Loading...
HomeMy WebLinkAbout8.2 Attch 4 PC Reso SDR/VTM 8072RESOLUTION NO. 12- XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A SITE DEVELOPMENT REVIEW PERMIT AND VESTING TENTATIVE TRACT MAP 8072 FOR CAPISTRELLO COURT AT POSITANO, A RESIDENTIAL PROJECT OF 12 SINGLE-FAMILY DETACHED UNITS ON APPROXIMATELY 2.8 ACRES (985-0073-005-00) PA 07-005 WHEREAS, the Applicant, Braddock & Logan, has submitted applications for an area of approximately 2.8 acres known as Capistrello Court, a residential project of 12 single-family detached homes, located within the planned community known as Positano and the Fallon Village planning area and the Eastern Dublin Specific Plan; and WHEREAS, the applications include: a) Amendments to the General Plan and the Eastern Dublin Specific Plan; and 2) Planned Development (PD) rezoning and related Stage 1 and Stage 2 Development Plan Amendment to change the land use designation and zoning from Semi-Public to Single-Family Residential; and WHEREAS, the applications also include: a) Site Development Review (SDR); and b) Vesting Tentative Tract Map 8072 for 12 single-family detached residential units/lots situated along a residential cul-de-sac within the 2.8-acre site; and WHEREAS, the applications collectively define this "Project" are available for review in the Community Development Department; and WHEREAS, the project site is vacant land generally located at the southeast corner of Positano Parkway and West Cantara Drive; and WHEREAS, the project complies with the development standards and requirements included in the existing Planned Development Zoning, Stage 2 Development Plan (PA 05-038); and WHEREAS, pursuant to the California Environmental Quality Act (CEQA), an Addendum has been prepared in compliance with the California Environmental Quality Act to the three Environmental Impact Reports (EIRs) certified previously for potential development that included the Project site; and WHEREAS, on January 24, 2012, the Planning Commission held a public hearing and adopted Resolution 12-XX recommending that the City Council adopt a CEQA Addendum, Resolution 12-XX recommending that the City Council approve General Plan and Eastern Dublin Specific Plan Amendments for the project as stated above from Semi-Public to Single- Family Residential and Resolution 12-XX recommending that the City Council adopt a Planned Development (PD) rezoning and Stage 1 and Stage 2 Development Plan Amendment to change the zoning from PD Semi-Public to PD-Single Family Residential; and ATTACHMENT 4 WHEREAS, the Planning Commission did hold a public hearing on said applications on January 24, 2012, for this project at which time all interested parties had the opportunity to be heard; and WHEREAS, the 12 lots that comprise Capistrello Court at Positano are identified as Lots 1 through 12 of Vesting Tentative Tract Map 8072; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted recommending that the Planning Commission approve the Site Development Review and Vesting Tentative Tract Map 8072; and WHEREAS, the Planning Commission did hear and use independent judgment and considered the Addendum and all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Dublin does hereby make the following findings and determinations regarding said proposed Site Development Review and Vesting Tentative Tract Map 8072 known as Capistrello Court at Positano: Site Development Review: A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance, with the General Plan and any applicable Specific Plans and design guidelines because: 1) The project will not undermine the architectural character and scale of development in which the proposed project is to be located; 2) the project will provide a unique, varied, and distinct housing opportunity consistent with the architectural design and floor plans approved as Calarosa for Neighborhood D-1 will be introduced in this area creating more varied design; 3) the project is consistent with the General Plan and Eastern Dublin Specific Plan Land Use designation of Single-Family Residential; and 4) the project complies with the development standards established in previously approved (Ordinance 33-05) Planned Development Zoning Stage 2 Development Plan. B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the project contributes to orderly, attractive, and harmonious site and structural development compatible with the existing site layout and subdivision mapping and blends well with the surrounding properties; and 2) the project complies with the development regulations set forth in the Zoning Ordinance where applicable and as adopted for PA 05-038 (Ordinance 33-05). C. The design of the project is appropriate to the City, the vicinity, surrounding properties, and the lot in which the project is proposed because: 1) the project augments the architectural style offerings in the vicinity; 2) the size and mass of the proposed houses are consistent with the lot sizes and other residential developments in the surrounding area; 3) the project will supply unique and varied floor plan options 2 and enhanced elevations on the corner lots; 4) the project will provide more design offerings contributing to a more "custom" look