Loading...
HomeMy WebLinkAbout4.06 RTIP I580/TassajCITY CLERK FILE # 1060-90 AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 19, 2000 SUBJECT: Approving the City of Dublin's Application for Funding in the 2000 Regional Transportation Improvement Program (RTIP) Augmentation for the 1-5 80/Tassajara Road Interchange Improvement Project Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: Resolution approving project application and authorizing the filing of a grant application RECOMMENDATION: Adopt resolution approving the City of Dublin' s project application and authorizing the Director of Public Works to execute and file an application with the Metropolitan Transportation Commission FINANCIAL STATEMENT: The 2000 RTIP funding application is the first step required for the City of Dublin to exchange funds with the Alameda County Congestion Management Agency (CMA). If a fund exchange is attained between the City of Dublin and the CMA, the City will receive $1 in State/Federal funds for every $0.90 of local funds exchanged. Once this application is approved, the CMA and the City will then confirm the exchange via a funding exchange agreement. At this time, the City is pursuing the exchange of $4.7 million in Federal/State funds for the 1-580/Tassajara Road interchange project, which will reduce developers' contributions to the project by $470,000. This would help fund the shortfall presently in the Eastem Dublin Traffic Impact Fee brought about by reduced contributions from Contra Costa County. DESCRIPTION: On August 1, 2000, the City Council authorized Staff to pursue exchange of funds with the CMA for the 1-580/Tassajara Road and 1-580/Fallon Road Interchange projects for up to $14.253 million. After discussion with the developers who will fund the two interchange projects, it was determined that the construction of the 1-5 80/Fallon Road project will be deferred two to three years later than the 1-580/Tassajara Road project. Because of the CMA's payback schedule requirements, it would only be feasible to pursue the exchange of funds for the construction of the 1-580/Tassajara Road interchange project. COPIES TO: g:miscproj\I-580/Tass\agst RTIP Funding Appli.doc ITEM NO. The construction of the 1-580/Tassajara Interchange project is estimated at $9.59 million. To maintain control of the administration of the project, it is required that the City fund 51% or more of the total construction cost. If federal funds for the project exceed 50% of the project cost, Caltrans will have to administer the project. If Caltrans administers the project, the project schedule would need to be extended by up to 12 months, based upon the Caltrans required review process. In addition, Staff estimates that Caltrans Construction Administration costs would exceed City Construction Administration costs by approximately $480,000, which would negate the advantage of applying for these funds. Staff believes that the construction of the project will proceed more expeditiously if the City administers the project; thus, Staff intends to apply only for $4.7 million, which is equivalent to 49% of the project cost. With the exchange of funds, the City would receive $470,000 of extra federal funds, which will reduce developers' contributions to the project by the same amount. The approval of the City' s application under the 2000 RTIP Augmentation for the 1-580/Tassajara Road Interchange Improvement project is the first step required for the City of Dublin to exchange funds with the CMA. Staff recommends that the City Council adopt the Resolution approving the City of Dublin' s project application and authorizing the Director of Public Works to execute and file an application with the Metropolitan Transportation Commission. Page 2 RESOLUTION NO. - O0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE CITY OF DUBLIN'S APPLICATION FOR FUNDING IN THE 2000 REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM AUGMENTATION FOR THE 1-580/TASSAJARA ROAD INTERCHANGE IMPROVEMENT PROJECT WHEREAS, SB 45 (Chapter 622, Statutes 1997) substantially revised the process for estimating the amount of state and federal funds available for transportation projects in the state and for appropriating and allocating the available funds to these projects; and WHEREAS, as part of that new process, the Metropolitan Transportation Commission (MTC) is responsible for programming