Loading...
HomeMy WebLinkAbout8.3 Attch 3 GreenPointRatedChkListGreenPoint Rated Checklist: Single Family `, The GreenPoint Rated checklist tracks green features incorporated into the home. The recommended minimum requirements for a green home are: Earn a total of 50 points or more; obtain the following minimum points per category: Energy (30), Indoor Air Quality/Health (5), Resources (6), and Water (g); and meet the prerequisites Build It Green ~; Or^ ih2 G~GJ,'1iJ' L~L7 Total Points Achieved: 7~ 33 A.3.a (50% construction waste diversion), J.1 (Exceed Title 24 by 15%), and N.1 (Incorporate Green Points ~"~-"_._. checklist in blueprints). 20 The green building practices listed below are described in the New Home Construction Green Building Guidelines, available at www.builditgreen.org. Build It Green is anon-profit organization providing the GreenPoint Rated g ~ program as a public service. Build It Green encourages local governments to leverage program resources to 2 ;; ~ support voluntary, market-based programs and strategies. ~, ' Positano D3 I .a ~' t ~ m c L E E rn °' = a`~ ~ °a °i a Q c°~ w g ~ 3 •~ ~ - • ~ 1. Protect Topsoil and Minimize Disruption of Existing Plants 8 Trees ^ a. Protect Topsoil from Erosion and Reuse after Construction 0 1 1 ^ b. Limit and Delineate Construction Footprint for Maximum Protection 0 1 ^ 2. Deconstruct Instead of Demolishing Existing Buildings On Site 0 3 ~~ 3. Recycle Job Site Construction Waste (Including Green Waste) Q a. Minimum 50% Waste Diversion by Weight (Recycling or Reuse) - Required 0 R ^ b. Minimum 65% Diversion by Weight (Recycling or Reuse) 0 ' 2 ^ c. Minimum 80% Diversion by Weight (Recycling or Reuse) 0 2 4. Use Recycled Content Aggregate (Minimum 25%) ~-_.__ _. -__ _ ___.__ ___..__._. _ _.__ _ _ ^ a. Walkway and Driveway 0 1 ^ b. Roadway Base 0 1 Total Points Available in Site = 12 0 1. Replace Portland Cement in Concrete with Recycled Flyash or Slag ^ a. Minimum 20%Flyash or Slag 0 1 b. Minimum 25%Flyash or Slag _ ___ O _ 0 1 _ ^ 2. Use Frost•Protected Shallow Foundation in Cold Areas (C.E.C. Climate Zone 16) 0 3 ^ 3. Use Radon Resistant Construction 0 1 [`Points automatically granted when project qualifes for measure J3: ES with IAA] _.___._. 4. Design and Build Structural Pest Controls ^ a. Install Termite Shields & Separate All Exterior Wood-to-Concrete Connections by Metal or Plastic 1 Fasteners/Dividers 0 [*Points automatically granted when project qualifies for measure J3: ES with IAO] ^ b. All New Plants Have Trunk, Base, or Stem Located At Least 36 Inches from Foundation 0 1 Total Points Available in Foundation = 8 0 1 '• •~' 1. Construct Resource-Efficient Landscapes ~ a. No Invasive Species Listed by Cal-IPC Are Planted 1 1 ^ b. No Plant Species Will Require Hedging 0 j 1 ^ c. 75% of Plants Are California Natives or Mediterranean Species or Other Appropriate Species 3 3 ^ 2. Use Fire-Safe Landscaping Techniques 0 1 3. Minimize Turf Areas in Landscape Installed by Builder n © Build It Green SF Data Collection Form v.3.4 Page 1 of 9 ATTACHMENT 3 