of the Positano planned community; and 5) the project complies with the development standards adopted with the PD Stage 2 Development Plan which all surrounding properties are subject to. D. The subject site is suitable for the type and intensity of the approved development because: the proposed homes to be developed on the property meet all of the development standards established to regulate development in the Positano planned community and the Fallon Village planning area overall as referenced in the previously approved Stage 2 Development Plan (Ordinance 33-05). E. Impacts to existing slopes and topographic features are addressed because: 1) the adjacent infrastructure has been constructed including streets and utilities; 2) the project site has been rough graded; and 3) retaining walls will be constructed to establish the required lot size and building envelope if necessary. F. Architectural considerations including the character, scale and quality of the design, site layout, the architectural relationship with the site and other buildings, screening of unsightly uses, lighting, building materials and colors and similar elements result in a project that is harmonious with its surroundings and compatible with other developments in the vicinity because: 1) the proposed houses will utilize three (3) of the approved architectural style standards established in the Fallon Village Development Plan (Ordinance 33-05); 2) the materials referenced in the style guidelines will be utilized; 3) the homes when constructed will blend with and be similar to homes already being constructed in the general vicinity; and 4) the color and materials proposed are similar and complementary to colors and material being utilized on homes currently being constructed in the vicinity. G. Landscape considerations, including the location, type, size, color, texture and coverage of plant materials, and similar elements have been incorporated into the project to ensure visual relief, adequate screening and an attractive environment for the public because: 1) all perimeter landscaping, walls, fences, and hardscape are proposed for construction in accordance with the overall landscape plan; and 2) the project front yard landscaping and sideyard fencing is consistent with other developments currently under construction in the vicinity and conform to the requirements of the previously approved Stage 2 Development Plan and the Water Efficient Landscape Ordinance. H. The site has been adequately designed to ensure the proper circulation for bicyclist, pedestrians, and automobiles because: 1) all infrastructure including streets, parkways, pathways, sidewalks, and streetlighting are proposed for construction in accordance with the PD Stage 2 Development Plan and 2) development of this project will conform to the major improvements already installed throughout Positano, adjacent to the proposed project, allowing residents the safe and efficient use of these facilities. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby make the following findings and determinations regarding Vesting Tentative Tract Map 8072: 3 Vesting Tentative Tract Map 8072 A. The proposed Vesting Tentative Tract Map 8072 is consistent with the intent of applicable subdivision regulations and related ordinances for Capistrello Court and the Positano planned community in that it creates lots of a similar size and configuration of the adjacent Cantara neighborhood. B. The design and improvements of the proposed Vesting Tentative Tract Map 8072 are consistent with the General Plan and the Eastern Dublin Specific Plan, as amended, as they relate to the subject property in that it is a subdivision for implementation of a portion of the Positano planned community in an area designated for this type of development. C. The proposed Vesting Tentative Tract Map 8072 is consistent with the Planned Development zoning approved for the Project through Ordinance 33-05 and therefore consistent with the City of Dublin Zoning Ordinance. D. The properties created by the proposed Vesting Tentative Tract Map 8072 will have adequate access to major constructed or planned improvements as part of the Positano planned community and the Eastern Dublin Specific Plan. E. Project design, architecture, and concept have been integrated with topography of the project site created by the proposed Vesting Tentative Tract Map 8072 to minimize overgrading and extensive use of retaining walls. Therefore, the proposed subdivision is physically suitable for the type and intensity of development proposed. F. The Mitigation Monitoring programs adopted with the General Plan Amendment and Eastern Dublin Specific Plan, EDPO and Fallon Village project approvals are applicable as appropriate for addressing or mitigating any potential environmental impacts identified in the related previously certified EIRs. G. The proposed Vesting Tentative Tract Map 8072 will not result in environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns. H. The design of the subdivision will not conflict with easements, acquired by the public at large, or access through or use of property within the proposed subdivision. The City Engineer has reviewed the map and title report and has not found any conflicting easements of this nature. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby approve the Site Development Review for the proposed subdivision known as Capistrello Court at Positano (12 lots), as shown on plans prepared by KTGY Group, Inc. Architects + Planning, Gates and Associates, and Mackay & Somps dated received January 18, 2012 subject to the conditions included below. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby approve Vesting tentative Tract Map 8072 for the proposed subdivision known as 4 Capistrello Court at Positano (12 lots), prepared by Mackay &Somps dated January 18, 2012 subject to the conditions included below. CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. (PL.1 Planning, fBl Building, fPO1 Police, (PWl Public Works fP&CSl Parks & Community Services, fADMI Administration/City Attorney, [FINI Finance, fFl Alameda County Fire Department, fDSRI Dublin San Ramon Services District, [COl Alameda County Department of Environmental Health, [Z71 Zone 7. NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: PLA NNING DIVISION 1. Approval. This Site Development Review approval is for PL Ongoing Standard the construction of 12 single-family detached residential units on approximately 2.8 acres within Tract 8072. This approval shall be as generally depicted and indicated on the plans prepared by KTGY Group, Inc. Architects + Planning, Gates and Associates, and Mackay &Somps dated received January 18, 2012 on file in the Community Development Department, and as specified by the following Conditions of Approval for this project and subject to City Council approval of the Amendment to the General Plan and Eastern Dublin Specific Plan, the CEQA Addendum and Planned Development and related Stage 1 and Stage 2 Development Plan Amendment becomin effective. 2. Time Extension. The original approving decision-maker PL One year Standard may, upon the Applicant's written request for an following extension of approval prior to expiration, and upon the approval determination that any Conditions of Approval remain date adequate to assure that applicable findings of approval will continue to be met, grant a time extension of approval for a period not to exceed six (6) months. All time extension requests shall be noticed and a public hearing or public meeting shall be held as required by the articular Permit. 3. Effective Date. This Site Development Review approval PL Ongoing Standard becomes effective 10 days after action by the Planning Commission subject to the City Council approval of the Amendments to the General Plan and Eastern Dublin Specific Plan, the CEQA Addendum and the Stage 1 and Sta e 2 Develo ment Plan Amendment. 4. Compliance with previous approvals: The Applicant PL Ongoing Standard shall com I with all Conditions of A royal for Vestin NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: Tentative Tract 7586 as approved by the Planning Commission, Resolution No. 05-61 on November 8, 2005 as a licable. 5. Permit Expiration: Construction or use shall commence PL One year Standard within one (1) year of Site Development Review (SDR) from approval, or the SDR shall lapse and become null and approval void. Commencement of construction or use means the actual construction or use pursuant to the approval, or demonstrating substantial progress toward commencing such use. If there is a dispute as to whether the SDR has expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a SDR expires, a new application must be made and processed according to the re uirements of the Dublin Zonin Ordinance. 6. Revocation of permit. The permit shall be revocable for PL Ongoing Standard cause in accordance with Chapter 8.96 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this ermit shall be sub'ect to citation. 7. Required Permits. Applicant/Developer shall comply with PL, PW Issuance of Standard the City of Dublin Zoning Ordinance and obtain all Building necessary permits required by other agencies (Alameda Permits County Flood Control District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, State Water Quality Control Board) and shall submit copies of the ermits to the Public Works De artment. 8. Requirements and Standard Conditions. The Various Issuance of Standard Applicant/Developer shall comply with applicable Building Alameda County Fire, Dublin Public Works Department, Permits Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions re uired have been or will be met. 9. Modifications: The Community Development Director PL Ongoing Standard may consider modifications or changes to this Site Development Review approval if the modifications or chan es ro osed com I with Section 8.104.100 of the NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: Zonin Ordinance. 