AGEN DA STATEMENT
CITY COUNCIL MEETING DATE: February 18, 2003
SUBJECT: Grant Agreement with Alameda County Waste Management
Authority
Report by: Rosemary Alex, Parks and Facilities Development
Coordinator
ATTACHMENTS: 1) Agreement
Authorize Staff to enter into an Agreement with Alameda County
RECOMMENDATION:
'~qcff'~ Waste Management Authority (ACWMA)
FINANCIAL STATEMENT: The grant funding will provide $100,000 for the construction of Fire
Stations gl 7 and gl 8 in Eastern Dublin.
DESCRIPTION: As approved in the 2002-2007 Capital Improvement Program,
construction of Fire Stations #17 and #18 will begin in Fiscal Year 2002-2003 and be complete in Fiscal
Year 2003-2004. In order to proceed with that timeframe, on June 4th, 2002 the City Council approved the
Construction Documents for Fire Stations gl 7 and gl 8 as prepared by BSA Architects.
Throughout the design process City Staff along with BSA Architects worked extensively with the ACWMA
Staff to incorporate many of the recommended 'Green Building' materials and methods for these projects.
The plans that were approved by City Council on June 4th, 2002 had included those 'Green Building'
recommendations. City Staff subsequently completed the required grant application, which was approved
for funding by the Alameda County Waste Management Board. The $100,000 awarded will be equally
divided for the construction of the two fire stations. The attached Agreement outlines the scope of work,
reporting requirements and payment procedures for Fire Station gl7 and #18.
Fire Stations #17 and #18 are currently under construction and are anticipated to be complete by Fall 2003
and Summer 2003 respectively.
RECOMMENDATION:
It is recommended that the City Council authorize City Staff to enter into an Agreement with Alameda
County Waste Management Board (Attachment 1).
COPIES TO: Alameda County Waste Management Authority
ITEM NO.
G:\COUNCILLAgenda Statementsk2003k2-18 Grant Agreement - Fire Stations.doq
,%5
AGREEMENT BETWEEN
ALAMEDA COUNTY WASTE MANAGEMENT AUTHORITY
AND
CITY OF DUBLIN
THIS AGREEMENT, by and between Alameda County Waste Management Authority,
hereinafter referred to as "Authority", and the City of Dublin hereinafter referred to as
"Contractor",
WITNESSETH:
WHEREAS, the Authority desires to assist waste reduction efforts and promote green
building practices in Alameda County; and
WHEREAS, the Contractor proposes to build Fire Stations #17 (Madigan Road) and #18
(Fallon Road) using green building practices, technologies, and as specified in Appendix
A and hereinafter referred to as "Program"; and
WHEREAS, Contractor has requested funding from Authority in the amount of $100,000
in order to partially fund "Program"; and
WHEREAS, the Authority has agreed to provide such funding;
NOW, THEREFORE, Authority and Contractor agree as follows:
I. SCOPE OF CONTRACTOR SERVICES
Contractor agrees to perform those services described in Appendix A and to
adhere to the proposal described therein. Appendices A (Scope of Work), B
(Payment and Reporting Schedule), and C (Authority Resolution) are by this
reference incorporated in and made a part of this Agreement.
II. AUTHORITY REPRESENTATIVE
Authority shall appoint a representative or representatives with respect to
work to be performed under this Agreement. Authority's representative(s)
shall have complete authority to transmit instructions, receive information,
and interpret Authority's policies. Contractor shall be entitled to rely on
representations made by Authority's representative(s) unless otherwise
directed in writing by Authority.
lJI. TERM
The term of this Agreement shall be from the date of signatures to December
31, 2003. Contractor is required to submit reports describing the program,
including an accounting of the expenditure of Authority funds provided by this
agreement.
[Revised - May 30, 1997] Page 1
Contract dated 12/9/02 ~
IV. COMPENSATION
For the services described in Appendix A, Authority agrees to pay, and
Contractor agrees to accept, compensation in accordance with Appendix B.
The maximum amount to be paid to Contractor under this agreement is
$100,000.
