Loading...
HomeMy WebLinkAbout8.1, Attch 3 Green Point Rated ChecklistGreenPoint Rated Checklist: Single Family ,: I ne LireenP0lnt Katetl CheCkllSt tracks green features InCOrpOratetl Into the home. A home is only UfeenPOlnt Rated if all features are verified by a Certified GreenPoint Raterthrough Build It Green. GreenPoint Rated Total Points Achieved: 65 GireenPoirnRATED is provided as a public service by Build It Green, a professional non-profR whose mission is to promote heaRhy, energy and resource efficient buildings in California. The minimum requirements of GreenPoint Rated are as follows: verification of 50 or more points; Eam the __ _ followin minimum points r cafe ory: Ener 30 ,Indoor Air Guaf /HeaRh 5 ,Resources 6), and Water 9 ; ~ --~ -- - ~~ 9 Pe 9 9Y ( ) ItY l l ( ( ) and meet the prerequisdesA.3.a (50 % construIXion waste diversion), J 1 (Exceed Title 24 by 15 % ), and N.1 16 (Incorporate Green Point Rated checklist in blueprints). 7 7 The criteria for the green building practices listed below are described in the GreenPoint Rated Single Family 3 Rating Manual. For more information please visA www.builditgreen.orglgreenpointrated __ ~_.~- __ a° a l E I w I a I ~ ... 3 NO NO 1. Protect Topsoil and Minimize Disruptlon of Existlng Plants 87rees a. Protect Topsoil from Erosion and Reuse after Construction b Limit and Delineate Construction Footprint for Maximum Protection I ,____--- 0 0 _-_ 1 1 1 _ _ __ NO 2. Deconstruct Instead of Demolishing Ezistlng Buildings On Site _ 0 3 _ __ ,_ __~ 3. Recycle Job Site ConsVUCtion Waste (Including Green Waste) -_ Yes a. Minimum 50 % Waste Diversion by Weight (Recycling or Reuse) Required 0 ~' R Required of BIG NO b. Minimum 65 % Diversion by Weight (Recycling or Reuse) 0 2 ~~ NO c. Minimum 80% Diversion by Weight (Recycling or Reuse) 0 2 __ 4. the Recycled Content Aggregate (Minimum 26% ) _ _ No a Walkway and Driveway Base 0 1 NO b. Roadway Base 0 1 Total Paints Available in Sile = 12 .,, B. FOUNDATION - _:, 1. Replace Portland Cement in Concrete with Recycled Flyash or Slag _ 0 _....._.i_ Points Available Per Measure II -- _ ,.. - - ~ ` " " - NO a Minimum 20% Flyash or Slag 0 1 NO b Minimum 25 % Flyash or Slag ih 0 1 NO Use Frost-Protected Shallow Foundatlon in Cold Areas (C.E.C. Climate Zone 16) '.. 2 0 _ _ _ _. _. 3 NO . 3. Use Radon Resistant ConsVUCtion i I'Poinls automatically granted when project qualities for measure J3 ES wiM IA0 0 t 4. Design and Build SVUCtural Pest Controls __ . NO a. Install Termite Shields 8 Separate All Exterior Wood-to-Concrete Connections by Metal or Plastic FastenerslDividers I'Points automatically granted when project qualifies for measure J3. ES with IAOI _ _ _ 0 _ __ _ __ __.__ 1 '~ No or Stem Located At Least 36 Inches from Foundation b Ad New Plants Have Trunk Base 0 , , Total Points Available in Foundation = 8 0 __ _ LANDSCAPING C _ _ __ ~ Points Available Per Measure . 1 COnSVOC[Resource-Efficient Landscapes Yes a No Invasive Species Listed by Cal-IPC Are Planted -_,._ _ 1 ! --. by Landscape Architect No b. No Plant Species Will Require Hedging 0 1 _ Yes c 75% of Plants Are California Natives or Mediterranean Species or Other Appropriate Species 9 I ' 3 _ _ by Landscape Architect Nc Use Fire-Safe Landscaping Techniques 2 I- 0 ------------------- 1 . 