
Modifications for Contract No. 11-09, Dougherty Hills Park Slope and Drainage Repair, which
Plans, Specifications, and Modifications are hereby expressly referred to for a description of
said work and for all particulars relative to the proceedings under the request for bids; and
WHEREAS, said bids were submitted to the Public Works Director, who has
recommended that the bid hereinafter is the lowest and best responsive bid for doing said work;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby award Contract No. 11-09, Dougherty Hills Park Slope and Drainage Repair, to the
lowest responsible bidder therefore, to wit, Evans Brothers, Inc., at a bid of Ninety-six
Thousand, Four Hundred and Ninety-Six Twelve Dollars, and 50 Cents ($96,496.50), the
particulars of which bid are on file in the Office of~the Public Works Director.
BE IT FURTHER RESOLVED that the City Manager is authorized to execute the
Agreement.
PASSED, APPROVED AND ADOPTED this 16th day of August, 2011, by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
City Clerk
G:\CIP\Dougherty Hills Slope Drainage Repair\Resolution ofAward 8-16-11.doc
Mayor
ATTACHMENT ~
CiTV OF DU~LO~
~IJDGET' CFB~4iVGE FORIVI FY 2011 / 2012
CHAIVGE FORM #
New Appropriations (City Council Approval Required): Budget Transfers:
From Unappropriated Reserves ('") X From Budgeted Contingent Reserve (1001.1901.81101)
From New Revenues
Other
Within Same Department Activity
__ Between Departments (City Cbuncil Approval Required)
~ ~-- -~ , ~
DECRE.~~4SE,8~UDGE~T,A-G,~COUNT ~ :° ~ ~--
_ ~ilAOllf~l`~ :. , ~m , ,~ ~ ~
;1NCRE~4SEKBUD'GETACCOt~1f~T -'.,, . ~ ,.
, ANIOUiV~T~,___ ;~
Name: EXPEIVSE - GENERAL CIP EXPENDITURE: GENERAL .
FUND - Non-Departmental - $19,146 FUND -Improvem~nts Dougherty $ 19,146
Budgeted Contingency Hills Slope/Drainage Repair
GL Account # 1001.1901.81101 Project # 950017.9400.9401.1001
GL Account #: 3500.9501.73103
CIP Transfer Out:
General Fund 1001.1901.89101 $ 19,146
CIP Transfer In:
Parks CIP: #3500.9501.49999 $19,146
REASON FOR BUDGET CHANGE ENTRY: As presented to the City Council on August 16, 2011, Staff
have obtained bids to undertake soil repairs at the Dougherty Hills Park as part of a Capital Improvement
Project. During the design phase the proposed scope of repair work was expanded to address including
replacement of an existing drain line that was displaced by soil erosion. Based on the low bid received
including the expanded scope of work an additional appropriation is required. The additional funds
required will be provided from a transfer from the Budgeted Contingent Reserve.
Fin Mgr/ASD: ~°Jr~
Signature
City Manager: \ ~f'~/
ature
Date: $ f $ ~ 0
Date: ~ ~ ~
~ ~ .
,
g ~
AsY.A~ppro~ed at'the City Councfl Meeting on : Date 8/16/2011
s.a+. ' ~ ~~ a
Mayor: Date:
Signature .
Posted By: Date:
~ ~
~
G:IBudgetChangesl4_2011_1213_8_16_ll_Dougherry_Hills_Pk_Repair(2}.doc ATTACHMENT 3