V. INDEMNIFICATION
Contractor shall indemnify and hold harmless the Authority, its officers,
employees and agents from and against any and all loss, liability, expense,
claim costs (including costs of defense), from suits and damages of every
kind, nature and description directly or indirectly arising from the negligent or
intentional acts, errors or omissions of Contractor in the performance of this
Agreement and Contractor shall pay all claims, damages, judgments, legal
costs, adjusters' fees and attorneys' fees related thereto.
VI. INSURANCE
During the life of this Agreement, Contractor shall maintain the following
minimum insurance (if necessary/applicable):
1. Comprehensive general liabilitY insurance, including personal injury
liability, blanket contractual liability, and broad-form property damage
liability coverage. The combined single limit for bodily injury and
property damage shall be not less than $1,000,000.
2. Automobile bodily injury and property damage liability insurance
covering owned, non-owned, rented, and hired cars. The limits of such
coverage shall not be less than $250,000 bodily injury per
person/S500,000 bodily injury per occurrence/$100,000 property
damage.
3. Statutory workers' compensation and employer's hability insurance as
required by state law.
If Contractor submits a statement of assurance that it is self-insured, such
assurance shall constitute compliance with the above paragraph.
Upon request, Contractor shall submit to Authority certificates of insurance
for the policies listed above. The certificates shall provide that the Contractor
give written notice to Authority at least 10 days prior to cancellation of or any
material change in the policy.
VII. ASSIGNABILITY
Except for a general construction contractor hired by Contractor as identified
in Appendix A and B, Contractor may not assign or transfer any of its
obligations under this Agreement except that with the written consent of the
Authority, Contractor shall be entitled to subcontract specified portions of the
work to be done under this Agreement.
[Revised -- May 30, 19971 raue
Contract dated 12/9/02
vm. TERMINATION
This Agreement may be terminated for cause at any time upon fifteen (15)
days written notice to the party against whom the right to terminate is being
exercised. The Authority may terminate this Agreement at any time without
prior notice in the event that Contractor commits a material breach of the
terms of this Agreement. In the event of termination pursuant to the provisions
of this paragraph, Authority will be obligated to make payment for services
performed and expenses incurred to the date of termination.
IX. NON-DISCRIMINATION
Contractor agrees that it will comply with Title VI of the Civil Rights Act of
1964 and that no person, on the grounds of race, creed, color, sex or national
origin be excluded from participation in or be denied the benefits of or
otherwise be subjected to discrimination in the performance of this
Agreement.
X. SOLE AGREEMENT OF THE PARTIES
This contract contains the sole agreement of the parties relating to the
execution of this Program and correctly sets forth the rights, duties, and
obligations of each party to the other party. Any prior agreements, promises,
negotiations, or representations not expressly set forth in this Agreement are
of no force and affect.
XI. AMENDMENTS NOT VALID WITHOUT ADDITIONAL WRITTEN
AGREEMENT
No alteration or variation in the terms of this Agreement shall be valid unless
made in writing and signed by both parties.
XII. ACKNOWLEDGMENT
All publicity or promotional materials concerning the Program, including press
releases, feature stories, public service announcements, brochures and product
literature produced during the term of this Agreement must be submitted to the
Authority representative (s) for review and approval prior to distribution. Such
approval may not be unreasonably withheld. The Authority shall be
acknowledged as a supporter in all aforementioned materials for the duration of
this Agreement.
XIII. LITIGATION
If any litigation is commenced between the parties to this Agreement
concerning any provision hereof or the rights and duties of any person in
relation thereto, each party shall bear its own attorneys' fees and costs.
[Revised -- May 30, 19971 raue
Contract dated 12/9/02
XIV. JURISDICTION
This Agreement shall be administered and interpreted under the laws of the
State of California. Any litigation arising as a result of this Agreement shall
be in California.
XV. SEVERABILITY
If any term or provision of this Agreement is found to be illegal or
unenforceable, then, notwithstanding any such term or provision, this
Agreement shall remain in full force and effect and such term or provision
shall be deemed stricken.
