Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
8.1 Attch 4 Green Point Rated Checklist
GreenPoint Rated Checklist: Single Family The GreenPoint Rated checklist tracks green features incorporated into the home. A home is only GreenPoint ■A I,�A Rated If all features are verifled by a Certified GreenPoint Rater throu°h Build It Green.GreenPoint Rated Green PointR/iTE{J is provided as a public service by Build Il Green,a professional non-profit whose mission is to promote healthy, energy and resource efficient buildings in California. - The minimum requirements of GreenPoint Rated are:verification of 50 or more points;Earn the following minimum points per category:Energy(30),Indoor AirQuality/Health(5),Resources(6),and Water(9);and Total Points Targeted: 68 meet the prerequisites A.2.a,H10a.,J.2.,N.1,and Q0. This checklist accommodates the verification of mandatory CALGreen measures but does not signify compliance unless accepted by enforcing agency. All CALGreen measures within the checklist must be selected as"Yes"or"Na"for compliance with GreenPoint Rated. Build It Green is not a code enforcement 37 30 agency. The criteria for the green building practices listed below are described in the GreenPoint Rated Single 9 14 g Family Rating Manual.For more information please visit www.builditgreen.org/greenpointrated t s 7 s Sing Family New Home 4.2/2008 Title 24 T LOrchid Schaefer Ranch d N E E a° v ` ? 3 A.SITE Possible Points 1.Protect Topsoil and Minimize Disruption of Existing Plants&Trees No a.Protect Topsoil and Reuse after Construction 0 1 1 No b.Limit and Delineate Construction Footprint for Maximum Protection 0 1 2.Divert/Recycle Job Site Construction Waste (Including Green Waste and Existing Structures) Yes a.Required:Divert 50%(by weight)of All Construction and Demolition Waste Y R (Recycling or Reuse) (CALGreen Code) __. Yes b.Divert 100%of Asphalt and Concrete and 65%(by weight)of Remaining Materials 2 2 No c.Divert 100%of Asphalt and Concrete and 80%(by weight)of Remaining Materials 0 2 3.Use Recycled Content Aggregate(Minimum 25%) No a.Walkway and Driveway Base 0 1 No b.Roadway Base 0 1 No 14.Cool Site:Reduce Heat Island Effect On Site 0 1 1 5.Construction Environmental Quality Management Plan,Duct Sealing, and Pre-Occupancy Flush-Out["This credit is a requirement associated with J4:EPA IAP] Yes a. Duct openings and other related air distribution component openings shall be covered during 1 1 construction.(CALGreen code if applicable) No b. Full environmental quality management plan and pre-occupancy flush out is 0 1 conducted(Prerequisite is A5a Total Points Available in Site=12 3 B.FOUNDATION No 1.Replace Portland Cement in Concrete with Recycled Fly Ash and/or 0 2 Slag(Minimum 20%) No 2.Use Frost-Protected Shallow Foundation In Cold Areas(CEC Climate 0 2 Zone 16) No 3.Use Radon Resistant Construction 0 2 ['This credit is a requirement associated with J4:EPA IAP] No 4.Install a Foundation Drainage System 0 2 [`This credit is a requirement associated with J4:EPA IAP] No 5.Moisture Controlled Crawlspace 0 2 [`This credit is a requirement associated with J4:EPA IAP 6.Design and Build Structural Pest Controls NO a.I nstall Termite Shields&Separate All Exterior Wood-to-Concrete Connections 0 1 _ No b.All Plants Have Trunk,Base,or Stem Locatetl At Least 36 Inches from Foundation 0 1 Total Points Available in Foundation=12 0 C.LANDSCAPE Enterin the%oflandscape area.