Loading...
HomeMy WebLinkAbout4.09 Waterslide CITY CLERK File # 0600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: January 18, 2000 SUBJECT: Swim Center Waterslide Installation Project (Contract 99-15) Report Prepared by Paul McCreary ATTACHMENTS: Summary of Bid Results Resolution Budget Change Form RECOMMENDATION: Adopt resolution awarding contract to Tricon Construction in the mount of $184,900 for the installation of a waterslide at the Dublin Swim Center. Approve the budget change form to appropriate $95,890 from reserves to Capital Improvement Proj eot No. 95910. FINANCIAL STATEMENT: Budget $105,700 Low Bid $184,900 The base bid plus a 10% contingency is $203,390 which exceeds the funds budgeted for the improvements by $95,890. In order to award the bid, an additional appropriation in this amount from the Unappropriated General Fund Reserve is required. DESCRIPTION: At its meeting on December 21, 1999, the City Council authoriZed Staff to advertise Contract 99-15 for bids. This project provides for the installation of a 100-foot long, double loop waterslide at the Dublin Swim Center. The project was advertised in accordance'with the City's ordinance and bids were received by the bid opening on January 12, 2000 at 2:00 P.M. Two bids were received for the project (see Attachment 1). The low bidder was Tricon Construction with a bid of $184,900. Staff recommends including a 10% contingency, which brings the total funds needed to $203,390. The total budgeted for waterslide installation is $107,500 which would result in a funding shortfall in the mount of $95,890 if the bid is awarded. The City's pool consultant Arch Pac, Inc prepared the estimated cost of the project for budgeting purposes. Since the budget was prepared, the cost of the waterslide has increased. In reviewing the other components of the bid results, it appears that the concrete work and electrical work also exceed the project budget. Staff however does not believe that substantial cost savings could be achieved.by rebidding the project. If the project were rebid, the slide could not be installed for the upcoming swim season. It should be noted, however, that neighboring cities that have installed similar slide features have experienced an increase in pool attendance. If this trend continues in Dublin, an increase in pool revenue could be expected. G:\COUNCIL\I 18ccslideagree.doe COPIES TO: Triton Construction ITEM NO. Staff has reviewed the low bidder's proposal and license stares. Staff also checked the contractor's references and received no negative comments. Therefore, Staff recommends that the City Council adopt the resolution awarding Contract 99-15 to Triton Construction. Further, it is recommended that the City Council approve the Budget Change Form in Attachment 3 that will provide for an additional appropriation from the Unappropriated General Fund Reserve for $95,890. The project is expected to take 80 working days to complete. Therefore, Staff anticipates that the slide will be available for use by Memorial Day Weekend. BID RESULTS- DUBLIN SWIM cENTER WATERSLIDE INSTALLATION, CONTRACT 99-15 i~i~---~ ~ [,iii, i~'-5~,:f E-~. j ~,~ ~'~-~o .................................... ENGINEER'S ESTIMATE TRICON CONSTRUCTION WESTERN BID UNIT TOTAL ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 CONCRETE WORK LS 1 $ 7,740.00 $ 7,740.00 $ 22,560.00 $ 22,560.00 $ 25,000.00 $ 25,000.00 2 FIBERGLASS WATERSLIDE LS 1 $ 86,400.00 $ 86,400.00 $ 129,104.00 $ 129,104.00 $ 105,000.00 $ 105,000.00 3 MECHANICAL EQUIPMENT LS 1 $ 6,660.00 $ 6,660.00 $ 9,891.00 $ 9,891.00 $ 39,800.00 $ 39,800.00 4 ELECTRICAL WORK LS 1 $ 6,660.00 $ 6,660.00 $ 23,345.00 $ 23,345.00 $ 26,500.00 $ 26,500,00 TOTAL BID: $107,460.00 $ 184,900.00 $ 196,300.00 . RESOLUTION NO. - 2000 A RESOLUTION OF TI-IE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 99-15 DUBLIN SWIM CENTER WATERSLIDE INSTALLATION PROJECT TO TRICON CONSTRUCTION WI-IEREAS, the City of Dublin did, on January 12, 2000, publicly open, examine, and declare all sealed bids for doing the work described in the approved Specifications for Contract No. 99-15, which Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WI--IEREAS, said bids were submitted to the City En~neer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 99-15 to the lowest responsible bidder therefor, to wit, Tricon Construction, at a base bid of One Hundred Eighty Four Thousand Nine Hundred DOllars and no cents ($184,900.00), the particulars of which bid are on file in the office of the City En~neer. PASSED, APPROVED AND ADOPTED this 18th day of January, 2000. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk G :\CO UNCIL~slideresoIution. doc ATTACI-L-MENT 2 CITY OF DUBLIN BUDGET CHANGE FORM CttA~GE FORM # New Appropriations (City Council Approval Required): Budget Transfers: Required) From Unappropriated Reserves From New Revenues From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Depat~iients (City Council Approval Other . DECREASE BUDGET ACCOU/~ 1~ .:.,: ::::.':,,:'. :., AMOUA'I' ....~, . ..~ .. INCREASE BUDGET ACCOIJ~T' '~ :..;,~.: ? AMOIJNT .~: Name: Name: Improvements Not Buildings $95,890 Account #: Account #: 001-95910-750-050 Name: Nme: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #:' Account #: City Manager: Date: Signature !REASON FOR BUDGET CHANGE ENTRY: In order to award the bid for the Dublin Swim Center Waterslide Installation project, an additional appropriation is needed. As App~:0~ed at the city Council Meeting On: Date: Mayor: Date: Signature Posted By: Date: Signature ATTACHMENT 3