Loading...
HomeMy WebLinkAbout4.10 Traffic Sign Improvor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL June 5, 2012 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 SUBJECT: Acceptance of Work- Contract No. 11 -03, Dublin Traffic Signal Improvements, (Columbia Electric, Inc. — CIP No. 960022) Prepared by Ferd Del Rosario, Senior Civil Engineer EXECUTIVE SUMMARY: A contract was awarded by the City Council on June 7, 2011 to Columbia Electric, Inc. for the Dublin Traffic Signal Improvements (CIP #960022) which included the installation of a new traffic signal at the intersection of Amador Valley Boulevard and Brighton Drive and upgrade an existing traffic signal at the intersection of San Ramon Road and Shannon Avenue. The Public Works Department has determined that the work under this contract is now complete and ready for acceptance. FINANCIAL IMPACT: The total project budget for CIP #960022 is $684,492. This includes all design, inspection and the work performed under the agreement with Columbia Electric, Inc, which was performed over two fiscal years. The total estimated final project cost is $ 522,356. The final cost of the improvements performed under the agreement with Columbia Electric, Inc. is shown below: Dublin Traffic Signal Improvements: Improvements (Columbia Electric, Inc.) Task Approved Contract Amount Including Contingency Actual Contract Cost AVB /Brighton Drive Traffic Signal - (Traffic Impact Fee Fund) $ 259,000 $ 228,977 San Ramon Rd /Shannon Avenue Traffic Signal - (Measure B Bike /Ped $ 147,920 $ 147,050 Fund TOTAL $ 406,920 $376,027 Page 1 of 2 ITEM NO. 4.10 RECOMMENDATION: Staff recommends that the City Council accept the improvements under Contract No. 11 -03, Dublin Traffic Signal Improvements, with Columbia Electric, Inc., and authorize the release of retention after 35 days if there are no subcontractor claims. x Submit ed By Public Works Director DESCRIPTION: Submitted By Administrative Services Director Reviewed By Assistant City Manager On June 7, 2011, the City Council awarded a contract to Columbia Electric, Inc. to construct the Dublin Traffic Signal Improvements project. The project included the installation of a new traffic signal at the intersection of Amador Valley Boulevard and Brighton Drive. This was the result of a traffic signal warrant analysis of said intersection which concluded that installation of a traffic signal was justified. In addition, the project included upgrading of the existing traffic signal at the intersection of San Ramon Road and Shannon Avenue to improve pedestrian safety for school children crossing San Ramon Road at Shannon Avenue. The projects are identified on the location map (Attachment 1). Staff has determined that the work under this contract is now complete and ready for acceptance. The new traffic signal installed at the intersection of Amador Valley Boulevard and Brighton Avenue has significantly reduced the queuing of cars at said intersection particularly during school drop -off and pick -up periods, and pedestrian safety has been increased with the installation of signalized crosswalks. Furthermore, the upgraded signal at the intersection of San Ramon Road and Shannon Avenue has provided safer pedestrian access across Ramon Road. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Copy to Columbia Electric, Inc. ATTACHMENTS: 1. Location Map Page 2 of 2 m umenck pWe uunan b�mm Genter �{ �K• '~ * Co {{ Can e sr 3°" ,Psaa Cardiq Dub r Daugherty 5 011' G,r -4 drd {{ r)ubin High * Stagecaa�h Hills Park 111h s1 10th St 4l J77q.7 Or $ehooa ` Park o �p m J - Brighton [}r Ly��'� 1 1.1�4t�p9� Pie •:� �� r➢n� �ayr�,� m 3 Kolb Park pet5a pt� W a �D Bth $t cs &Ln ¢ '8 ` I Komandorski =111111- `,,fiord Way ° G Golan Park t Park s sPe 3 Village Warmsley $t: � �fiirc� °MCr $ 'famardcrt or y {3, fiord Way m m c St .n ey FFF""" sqP` Valley CanYPr a ;Yat wing : prier e mat ey Call Google g e.'" st m oTim her Wolf i a � O J. j� a der Rrvtr -Rai wSth St -4- �# 01 A n7 41 "Pcy ;Aap data .1201 fGoogle New Traffic Signal at Amador Valley Boulevard /Brighton Drive {hro golana ❑r o- °her r Hnnr'Y� D gh4�lplr d sr+ter �4 ON a�eDr 3 �` 8hamruCk llrage hiap di �2Q11 GoIC X201 1 Goggle a _ cw r. n rammr I Upgrade of Existing Traffic Signal At San Ramon Road /Shannon Avenue LOCATION MAP e sr 3°" ,Psaa Cardiq Dub r Or h wav y y v vorr" a Kolb Park �� L Ly��'� 1 1.1�4t�p9� Pie •:� �� r➢n� �ayr�,� A �y erg b µollan� & &Ln ' ' '8 ` Shannon m `,,fiord Way ° G Golan Park t Park s sPe 3 M OrfkryC� Y � m yy rx y y N o o Valley Upgrade of Existing Traffic Signal At San Ramon Road /Shannon Avenue LOCATION MAP