(Projects with less than 15%ofthe total site area(i.e.total lot 0% size)as landscape area are capped at 6 points for the following measures:C1 through C7 and C9 through C11. No 1.Group Plants by Water Needs H drozonin 0 2 No 2.Mulch All Planting Beds to the Greater of 3 Inches or Local Water 0 2 Ordinance Requirement 3.Construct Resource-Efficient Landscapes No a.No Invasive Species Listed by Cal-IPC Are Planted 0 1 No b.No Plant Species Will Require Shearing 0 No c.75%of Plants Are Drought Tolerant,California Natives or Mediterranean Species 0 3 or Other Appropriate Species 4.Minimize Turf In Landscape Installed by Builder No a.Turf Shall Not Be Installed on Slopes Exceeding 10%and No Overhead Sprinklers 0 2 Installed in Areas Less than 8 Feet Wde No b.Turf is Small Percentage of Landscaped Area(2 Points for<25%,4 Points for<10%) 0 4 No 5.Plant Shade Trees 0 1 1 1 6.Install High-Efficiency Irrigation Systems No a.System Uses Only Low-Flow Drip,Bubblers,or Sprinklers 0 2 Yes b.System Has Smart Weather-Based Controller CALGreen code if applicable) 3 3 No 17.incorporate Two Inches of Compost In the Top 6 to 12 Inches of Soil 0 3 8.Rain Water Harvesting System Single Family Checklist ©Build It Green New Home Version 4.2 Page 1 of 6 ATTACHMENT 4 _T i N O • 1 a "No a.Cistem(s)is Less Than 750 Gallons 0 1 No b.Cistem(s)is 750 to 2,500 Gallons 0 No c.Cistem(s)is Greater Than 2,500 Gallons 0 1 No 9.Iirrigation System Uses Recycled Wastewater 0 1 No 10. Submetering for Landscape Irrigation 0 1 11.Design Landscape to Meet Water Budget a Install Irrigation System That W II Be Operated at 1570%Reference ET No (Prerequisites for Credit are C1.and C2.) 0 1 b.Install Irrigation System That Wit Be Operated at 5550%Reference ET No (Prerequisites for Credit are C1,C2,and 06a or 06b.) 0 1 12.Use Environmentally Preferable Materials for 70%of Non-Plant 's No Landscape Elements and Fencing 0 1 A)FSC-Certified Wood,B)Reclaimed,C)Rapidly Renewable,D)Recycled-Content E)Finger-Jointed or F)Local No 13.Reduce Light Pollution by Shielding Fixtures and Directing Light 0 1 Downward Total Points Available in Landsca e=35 3 D.STRUCTURAL FRAME&BUILDING ENVELOPE 1.Apply Optimal Value Engineering No a.Place Joists,Rafters and Studs at 24-Inch On Center 0 3 H No No b.Door and Window Headers are Sized for Load 0 1 c.Use Only Cripple Studs Required for Load 0 1 2.Construction Material Efficiencies No a.Wall and Floor Assemblies(Excluding Solid Wall Assemblies)are Delivered 0 2 - Panelized from Supplier(Minimum of 80%Square Feet) No b.Modular Components Are Delivered Assembled to the Project Minimum 25%) 0 6 '1 3.Use Engineered Lumber MBD a.Engineered Beams an d Headers 0 b.Wood I-Joists or Web Trusses for Floors 1 c.Engineered Lumber for Roof Rafters 1 d.Engineered or Finger-Jointed Studs for Vertical Applications e.Oriented Strand Board for Subfloor 1 f.Oriented Strand Board for Wall and Roof Sheathing 1 4.Insulated Headers 0 1 S.Use FSC-Certified Wood No a.Dimensional Lumber,Studs and Timber(Minimum 40%) 0 g No b.Panel Products Minimum 40%) 0 6.Use Solid Wall Systems(Includes SIPS,ICFs,&Any Non-Stick Frame Assembly) No a.Floors 0 2 No b.Walls 0 2 No c.Roofs 0 1 No 7.Energy Heels on Roof Trusses 0 1 75%of Attic Insulation Height at Outside Edge of Exterior Wall 8.Install Overhangs and Gutters No a.Minimum 16-Inch Overhangs and Gutters 0 1 No b.Minimum 24-Inch Overhangs and Gutters 9.Reduce Pollution Entering the Home from the Garage ['This credit is a requirement associated with J4:EPA IAP] No a.Install Garage Exhaust Fan OR Build a Detached Garage 0 _ No b.Tightly Seal the Air Barrier between Garage and Living Area(Performance Test 1 Required) ...._----- ..._....