3. Minimize Turf Areas in Landscape Installed by Builder No a All Turf Will Have a Water Requirement Less than or Equal to Tall Fescue (< = 0.8 plant factor) ~ 0 2 Yes b. Turf Shall Not Be Installed on Slopes Exceeding 10%or in Areas Less than 8 Feet Wide 2 2 by Landscape Architect NO c Turf is 533 % of Landscaped Area (total 2 points) 0 2 _ __ -_ No d. 1 uri is <510 % of Landscaped Area (total 4 points) 0 2 - __,-_ - -..--. No Yes 4 Plant Shade Trees _. _ 5. Group Plants by Water Needs (Hydrozoning) 0 2 _ -..___ ..._.__ t _3 I, _2 _. __ ._ __-----__- by Landscape Architect 6 Install High-Efficiency Irrigation Systems Yes a System Uses Only Low-Flow Drip, Bubblers, or Low-flow Sprinklers 2 ~. 2 by Landscape Architect No b. System Has Smart (Weather-Based) Controllers 0 _ 3 YeS 7. Incorporate Two Inches of Compost in the Top 6 to 121nches of Soil 3 3 _._ by Landscape Architect Yes 6. Mulch All Planting Beds to the Greater of 2 Inches or Local Water Ordinance Requirement 2 _ - 2 _ __ by Landscape Architect _._ _ NO 9. Use 50 % Salvaged or Recycled-Content Materials for 60% of Non-Plant Landscape Elements . 0 1 NO 10. Reduce Light Pollution by Shielding Fixtures and Directing Light Downward Total Points Available In Landscaping = 31 , 0 _ 15 ~ t '~ STRUCTURAL FRAME ffi BUILDING ENVELOPE D -_~_ Points Available Per Measure "' . 1 Apply Optimal Value Engineering r NO ~ d s at24lnoh a Plare a ers and ~h ing _ 0 ~ No µ Headers for Load b size oor 0 i -- p p q red for Load ri le Studs Re u' y l a 0 1 Use Engineered Lumber 2 m _ No . Headers a Bea s and 0 1 No Insulated Engineered Headers 0 1 b --- _......_. Yes . c. Wood I-Joists or Web Trusses for Floors 1 1 _. __ _ __ Typical Construction No d Wood I-Joists for Roof Rafters 0 1 NO e. Engineered or Finger-Jointed Studs for Vertical Applicafions 0 1 Yes Yes f. Oriented Strand Board for Subfloor 1 1 g. Oriented Strand Board for Wall and Roof Sheathing 1 1 _.- Typical Construction --... Typical Construction ~ 3. Use FSC-Certified Wood NO NO - a. Dimensional Lumber Studs and Timber. Minimum 40 % 0 ~ 2 Studs and Timber. Minimum 70% 0 2 b Dimensional Lumber __ _ _ __ ~ No , 0 t Panel Products: Minimum 40% c _ NO ~ . d. Panel Products. Minimum 70 % 0 ~ 1 __ © Build It Green SF Data Collection Form v.3.7 Page 1 of 6 ATTACHMENT 3 4. Use Solid Wall Systems (Includes SIPa, ICFs, 8 Any Non-Stick Frame Assembly) ~_ _ _ No a Floors ~ 0 2 '~~, 2 No b. Walls ~' 0 2 2 No c. Roofs 0 _ 2 2 _ 5. Reduce Pollution Entering the Home trom the Garage ['Points automatically granted when project qualifies for measure J3: ES with IAOj NO a Tightly Seal the Air Barrier between Garage and Living Area 0 1 NO b Install Garage Exhaust Fan OR Build a Detached Garage 0 I NO fi. Design Energy Heels on Trusses (75 % of Attic Insulation Height at Outside Edge of 6cterior Wall) 0 I NO 7. Design Roof Trusses to Accommodate Ductwork 0 _ _ I ~ ' NO 8. Use Recycled-Content Steel Studs for 90% of Interior Wall Framing _ _ 0 ' 1 No 9. Thermal Mass Walls: 516-Inch Drywall on All Interior Walls or Walls Weighing more than 401blcuft. ~. 