Positano D3 • 'p ~ ~ C L a.. ~ w d E C) °' ~ ~ d Q v w g ~ 3 ^ a. All Turf Will Have a Water Requirement Less than or Equal to Tall Fescue (< = 0.8 plant factor) 0 2 ~ b. Turf Shall Not Be Installed on Slopes Exceeding 10% or in Areas Less than 8 Feet Wide 2 ~ - 2 Q c. Turf is <_33% of Landscaped Area (total 2 points) 2 2 ^ d. Turf is <_10% of Landscaped Area (total 4 points) 0 2 ~ 4. Plant Shade Trees 3 3 Q 5. Group Plants by Water Needs (Hydrozoning) 2 2 6. Install High-Efficiency Irrigation Systems ^ a. System Uses Only Low-Flow Drip, Bubblers, or Low-flow Sprinklers 0 Z ^ b. System Has Smart (Weather-Based) Controllers 0 3 ~ 7. Incorporate Two Inches of Compost in the Top 6 to 12 Inches of Soil 3 3 ^ 2 8. Mulch All Planting Beds to the Greater of 2 Inches or Local Water Ordinance Requirement 2 ^ 9. Use 50% Salvaged or Recycled-Content Materials for 50% of Non-Plant Landscape Elements 0 1 ^ 1 10. Reduce Light Pollution by Shielding Fixtures and Directing Light Downward 0 Total Points Available in Landscapin g = 31 18 1. Apply Optimal Value Engineering ^ a. Place Rafters and Studs at 24-Inch On Center Framing 0 1 ~ b. Size Door and Window Headers for Load 1 1 ^ c. Use Only Jack and Cripple Studs Required for Load 0 1 _ 2. Use Engineered Lumber ~ ~ ___Wm__ ~~ ~.. ^ a. Beams and Headers 0 1 ^ b. Insulated Engineered Headers 0 1 -N -~ ^ c. Wood I-Joists or Web Trusses for Floors 1 , 1 _ ^ d. Wood I-Joists for Roof Rafters 0 1 ^ e. Engineered or Finger-Jointed Studs for Vertical Applications 0 1 ~ f. Oriented Strand Board for Subfloor 1 1 ~ g. Oriented Strand Board for Wall and Roof Sheathing 1 1 3. Use FSC-Certified Wood ^ a. Dimensional Lumber, Studs and Timber: Minimum 40% 0 2 ^ b. Dimensional Lumber, Studs and Timber: Minimum 70% 0 j _ 2 ' ^ c. Panel Products: Minimum 40% 0 ~ 1 ^ d. Panel Products: Minimum 70% 0 1 4. Use Solid Wall Systems (Includes SIPs, ICFs, 8 Any Non-Stick Frame Assembly) ^ a. Floors 0 2_ ^ b. Walls 0 2 2 ^ c. Roofs 0 2 2 5. Reduce Pollution Entering the Home from the Garage ['Points automatically granted when project qualifies for measure J3: ES with IAQ] ^ a. Tightly Seal the Air Barrier between Garage and Living Area 0 1 b. Install Garage Exhaust Fan OR Build a Detached Garage 0 1 6. Design Energy Heels on Trusses (75% of Attic Insulation Height at Outside Edge of Exterior Wall) 0 1 ^ 7. Design Roof Trusses to Accommodate Ductwork ~ 0 1 (] 8. Use Recycled-Content Steel Studs for 90% of Interior Wall Framing _ 0 1 U © Build It Green SF Data Collection Form v.3.4 Page 2 of 9 Positano D3 i a 'a ,~•~ L N d Y m C t E E m 07 ~ a° °i _ _ ~ a° Q ~ w a s ~ ___ -~~~-~9. Thermal Mass Walls:~518-Inch~Drywall on All Interior Walls or Walls Weighing more than 40 Ib/cu.ft. 0 1 _____r~___ __~_.v ~.._m " _.._ ~e_ n ______. . _®a..m.®.~.._.__ .. . ,..~ _°___._....,_._ 10. Install Overhangs and Gutters ^ a. Minimum 16-Inch Overhangs and Gutters 0 1 (*Points automatically granted when project qualifies for measure J3: ES with IAQ] ^ b. Minimum 24-Inch Overhangs and Gutters 0 1 Total Points Available in Structural Building Frame and Envelope = 36 ~ 4 • - ~ ~ ^ 1. Use Recycled-Content (No Virgin Plastic) or FSC-Certified Wood Decking 0 .