---- ... _ Total Points Available in Structural Frame and Buildin Envelope=39 4 E.EXTERIOR _ 'ts No 11.Use Environmentally Preferable Decking 5555. 0 2 f No 2.Flashing Installation Techniques Specified and Third-Party Verified 0 1 ['This credit is a requirement associated with J4:EPA IAP] No 3.Install a Rain Screen Wall System 0 2 No 4.Use Durable and Non-Combustible Siding Materials 0 1 No 15.Use Durable and Fire Resistant Roofing Materials or Assembly 0 2 _ Total Points Available in Exterior=8 0 F.INSULATION _ Possible Points 1.Install Insulation with 75%Recycled Content No a.Walls 0 1 No I b.Ceilings p 1 No ji c.Floors __ 5.555 _ 0 1 Total Points Available in Insulation=3 0 G.PLUMBING Possible Points 1.Distribute Domestic Hot Water Efficiently (Max.5 points,G1a.is a Prerequisite for G1b-e) No a.Insulate All Hot Water Pipes 0 1 1 ['This credit is a requirement associated with J4:EPA IAP] No b.Use Engineered Parallel Plumbing No c.Use Engineered Parallel Plumbing with Demand Controlled Circulation Loop(s) 0 ! No d.Use Traditional Trunk,Branch and Twig Plumbing with Demand Controlled 0 1 Circulation Loop(s) - No e. Use Central Care Plumbing 0 2.Water Efficient Fixtures a.High Efficiency Showerheads s2.0 Gallons Per Minute(gpm)at 80 psi.(Multiple Yes showerheads shall not exceed maximum flow rates) (CALGreen code if applicable) 3 3 Yes b.High Efficiency Bathroom Faucets 5_1.5 gpm at 60psi(CALGreen code) 1 Single Family Checklist ©Build It Green New Home Version 4.2 Page 2 of 6 � L N VC « • ti N j £ _ d N r a°¢ 0 w` a z 3 -High Efficiency Kitchen and Utility Faucets 51.8 gpm(CALGreen code if appli vable) 1 1 Yes 3.Install Only High Efficiency Toilets(Dual-Flush or!51.28 Gallons Per 2 ( 2 Flush(gpf)) (CALGreen code if applicable) Total Points Available in Plumbin =12 7 _ H.HEATING,VENTILATION&AIR CONDITIONING Possible Points �_-...----------------_ 1.Properly Design HVAC System and Perform Diagnostic Testing a.Design and Install HVAC System to ACCA Manual J,D,and S Recommendations Yes (CALGreen code if applicable) 4 4 ['This credit is a requirement associated with J4:EPA IAP] No b.Test Total Supply Air Flow Rates 0 1 ['This credit is a requirement associated with J4:EPA IAP] No c.Third Party Testing of Mechanical Ventilation Rates for AD(meet ASHRAE 62.2) 0 1 2.Install Sealed Combustion Units [*This credit is a requirement associated with J4:EPA IAP] No a.Furnaces 0 2 No I b.Water Heaters 0 2 No 3.Install High Performing Zoned H dronic Radiant Heating 0 1 1 No 4.Install High Efficiency Air Conditioning with Environmentally 0 1 Preferable Refrigerants 5.Design and Install Effective Ductwork No a.Install HVAC Unit and Ductwork within Conditioned Space 0 1, No b.Use Duct Mastic on All Duct Joints and Seams 0 1 ['This credit is a requirement associated with J4:EPA IAP] No c.Pressure Relieve the Ductwork System 0 1 ('This credit is a requirement associated with J4:EPA IAP] No 6.Install High Efficiency HVAC Filter(MERV 6+) 0 1 [*This credit is a requirement associated with J4:EPA IAP 7.No Fireplace OR Install Sealed Gas Fireplace(s)with Efficiency No Rating>60%using CSA Standards 0 1 [*This credit is a requirement associated with J4:EPA IAP] Yes 8.Install ENERGY STAR Bathroom Fans on Timer or Humidistat(CALGreen code if 1 1 applicable) 9.Install Mechanical Ventilation System for Cooling (Max.4 Points) No a.Install ENERGY STAR Ceiling Fans&Light Kits in Living Areas&All Bedrooms .0 1 Yes b.Install Whole House Fan(Credit