0 1 10. Install Overhangs and Gutters NO a Minimum 16-Inch Overhangs and Gutters 0 1 ['Points automatically granted when project qualifes for measure J3'. ES with IAO] NO b Minimum 24~Inch Overhangs and Gutters 0 ? Total Points Available in Structural Building Frame and Envelope = 36 _.. _ ___- 3 P re i A il bl P r M as t E. EXTERIOR FINISH ~I NO 1. Use Recycled-Content (No Yrgin Plastic) or FSC-Certified Wood Decking _ o 0 n va a e e e u s 1 NO 2. Install a Rain Screen Wall System _ __ I _ 0 - , Yes 3. Use Durable and Non-Comhustible Siding Materials 1 i '~ YeS 4. Use Durable and Non-Combustible Roofing Materials 2 2 _., Total Paints Available in Extenor Finish = 7 3 P oints Available Per Measure F. INSULATION 1. Install Insulation with 75% Recycled Content _ _ __.. NO a. Walls and Floors '.. 0 1 No b. Ceilings 0 1 2. Install Insulaton that is Low-Emitting (Certified Section 01350) _ _ ~ _ Yes a. Walls and Floors 1 I No b Ceilings _ _ 0 1 NO 3. Inspect Duality of Insulation Installatlon before Applying Drywall 0 1 ['Points automatically granted when project qualifes for measure J3 ES wvth IAO( Total Points Available in Insulation = 5 _ t ~ P oints Available Per Measure G. PLUMBING 1. Distribute Domestlc Hot Water Efficiendy (Additive, Maximum 7 Points) I No a Insulate Hot Water Pipes from Water Healer to Kitchen ~l 0 1 NO b. Insulate All Hol Water Pipes 0 1 1 No c. Use Engineered Parallel Piping 0 ~ I NO d Use Engineered Parallel Piping wdh Demantl Controlled Circulation Loop 0 1 No e. Use Structured Plumbing with Demand Controlled Circulation Loop 0 1 2 NO (. Use Central Core Plumbing 0 1_ 1 1 TBD 2. Install Only High Efficiency Toilets (Dual-Flush or <_1.28 gpf) 0 4 Total Points Available in Plumbing=Total 11 NING ~ 0 P oints Available Per Measure H. HEATING. VENTILATION ~ AIR CONDITIO NO 1. Design and Install HVAC System to ACCA Manual J, D, and S Recommendations 0 _ ~; [`Points automatically granted when project quallfies for measure J3 ES with IAOJ 2. Install Sealed Combustion Units j`Poinls automatically granted when project qualifies for measure J3: ES vnth IAOj ___ YBS a. Furnaces 2 2 No b Water Heaters 0 _ 2 _ No 3. Install Zoned, Hydronic Radiant Heating 0 _ 1 ___ 1. _____ YeS 4. Install High Efficiency Air Conditioning with Environmentally Responsible Refrigerants 1 _ _ I _____ ___,_ 5. Design and Install Effective Ductwork ['5b,d,8e are automatically granted when project qualifies for measure J3 ES with IAOj _..__-Y _... ._.........._...._.__.._.__..... NO a Install HVAC Unil and Ductwork within Conditioned Space 0 i 3 No b. Use Ducl Mastic on All Duct Joints and Seams 0 ; 1 NO c. Install Ductwork under Attic Insulation (Buried Ducts) 0 ~ 1 NO d. Pressure Relieve the Ductwork System 0 1 NO e. Protect Ducts during Construction and Clean All Ducts before Occupancy _ _0 _1 __ 6. Install High Efficiency HVAC Filter (MERV 6i) N 0 ~ 1 O [`Points automatically granted when project qualifies for measure J3- ES with IAOj , __ _ _ NO ~~ Don't Install Fireplaces or Install Sealed Gas Fireplaces with Efficiency Rating NOT Less Than 60% ', 0 I using CSA Standards 6. Install Effective Ezhaust Systems in Bathrooms and Kitchens j`ea8c are automatically granted when project qualifes for measure J3 ES with IAQJ i _ _ t NO a. Install ENERGY STAR Bathroom Fans Vented to the Outside 0 1 NO b All Bathroom Fans Are on Timer or Humidislat 0 1 NO c Install Kitchen Range Hood Vented to the Outside - 0 1 9. Install Mechanical Ventilation System for Cooling (Maz. 4 Points) _ ~ ~ __ NO a Install ENERGY STAR Ceiling Fans & Light Kits in Living Areas 8 Bedrooms 0 1 NO b Install Whole House Fan with Variable Speeds 0 1 No c Automatically Controlled Integrated System ~i 0 2 No d. Automatically Controlled Integrated System with Variable Speed Control ~, 0 ~... 