projects eligible for Regional Improvement Program funds, pursuant to Government Code Section 14527(b), for inclusion in the Regional Transportation Improvement Program, and submission to the California Transportation Commission, for inclusion in the State Transportation Improvement Program; and WHEREAS, the MTC has requested that eligible transportation project sponsors submit applications nominating projects to be programmed for Regional Improvement Program funds in the 2000 Regional Transportation Improvement Program Augmentation; and WHEREAS, applications to the MTC must be submitted consistent with procedures, conditions, and forms the MTC provides transportation project ,sponsors; and WHEREAS, the City of Dublin is a sponsor of transportation projects eligible for Regional Improvement Program funds; and WHEREAS, Part 2 of the project application, attached hereto and incorporated herein as though set forth at length, lists the project, purpose, schedule and budget for which the City of Dublin is requesting that the MTC program Regional Improvement Program funds for inclusion in the 2000 Regional Transportation Improvement Program Augmentation; and WHEREAS, Part 3 of the project application, attached hereto and incorporated herein as though set forth at length, includes the certification by the City of Dublin of assurances required by SB 45 in order to qualify the project listed in Part 2 of the project application for programming by the MTC. NOW, THEREFORE, BE IT RESOLVED that City of Dublin authorizes its Public Works Director to execute and file an application with the MTC to program Regional Improvement Program funds into the 2000 Regional Transportation Improvement Program Augmentation, for the 1-580/Tassajara Road Interchange Improvement project as indicated in the project application attached to this resolution; and BE IT FURTHER RESOLVED that the City of Dublin approves the assurances set forth in Part 2 of the project application, attached to this resolution; and BE IT FURTHER RESOLVED that a copy of this resolution shall be transmitted to the MTC in conjunction with the filing of the City of Dublin application referenced herein. PASSED, APPROVED AND ADOPTED this 19th day of September, 2000. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk g:miscproj~l-580/Tasslreso RTIP Funding App Project Application Part 2: STIP STATE TRANSPORTATION IMPROVEMENT PROGRAM Project Nomination Fact Sheet (Page A-l) Reformatted - 11/05/1999 (All Dollars in Thousands and Escalated) Project Information Fact Sheet Date: Caltrans Region/MPO/ Rural (R) / Route/ PM / KP PM / KP County District PPNO * EA * 'TIP ID* Urbanized(U) Corridor * Back * Ahead * Alameda 4 4257- MTC U 580 PM: 16.8 PM: 18.2 25770K KP: 27,0 KP: 29.3 Congressional: District 10 Legislative Districts: Senate: District 7 Assembly: District 15 Project Sponsor: City of Dublin Implementing Agency: City of Dublin Project Title: 1-580/Tassajara Road Interchange Improvement * NOTE: PPNO & EA assigned by Ca~trans. RegionlMPOrrlP ID assigned by RTPNMPO. Route/Corridor & PM/KP Back/Ahead used for State Highway System and Intercity Rail projects. I Location and Project Limits - (brief) (State/Region and Area Specific Maps to be included on Page 2 (SheetA-2)) The 1-580/Tassajara Road I/C is located west of the 1-580/EICharm Road - Fallon Road I/C and east of the 1-580/Hacienda Drive Interchange in the Cities of Dublin and Pleasanton, I Description and Scope of Work - (brief) The proposed modifications include: Demolishing the existing two lane northbound Tassajara Road overcrossing and constructing a new three lane northbound Tassajara Road overcrossing; constructing an auxiliary lane along eastbound 1-580 between the Tassajara Road andFallon Road I/C's and widening of the on & off ramps at the Tassajara Road I/C. I Transportation Problem to be Addressed by Project and Description of Project Benefits - (brief) The project will alleviate congestion, improve safety and traffic operations at the interchange as a result of existing traffic and future traffic generated from approved local development. Proposed improvements will also increase the traffic capacity of the interchange ramps and ramp tarmini intersections. Total Project Component Costs Component E&P/PA&ED PS&E RAN SUP * CON SUP * CON TOTAL (dollars in thousands and escalated) Prior and Existing Funding Change in Funding