ALAMEDA COUNTY WASTE
MANAGEMENT AUTHORITY CITY OF DUBLIN
KAREN SMITH RICHARD AMBROSE
Executive Director City Manager
Date: Date:
APPROVED AS TO FORM:
E. CLEMENT SHUTE, JR.
Authority Counsel Date:
[Revised - May 30, 19971
Contract dated 12/9/02
APPENDIX A
SCOPE OF WORK
The following Scope of Work is agreed to by the Alameda County Waste Management
Authority (Authority) and the City of Dublin (Contractor):
Proiect Description
The City of Dublin in constructing two new fire stations to serve the expanding
population of the City.
· Fire Station 4/17 is an 11,000 square foot fire station located on Madigan Road, near
the intersection of Gleason Drive. The project is expected to begin construction in
October 2002 and will be completed by October 2003. The budget for this project is
$5.69 million with funding coming from development impact fees retained in the Fire
Impact Fund.
· Fire Station #18 is an 8,900 square foot fire station located on Fallon Road, near the
intersection of Bent Tree Road. The project is expected to begin construction in
October 2002 and will be completed in May 2003. The budget for this project is
$4.69 million with funding coming from development impact fees retained in the Fire
Impact Fund.
As a result of the ACWMA's Green Building Design Assistance Program, Dublin's Fire
Stations #17 and #18 will include provisions for waste reduction, the use of recycled and
other sustainable building materials, energy efficiency, indoor environmental quality, and
water conservation and pollution reduction. The measures that will be employed in this
station represent a significant reduction in the negative impacts on waste, energy, water,
health and comfort. Many of these measures will provide on-going operating costs
savings to the City of Dublin.
Green Building Grant Requirements
[Revised -- May 30, 1997] ra~e
Contract dated 12/9/02
Green Building Measures Organized by LEED Category Dublin Dublin
#17 #18
.EED CATEGORY: MATERIALS & RESOURCES
Recycling ........................................................................................................................................
1 '~'~i"'~j~'~'~j'j;~'~"~'~i'"~'~'~'~'~'~{J~'~"~'~te management plan, % diversion goal ......... ~'~'~"*'""["'"'"~'~'~ ........
~.~f~i.;~.~.~g~i.i~.T~.~.~.i~a.:~.~.~.~.~[...{~;G.i.~.~i~...g~.fia~.~.~.~i.~i; ................................................................................
3 -~'~gg~'~T~6~"~ii~'"~"gaa'~a'"~'~'~"¢~'ia'~'~'a~' ................................................................................................................... ~' ........................... ~ .............
4 '~'~ i' ~T~&'G~i'~"~ig~"gii'B'"B'i'~'~"~'~i'~a"~i~'~i ........................................................................................................... ; ............. :~' ........................... ~' ............
6 Concrete: recycled flyash percent 30% 30%
7 ................................................................................................................................................................................................................................................................................... F oor Athletic: recycled content rubber 4 ............ ~' .............
8 '~' ~'~'~;"~'~g{~"i'~:~5'~"[~;~'~';"~'ffi'"~'~'ii'~'~ ................................................................................................................................ ~' ........................... ~' .............
9 F oor Carpet: Iow-VOC carpet adhesives
~ o '~' ~'~'~"~'~'~'~"~i'~"~'~'~"G~'"~'~7~T~'~i'~ ................................................................................................. : ................ ~' ........................... ~' .............
14 F oor, Resiliant: no vinyl flooring
~ 5 '~' ~.~.~;..~.~.~iii~.~i~...~iG.~i..ii.~.~i~G.~...~.~..~.~T~.~i.a.i.~...~.~.~.~¥~..~.G~i.~i~. .................................................................. ~' .......................... ~' .............
16 F oor, T e ceram c tile for durability 4 4
20 .~..~.fi~...~i~.~.~.~i..~..~..~.~:.~:.T~:~.~.6~..g:.~6.f~..~T~...~ ................................................................ ; ................. ~' ............. [; ............ ~ ..............
21 .i.~.~i~i~.~;.~.~i7?~i.~.~..~.~¥~a..~.~..~.~.a)~.~.~.~i~.~a.~:~.~.~.:.~.~.~.~.~ii~i.~.~ ................. ~ ................. ~' ............. [ ............. ~ ..............