~ ~ Z ^ 2. Install a Rain Screen Wall System 0 2 ~ 3. Use Durable and Non-Combustible Siding Materials 1 1 D 4. Use Durable and Non-Combustible Roofing Materials 2 2 Total Points Available in Exterior Finish = 7 3 ~ •• ~ .~ - 1.Install Insulation with 75% Recycled Content _ ^ a. Walls and Floors 0 1 b. Ceilings __ ^ ~~ ~ ~ ~~ 0 1 _ 2. Install Insulation that is Low-Emitting (Certified Section 01350) ~~ ~~ D a. Walls and Floors 1 1 `, ^ b. Ceilings -.._. 1 1 ___..~~__.._._. __.~._.~ _~____._ _ ~______._ ___.~_-------____~_.._ ._._.--_r.~ _._._____._. ~ 3. Inspect Quality of Insulation Installation before Applying Drywall 0 1 [*Points automatically granted when project qualifies for measure J3: ES with IAQ] Total Points Available in Insulation = 5 2 ~. ~ .~ 1. Distribute Domestic Hot Water Efficiently (Additive, Maximum 7 Points) ^ a. Insulate Hot Water Pipes from Water Heater to Kitchen 0 i 1 ^ b. Insulate All Hot Water Pipes 0 1 _ 1 ^ c. Use Engineered Parallel Piping 0 ~ 1 ^ d. Use Engineered Parallel Piping with Demand Controlled Circulation Loop 0 1 ^ e. Use Structured Plumbing with Demand Controlled Circulation Loop 0 1 2 ^ f. Use Central Core Plumbing 0 1 1 1 ^ 2. Install Only High Efficiency Toilets (Dual-Flush or <_1.28 gpf) 0 4 Total Points Available in Plumbing =Total 11 0 ^ 1. Design and Install HVAC System to ACCA Manual J, D, and S Recommendations 4 [*Points automatically granted when project qualifies for measure J3: ES with IAQ] ___---._. ___._-------_.___ ____. p ~_ ._ a. ----- ~sm~__ _ _...._ ~w.~ ~~ _ __.. __..-._..._~...~~ - _. e_._ 2. Install Sealed Combustion Units [*Points automatically granted when project qualifies for measure J3: ES with IAO] ^ a. Furnaces 0 2 ^ b. Water Heaters 0 2 ^ 3. Install Zoned, Hydronic Radiant Heating ~ -~ ~~"~~~~"-`°""®~~-__...__._._.__.__ ___ 0 1 1 ^ 4. Install High Efficiency Air Conditioning with Environmentally Responsible Refrigerants _ w - _____ 1 0 ._.___.._ ~__._._..___..____d_._.___..___.___.._..__.__.._~..~.___..._ 5. Design and Install Effective Ductwork [*5b,d,&e are automatically granted when project qualifies for measure J3: ES with IAQ] ^ a. Install HVAC Unit and Ductwork within Conditioned Space 0 3 n © Build It Green SF Data Collection Form v.3.4 Page 3 of 9 Po ~ __ _____.___.~.___~~ .. _.._.__ __._. ~._ _ , _ _ _.__ __ __._____.w.______ . , _ ._ _-. _ _ _______... sitano D3 ... 1 I -~ 7 ~ 7 t ~ N ~ ~ d L E E rn d = ~ o a`~ C! a ;, a Q ~ w g z 3 ^ b. Use Duct Mastic on All Duct Joints and Seams 0 1 ^ c. Install Ductwork under Attic Insulation (Buried Ducts) 0 1 ^ d. Pressure Relieve the Ductwork System 0 1 ^ e. Protect Ducts during Construction and Clean All Ducts before Occupancy 0 1 ^ 6. Install High Efficiency HVAC Filter (MERV 6+) 0 1 [*Points automatically granted when project qualifies for measure J3: ES with IAO] ^ 7. Don't Install Fireplaces or Install Sealed Gas Fireplaces with Efficiency Rating NOT Less Than 60% using 0 1 CSA Standards ----. _ ______ _ ..