Not Available if H9c Chosen) (CALGreen code if 1 1 applicable) _ No c.Automatically Controlled Inte rated S stem with Variable Speed Control 0 3 10.Advanced Mechanical Ventilation for IAQ Yes a.Required:Compliance with ASHRAE 62.2 Mechanical Ventilation Standards(as Y R adopted in Title 24 Part 6) ['This credit is a requirement associated with J4:EPA IAP] No b.Advanced Ventilation Practices(Continuous Operation,Sone Limit,Minimum 0 1 Efficiency,Minimum Ventilation Rate,Homeowner Instructions) No c.Outdoor Air Ducted to Bedroom and Living Areas of Home 0 2 11.Install Carbon Monoxide Alarm(s)(or No Combustion Appliances in Living Yes Space and No Attached Garage) 1 ( 1 ['This credit is a requirement associated with J4:EPA IAP] Total Points Available in Heating,Ventilation and Air Conditioning=27 7 I.RENEWABLE ENERGY Possible Points No 1.Pre-Plumb for Solar Water Heating 0 1 2.Install Wiring Conduit for Future Photovoltaic Installation&Provide 0 1 No 200 ft'of South-Facing Roof 3. Offset Energy Consumption with Onsite Renewable Generation 0.0% (Solar PV,Solar Thermal,Wind) 0 25 Enter%total energy consumption offset,1 point per 4%offset Total Available Points in Renewable Energy=27 0 J.BUILDING PERFORMANCE 1.Building Envelope Diagnostic Evaluations TBD a.Verify Quality of Insulation Installation&Thermal Bypass Checklist before Drywall 0 1 [*This credit is a requirement associated with J4:EPA IAP] _ TBD b.House Passes Blower Door Test 0 1 ['This credit is a requirement associated with J4:EPA IAP] _ TBD c.Blower Door Results are Max 2.5 ACH50 for Unbalanced Systems(Supply or Exhaust) 0 1 or Max 1.0 ACH,for Balanced Systems (2 Total Points for J 1 b.and J 1 c.) TBD d.House Passes Combustion Safety Backdraft Test 0 1 1 15 2,Required:Building Performance Exceeds Title 24(Minimum 15%) 30 an (Enter the Percent Better Than Title 24, Points for Every 1% Better Than Title 24) No 3.Design and Build Near Zero Energy Homes 0 6 (Enter number of points,minimum of 2 and maximum of 6 points) ------------ No 4.Obtain EPA Indoor airPlus Certification 0 2 (Total 42 points,not including Title 24 performance;read comment) No 5.Title 24 Prepared and Signed by a CABEC Certified Energy Plans 0 1 Examiner(CEPE) 6.Participation in Utility Program with Third Party Plan Review No a.Energy Efficiency Program 0 1 ['This credit is a requirement associated with J4:EPA IAP] No b.Renewable Energy Program with Min.30%Better Than Title 24(High Performing 0 1 Home) Total Available Points in Building Performance=45+ 30 „^ Possible Points Single Family Checklist ©Build It Green New Home Version 4.2 Page 3 of 6 ' t Orchid @ Schaefer Ranch a d E 0 x o `a c r E d O m No j 1.Design Entryways to Reduce Tracked-In Contaminants 0 2.Use Low-VOC or Zero-VOC Paint(Maximum 3 Points) a.Low-VOC Interior Wall/Ceiling Paints(CALGreen code if applicable) ' Yes (<50 Grams Per Liter(gpl)VOCs Regardless of Sheen) 1 1 [*This credit is a requirement associated with J4:EPA IAP] No b.Zero-VOC:Interior Wall/Ceilin Paints <5 gpl VOCs R ardless of Sheen 0 2 Yes 3.Use Low-VOC Coatings that Meet SCAQMD Rule 1113 (CALGreen code If applicable) 2 2 [*This credit is a requirement associated with J4:EPA IAP] Yes 4.Use Low-VOC Caulks,Construction Adhesives and Sealants that 2 " 2 Meet SCAQMD Rule 1168 (CALGreen code if applicable) No 5.Use Recycled-Content Paint 0 1 6.Use Environmentally Preferable Materials for Interior Finish A)FSC-Certfed Wood,B)Reclaimed,C)Rapidly Renewable,D)Recycled-Content or E)Finger-Jointed F)Local No a.Cabinets(50%Minimum) 