10. Satellite Dishes: The Developer's Architect shall PL Issuance of Project prepare a plan for review and approval by the Director of building Specific Community Development and the Building Official that permit provides a consistent and unobtrusive location for the placement of individual satellite dishes. Individual conduit will be run on the interior of the unit to the satellite location on the exterior of the home to limit the amount of exposed cable required to activate any satellite dish. It is preferred that where chimneys exist, the mounting of the dish be incorporated into the chimney. In instances where chimneys do not exist, then the plan shall show a common and consistent location for satellite dish placement to eliminate the over proliferation, haphazard and irre ular lacement. 11. Indemnification: The Developer shall defend, indemnify, PL, B Ongoing Standard and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or roceedin s. 12. Retaining Walls: The developer shall indicate on the PL Issuance of Project plot plans, with dimensions, the precise location of the building Specific point on the side yard retaining walls where the wall permit material will change from precision block (able to be stuccoed) to split face block. The intent of this condition is to assure that the entire portion of the wall visible to the street (from the perpendicular side-yard fence to the end of the wall closest to the street) is able to be enhanced with stucco material as required in the Development Plan. Also, it is intended that the perpendicular side yard fence should be located at the transition point of the two block materials. No stucco wall face should occur behind the perpendicular side yard fence. Potential issues may arise in the field conditions which will be addressed on a case- NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: by-case basis as directed by the Stage 1 Development Plan. 13. Clean up. The Applicant/Developer shall be responsible PL Ongoing Standard for clean-up and disposal of project related trash and for maintainin a clean, litter-free site. 14. Controlling Activities. The Applicant /Developer shall PO, PL Ongoing Standard control all activities on the project site so as not to create a nuisance to the surroundin residences. 15. Noise/Nuisances. No loudspeakers or amplified music PO, PL Ongoing Standard shall be permitted to project or be placed outside of the residential buildin s durin construction. 16. Accessory Structures. The use of any accessory PL, B, F Ongoing Standard structures, such as storage sheds or trailer/container units used for storage or for any other purpose during construction, shall not be allowed on the site at any time unless a Temporary Use Permit is applied for and a roved. 17. Final building and site development plans shall be PL Issuance of Project reviewed and approved by the Community Development building Specific Department staff prior to the issuance of a building permit permit. All such plans shall insure: a. That standard residential security requirements as established by the Dublin Police Department are provided. b. That ramps, special parking spaces, signing, and other appropriate physical features for the handicapped, are provided throughout the site for all publicly used facilities. c. That continuous concrete curbing is provided for all parking stalls, if necessary. d. That exterior lighting of the building and site is not directed onto adjacent properties and the light source is shielded from direct offsite viewing. e. That all mechanical equipment, including air conditioning condensers, electrical and gas meters, is architecturally screened from view, and that electrical transformers are either underground or architecturally screened. f. That all vents, gutters, downspouts, flashings, etc., are painted to match the color of adjacent surface. NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: g. That all materials and colors are to be as approved by the Dublin Community Development Department. Once constructed or installed, all improvements are to be maintained in accordance with the approved plans. Any changes, which affect the exterior character, shall be resubmitted to the Dublin Community Development Department for approval. h. That all exterior architectural elements visible from view and not detailed on the plans be finished in a style and in materials in harmony with the exterior of the building. All materials shall wrap to the inside corners and terminate at a perpendicular wall plane. i. That all other public agencies that require review of the project are supplied with copies of the final building and site plans and that compliance is obtained with at least their minimum Code requirements. 18. Fees. The Developer shall pay all applicable fees in PW Zone 7 and Standard effect at the time of building permit issuance including, Parkland In- but not limited to, Planning fees, Building fees, Dublin Lieu Fees San Ramon Services District fees, Public Facilities fees, Due Prior to Dublin Unified School District School Impact fees, Public Filing Each Works Traffic Impact fees, City of Dublin Fire Services Final Map; fees, Noise Mitigation fees, Inclusionary Housing In-Lieu Other Fees fees, Alameda County Flood and Water Conservation Required District (Zone 7) Drainage and Water Connection fees, with and any other fees either in effect at the time and/or as Issuance of noted in the Development Agreement. Building Permits 19. Final landscape plans, irrigation system plans, tree PL Issuance of Standard preservation techniques, and