___.__.._________ _ .__ ~~._.ro.__. __ ...,,._..,.___~_m_„ ._ ~_ _.._._~_.,.._....~ 8. Install Effective Exhaust Systems in Bathrooms and Kitchens [*Sa&c are automatically granted when project qualifies for measure J3: ES with IAO] ^ a. Install ENERGY STAR Bathroom Fans Vented to the Outside 0 1 ^ b. All Bathroom Fans Are on Timer or Humidistat 0 1 Q c. Install Kitchen Range Hood Vented to the Outside 1 1 9. Install Mechanical Ventilation System for Cooling (Max. 4 Points) ^ a. Install ENERGY STAR Ceiling Fans & Light Kits in Living Areas & Bedrooms 0 1 ^ b. Install Whole House Fan with Variable Speeds 0 1 ^ c. Automatically Controlled Integrated System 0 2 ^ d. Automatically Controlled Integrated System with Variable Speed Control -m---_____ 0 3 10. Install Mechanical Fresh Air Ventilation System (Maximum 3 Points) ~~ ^ a. Any Whole House Ventilation System That Meets ASHRAE 62.2 0 2 ^ b. Install Air-to-Air Heat Exchanger that meets ASHRAE 62.2 0 1 2 ['Points automatically granted when project qualifies for measure J3: ES with IAO] ^ 11. Install Carbon Monoxide Alarm(s) 0 1 [*Points automatically granted when project qualifies for measure J3: ES with IAO] Total Points Available in Heating, Ventilation and Air Conditioning = 30 1 •• ~ .~ - ^ 1. Pre-Plumb for Solar Hot Water Heating 0 4 2. Install Solar Water Heating System 0 10 3. Install Wiring Conduit for Future Photovoltaic Installation 8 Provide 200 ft~ of South-Facing Roof 0 2 4. Install Photovoltaic (PV) Panels ^ a. 30% of electric needs OR 1.2 kW (total 6 points) 0 6 ^ b. 60% of electric needsOR 2.4kW (total 12 points) 0 6 ^ c. 90% of electric need OR 3.6 kW (total 18 points) 0 6 Total Available Points in Renewable Energy = 28 0 1. Diagnostic Evaluations ^ a. House Passes Blower Door Test 0 1 [*Points automatically granted when project qualifies for measure J3: ES with IAQ] ^ b. House Passes Combustion Safety Backdraft Test 0 1 15% 2. Design and Build High Performance Homes -15% above Title 24 -Required 30 >_30 ^ 3. House Obtains ENERGY STAR with Indoor Air Package Certification -Pilot Measure (Total 45 points; read 0 5 2 comment) Total Available Points in Building Performance = 109 30 • ~ • - ^ 1. Design Entryways to Reduce Tracked in Contaminants 0 • . 1 © Build It Green SF Data Collection Form v.3.4 Page 4 of 9 Positano D3 d d ~ -~ ~ =t ~ ~, ~ ~~ ~ ~- a Q v w a ~ 3 _ _ 2. Use Low-VOC or Zero-VOC Paint (Maximum 3 Points) ~ ~ ~ a. Low-VOC Interior Wall/Ceiling Paints (<50gp1 VOCs (Flat) & <150gp1 VOCs (Non-Flat)) 1 1 ^ b. Zero-VOC: Interior Wall/Ceiling Paints (<5 gpl VOCs (Flat)) 0 3 D 3. Use Low VOC, Water-Based Wood Finishes (<250 gpl VOCs) 2 2 D 4. Use Low-VOC Caulk and Construction Adhesives (<70 gpl VOCs) for All Adhesives 2 2 ^ 5. Use Recycled-Content Paint _ 0 1 ~ ~~ ____._ 6. Use Environmentally Preferable Materials for Interior Finish: A)FSC-Certified Wood, B) Reclaimed, C) ^ Rapidly Renewable, D) Recycled-Content or E) Finger-Jointed a. Cabinets (50%Minimum) 0 1 ^ b. Interior Trim (50%Minimum) 0 1 ^ c. Shelving (50%Minimum) 0 1 ^ d. Doors (50%Minimum) 0 ~ ^ e. Countertops (50%Minimum) . _~ ~.