0 3 No b.Interior Trim(50%Minimum) 0 2 No c.Shelving(50%Minimum) 0 2 No d.Doors(50%Minimum) 0 2 No e.Countertops(50%Minimum) 0 2 7.Reduce Formaldehyde in Interior Finish—Meet Current Yes CARB Airborne Toxic Control Measure(ATCM)for Composite Wood Y 0 Formaldehyde Limits by Mandatory Compliance Dates (CALGreen code if applicable) [*This credit is a requirement associated with J4:EPA IAP] 8.Reduce Formaldehyde in Interior Finish-Exceed Current CARB ATCM for Composite Wood Formaldehyde Limits Prior to Mandatory Compliance Dates No a.Doors(90%Minimum) 0 1 No b.Cabinets&Countertops(90%Minimum) 0 2 No c.Interior Trim and Shelving(90%Minimum) 0 1 9.After Installation of Finishes,Test of Indoor Air Shows Formaldehyde No Level<27ppb 0 3 __ Total Available Points in Finishes=27 5 L.FLOORING Possible Points 1.Use Environmentally Preferable Flooring(Minimum 15%Floor Area) No A)FSC-Certified Wood,B)Reclaimed or Refinished, C)Rapidly Renewable, 0 4 D)Recycled-Content,E)Exposed Concrete,F)Local. Flooring Adhesives Must Meet SCAQMD Rule 1168 for VOCs No 12.Thermal Mass Floors(Minimum 50%) _ _ _ __ 0 1 No 3.Low Emitting Flooring(Section 01350,CRI Green Label Plus, 0 3 Floorscore[*This credit is a requirement associated with J4:EPA Al] Yes 4.All carpet and 50%of Resilient Flooring is low emitting. (CALGreen code if Y applicable) Total Available Points in Flooring=8 0 M.APPLIANCES AND LIGHTING POSSible P, Yes 1.Install ENERGY STAR Dishwasher(Must Meet Current Specifications) 2 1 1 ........ .. .. . ... 2.Install ENERGY STAR Clothes Washer No a.Meets ENERGY STAR and CEE Tier 2 Requirements 0 1 (Modified Energy Factor 2.0,Water Factor 6.0 or less) b.Meets ENERGY STAR and CEE Tier 3 Requirements NO (Modified Energy Factor 2.2,Water Factor 4.5 or less) 0 3.Install ENERGY STAR Refrigerator No a.ENERGY STAR Qualified&<25 Cubic Feet Capacity. 0 No b.ENERGY STAR Qualified&<20 Cubic Feet Capacity 0 1 4.Install Built-in Recycling Center or Composting Center No a.Built-In Recycling Center 0 1 No b.Built-in Composting Center 0 ' 5.Install High-Efficacy Lighting and Design Lighting System No a.Install High-Efficacy Lighting 0 1 '. No b.Install a Lighting System to IESNA Footcandle Standards or Hire Lighting Consultant 0 1 Total Available Points in Appliances and Lighting=13 2 N.OTHER __ Possible Points 1. Required:Incorporate GreenPoint Rated Checklist in Blueprints Yes [*This credit is a requirement associated with J4.EPA IAP] Y R No 2.Pre-Construction Kick-Off Meeting with Rater and Subs 0 1 No 3.Homebuilder's Management Staff are Certified Green Building 0 1 Professionals 4.Develop Homeowner Education a.Develop Homeowner Manual of Green Features/Benefits (CALGreen code if applicable; Yes [*This credit is a requirement associated with J4:EPA IAP] 2 1 1 No b.Conduct Educational Walkthroughs(Prerequisite is N4a) [*This credit is a requirement 0 1 5 associated with J4:EPA IAP] No 5.Install a Home System Monitor OR Participate in a Time-of-Use 0 1 Pricing Program _ _ Total Available Points in Other=6 2 O.COMMUNITY DESIGN&PLANNING Possible Points 1.Develop Infill Sites Single Family Checklist ©Build It Green New Home Version 4.2 Page 4 of 6 � S N C r y Orchid @ Schaefer Ranch Notes v w 5 z 3 `' Nq a.Project is an Urban Intill Development 0 1 1 G.. Pbo b.Home s)/Development is Located within 1/2 Mile of a Major Transit Stop 0 2 I No 2.Build on Designated Brownfield Site 0 1 3 3.Cluster Homes&Keep Size in Check No a.Cluster Homes for Land Preservation 0 1 t No b.Conserve Resources by Increasing Density(10 