HomeMy WebLinkAbout8.1 Attch 7 ResoAdoptCEQAaddendumRESOLUTION NO. 12-XX
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
RECOMMENDING THAT THE CITY COUNCIL ADOPT A CEQA ADDENDUM FOR THE
PROJECT PROPOSED FORA 3-ACRE SITE ON BRANNIGAN STREET NORTH OF
GLEASON DRIVE WITHIN DUBLIN RANCH
(APN 985-0052-021)
PLPA-2011-00039
WHEREAS, Lennar Homes of California, Inc. ("Applicant") submitted applications fora 3-
acre site located along the west side of Brannigan Street north of Gleason Drive ("Project Site").
The applications include: 1) General Plan and Eastern Dublin Specific Plan amendments to
change the land use from its current designation of Public/Semi-Public to Medium Density
Residential; 2) Planned Development rezoning with related Stage 1 Development Plan
Amendment and new Stage 2 Development Plan; 3) Site Development Review (SDR) to
construct 19 single-family detached homes; 4) Vesting Tentative Tract Map 8093 to create 19
residential lots; and 5) Development Agreement. The Project Site and the applications are
collectively known as the "Project;" and
WHEREAS, the Project site and currently is vacant land; and
WHEREAS, the Project is in the General Plan Eastern Extended Planning Area and the
Eastern Dublin Specific Plan area, for which the City Council certified a Program Environmental
Impact Report by Resolution 51-93 ("Eastern Dublin EIR" or "EDEIR", SCH 91103064) on May
10, 1993 (resolution incorporated herein by reference). The Eastern Dublin EIR identified
significant impacts from development of the Eastern Dublin area, some of which could not be
mitigated to less than significant. Upon approval of the General Plan Amendment and Eastern
Dublin Specific Plan, the City Council adopted mitigations, a mitigation monitoring program and
a Statement of Overriding Considerations (Resolution 53-93, incorporated herein by reference);
and
WHEREAS, since certification of the EDEIR, the Project site has been addressed in
several later CEQA reviews, including a 1997 Negative Declaration (Resolution 140-97), a 2000
MND for the Dublin Ranch Area F project (Resolution 34-00), and a 2004 Addendum for the
Dublin Ranch Area F North project (Resolution 43-04). The foregoing resolutions are
incorporated herein by reference; and
WHEREAS, the Eastern Dublin EIR identified significant unavoidable impacts from
development of the Eastern Dublin area, some of which would apply to the Project; therefore,
approval of the Project must be supported by a Statement of Overriding Considerations; and
WHEREAS, for the Brannigan Street Project, the City prepared an Initial Study to
determine if additional review of the proposed Project modifications and development was
required pursuant to CEQA Guidelines section 15162. Based on the Initial Study, the City
prepared an Addendum dated March 27, 2012 describing the modifications, development and
findings that the impacts of the proposed Project have been adequately addressed in the prior
Page 1 of 3 ATTACHMENT 7
CEQA documents referenced above. The Addendum is attached as Exhibit A and is
incorporated herein by reference; and
WHEREAS, a Staff Report for the Planning Commission, dated March 27, 2012 and
incorporated herein by reference, described and analyzed the project, and recommended
adoption of the CEQA Addendum and approval of the Project; and
WHEREAS, on March 27, 2012 the Planning Commission held a properly noticed public
hearing on the project at which time all interested parties had the opportunity to be heard; and
WHEREAS, the Planning Commission considered the CEQA Addendum as well as the
prior CEQA documents, and all above-referenced reports, recommendations, and testimony
before taking any action on the project.
NOW, THEREFORE BE IT RESOLVED that the foregoing recitals are true and correct
and made a part of this resolution.
BE IT FURTHER RESOLVED that the Planning Commission makes the following
findings to support the determination that no further environmental review is required under
CEQA for the proposed Project. These findings are based on information contained in the
CEQA Addendum, the prior CEQA documents, the Planning Commission Staff Report, and all
other information contained in the record before the Planning Commission. These findings
constitute a summary of the information contained in the entire record. The detailed facts to
support the findings are set forth in the CEQA Addendum and related Initial Study, the prior
CEQA documents, and elsewhere in the record. Other facts and information in the record that
support each finding that are not included below are incorporated herein by reference:
1. The proposed Project does not constitute substantial changes to the previous projects
affecting the Project site, as addressed in the prior CEQA documents, that will require major
revisions to the prior documents due to new significant environmental effects or a substantial
increase in severity of previously identified significant effects. Based on the Initial Study, all
potentially significant effects of the proposed Project are the same or less than the impacts for
the projects which were previously addressed. The proposed Project will not result in
substantially more severe significant impacts than those identified in the prior CEQA
documents. All previously adopted mitigation measures continue to apply to the proposed
Project and project site as applicable.
2. The Initial Study and Addendum did not identify any new significant impacts of the
proposed Project that were not analyzed in the prior CEQA documents.
3. The City is not aware of any new information of substantial importance or substantial
changes in circumstances that would result in new or substantially more severe impacts or meet
any other standards in CEQA Section 21166 and related CEQA Guidelines Sections 15162/3.
BE IT FURTHER RESOLVED that the Planning Commission recommends the following
to the City Council:
1. No further environmental review under CEQA is required for the proposed Project
because there is no substantial evidence in the record as a whole that any of the standards
under Sections 21166 or 15162/3 are met.
2 of 3
2. The City has properly prepared a CEQA Addendum and related Initial Study under
CEQA Guidelines section 15164 to explain its decision not to prepare a subsequent or
supplemental EIR or conduct further environmental review for the proposed Project.
3. The City Council adopt the CEQA Addendum and related Initial Study, attached as
Exhibit A, pursuant to CEQA Guidelines Sections 15162 and 15164 for the Project.
PASSED, APPROVED AND ADOPTED this 27th day of March, 2012 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chair
ATTEST:
Planning Manager
G:IPA#120111PLPA-2011-00039 Lennar Homes Brannigan GPA EDSPAIKit's DOC commentslpc reso recommending cega addendum for
brannigan lennar. DOC