-__ ____ ~ ~ _ 0 1 _ __ _ .. . 7. Reduce Formaldehyde in Interior Finish (CA Section 01350) ____ ^ a. Subfloor & Stair Treads (90%Minimum) 0 1 ^ b. Cabinets & Countertops (90%Minimum) 0 1 ^ c. Interior Trim (90%Minimum) 0 1 ^ d. Shelving (90%Minimum) 0 1 8. After Installation of Finishes, Test of Indoor Air Shows Formaldehyde Level <27ppb 0 3 Total Available Points in Finishes = 21 5 ~ •~ ~ .~ - 1. Use Environmentally Preferable Flooring: A) FSC-Certified Wood, B) Reclaimed or Refinished, C) Rapidly Renewable, D) Recycled-Content, E) Exposed Concrete. Flooring Adhesives Must Have <70 gpl VOCs. ^ a. Minimum 15% of Floor Area 0 1 ^ b. Minimum 30% of Floor Area 0 ' 1 ^ c. Minimum 50% of Floor Area 0 1 ^ d. Minimum 75%of Floor Area 0 1 ^ 1 2. Thermal Mass Floors: Floor Covering Other than Carpet on 50% or More of Concrete Floors 0 2 ^ 3. Flooring Meets Section 01350 or CRI Green Label Plus Requirements (50%Minimum) 0 [`Points automatically granted when project qualifies for measure J3: ES with IAQ] Total Available Points in Flooring = 7 0 1. Install Water and Energy Efficient Dishwasher D a. ENERGY STAR (total 1 point) 1 1 ^ b. Dishwasher Uses No More than 6.5 Gallons/Cycle (total 2 points) _ _ ,__ _ ~_ 0 1 , _ 2. Install ENERGY STAR Clothes Washing Machine with Water Factor of 6 or Less ^ a. Meets Energy Star and CEE Tier 2 requirements (modified energy factor 2.0, Water Factor 6.0 or less) 0 1 2 (total 3 points) ^ b. Meets Energy Star and CEE Tier 3 requirements (modified energy factor 2.2, Water Factor 4.5 or less) 0 2 (total 5 points) 3. Install ENERGY STAR Refrigerator © Build It Green SF Data Collection Form v.3.4 Page 5 of 9 Positano D3 i -~ 7 ?~ ,l+ 7 E rn L ~ = d ~ ~ t E `m ~ H a Q U W Q ~ ~ ^ a. ENERGY STAR Qualified & < 25 Cubic Feet Capacity 0 1 ^ b. ENERGY STAR Qualified & < 20 Cubic Feet Capacity 0 1 4. Install Built-In Recycling Center and Composting Center ^ a. Built-In Recycling Center 0 2 ^ b. Built-In Composting Center 0 1 Total Available Points in Appliances and Lighting = 12 1 ~ •. ~ .~ - - ~ 1. Incorporate Green Point Rated Checklist in Blueprints -Required 0 R D 2 Develop Homeowner Manual of Green FeatureslBenefits ~ ~~ ~ ~ ~ _ ~ ~ 3 1 1 1 ['Points automatically granted when project qualifies for measure J3: ES with IAQ] Total Available Points in Other = 3 3 ~ 1 ~ i~ 1. Develop Infill Sites ^ a. Project is Located in a Built Urban Setting with Utilities in Place for Fifteen Years 0 1 1 ^ b. Development is Located within 1/2 Mile of a Major Transit Stop 0 2 : 2. Cluster Homes & Keep Size in Check ^ a. Cluster Homes for Land Preservation 0 1 1 ^ b. Conserve Resources by Increasing Density (10 Units per Acre or Greater) 0 2 ' 2 ^ c. Home Size Efficiency 0 9 0 3 7 0 3. Subdivision Layout & Orientation to Improve Natural Cooling and Passive Solar Attributes 4. Design for Walking & Bicycling ^ a. Pedestrian Access to 5 or More Neighborhood Services within'/z Mile: 1) Community Center/Library; 2) Grocery 