3 -_- - 10. Install Mechanical Fresh Air Ventlaton System (Maximum 3 Points) .~ _ _ __ _ _ __ No a. Any Whole House Ventilation System That Meets ASHRAE 62.2 0 2 b Install Air-to-Air Heat Exchanger that meets ASHRAE 62.2 N ~ 0 1 2 O [`Points automatically granted when project qualifies for measure J3 ES with IAQ) 11. Install Carbon Monoxide Alarm(s) N 0 I O [`Points automatically granted when project qualifies for measure J3 ES with IAO) ____ _ ____ _ _ Total Points Available in Healing, Ventilation and Air Conditioning = 30 . - 3 1 -~'hS Hardi-siding (or eq) or stucco MU Roof or 40 yr tromp shingle Johns manville or equal-_ - ©Build It Green SF Data Collection Form v.3.7 Page 2 of 6 a o ~ o E ~ t E 0 a a ~ WABLE ENERGY ; 1. Pre-Plumb for Solar Hot Water Heating 0 1. Install Solar Water Heating System ._ 0 '__-_ 0 3. Install Wiring Conduit for Future Photovolaic Installation 8 Provide 100 tt' of South-Facing Roof - .. 4. Install Photovoltaic (PV) Panels a 30 % of electric needs OR t2 kW (total 6 points) r 0 b 60 % of electric needsOR 24kW (total 12 points) 0 c. 90 % of electric need OR 3.6 k W (Total 18 points) 0 Total Available Points in Renewable Energy = 28 0 L a I~ I 3 s Available Per Measure _..___.. 4 10__ 2 6 6 t. Diagnostic Evaluations NO a House Passes Blower Door Test 0 1 ('Points automatically granted when project qualifies for measure J3'. ES vnth TAO) NO b. House Passes Combustion Safety Backdrafl Test ~'. 0 1 15'/0 2. Design and Build High Pertormance Homes -15% above 2005 Title 14 -Required 30 ?30 NO 3. House Obtains ENERGY STAR with Indoor Air Package Certificatlon - Pibf Measure (Total 45 points; ~, 0 5 2 read comment) Total Available Points in Building Performance = 39 30 K. FINISHES ~~, - Points Available Per Mea No f. Design Entryways to Reduce Tracked in Contaminants 0 - 2. Use Low-VOC or Zero-VOC Paint (Maximum 3 Points) _ . Yes a. Low-VOC Interior WaIllCeiling Paints (<SOgpl VOCs (Flat) 8 <150gp1 VOCs (Non-Flat)) 1 1 NO b Zero~VOC. Interior WaIllCeiling Paints (<5 gpl VOCs (Flat)) 0 3 , NO 3. Use Low VOC, Water-Based Wood Finishes (<250 gpl VOCs) _... 0 _. 2 Yes 4. Use Low-VOC Caulk and Construction Adhesives (<70 gpl VOCs) for All Adhesives _ 2 __ _ 2 No 5. Use Recycled-Content Paint 0 1 6. Use Environmentally Preferable Materials for Interior Finish: A) FSC-Certified Wood, B) Reclaimed, C) Rapidly Renewable, D) Recycled-Content or E) Finger-Jointed NO a. Cabinets (50 %Minimum) 0 1 NO b. Interior Trim (50 %Minimum) 0 1 No c. Shelving (W%Minimum) 0 1 NO d Doors (50 %Minimum) 0 1 No e. Countertops (50 % Minimum) 0 ~ __ _. ____ 1 7. Reduce formaldehyde in Interior Finish (CA Section 01350) ~_ l _,.,,_ _ _ _._,.,.._ NO a Subfioor 8 Stair Treads (90 % Minimum) 0 ~ 1 NO b. Cabinets BCountertops (90%Minimum) 0 i 1 NO c. Interior Trim (90 % Minimum) 0 1 NO d. Shelving (90 % Minimum) ' _ 0 .... - - _ 1 .... .