Loading...
HomeMy WebLinkAbout4.6 Sidewalk Repair Curb Rampdoc STAFF REPORT CITY CLERK CITY COUNCIL File #600-35 DATE: October 4, 2011 TO: Honorable Mayor and City Councilmembers FROM: Joni Pattillo, City Manager SUBJECT: Approval of Contract Change Order and Budget Adjustment -Contract No. 11-02, Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp Installation Prepared by Mark Lander, City Engineer EXECUTIVE SUMMARY: On April 19, 2011, the City Council approved award of contract to Weber Tractor Services for Contract No. 11-02, Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp Installation. The scope of improvements covers two separate Capital Improvement Projects: 1) the Annual Sidewalk Safety Repair Program (CIP No. 949102); and 2) The Americans with Disabilities Act (ADA) Transition Plan (CIP No. 939102). The cost of the project is expected to exceed the current budget amount, requiring a budget change to transfer additional funds into the project as well as City Council approval of a contract change order. Approval is also recommended for a second change order to add work included in the Citywide Storm Drain Assessment (CIP No. 960017) for which funding is available and a budget adjustment is not needed. FINANCIAL IMPACT: The total budgeted for the two projects is $243,440 ($177,966 for the Annual Sidewalk Repair and $65,474 for the Americans with Disabilities Act (ADA) Transition Plan). Total costs for the project are estimated to exceed the budgeted amount by $21,532. The recommended budget adjustment would transfer $22,000 in unallocated Measure B funds to the Annual Sidewalk Repair Project (No. 949102) to cover the additional costs. Funding Source Existing Proposed Revised Funding Adjustment Funding Annual Sidewalk Program (949102) General Fund $107,966 $107,966 Measure B (Bicycle and Pedestrian) $70,000 $22,000 $92,000 Subtotal $177,966 $22,000 $199,966 ADA Transition Plan (939102) General Fund $65,474 $65,474 Subtotal $65,474 $65,474 Total $243, 440 $22, 000 $265, 440 Page 1 of 3 ITEM 4.6 Funding is available in the Citywide Storm Drain Assessment (No. 960017) to cover the cost of the recommended change order for that work. RECOMMENDATION: Staff recommends that the City Council: 1. Authorize the City Manager to approve a Change Order with Weber Tractor Services in an amount not to exceed $44,281.07 for the installation of additional sidewalk work under the Annual Sidewalk Repair Project (CIP No. 949012). 2. Approve budget change which will transfer the amount of $22,000 in unappropriated Measure B funds to the Annual Sidewalk Repair Project (CIP No. 949102). 3. Authorize the City Manager to approve a Change Order with Weber Tractor Services in an amount not to exceed $17,150 for storm drain work funded. under the Citywide Storm Drain Assessment (CIP No. 960017). / y lac- Submitted By Reviewed By Director of Public Works Assistant City Manager DESCRIPTION: Annual Sidewalk Repair Program The total budgeted for the two projects is $243,440 (Annual Sidewalk Repair at $177,966 and Americans with Disabilities Act (ADA) Transition Plan at $65,474). The project budgets included $44,890 allocated for design, inspection, and project coordination. The remaining $198,550 was budgeted for improvements. The low bid by Weber Tractor Service for the work was $150,137.32. The total costs submitted by the low bidder resulted in an overall surplus in the total available funding. Accordingly, in conjunction with the award of contract, the City Council authorized the City Manager to approve a contract change order in an amount not to exceed $33,399.02. The scope of work for the sidewalk replacement in the contract provides for replacing approximately 600' of sidewalk on Village Parkway in front of Dublin High School, extending from Brighton Drive to the Dublin Swim Center driveway (Attachment 1). As a result of the favorable prices in the low bid, staff requested that the contractor complete an additional 200' of sidewalk, extending north to the Dublin Swim Center building. The total cost of the additional sidewalk work described in the previous paragraph is $44,281.07, for a total construction cost of $194,418.39. This amount exceeds the contract change amount of $33,399.02 allowed under the prior City Council approval. Therefore, approval is needed for an alternate change order in the amount of $44,281.07 (Attachments 2 and 3). Page2of3 Total project costs, including the additional sidewalk work and associated