22 '~'i~'"~'~?'~g~G~"~i'~'~':~'~"~T~'~i'g~"~'~ig~i ........................................... : ............................................................ ~"'" ......... [ ............. ~' .............
23 Pa nt Interior: Iow-VOC or zero-VOC
LEED CATEGORY: SUSTAINABLE SITES
26 Roof: L ght colored or metal roof
27 ..~¥~.~.~.~.~.i~i.~...g~.G~?~.~.~..~i~.~..~.~.~¥~.~...G...~.i.~.i~i.~..~.G.~..~.~..~.~.~.~ ...................................................... ~' ...........................................
28 ..~.G~".gg~.g~...~.G.~.~..~gg~...~.~¥~..~.G.~"i~..~.~.~..~g~g~..~.~Tg~.i.~. ................................................. ~' ............................ ~ .............
"E~6'"~'~'~6~f~'"'g~'~"~'~f~'6~'~'~ .....................................................................................................................................................................
29 ..~.~i.i~.~.~....~.~.~.~.~..~.~.~.~..~.~?..~.~.~..~..~.~.~iG.~.~ ............................................................................... ~' ......................... ~' ............
~0 '~'~'i~'~'~'"~'i~'~'~'~?~'~'~'~'~'~"~f~'~'~'~'i~'~ ............................................................................................................... ~' ........................... ~' .............
31 '~'~i¥~'~'"~'~G~"~'~'i~'~'~"~'~'~'ff~"~'~"~'~'~i'G'~ ........................................................................................................... ~' ............................ ~ ..............
32 '~'~i'~'~' '"~i~'~'~G~'~"~'~'~'~"~"~'~'~i¥~'~'~ ................................................................................................................ ~' ............................ ~ ..............
34 Comm ss oning: duct leakage controls, etc.
36 '~' ~'j"~'~'~'~:'~'~"i'~'~'~'~"~'i~"~'~'~'~"~ ...................................................................................................................... ~' ............................ ~ ..............
37 Contro s gas BBQ auto-shutoff
............................................................................................................................................................................................................................................................. ~- ............................ ~ ..............
38 Contro sighting occupancy sensors
39 .6.~.~...~¥~..~.~i.~.~¢.~.~..~i~T~.~.G~..~..~i..i.~.~.~..6.;~..~..~.~..G.~.~i.~ .................................................................. ~' ............................ ~ ..............
4~ .~T~i.~...~i~i.~.~¢..~i.~..~.a.iii.~.~..~..~i..i~.~i..~..~...~.~...~.~..~..~ ........................................................................ ~ .............. ] .............. ~ ..............
[Revised -- May 30, 1997] Page 6
Contract dated 12/9/02
'iXi~'6"d'~¥'g~6~'~i'"'i'~'dS'Gff~'i~gii~5'~'~'~'~'¥~'£"5'O~i¥~' .........................................................................................................................................
53 Day 9hr ng: apparatus bay
54 .5.~.i~.~.[i~.~.i.~.~.~.~i.~.i~;.~.~...~.~..~i.[~..~.~:~..[~..~i~[~..~.~..~.i~ ......................................................................................... ~' ........................... ~ .............
55 '~i'~ ~5~.;.i..~.~;~.~.~.i~..~i~..¥i7~..~.;~.~;~i~..~i~.~.~..5.i..~.~.~.~Bi~..[~.ii5.f.~.~.~.~.~ ..................................................... ~ ........................... ~ .............
LEED CATEGORY: WATER EFFICIENCY
56 -~ ~'i~Ti'f~'i~'~[i~;'~'i"'~;~i~;i'~ ~'f i'~ ;~'3'~ ~;'~'~'~'~ ~'~i'~'~"G~'~'~5'iS'~ ~"~'~ ~'"~'i'~'~ ~i'~'~" ~'~'~Zi'~ .................................... ~' ............................ ~' ............