guarantees, shall be building reviewed and approved by the Dublin Planning Division permit prior to the issuance of the building permit. All such submittals shall insure: a. That plant material is utilized which will be capable of healthy growth within the given range of soil and climate. b. That proposed landscape screening is of a height and density so that it provides a positive visual impact within three years from the time of planting. c. That unless unusual circumstances prevail, at least 75% of the proposed trees on the site are a minimum of 15 allons in size, and at least 50% of the NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: proposed shrubs on the site are minimum of 5 gallons in size. d. That a plan for an automatic irrigation system be provided which assures that all plants get adequate water. In unusual circumstances, and if approved by Staff, a manual or quick coupler system may be used. e. That concrete curbing is to be used at the edges of all planters and paving surfaces where applicable. f. That all cut and fill slopes conform to the Vesting Tentative Tract Map and conditions detailed in the Site Development Review packet. g. That all cut and fill slopes graded and not constructed by September 1, of any given year, are hydroseeded with perennial or native grasses and flowers, and that stock piles of loose soil existing on that date are hydroseeded in a similar manner. h. That the area under the drip line of all existing oaks, walnuts, etc., which are to be saved are fenced during construction and grading operations and no activity is permitted under them that will cause soil compaction or damage to the tree, if applicable. i. That a guarantee from the owners or contractors shall be required guaranteeing all shrubs and ground cover, all trees, and the irrigation system for one year. j. That a permanent maintenance agreement on all landscaping will be required from the owner insuring regular irrigation, fertilization and weed abatement, if applicable. 20. Water Efficient Landscaping Regulations: The PL On going Standard Applicant shall meet all requirements of the City of Dublin's Water-Efficient Landscaping Regulations, Section 8.88 of the Dublin Munici al Code. 21. Sustainable Landscape Practices: The landscape PL On going Standard design shall demonstrate compliance with sustainable landscape practices as detailed in the Bay-Friendly Landscape Guidelines by earning a minimum of 60 points or more on the Bay-Friendly scorecard and specifying that 75% of the non-turf planting only requires occasional, little or no shearing or summer water once established. 22. Plotting: This Site Development Review approval allows PL Issuance of Project any of the three floor plans in the materials referenced in building Specific Condition #1 to be constructed on an of the lots within permits ~o NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: Capistrello Court, subject to limitations as follows: ^ Any single floor plan may not exceed 40% of the subdivision. ^ Individual floor plans may be placed next to each other. However, only two of the same individual floor plans may be plotted next to each other without being interrupted by a different floor plan. ^ If two of the same individual floor plans are plotted next to each other, the same individual floor plan may not be plotted across the street from the two. ^ In no case will the same architectural elevation or color scheme be allowed next to or across the street from each other, unless they are a different individual floor plan. PUB LIC WORKS 23. Clarification. In the event that there needs to be PW, PL On-going Standard clarification to these Conditions of Approval, the City Engineer or Community Development Director has the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The City Engineer or Community Development Director also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from im acts of this ro'ect. 24. Developer shall obtain an Encroachment Permit from PW Construction Standard the Public Works Department for all construction activity within the public right-of-way of any street where the City has accepted the improvements. At the discretion of the City Engineer an encroachment for work specifically included in an Improvement Agreement may not be re uired. 25. Developer shall obtain aGrading / Sitework Permit from PW Construction Standard the Public Works Department for all private grading and site improvements. This will include any community walls or soundwalls installed as part of the project. Wall construction will be subject to plan review by the Public Works Department and the Building Division, and will be subject to s ecial ins ections durin construction. 26. Plot plans shall be submitted for review and approval by PW Building Standard the Public Works Department and the Community Permits Development Department prior to approval of building ermits. NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 27. Roof drainage shall be connected to a closed conduit, PW Tract impmt Standard discharging to a curb drain or connected to the storm agreement drain system. Concentrated flows will not be allowed to drain across ublic sidewalks 28. The Developer is responsible for ensuring that all PW During Standard contractors implement all storm water pollution prevention construction measures in the SWPPP. 