inspection, are expected to exceed the current budget of $243,440 by approximately $21,531. Approval of a budget adjustment to transfer $22,000 in unappropriated Measure B Bicycle/Pedestrian reserves is recommended to fund the additional inspection costs and to provide a nominal contingency for remaining costs (Attachment 4). Citywide Storm Drain Assessment The Citywide Storm Drain Assessment (CIP No. 960017) allocated $150,000 for the cleaning, inspection, repair, and replacement of the City's storm drain system. The construction work includes the replacement of two segments of pipe in Dover Court and Holanda Court (Attachment 5). Previous assessment of these pipes in 2009 recommended immediate replacement of the pipes. The cost of this work was estimated at $20,000 per location, for a total of $40,000. Weber Tractor Services has provided a proposal to complete the work under a contract change order to the Sidewalk Program for a cost of $17,150 for both pipes. The low cost is the result of the needed equipment already being mobilized (the Sidewalk Project included a small amount for storm drain work) and the proximity of the pipes to the sidewalk work being completed under the existing contract. Staff recommends that the City Manager be authorized to approve an additional change order to cover the cost of the storm drain replacement (Attachments 6 and 7). Completion of the storm drain work under a change order will eliminate the costs and staff time associated with developing and administering a separate construction contract. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Location Map, Additional Sidewalk Work 2. Contract Change Order No. 1, Additional Sidewalk Work 3. Contract Change Order Summary 4. Budget Change 5. Location Map, Storm Drain Replacement 6. Contract Change Order No. 2, Storm Drain Replacement 7. Contract Change Order Summary Page 3 of 3 p ~ t Q F ~ ~ . ~ ' y S ~ • l~ ' ~4 i r Fc, ~1 fr ~ PPuuWffe"` ~ ~ Z ~ 76}x• . r9 1 a~ ~ ~ ~ ~Z - ~ O r V - 'gyp` ~ ~ L L ,.~'Yr s ~ ` , 1'l ~ Q ;r, e ' ['rte ! ~ ~ ~ 1 I - d N g ~ Q p a=+ ~ w~ 3+H~+fyy77,y~ r ~ p (n C'b~. ~ -p pl C - !fey"` tea--' 'r ~ _ Cam! ~ - I ~ ~ 1~.,1~'~~ - ~ = - - ~ . ~ l , ~ _ r. ~ ~ --.3 fi`b' ~ r ~ ~~r p#I~iuci h ~ yi ~ ~ ~~oM IeuoialPPb k,~, ~~oM ~ileMa i ;_~t ~ f~ ~ per ~ ~ Lf) O ~ ~ ~ ~ r~~ tip,: u n ~ _ ~r 0 ~ ~'.Fi = - ~ a - r ~ ~ x ~ . L' - - ~ . - M. i~ _ - ATTACHMENT / ~ d ~f N~~,j D F ~ - 4 ` i OP~Dpe~ 19'~'~- CITY OF DUBLIN 100 CIVIC PLAZA, DUBLIN, CALIFORNIA 94568 (925) 833-6630 (925)829-9248 FAX ~ 1/ ~ CONTRACT CHANGE ORDER NO. 1 DATE: September 19, 2011 PAGE: 1 of 1 PROJECT/ROAD: Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program CONTRACT NO: 11-02 TO: Weber Tractor Services . 867 2"d Ave Redwood City, CA 94063 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. Please note that this change order is not effective until approved by the Public Works Director. This change order is requested by the City. 1. Furnish all materials, equipment and labor to remove and replace additional 200 LF of curb, $44,281.07 gutter, and sidewalk on Village Parkway in front of Dublin High School. This additional work shall be paid for at the contract unit prices for the various items of work. . r ESTIMATED. COST INCREASE: $44,281.07 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED 20 WORKING DAYS. SUBMITTED BY: APPROVAL RECOMMENDED BY: ~ APPROVED BY: Mark Lander Date Gary Huisingh Date Joni Pattillo Date City Engineer Public Works Director City Manager We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. ATTACHMENT i i t CHANGE ORDER SUMMARY DATE: September 19, 2011 PROJECT NAME: Fiscal Year 2010-2011 Annual Sidewalk Safet Re air Pro ram CIP 949102 CONTRACT NO: 11-02 CONTRACTOR: Weber Tractor Services PERCENT COMPLETED: 95% CONTRACT AMOUNT: $150,137.32 APPROVED BUDGET AMT: $198,550.00 CHANGER ORDERS: r CHANGE ORDER #1 $44,281.07 CHANGE ORDER #2 CHANGE ORDER #3 CHANGE ORDER #4 CHANGE ORDER #5 CHANGE ORDER #6 CHANGE ORDER #7 TOTAL OF CHANGE ORDERS: $44,281.07 CURRENT CHANGE ORDER DESCRIPTION: Include additional 200 LF of sidewalk, curb and gutter on Village Parkway at Dublin High School ADJUSTED CONTRACT AMOUNT: $ 194,418.39 PROGRESS PAYMENTS MADE: PAYMENT #1 $25,800.00 PAYMENT #2 14,715.60 PAYMENT #3 25,546.34 PAYMENT #4 22,115.65 PAYMENT #5 33,095.50 PAYMENT #6 36,904.50 { PAYMENT #7 32,395.80 PAYMENT #8 3,845.00 PAYMENT #9 PAYMENT #10 TOTAL PROGRESS PAYMENTS: $194,418.39 REMAINING BALANCE ON CONTRACT: $0.00 RECOMMENDATION: APPROVED APPROVED DENIED DENIED SIGNATURES: Assistant City Manager City Manager TTACHMENT A 3 1 i CITY OF DUBLIN FY 2011 - 2012 BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unapprop"riated Reserves (Fund 2205) From Budgeted Contingent Reserve Measure B Sales Tax -Bike /Pedestrian Fund (1001.1901-81101) Within Same Department Activity From New Revenues Between Departments (City Council Approval Reqd) Other DECREASE BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT AMOUNT EXPENDITURE: Measure BBike/Pedestrian Fund Annual Sidewalk Safety Repair CIP Inspection Services Project 949102.9200.9205.2205 $22,000 GL Account 3400.9401.64001 TRANSFER OUT: Measure BBike/Pedestrian Fund GL Account 2205.9401.89101 $22,000 TRANSFER IN: Community Improvements CIP Fund $22,000 Project 949102.9403 GL Account 3400.9401.49999 ASD/Fin Mgr Date ~2~~1~ Signature REASON FOR BUDGET CHANGE ENTRY: As presented to the City Council on .Oct 4, 2011, Staff projected the total cost for the Annual - Sidewalk Safety Repair Project.#949102 exceeding its current budget by approximately $22,000. The increase is primary due to the cost of inspection, which is estimated to total .approximately $29,000. Currently there. is $6,700 budgeted for. inspection services. The current construction workload for both the Capital Improvement Projects and Private Development has resulted in the needs to utilize the services of a contract inspector, as-the two staff inspectors being assigned to other projects. This Budget Change appropriates an additional $22,000 from the Measure B Bike/Pedestrian Reserves to full fund inspection cost. City Manager: Date Signature As approved at the City Council Meeting on: Date 10/4/2011 Mayor: Date Signature . Posted By: Date Signature G:\Budget Changes\4_2011_12\7_10_4_ll_Sidewalk Safety.doc ATTACHMENT 4 i Attachment 5, Storm Drain Replacement - Holanda Court u _ - ~ - 1 ~ ~ ~ x s = .a ~ Q ~ y~ - - - : ; rir, r~~ i; _ ' ~ ~`entzr i~ 4. ~ - ~ _ , ~ ~ xj - ~ 'F - "t ~ - '7 ' G ~ ~ - 3 Attachment 5 -Storm Drain Replacement, Dover Court ~p ~ s i b g, - ~ ~ ~~a _ ~ ei~ASltNt:r~ f~ ~ i ~ ~ i~ ~ # ~ ~ ~ ' ~ Tr ~ ~ - i r i`k~ ~ ~ T ~ ~ ~ ~ - - f x ~ r :l n..._. _ ~ r~ t Ir ~ ~ F~~ ~ QCs R,„ ~ . ~ ~ t+'e . ~ ~ ~ P`~" ~ ~ V fit, . ~ 3 G~~~ OP~DpB~ 19 CITY OF DUBLIN 100 CIVIC PLAZA, DUBLIN, CALIFORNIA 94568 (925) 833-6630 (925) 829-9248 FAX ~ - ~trFOR~ CONTRACT CHANGE ORDER NO. 2 DATE: September 19, 2011 PAGE: 1 of 1 PROJECT/ROAD: Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program CONTRACT NO: 11-02 TO: Weber Tractor Services . 867 2"d Ave Redwood City, CA 94063 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. Please note that this chance order is not _ effective until approved by the Public Works Director. This change order is requested by the City. 1. Furnish all materials, equipment and labor to remove and replace 30 LF of 12" reinforced $17,150.00 concrete pipe on Dover Court and 30 LF of reinforced concrete pipe on Holanda Court. Backfill and pavement will be in conformance with City Standard. Drawing No. CD-801. (Funding to be from Citywide Storm Drain Assessment, CIP No. 960017} ESTIMATED COST INCREASE: $17,150.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED 10 WORKING DAYS. SUBMITTED BY: APPROVAL RECOMMENDED BY: APPROVED BY: Mark Lander Date Gary Huisingh Date Joni Pattillo Date City Engineer Public Works Director City Manager We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. ATTACHMENT- i CHANGE ORDER SUMMARY DATE: September 19, 2011 PROJECT NAME: Fiscal Year 2010-2011 Annual Sidewalk Safet Re air Pro ram CIP 949102 CONTRACT NO: 11-02 CONTRACTOR: Weber Tractor Services PERCENT COMPLETED: 95% CONTRACT AMOUNT: $150,137.32 APPROVED BUDGET AMT: $198,550.00 CHANGER ORDERS: CHANGE ORDER #1 $44,281.07 CHANGE ORDER #2 17,150.00 CHANGE ORDER #3 CHANGE ORDER #4 CHANGE ORDER #5 CHANGE ORDER #6 CHANGE ORDER #7 TOTAL OF CHANGE ORDERS: $61,431.07 CURRENT CHANGE ORDER DESCRIPTION: Remove and replace 30 LF of 12" RCP on Dover Court and 30 LF of 12" RCP on Holanda Court. ADJUSTED CONTRACT AMOUNT: $ 211,568.39 PROGRESS PAYMENTS MADE: PAYMENT #1 $25,800.00 PAYMENT #2 14,715.60 PAYMENT #3 25,546.34 PAYMENT #4 22,115.65 PAYMENT #5 33,095.50 PAYMENT #6 36,904.50 PAYMENT #7 32,395.80 PAYMENT #8 3,845.00 PAYMENT #9 PAYMENT #10 TOTAL PROGRESS PAYMENTS: $194,418.39 REMAINING BALANCE ON CONTRACT: $17,150.00 RECOMMENDATION: APPROVED APPROVED DENIED DENIED SIGNATURES: Assistant City Manager City Manager ATTACHMENT ~