Units per Acre or Greater) 0 2 2 c.Home Size Efficiency 0 9 i.Enter Average Unit Square Footage ii.Enter Average Number of Bedrooms/Unit 4.Design for Walking&Bicycling a.Site Has Pedestrian Access Within 1/2 Mile of Community Services: TIER 1:Enter Number of Services Within 1/2 Mile 1)Day Care 2)Community Center 3)Public Park 4)Drug Store 5)Restaurant 6)School 7)Library 8)Farmer's Market 9)After School Programs 10)Convenience Store Where Meat&Produce are Sold TIER 2:Enter Number of Services Within 1/2 Mile 1)Bank 2)Place of Worship 3)Laundry/Cleaners 4)Hardware 5)Theater/Entertainment 6)Fitness/Gym 7)Post Office 8)Senior Care Facility 9)Medical/Dental 10)Hair Care 11)Commercial Office or Major Employer 12)Full Scale Supermarket i. 5 Services Listed Above(Tier 2 Services Count as 1/2 Service Value) 0 1 ii. 10 Services Listed Above(Tier 2 Services Count as 1/2 Service Value) 0 1 Yes b.Development is Connected with A Dedicated Pedestrian Pathway to Places of 1 1 ` Recreational Interest Within 1/4 mile C.Install Traffic Calming Strategies(Minimum of Two): -Designated Bicycle Lanes are Present on Roadways; No -Ten-Foot Vehicle Travel Lanes, 0 2 Street Crossings Closest to Site are Located Less Than 300 Feet Apart; Streets Have Rumble Strips,Bulbouts,Raised Crosswalks or Refuge Islands 5.Design for Safety&Social Gathering No a.All Home Front Entrances Have Views from the Inside to Outside Callers 0 1 b.All Home Front Entrances Can be Seen from the Street and/or from Other Front 0 1 No Doors � No c.Orient Porches(min.100sf)to Streets and Public Spaces 0 1 ;. No d. Development Includes a Social Gathering Space 0 1 6.Design for Diverse Households(6a.is a Prerequisite for 6b.and 6c.) MN a.All Homes Have At Least One Zero-Step Entrance 0 1 _'. _ b.All Main Floor Interior Doors&Passageways Have a Minimum 32-Inch Clear 0 1 I Passage Space c.Locate Half-Bath on the Ground Floor 0 1 d.Provide Full-Function Independent Rental Unit 0 i Total Achievable Points in Community Design&Planning=35 rn _ P.INNOVATION Possible Points A.Site 1.Stormwater Control:Prescriptive Path(Maximum of 3 Points,Mutually Exclusive with PA2.) No a.Use Permeable Paving for 25%of Driveways,Patios and Walkways 1 No b.Install Bio-Retention and Filtration Features 2 No C.Route Downspout Through Permeable Landscape 1 No d.Use Non-Leaching Roofing Materials 0 1 No e.Include Smart Street/Driveway Design 0 1 2.Stormwater Control:Performance Path(Mutually Exclusive with PA1):Perform Soil 0 3 No Percolation Test and Capture and Treat 85%of Total Annual Runoff C'Landscape Yes 1.Meet Local Landscape Program Requirement 2 2 D.Structural Frame&Building Envelope 1.Design,Build and Maintain Structural Pest and Rot Controls No a.Locate All Wood(Siding,Trim,Structure)At Least 12"Above Soil o-._ 1—ttilt No b.All Wood Framing 3 Feet from the Foundation is Treated with Borates 0 (or Use Factory-Impregnated Materials)OR Walls are Not Made of Wood Yes 2.Use Moisture Resistant Materials in Wet Areas:Kitchen,Bathrooms,Utility Rooms,and 2 1 1 Basements ['This credit is a requirement associated with J4:EPA IAP] E.Exterior No 1.Vegetated Roof Minimum 25%J 0 2 , 2 I G.Plumbing No 1.Greywater Pre-Plumbing(Includes Washing Machine at Minimum) 0 1 No 2.Greywater System Operational(Includes Washing Machine at Minimum) 0 2 No 3.Innovative Wastewater Technology(Constructed Wetland,Sand Filter,Aerobic System) 0 1 No 4.Composting or Waterless Toilet 0 2 No 5.Install Drain Water Heat-Recovery System 0 1 No 6.Install a Hot Water Desu erheater 0 2 