Additional Need** Total STIP Other RTIP ITIP Other Additional Prior&Existing RTIP, ITIP and Non-STIP Added or Added or Non-STIP Added or Funding Needs not + Change Grandfathered STIP Contributions (Subtracted) (Subtracted) (Subtracted) yet Committed + Additional FY FY FY FY FY FY yy/yy $Amount yy/yy $Amount yy/yy $Amount yy/yy $Amount yy/yy $Amount yy/yy $Amount $Amount 01/02 $4,700 01/02 $4,890 $9,590 $4,700 $4,890 $9,590 * NOTE: RNV SUP and CON SUP used only for Caltrans projects - see Section 41 of STIP Guidelines, Funding decreases displayed within "( )". Fiscal Year (FY) shown in yy/yy format. ~ ** Expected Source(s) of Additional Funding Necessary to Complete Project - as Identified Under 'Additional Need' - (brief) Special Funding Conditions or Terms (If any, including State-Only funding designation and explanation) - (brief) i FTA Grant Type: * FTA App. Date: * FTA 'Grantee': * · NOTE: FTA Grant Type, FTA Application Date and FTA Grantee are applicable only for transit projects to be funded in part from a FTA grant - Refer to Section 26 of the CTC Guidelines. Project Milestones Date I Document Date Milestone (mm/dd/yy) Milestone Type (mm/yy) Project Study Report (PSR) Complete: 06/30/00 Scheduled Circulation of Draft Environmental Document: ND/CE 06/00 Project Manager (Person responsible for delivering the project within cost, scope and schedule) Name: Ferd Del Rosado Agency: City of Dublin Phone: (925) 833-6637 E-Mail: ferd.delrosado@ci,dublin.ca.us Mail Address: 100 Civic Plaza, Dublin CA 94568 Fax: (925) 829-9248 NOTE: The CTC STIP Guidelines should have been read and understood prior to preparation of the STIP Fact Sheet, with particular attention to sectionsv~L/"-Mg2.~.~9 A copy of the CTC STIP guidelines and a tamplate of this fact sheet are available at: http:liwww.dot,ca.govlhqltransproglstip.htm Page I STiP STATE TRANSPORTATION IMPROVEMENT PROGRAM Project Nomination Fact Sheet (Page A-2) Project Information Alameda 4 425 770K MTC Project Title: 1-580 Tassajara Road Interchange Improvement NOTE: PPNO and EA a~lgneQ by Ca~mns, Region~PO ID ass~ned by RTP~PO 'Fact Sheet Date: Implementing Agency City of Dublin Project Location Maps - Location Map of Project in State/Region, and Area Specific Map .... :. ,.. :.. "~..,.,.. ~' ....,. .,. ........ ...~.~,:.~...' . ,, ....~ ... "...~ '%" ".. ,, . ~" .'.'....,..~2 ~~ f~,~ "... ~. ~..-' ':.,,:..:.::: ~ ..~~ .... ' County CT D~Strict [ Alameda Project Title: 1-580FFassajara Road Interchange Improvement * NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPAJMPO Proposed Total Project Cost Component Prior 00/01 01/02 02/03 E&P (PA&ED) PS&E RAN SUP (CT) * CON SUP (CT) * PJVV CON TOTAL Existing RTIP Funds Component E&P (PA&ED) PS&E PAN SUP (CT) * CON SUP (CT) * CON TOTAL Proposed RTIP Funds Component E&P (PA&ED) PS&E RAN SUP (CT) * CON SUP (CT) * 2000 STIP STATE TRANSPORTATION IMPROVEMENT PROGRAM Project Nomination Funding Sheet (Page B-l) (dollars in thousands and escalated) PPNO * 14 7,E2/%* 14 Region/MPO/TIP ID * I 25 770 MTC $9,590 $9,590 03/04 04/05 05/06 Prior 00/01 01/02 02/03 03/04 Total Prior 00/01 01/02 02/03 03/04 Total Date: Implementing Agency City of Dublin 5-Sep-00 07/08 and Project 06/07 Beyond Total RTIP Program Code: ** Comments: RTIP Program Code: ** Comments: Requesting construction funds only. CON 4,700 4700 TOTAL 4700 4700 * NOTE: RAN SUP and CON SUP to be used only for projects implemented by Caltrans - See Section 41 of CTC adopted STIP Guidelines. "Program Code provided by Caltrans Existing ITIP Funds ITIP Program Code: ** ' Component Prior 00/01 01/02 02/03 03/04 Total Comments: E&P (PA&ED) PS&E RNV SUP (CT) * CON SUP (CT) * CON I TOTAL Proposed ITIP Funds ITIP Program Code: ** Component Prior 00/01 01/02 02/03 03/04 Total Commen~s: E&P (PA&ED) PS&E RNV SUP (CT) * CON SUP (CT) * CON TOTAL * NOTE: RNV SUP and CON SUP to be used only for projects implemented by Caltrans - See Section 41 of CTC adopted STIP Guidelines. ~ Program Code provided by Cattrans Existing 'Grandfathered STIP' Funds IGF Program Code: ** Component Prior 00/01 01/02 02/03 03/04 Total Comments: E&P (PA&ED) PS&E RNV SUP (CT) * CON SUP (CT) * CON TOTAL Proposed 'Grandfathered STIP' Funds GF Program Code: ** Component Prior 00/01 01/02 02/03 03/04 Total Comments: E&P (PA&ED) PS&E RNV SUP (CT) * CON SUP (CT) * CON TOTAL The CTC STIP Guidelines and a template of the STIP fund sheet are