0 2 Store; 3) School; 4) Day Care; 5) Laundry; 6) Medical; 7) EntertainmenURestaurants; 8) Past Office; 9) Place of Worship; 10) Bank ^ b. Development is Connected with A Dedicated Pedestrian Pathway to Places of Recreational Interest within 1/4 0 1 mile ^ c. At Least Two of the Following Traffic-Calming Strategies: 0 2 -Designated Bicycle Lanes are Present on Roadways; -Ten-Foot Vehicle Travel Lanes; -Street Crossings Closest to Site are Located Less Than 300 Feet Apart; -Streets Have Rumble Strips, Bulbouts, Raised Crosswalks or Refuge Islands 5. Design for Safety 8~ Social Gathering ~ a. All Home Front Entrances Have Views from the Inside to Outside Callers 1 I ^ b. All Home Front Entrances Can be Seen from the Street and/or from Other Front Doors 0 1 ^ c. Orient Porches (min. 100sf) to Streets and Public Spaces 0 1 6. Design for Diverse Households ^ a. All Homes Have at Least One Zero-Step Entrance 0 1 ^ b. All Main Floor Interior Doors & Passageways Have a Minimum 32-Inch Clear Passage Space 0 1 O c. Locate at Least aHalf-Bath on the Ground Floor with Blocking in Walls for Grab Bars 1 1 ^ d. Provide Full-Function Independent Rental Unit 0 1 _ Total Achievable Points in Community Design & Planning = 20 2 A. Site ^ 1. Reduce Heat-Island Effect -Install light-colored, high albedo materials (solar reflectance index >= 0.3) for at least 0 1 50% of site's non-roof impervious surfaces ^ 2. Build on Designated Brownfield site 0 3 ' © Build It Green SF Data Collection Form v.3.4 Page 6 of 9 Positano D3 3 '0 d = s a Q ~+ = E E ~ n m w L ~ °' a g d ~ 3 H rr 3 B. Foundation ['Points automatically granted when project qualifies for measure J3: ES with IAQ] ^ 1. Install a Foundation Drainage System 0 2 ^ 2. Sealed and Moisture Controlled Crawlspace 0 2 C. Landscaping ^ 1. Meets Bay-Friendly Landscape Program Requirement 0 4 ^ 2. Meets California-Friendly Landscape Program Requirement 0 4 3. Rain Water Harvesting System (1 point for <350 gallons, 2 points for > 350 gallons) 2 ^ a. Less than 350 gallon capacity 0 1 ^ b. Greater than 350 gallon capacity 0 2 ^ 4. Assess Site Climate, Exposure, Topography, and Drainage 0 1 ^ 5. Perform a Soil Analysis 0 1 ^ 6. Irrigation System Uses Recycled Wastewater 0 1 ^ 7. FSC Certified, Recycled Plastic or Composite Lumber -Fencing: 70% 0 1 D. Structural Frame and Building Envelope 1. Design, Build and Maintain Structural Pest and Rot Controls ^ a. Locate All Wood (Siding, Trim, Structure) At Least 12" Above Soil 0 1 ^ b. All Wood Framing 3 Feet from the Foundation is Treated with Borates (or Use Factory-Impregnated Materials) OR Walls are Not Made of Wood 0 1 ^ 2. Use Moisture Resistant Materials in Wet areas of Kitchen, Bathrooms, Utility Rooms, and Basements [`Points automatically granted when project qualifies for measure J3: ES with IAQ] 0 1 3. Use FSC Certified Engineered Lumber (3 points maximum) ^ a. Beams and Headers 0 1 ^ b. Insulated Engineered Headers 0 1 ^ c. Wood I-Joists or Web Trusses for Floors 0 1 ^ d. Wood I-Joists for Roof Rafters 0 1 ^ e. Engineered or Finger-Jointed