29. Removal of Obstructions. Applicant/Developer shall PW Issuance of Standard remove obstructions from building sites that are Occupancy necessary for public improvements or for public safety as Permits directed b the soils en ineer and Public Works Director. 30. Utility Siting Plan. The Applicant/Developer shall PW, PL Issuance of Standard provide a final Utility Siting Plan showing that Grading transformers and service boxes are placed outside of Permits public view where possible and/or screened to the satisfaction of the Community Development Director and Public Works Director. Applicant/Developer shall place all utility infrastructures underground including electric, telecommunications, cable TV, -and gas in accordance with standards enforced by the appropriate utility agency. Utility plans showing the location of all proposed utilities shall be reviewed and approved by the City En ineer/Public Works Director rior to installation. BUILDING DIVISION 31. Building Codes and Ordinances: All project B Through Standard construction shall conform to all building codes and Completion ordinances in effect at the time of buildin permit. 32. Retaining Walls: All retaining walls over 30 inches in B Through Standard height and in a walkway area shall be provided with completion guardrails. All retaining walls located on private property, over 24 inches, with a surcharge, or 36 inches without a surcharge, shall obtain permits and inspections from the Buildin Division. 33. Phased Occupancy Plan: If occupancy is requested to B Occupancy Standard occur in phases, then all physical improvements within of any each phase shall be required to be completed prior to affected occupancy of any buildings within that phase except for building items specifically excluded in an approved Phased Occupancy Plan, or minor handwork items, approved by the Community Development Department. The Phased Occupancy Plan shall be submitted to the Directors of Community Development and Public Works for review and approval a minimum of 45 days prior to the request for occupancy of any building covered by said Phased Occu anc Plan. An hasin shall rovide for ade uate 12 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: vehicular access to all parcels in each phase, and shall substantially conform to the intent and purpose of the subdivision approval. No individual building shall be occupied until the adjoining area is finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated from remaining additional construction activity. Subject to approval of the Community Development Director, the completion of landscaping may be deferred due to inclement weather with the posting of a bond for the value of the deferred landsca in and associated im rovements. 34. Building Permits: To apply for building permits, B Issuance of Standard Applicant/Developer shall submit seven (7) sets of building construction plans to the Building Division for plan check. permit Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non-City agencies prior to the issuance of building permits. 35. Construction Drawings: Construction plans shall be B Issuance of Standard fully dimensioned (including building elevations) building accurately drawn (depicting all existing and proposed permit conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape Ian and details shall be consistent with each other. 36. Air Conditioning Units: Air conditioning units and B Occupancy Standard ventilation ducts shall be screened from public view with of unit materials compatible to the main building and shall not be roof mounted. Units shall be permanently installed on concrete pads or other non-movable materials approved by the Building Official and Community Development Director. Air conditioning units shall be located such that each dwelling unit has one side yard with an unobstructed width of not less than 36 inches. Air conditioning units shall be located in accordance with the Ordinance 33-05. 37. Temporary Fencing: Temporary Construction fencing B Through Standard shall be installed along the perimeter of all work under completion construction. 13 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 38, Addressing: B Issuance of Standard a. Provide a site plan with the City of Dublin's address building grid overlaid on the plans (1 to 30 scale). Highlight all permit and exterior door openings on plans (front, rear, garage, through etc.). (Prior to release of addresses) completion b. Provide plan for display of addresses. The Building Official and Director of Community Development shall approve plan prior to issuance of the first building permit. (Prior to permitting) c. Addresses will be required on the front of the dwellings. Addresses are also required near the garage door opening if the opening is not on the same side of the dwelling as the front door. (Prior to permitting) d. Address signage shall be provided as per the Dublin Residential Security Code. (Occupancy of any Unit). e. Provide a site plan with the approved addresses in 1 to 400 scale prior to approval or release of the project addresses. (Prior to permitting) f. Exterior address numbers shall be backlight and be posted in such a way that they can be seen from the street. 