H.Heating,Ventilation,and Air Conditioning No 1.Humidity Control Systems(Only in California Humid/Marine Climate Zones 1,3,5,6,7) 0 1 ['This credit is a requirement associated with J4:EPA IAPj No 2.Design HVAC System to Manual T for Register Design 0 1 K.Finishes No 1.Materials Meet SMaRT Criteria(Select the numberofpoints,up to 5 ints) 0 5 N.Other Single Family Checklist ©Build It Green New Home Version 4.2 Page 5 of 6 Orchid @ Schaefer Ranch Notes No 11.Detailed Durability Plan and Third-Party Verification of Plan Implementation 0 2 2.Educational Signage of Projects Green Features No a.Promotion of Green Building Practices 0 1 No b.Installed Green Building Educational Signage 0 1 3.Innovation: List innovative measures that meet green building objectives.Enter in the number of points in each category for a maximum of 4 points for the measure in the blue cells.Points achieved column will be automatically fill in based on the sum of the points in each category.Points and measures will be evaluated by Build It Green. No Innovation:Enter up to 4 Points at right.Enter description here 0 No Innovation:Enter up to 4 Points at right.Enter description here 0 No Innovation:Enter up to 4 Points at ri ht.Enter descri tion here 0 No Innovation:Enter up to 4 Points at right.Enter descri tion here 0 No Innovation:Enter up to 4 Points at nght.Enter description here 0 _ _ Total Achievable Points in Innovation=33+ 4 _ 0.CALIFORNIA CALGreen CODE _ Possible Points YES Home meets all applicable CAL Green measures listed in above Sections A-P of the GreenPoint Y R Rated checklist. The following measures are mandatory in the CALGreen code and do not earn points in the GreenPoint Rated Checklist,but have been included in the Checklist for the convenience of jurisdictions. The GreenPoint Rater is not a code enforcement official.The measures in this section may be verified by the GreenPoint Rater at their own discretion and/or discretion of the building official. Yes 1. CALGreen 4.106.2 Storm water management during construction. Y Yes 2. CALGreen 4.106.3 Design for surface water drainage away from buildings. Y 3. CALGreen 4.303.1 As an alternative to perscriptive compliance,a 20%reduction in baseline Yes Y water use shall be demonstrated through calculation Yes 4. CALGreen 4.406.1 Joints and openings.Annular spaces around pipes,electric cables, Y conduits,or other openings in plates at exterior walls shall be protected Yes 5.CALGreen4.503.1 Gas fireplace shall be a direct-vent sealed-combustion type.Woodstove or Y pellet stove shall comply with US EPA Phase 11 emission limits Yes 6. CALGreen 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. Y Yes 7. CALGreen 4.505.3 19%moisture content of building framing materials Y 8. CALGreen 702.1 HVAC system installers are trained and certified in the proper installation of Yes Y HVAC systems. Total Achievable Points in California Green Code=0 0 Summary Total Available Points in Specific Categories 35 96+ 44 110 56 Minimum Points Required in Specific Categories 50 0 30 5 6 9 Total Points Project has met all recommended minimum requirements c,e ofAt Least 50 Porr:':; Required measures- 43a,50%waste diversion by weight -1-110a:Compliance with ASHRAE 62.2 Mechanical Ventilation Standards 42:15%above Title 24 -N f.Incorporate GreenPoint Rated Checklist into bluepdn;s Minimum points in specific categories: -Energy(30 points) -IAQ/Health(5 points) - -Resources(6 points) -Water(9 points) Single Family Checklist ©Build It Green New Home Version 4.2 Page 6 of 6