Studs for Vertical Applications 0 1 ^ f. Roof Trusses: 100% 0 1 4. FSC Certified Wood ^ a. Dimensional Lumber, Studs and Timber: 100% 0 2 ^ b. Panel Products: 100% 0 ' 2 E. Exterior Finish ^ 1. Green Roofs (25% of roof area minimum) 0 1 1 ^ 2. Flashing Installation Techniques Specified ["Points automatically granted when project qualifies for measure J3: ES with IAQ] 0 1 F. Insulation G. Plumbing ^ 1. Graywater Pre-plumbing (includes washing machine at minimum) 0 1 ^ 2. Graywater System Operational (includes washing machine at minimum) 0 2 ^ 3. Innovative Wastewater Technology (Constructed Wetland, Sand Filter, Aerobic System) 0 1 ^ 4. Composting or Waterless Toilet 0 2 ^ 5. Install Drain Water Heat-recovery System 0 1 6. Install Water Efficient Fixtures O a. Showerheads or Shower Towers Use <2.0 Gallons Per Minute (GPM) Total 1 1 ^ b. Faucets -bathrooms <1.5 gpm 0 1 © Build It Green SF Data Collection Form v.3.4 Page 7 of 9 Po sitano D3 ~ I '~ Q7 d C a° Q ~ C v 7 w L ~' ~ = ¢ V/ N 7 ~ O ~ N 3 ^ c. Faucets -Kitchen & Utility <2.0 gpm 0 1 H. Heating, Ventilation, and Air Conditioning ^ 1. Humidity Control Systems (only in California humid/marine climate zones 1,3,5,6,7) 0 1 I. Renewable Energy ^ 1. Extraordinary Passive Solar Design (> 50% of load) That is Not Already Reflected in T-24 Modeling 0 5 J. Building Performance ^ 1. Test Total Supply Air Flow Rates 0 1 K. Finishes 1. Use Environmentally Preferable Materials for Interior Finishes ^ a. Cabinets (80% minimum) 0 1 ^ b. Interior Trim (80% minimum) 0 1 ^ c. Shelving (80% minimum) 0 ' 1 ^ d. Doors (80% minimum) 0 1 ^ e. Countertops (80% minimum) 0 1 L. Flooring ^ 1. Flooring Meets Section 01350 or CRI Green Label Plus Requirements (80% Minimum) ['Points automatically granted when project qualifies for measure J3: ES with IAQ] 0 1 M. Appliances N. Other ^ 1. Homebuilder's Management Staff are Certified Green Building Professionals 0 1 ^ 2. Detailed Durability Plan ['Points automatically granted when project qualifies for measure J3: ES with IAQ] 0 2 ^ 3. Third-Party Verification of Implementation of Durability Plan 0 2 4. Materials Sourced, Processed and Manufactured Within a 500 Mile Radius of the Home 0 1 m r h nsive Owner's Manual and Homeowner Educational Walkthrou hs 5Co pee g 1 1 Total Achieveable Points in Innovation = 20 2 Total Available Points in Specific Categories 32 193 51 103 71 _ Minimum Points Required in Specific Categories 0 30 5 6 9 Total Points Achieved 71 2 33 9 7 20 , Project has met all recommended minimum requirements i~eCJUrre(i measures: -A3a; 5t~% waste diversion by weight -J2: 15% above Titte 24 -N1: Incorporate GreenPaint Rated Chackiist into blueprints Minimum points in specific categories: -Energy (30 points) -IAQ/Neatth (5 paints) -Resources (6 points) © Build It Green SF Data Collection Form v.3.4 Page 8 of 9 ~ L ~ _ C _ ~ T ~ d ~ ~ _ ~ a O ate-. U W Q ~ © Build It Green SF Data Collection Form v.3.4 Page 9 of 9 -Maximum Zg points pursuer! under Community Design and Planning -l~laxirnum 20 points pursued under Innovation