__._ - T ' 3 No 8. Aker Installa0on o} Finishes, Test of Indoor Air Shows Formaldehyde Level <27ppb 0 Total Available Points rn Finishes = 21 3 Points Available Per Mee L. FLOORING 1 Use Environmentally Preferable Flooring: A) FSC-Certified Wood, B) Reclaimed or Refinished, C) Rapidly Renewable, D) Recycled-Content, E) Exposed Concrete. Flooring Adhesives Musf Have <70 gpl VOCs. NO a Minimum 15 % of Floor Area 0 1 NO b Minimum 30 % of Floor Area 0 1 NO c Minimum 50 % of Floor Area 0 1 NO dMrnmum 75%o(Floor Area 0~ _ _1 No 2. Thermal Mass Floors: Floor Covering Other than Carpet on 50 % or More of Concrete Floors 0 1 __ _ _ N 3. Flooring Meets Section 01350 or CRI Green Label Plus Requirements (50%Minimum) 0 2 o I'PCints automatically granted when project qualifies for measure J3: ES with IAQI Total Available Points In Fiooring = 7 G ~ 0 Points Available Per Me: M. APPLIANCES AND LIGHTIN 1 Install Water and Energy Efficient Dishwasher ~ Yes a ENERGYS1ARpotall pomp 1 NO b Dishwasher Uses No More than 6.5 GallonslCycle (total 2 points) ~. 0 2. Install ENERGY STAR Clothes Washing Machine with Water Factor of B or Less I - _- _ _ ' NO a Meets Energy Star and CEE Tier 2 requirements (modified energy facor 2.0, Water Factor 6.0 or less) 0 1 (total 3 paints) I No b. Meets Energy Slar and CEE Tier 3 requvemems (modified energy factor 2.2, Water Factor 45 or less) ~ 0 3 r E G o 8 ~ No 25 Cubic Feet Capacity C ali ed S AR O 8 a E~ERG 0 1 NO b. ENERGY STAR Qualified 8 < 20 Cubic Feet Capacity '~r 0 ~} _ 1 4. Install Built-In Recycling Canter and Compostlng Center ~ -- } _ ___ No a Bwlt-In Recycling Center I U I 2 NO b Built-In Composting Center '~ 0 1 Total Available Points In Appliances and Llghling = 12 _ __ 1 _ - Av ilable Per Me; P i t N. OT Yes HER 1. Incorporate GreenPoint Rated Checklist in Blueprints -Required -~ 0 o n s a R Yes 2 Develop Homeowner Manual of Green FeatureslBenefits 3 ' I'PO~nls aubrnatically granted when project qualifies for measure J3 ES with IAQ Iola) Available Points ~.n Other=3 oints in this section) ximum 20 DESIGN & PLANNING ( 3 Points Available Per Met p ma O. CObIMITNITY 1 Develop Infill Sites NO a Project s Located m a Butlt Urban Setting wdh Utilities in Place for Fifteen Years U '. No b Development is Located within 1l2 Mile of a Major Transit Stop ~,_ ~ , 1. 2 2 2 1 ©Build It Green SF Gata Collection Form v 3.7 Page 3 of 6 ° I ~., I a rr 3 2. Cluster Homes 8 Keep Siza in Check I Yes a. Cluster Homes for Land Preservation 2 1 -. b. Conserve Resources by Increasing Density (1 pl for every 5 ula greater than 10 u/a) Erter Prolecl Density 0 2 pn Umts Per 9aej __„__ NO c. Home Size Efficiency _ 0 0 3 7 3. Subdivision Layout 8 Orientation to Improve Natural Cooling and Passive Solar Attributes ', _ 4. Design for Walking 8 Bicycling _ ~ a. Pedestrian Access to Neighborhood Services within % Mile: 1) Community CeNertiibrary; 2) Grocery Store; 0 2 ', C 3) School, 4) Day Care, 5) Laundry; 6) Medical; 7) Enlertainmenth2estaurants; 8) Post Office; 9) Place of ' ~I Worship; 10) Bank Enter number of servicos 1 Yes b. Development is Connected with A Dedicated Pedestrian Pathway to Places of Recreational Interest within 1 1 1I2 mile c. At Least Two of the Following Traffic-Calming Strategies: 