57 "~¥~7'~;ii~ii'~;'~'i"~;iiT~7'~'~;~i'57¥~?~;~i'~'~";'~' ............................................................................................................... ~,' ............................ ;~' .............
58 ..~.i~7§.~.~.~;i.~;.&...§~;~.~.~T~;~7.iq5~..§K.~.~K.~.~.;..§i.~.g~7%.ii.~ ............................................................................ ~,' ......................... ;~' .............
$ Amount of Grant $50,000 $50,000
Project Scope of Work
Project Status Expected Expected
(as off 8/23/02 ) Start Date Completion Date
Programming Completed
Schematic Design Completed
(Concept~j_~l~ Preliminary)
Design Development Completed
Construction Documenr-q Completed
Bidding FS # 17 - 9/5/02
FS # 18 - Completed
Construction FS # 17 - 10/1/02 FS # 17 - 10/1/03
FS # 18 - 10/1/02 FS # 18 - 5/15/03
Commissioning FS # 17 - 9/1/03 FS # 17 - 10/1/03
FS # 18 - 4/15/03 FS # 18 - 5/15/03
Project Roles & Responsibilities
1. City of Dublin
Key Personnel:
Herma Lichtenstein, Project Manager
The City of Dublin will:
[Revised - May 30, 1997]
Contract dated 12/9/02
1. Monitor the contracted design and construction professionals' work to ensure that
the design and construction of Fire Station #17 and #18 complies with the terms
of the ACWMA Green Building Grant.
2. Communicate questions regarding green building practices and the use of
ACMWA Green Building Grant funds to the ACWMA project manager in an
expeditious manner.
3. Submit copies of all publicity or promotional materials concerning the project,
including press releases, feature stories, public services announcements and
brochures, to the Authority Program Manager for review and approval prior to
release of the information.
4. Submit work documents and progress reports as required in Appendix B.
2. Alameda County Waste Management Anthority
Key Personnel:
Ann Ludwig, Program Manager
ACMWA will:
1. Provide technical assistance to the City of Dublin, its architects, and its
contractors as necessary to ensure maximum compliance of the project to the
terms of the grant funding.
[Revised - May 30, 1997] ,~aue
Contract dated 12/9/02
APPENDIX B
PAYMENT AND REPORTING SCHEDULE
The following schedule of payment and reporting is agreed to by the Alameda
County Waste Management Authority (Authority) and the City of Dublin (Contractor):
Total Project Budget = $100,000
1. Initial invoice of $85,000 will be due and payable by the Authority to the Contractor
when all of the following conditions have been met:
· This Funding Agreement has been fully executed.
· Certificates of Insurance meeting the requirements of Section VI of this Agreement
have been submitted.
Signed Federal Taxpayer ID Number Form (substitute IRS Form W-9) has been
submitted.
Documentation from the Construction Documents or required change orders is
submitted to the Authority showing that the items listed in Appendix A: Green
Building Grant Requirements have been specified in the Construction Documents and
the contract for services with the construction contractor.
· Documentation showing that a construction contractor has been selected by the City
of Dublin and a contract for services has been signed.
· Contractor submits signed invoice for payment.
2. Final invoice in the amount of $15,000 is due and payable by the Authority to the
Contractor when all of the following conditions have been met:
· Final report has been submitted to the Authority and approved by the Authority
Project Manager. The Final Report should contain a narrative description of the
Fire Station #17 and #18 Green Building activities, including:
· A description of the key environmental benefits achieved in the project,
including energy efficiency, use of more durable, longer-lasting products,
and innovative uses of materials (reduced amount of material needed, use
of sustainable, low-toxic, and recycled-content materials);
· A narrative describing barriers or obstacles encountered in the design and
construction of the project;
· A narrative describing how this grant will influence future City of Dublin
building projects.
· A list of Green Building Materials used in the project, including
manufacturer and product name. This list should match the items listed in
Appendix A: Green Building Grant Requirements.
· Documentation showing that the contractors met the Construction Waste
Management requirements of 50% diversion as specified in Appendix A;
· Contractor submits final signed invoice for payment.
[Revised -- May 30, 1997] raue
Contract dated 12/9/02