Loading...
HomeMy WebLinkAbout4.8 WIS AmendAgmt DubBlvd1 ITY CLERK File # E&W 16muld AGENDA STATEMENT CITY COUNCIL MEETING DATE: April 1, 2UUJ SUBJECT: ATTACHMENTS: RECOMMENDATION: FINANCIAL STATEMENT Amendment to Consulting Services Agreement with Washington Infrastructure Services (formerly MK Centennial) for the Widening of Dublin Boulevard from Village Parkway to Sierra Court (Modification to Scope of Work and Additional Compensation) Report Prepared by: Lee S. Thompson, Public Works Director 1) Resolution amending agreement 2) Budget Change Form 1) Adopt Resolution approving Amendment No. 4 to the Agreement with Washington Infrastructure Services, Inc., to expand the scope of work as described in the letter dated February 11, 2003. 2) Approve a budget change from Gas Tax reserves in the amount of $50,000. The City's agreement with Washington Infrastructure Services, Inc. (WIS) contract for the Dublin Boulevard Widening project was for design and construction services. The construction services are provided on an on -call basis, as determined by the City. Due to the complexity of the project, the not -to -exceed time and materials fee has been exhausted. Staff is recommending a budget change to add $50,000 to fund WIS' work through the end of the project. DESCRIPTION: During construction of the Dublin Boulevard Widening project, WIS has responded to Contractor's requests for information and structural design clarifications at the City's request. Amendment No. 3 added a not -to -exceed amount of $50,000 for construction support services, but due to the complexity of the project, the contracted not -to -exceed time and materials fees have been exhausted. This is primarily due to unforeseen structural design changes and issues raised by the Contractor regarding the Alamo Canal Bridge. The bridge is being widened to six lanes as part of the road widening project and is only partly finished. To continue to respond timely to any further structural design clarifications it is necessary to add to WIS' contract an extension of their construction support services. The consultant has prepared a scope of work, and the compensation associated with the expanded scope of services is proposed at an amount not to exceed $50,000. Staff recommends that the City Council adopt the resolution approving Amendment No. 4 to the agreement with Washington Infrastructure Services, Inc., to expand the scope of work as described in WIS' letter dated February 11, 2003. --------------------------------------------------------- - - - - - - COPIES TO: James H. Lundell, WIS ITEM NO. g:\engr-contract\Wash\AgstWash4AmendApril 1-2003.doc RESOLUTION NO. - 03 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDMENT NO. 4 TO AGREEMENT WITH WASHINGTON INFRASTRUCTURE SERVICES, INC. (FORMERLY MK CENTENNIAL), FOR CONSULTING SERVICES FOR THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary Engineering and Environmental Services with Washington Infrastructure Services, Inc., for the Dublin Boulevard project from Village Parkway to Sierra Court, on November 16, 1999; and WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of services to include the preparation of Plans, Specifications and Estimates for the said project with an additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and WHEREAS, the agreement was further amended on November 20, 2001, to expand the Scope of Work to include additional right-of-way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction at a cost of $139,164; and WHEREAS, the agreement was further amended on July 16, 2002, to expand the Scope of Work to include design services during construction at a cost of $30,000; and WHEREAS, it is proposed to amend the agreement to expand the Scope of Work to allow the consultant to respond to additional requests from the contractor performing the construction of said project for information and design clarification at a not-to-exceed amount of $50,000; NOW, THEREFORE, BE IT RESOLVED that the City Council o£the City of Dublin does hereby approve Amendment No. 4 to the agreement with Washington Infrastructure Services to expand the scope of work, as described in Exhibit "A", which is attached to this resolution. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement. PASSED, APPROVED AND ADOPTED this 1 st day of April, 2003. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk EXHIBIT "A*' OF RESOLUTION -03 AMENDMENT NO. 4 TO AGREEMENT BETWEEN CITY OF DUBLIN AND W'ASHINGTON INFRASTRUCTURE SERVICES, INC., FOIl THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Washington Infrastructure ServiceS, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on November 16, 1999, for Preliminary Engineering and. Environmental Services for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court; and WHEREAS, the City amended the agreement on July' 18, 2000, to extend the scope of work to include the preparation of Plans, Specifications and Estimates; and WHEREAS, the City further amendec~ the agreement on November 20, 2001 and again on July 16, 2002, to extend the Scope of Work to include additional design work; and WHEREAS, the Scope of Work to be performed is proposed to be extended to allow the consultant to respond to requests from the contractor performing the construction of the Dublin Boulevard Widening for additional information and design clarification; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work' The Scope of Work shall be modified as described in Consultant's Amended Scope of Services dated February 28, 2003, for the Dublin Boulevard Widening Project.between Village Parkway and Sierra Court (attached). Extension of Term The total cost for work covered by this amendment