0 Z Designated Bicycle Lanes are Present on Roadways, ' No Ten-Foot Vehicle Travel Lanes; - Street Crossings Closes) to Site are Located Less Than 300 Feet Apart; - Streets Have Rumble Strips, Hulbouls, Raised Crosswalks or Refuge Islands 5. Design for Safety 8 Social Gathering NO a. All Home Front Entrances Have Vews from the Inside to Outside Callers 0 1 No b NI Home Front Entrances Can be Seen from the Street and/or from Other Front Doors 0 1 No c. Orient Porches (min 100sf) to Streets and Public Spaces 0 1 _.__. _ 6. Design for Diverse Households No a. All Homes Have at Least One Zero-Step Entrance 0 1 No b All Main Floor Interior Doors 8 Passageways Have a Minimum 32-Inch Clear Passage Space 0 1 _ ' NO c Locale at Least aHalf-Bath on the Ground Floor wish Blocking in Walls for Grab Bars 0 1 _ ,___ NO d. Pievlde Full-Function Independent Rental Unil _ 0 1 Total Achievable Points in Community Design 8 Planning = 20 _ 3 P. INNOVATION (maximum 20 points in this section) Possible Points A Site _.- NO 1 Reduce Heat-Island Effect Install hghl-colored. high albedo materials (solar reflectance index >=0-3) for al 0 1 least 50 % of site's non-root impervious surfaces NO 2. Build on Designated Brownfield site _.. - 0 3 _ __- _ __ _._ B. Foundatlon ('Points aulomalically granted when project qualifies for measure J3'. ES with IAgj NO 1. Install a Foundation Drainage System - 0 2 __ 0 -_ 2 NO 2. Sealed and Moisture Controlled Crawlspace - ____ C. Landscaping __ _ NO 1. Meets Bay-Friendly Landscape Program Requirement (mutually exclusive with P.C.2) 0 - 4 NO 2. Meets California-Friendly Landscape Program Requirement 0 4 3 Rain Water Harvesting System (1 point for <350 gallons, 2 points for > 350 gallons) _ - _ 2 NO a. Less than 350 gallon capacity 0 _ ~ NO b. Greater than 350 gallon capacity 0 2 NO 4. Assess Site Climate, Exposure, Topography, and Drainage _ 0 ~ ~ NO 5. Pertorm a Soil Analysis 0 ~-.. t No 6. Irrigation System Uses Recycled Wastewater _~~ 0 ~ t NO 7. FSC Certified, Recycled Plastic or Composite Lumbe_ r Fencing'. 70 % 0 1 D. Structural Frame and Building Envelope _ 1 Design, Build and Maintain Structural Pest and Rot Controls _._ _ No a Locate NI Wood (Siding, Trim, Structure) At Least 12' Above Soil 0 ~ _ No b, All Wood Framing 3 Feet from the Foundation is Treated vnth Boraces (or Use Factory-Impregnated 0 1 Materials) OR Walls are Not Made of Wood _ _ _ ___ NO 2. Use Moisture Resistant Materials in Wet areas of Kitchen, Bathrooms, Utility Rooms, and Basements 0 1 ['Points automatically granted when project qualifies for measure J3. ES with IAgJ _ _ _ _ 3. Use FSC Certified Engineered Lumber (3 points maximum) _ _ _ _ No a. Beams and Headers 0 _--._,_ _.. ~ _ - NO b. Insulated Engineered Headers 0 -.,._-____-. ~ ___ No c. Wood I-Joists or Web Trusses for Floors 0 _... ~ _.- No d. Wood I-Joists for Roof Rafters _ _ 0 _~_.. 1 _._ No e. Engineered or Finger-Jointed Studs for Vertical Applications _ _ _0_ _,_ ~ ___ NO f. Roof Trusses: 100 % _ _0 _ - ~ -- 4. FSC Certified Wood -- -__- NO a. Dimensional Lumber, Studs and Timber. 100 % 0 2 NO b. Panel Products: 100 % 0 2 E. Exterior Finish __ NO 1 Green Roofs (25 % of roof area minmum) 0 ' ~ ~ _... --- NO 2 Flashing Installation Techniques Specifed 0 ~ ~ j'Points aulomalically granted when protect qualifies for measure J3'. ES vnth IAOJ F. Insulation G. Plumbing _ ~ __ _.