39. Engineer Observation: The Engineer of record shall be B Scheduling Standard retained to provide observation services for all the final components of the lateral and vertical design of the frame building, including nailing, hold downs, straps, shear, roof inspection diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to schedulin the final frame ins ection. 40. Foundation: Geotechnical Engineer for the soils report B Through Standard shall review and approve the foundation design. A letter completion shall be submitted to the Building Division on the a royal. 41. Green Building: Green Building measures as detailed B Through Standard may be adjusted prior to master plan check application completion submittal with prior approval from the City's Green Building Official. Provided that the design of the project complies with the City of Dublin's Green Building Ordinance and State Law as applicable. In addition, all changes shall be reflected in the Master Plans. (Through Completion) The Green Buildin checklist shall be included in the 14 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: master plans. The checklist shall detail what Green Points are being obtained and where the information is found within the master plans. (Prior to first permit) Prior to each unit final, the project shall submit a completed checklist with appropriate verification that all Green Points required by 7.94 of the Dublin Municipal Code have been incorporated. (Through Completion) Homeowner Manual - if Applicant takes advantage of this point the Manual shall be submitted to the Green Building Official for review or a third party reviewer with the results submitted to the City. (Through Completion) Developer may choose self-certification or certification by a third party as permitted by the Dublin Municipal Code. Applicant shall inform the Green Building Official of method of certification prior to release of the first permit in each subdivision / nei hborhood. 42. Electronic File: The Applicant/Developer shall submit all B Issuance of Standard building drawings and specifications for this project in an building electronic format to the satisfaction of the Building Official permit prior to the issuance of building permits. Additionally, all revisions made to the building plans during the project shall be incorporated into an "As Built" electronic file and submitted riot to the issuance of the final occu anc . 43. Construction trailer: Due to size and nature of the B Issuance of Standard development, the Applicant/Developer, shall provide a Building construction trailer with all hook ups for use by City Permits Inspection personnel during the time of construction as determined necessary by the Building Official. In the event that the City has their own construction trailer, the applicant/developer shall provide a site with appropriate hook ups in close proximity to the project site to accommodate this trailer. The applicant/developer shall cause the trailer to be moved from its current location at the time necessary as determined by the Building Official at the a licant/develo er's ex ense. 44. Copies of Approved Plans: Applicant shall provide City B 30 days Standard with 4 reduced (1/2 size) copies of the approved plan. after permit and each revision issuance S ECURITY AND POLICE 45. Security During Construction. PO, B, During Standard a. Fencin -The erimeter of the construction site shall PW construction 15 NO. CONDITIONS OF APPROVAL Agency When Required, Prior to: Source be fenced and locked at all times when workers are not present. All construction activities shall be confined to within the fenced area. Construction materials and/or equipment shall not be operated or stored outside of the fenced area or within the public right-of-way unless approved in advance by the Public Works Director. b. Address Sign - A temporary address sign of sufficient size and color contrast to be seen during night time hours with existing street lighting is to be posted on the perimeter street adjacent to construction activities. c. Emergency Contact - Prior to any phase of construction, Applicant/Developer will file with the Dublin Police Department an Emergency Contact Business Card that will provide 24-hour phone contact numbers of persons responsible for the construction site. d. Materials & Tools -Good security practices shall be followed with respect to storage of building materials and tools at the construction site. e. Security lighting and patrols shall be employed as necessary. 46. Graffiti. The Applicant/Developer shall keep the site clear PO, PL Ongoing Standard of graffiti on a regular and continuous basis and at all times. Graffiti resistant materials should be used. PASSED, APPROVED AND ADOPTED this 24th day of January 2012 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Planning Commissioner Chair ATTEST: Planning Manager G:IPA#12007107-005 PositanolPC Mtg 1.24.12 Capistrello Court GPA.SPA.Stage 1,2.SDR.VTMIpc reso approving sdr vtm for capistrello.doc 16