shall not exceed $50,000. CITY OF DUBLIN Mayor ATTEST: City Clerk WASHINGTON' INFRASTRUCTURE SERVICES ~J~mes H. Lundell, V~e President Febm~ 11, 2003 File No. 2262.020 Lee Thompson, City Engineer City of Dublin 100 Civic Plaza Dublin, CA 94568 RE: Dublin Blvd. Widening Project from Village Parkway to Sierra Court/Civic Plaza Amendment No. 4 - Design Services During Construction Dear Lee: In response to Ferd Del Rosario's request ofArvind Joshi on Jalmary 21, 2003, we are enclosing a rare schedule for staff we anticipate to work during the period begilming February 11, 2003 through the end of construction, September 30, 2003. h~ addition, we have also included a brief scope of work for design services during construction for A~nendment No. 4. The design services during construction (DSDC) will be billed on a time and lnaterials basis. We will need to include time and materials for our subconsultants, Chaudhary & Associates and Haygood & Associates since these subconsukants are not included in your on-call service contracts that you have for the other subconsultm~ts used in design, Kleinfelder and Fehr & Peers Associates We xvill be amending their contracts accordingly based on receipt of an executed contract from the City or an authorization letter. We request the City send us an attthorization letter that approves the above work and authorization to proceed with DSDC pending an executed amendment for desigu service during construction. If you have any questions or reqnire more information, please do not hesitate to call me at (925) 824-44i4 or Joe Baughman at (925) 824-4419. Z~~Sincerely' ~~w"- Etty Mercurio ~ Project Manager EM/nc Encl. cc: F. Del Rosario, City of Dublin J. Lm~dell, WIS A. Joshi. WIS J. Bauglunan, WIS j:\2262\Admin\Correspondence~Letters~Letter City DSDC Amend4.doc Washington Group International, Inc. * 2633 Camino Ramon ~ Suite 450 ,, San Ramon, CA USA 94583 Phone: (925) 244-1500 ,, Fax: (925) 244~1520 2003 HOURLY RATE SCHEDULE Average Hourly Classification Design Staff for 2003 Hourly Rate Average Hourly Overhead Rate Fee on Labor Rate Including OH Rate Including DSDC by Individual Rate & Fee Overhead and Profit , ~ , Etty Mercurio .... $53.60 i.69293 10% --' $158,78 Joe Baughman I $55.28 1.69293 10% $163.75 Project Manager / I $54.00 ' $161.00 Principal -- Farhad Shahpar $40.98 1.69293 10% $121.39 Dave Whitmore $43.90 1,69293 10% $130.04 Structural Aurelio Alegria $45.14 $43,00 1.69293 10%. $133.71 $128,00 Engineer ,, Peter DeStefano $44.00 1.69293 10% $130,34 Erica Skyrman $40.85 1.69293 10% , , $12t.01 Ron Allen $34.49 $39.00 1.69293 10% $102.17 Engineer II Steve Jackson $35.71 1.69293 10% $105,78 $115.00 Roadway Engineer Chuck Morgansen $35.76 1.69293 10% $105.93 Miguel Lopez - $27.11 1.69293 10% $80,31 Engineer I Karen Stewar[ $33.65 $32.00 1,69293 10% $99.68 $95,00 Reggie Moo~:e $40.00 1.69293 10% $118.49 Mark Matsumoto $30.62 1.69293 10% $90.70 CADD Cathy Woods $29.49 1.69293 10% $87,36 $98.00 Veenu Chand $32,49 $33,00 1.69293 10% $96.24 " Nancy Cook $19.86 1.69293 10% $58.83 Clerical $20.00 , $59.00 Notes: 1. These 2003 hourly rates are valid from February 11,2003 through March 1, 2003. After March 1. 2003, the hourly rate will increase on the average of 5%. 2. Actual rates for each individual will be used for billing and may exceed average hourly rates stateO above. J:/Project/2262/Admin/Contract/HrlyRtAmd4.xls DUBLIN BOU£EVARD WIDENING PROJECT February l ~, 2003 Scope of Services Paste 1 EXHIBIT A Professional Services Agreement Between CITY OF DUBLIN (CITY) and WASHINGTON INFRASTRUCTURE SERVICES (formerly MK Centennial) (CONSULTANT) for the DUBLIN BOULEVARD WIDENING PROJECT AMENDMENT NO. 4 SCOPE OF SERVICES INTRODUCTION This scope of services covers design services during consmtction for the project. The design service during consn-action schedule will anticipate beghming February 11, 2003 and contimfing through construction. Construction is anticipated to be complete by September 30, 2003. 1. Design Services During Construction (DSDC) The CONSULTANT will provide design services during consmictions that include response to request for informatio.n (RFIs) and response to contract change orders (CCOs). These services will be provided on a t~me and material Basis during construction and are estimated to be $30,000. These services do not include inspection services, construction quality control services, utility coordination, as-buiks drawings (record drawings), record of survey or right-of-way record maps. Design services during construction for subconsultants will be limited to ser~dces by Chaudhary and Associates and Haygood and Associates. Their services will be provided on a time a material basis and are included in the estimated $30,000. No other subconsultants are included in these design services during construction, as the City will contract with the other subconsulants m~der separate contract. J:k2262\Admin\Contrac~s\Amendment 4 DSDC scope.doc CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM New Appropriations (City Council Approval. Required): Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) __X__ From Unappropriated Reserves Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other Name: Dublin Boulevard Widening Project from Village Parkway to Sierra Court (Engr- $50,000 Design) Account #: 206-96920-740-078 Name: Name': Account #: Name: Name: Account #: Finance Mgr: ~..~.~ ~ Date: ~ ] Z"1[ ~c~ Signature City Manager: Date: Signature REASON FOR BUDGET CHANGE ENTRY: The budget change is required to amend Washington Infrastructure Services agreement to expand the scope of work and provide additional compensation. Mayor: Date: Signature Posted By: Date: Signature G:engr~hqdbudgchng. doc