__-___- NO 1 Graywater Pre-plumbing (includes washing machine at minimum) 0 _~ NO 2. Graywater System Operational (includes washing machine at minimum) 0 _ _ .____. _ 2 No 3. Innovative Wastewater Technology (Constructed Wetland, Sand Filter, Aerobic System) 0 _ _ 1 NO 4 Composting or Waterless Toilet 0 .-___ 2 NO 5. Install Drain Water Heat-recovery System _ 0 ~ ___. 6. Install Water Efficient Fixtures NO a. Showerheads or Shower Towers Use <2.0 Gallons Per Minute (GPM) Total ~ ~ t NO b. Faucets bathrooms <15 gpm _ -. NO c. Faucets -Kitchen 8 Utility <2.0 gpm _ _ _ _ 0 ~ H. Heatlng, Ventilation, and Air Conditloning __ ~~ 1. Humidity Control Systems (only in California humidlmarine climate zones 1,3,5,6,7) 0 ! __ t ©Build It Green SF Data Collection Form v.3.7 Page 4 of 6 I. Renewable Energy rN0 1. Exlraordmary Passive Solar Design (> 50%of load) That is Nat Nready Reflected in T 24 Modeling _ J. Building Performance No 1 Test Total Supply Air Flow Rates 2. Energy Analysis Design Review NO a Tdle-24 prepared and signed by CABEC Certified Energy Analyst NO b Participation m utility incenfive program K. Flnishas 1 Use Environmentally Preferable Materials for Interior Finishes NO a. Cabinets (00 % minimum) No b. Interior Trim (80 % minimum) No c. Shelving (80% minimum) No d. Doors (W % minimum) NO e. Countertops (80 % minimum) L. Floonng No t Flooring Meets Section 01350 or CRI Green Label Plus Requirements (80% Minimum) ('Points automatically granted when proect qualifies for measure J3 ES wath IAQ] M. Appliances N. Other _._ _. _.... NO 1 Homebuilder's Management Stall ara Certified Green Building Professionals No 2. Detailed Durability Plan rPoints automatically granted when project qualifies for measure J3. ES with IAQ( NO 3. Third-Party Verifcation of Implementation of Durability Plan b 4 Materials Sourced, Processed and Manufactured Within a 500 Mile Radius of the Home NO 5. Comprehensive Owner's Manual and Homeowner Educational Walkthroughs 6. Additional Innovations. Points to be assessed by Duild It Green and GreenPoint Rater. NO a. Describe Innovation Here, and Elver Possible Points in Columns L-P No b. Describe Innovaton Here, and Enter Possible Points in Columns L-P No c. Describe Innovation Here, and Enter Possible Points in Columns L-P NO d Describe Innovation Here, and Enter Possible Points in Columns L-P NO e. Describe Innovation Here, and Enter Possible Points in Columns L-P NO f Describe Innovation Here, and Enter Possible Points in Columns L-P No g. Describe Innovation Here, and Enter Possible Points In Columns L-P No h. Describe Innovation Here, and Enter Passible Points in Columns L-P Total AcMeveable Points in Innovation = 20 :~iiQ~~ n _ E ~ C t o ~ a°¢~ v ¢ 0 5 _ } 0 ~ _ 1 0 1 ' I+ 2 2 3 Total Available Points in Specifc Categories 32+ 125+ 51+ _103+ 71+ Minimum Points Required in Specific Categories 0 30 5 6 9 Project has met all recommended minimum requirements -!aQ/r-lealth (.5 points) Resources (E pom£s) -Water (9 pants) © Build It Green SF Data Collection Form v.3.7 Page 5 of 6 ~E L E xe o d a°af u a D~i i- ©Build It Green SF Data Collection Form v.3.7 Page 6 of 6