available at: http://www. dot.ca, gov/hq/transprog/stip. htm Page 1 $9,590 $9,590 ReformatedVersionKMB-12/29/99 9/8/00 County Alameda Project Title: Existing Non-STIP Funding - Contributor 1 Component Prior 00/01 E&P (PA&ED) PS&E R/VV SUP (CT) * CON SUP (CT) * CON TOTAL Proposed Non-STIP Funding -Contdbutor '1 Component Prior 00/01 E&P (PA&ED) PS&E PAN SUP (CT) * CON SUP (CT) * CON TOTAL 2000 STIP STATE TRANSPORTATION IMPROVEMENT PROGRAM Project Nomination Funding Sheet (Page B-2) (dollars in thousands and escalated) 1-580/Tassajara Road Interchange Improvement 01/02 02/03 03/04 04/05+ Total 01/02 02/03 03/04 04/05+ Total 4,890 4890 4890 $4,890 * NOTE: R/VV SUP and CON SUP to be used only for projects implemented by Caltrans - See Section 41 of CTC adopted STIP Gui~ielines. Existing Non-STIP Funding - Contributor 2 Component Prior 00/01 01/02 02/03 ~ 03/04 04/05+ Total E&P (PA&ED) PS&E PJVV SUP (CT) * CON SUP (CT) * CON TOTAL Proposed Non-STIP Funding - Contributor 2 Component Prior 00/01 01/02 02/03 03/04 04/05+ Total E&P (PA&ED) PS&E RAN SUP (CT)'* CON SUP (CT) * CON TOTAL · NOTE: RAN SUP and CON SUP to be used only for projects implemented by Caltrans - See Section 41 of CTC adopted STIP Guidelines. Existing Non-STIP Funding - Contributor 3 Component Prior 00/01 01/02 02/03 03/04 04/05+ Total E&P (PA&ED) PS&E RAN SUP (CT) * CON SUP (CT) * RAN CON TOTAL Proposed Non-STIP Funding - Contributor 3 Component Prior 00/01 01/02 E&P (PA&ED) PS&E RAN SUP (CT) * CON SUP (CT) * CON TOTAL 02~03 03/04 04~05+ Total Additional Funding Needs (funding needs not yet committed) Component Prior 00/01 01/02 - 02/03 03/04 04/05 E&P (PA&ED) PS&E R/VV SUP (CT) * CON SUP (CT) * CON TOTAL The CTC STIP Guidelines and a template of the STIP fund sheet are available at: http:llwww,dot. ca,govlhqltransproglstip.htm Page 2 05/06 Date: Implementing Agency 5-Sep-00 Comments Agency: IFund Type: City of Dublin Traffic Impact Fees Agency: Fund Type: Agency: Fund Type: Agency: IFund Type: Agency: Fund Type: 07/08 and 06/07 Beyond Total Reformated Version KMB-I ,?J29/99 9/8/00 Project Application - Part 3 City of Dublin CERTIFICATION of ASSURANCES The project sponsor certifies that the project for which Regional Improvement Program funding is requested meets the following project screening requirements. Please initial each. 1. The project is eligible for consideration in the RTIP. Pursuant to Streets and Highways Code Section 164 (e), eligible projects include improving state highways, local roads, public transit, intercity rail, pedestrian, and bicycle facilities, and grade 2.~~.mdy Repo~ (PSR) or PSR equivalent has been prepped for the project. 3. The project budget included in Paa 2 of the project application reflects c~ent costs updated as of ~e date of application ~d escalated to the appropriate 4. The project is included in a loc~ congestion m~agement progrin (CMP). ~ote: For those cowries ~at have opted out'of prepping a CMP in accord~ce wi~ Government Code Section 65088.3, ~e project must be consistent ~ the capital 5. Each of the project components will be delivered in the ye~ propose~~ 6. The project is fully funde~~' 7. The r__ p oject sponsor agrees to be available Br an audit of STIP ~nds, if requested. The project sponsor also agrees to abide by all rules and regulations applying to the State Transportation Improvement Program (STIP), and to follow al requirements associated w~th the funds programmed to the project ~n the STIP These include, but are not limited to: 1. Environmental requirements: NEPA standards and procedures for all projects with Federal funds; CEQA standards and procedures for all projects programmed with · State funds. 2. California Transportation Commission (CTC) requirements for transit projects, formerly associated with the Transit Capital Improvement (TCI) program. These include rules governing right-of-way acquisition, hazardous materials testing, and timely use of funds. 3. Federal Transit Administration (FTA) requirements for transit projects as outlined in FTA regulations and circulars. 4. Federal Highway Administration (FHWA) and Caltrans requirements for highway and other roadway projects as outlined in the Caltrans Local Programs Manual. 5. Federal air quality conformity requirements, and local project review requirements, as outlined in the adopted Bay Area Conformity Revision of the State Implementation .Plan (SIP).