Loading...
HomeMy WebLinkAbout8.1 Attch 5 Parking Study • S ■ E N G I N E E R S • PLAN N E R S April 19,2012 Ms. Jaimee Bourgeois Transportation&Operations Manager City of Dublin 100 Civic Plaza Dublin,CA 94568 RE: Focused Parking Analysis for a Proposed Pre-School Project in the City of Dublin Dear Ms.Bourgeois: The following letter report provides a focused weekday parking analysis for a proposed Pre-School project in the City of Dublin. The proposed project would be located adjacent to an existing retail center on the southeast quadrant of the Village Parkway/Amador Valley intersection (see Project Site Plan— attached). The existing retail center contains a mixture of small commercial tenants that includes a Starbuck's coffee shop. This center currently has an on-site parking supply of 32 spaces. There are an additional 10 spaces used as overflow parking; however,these 10 spaces are located beyond the center's property and are included on the property of the proposed project. The proposed project would be constructed on the eastern half of the site with a capacity for 60 pre-school students, 5 staff,and a parking supply/allotment of 17 parking spaces (seven more spaces than currently exist today). Combined with existing retail uses, proposed pre-school uses could create a higher parking demand affecting overall parking supply and availability during peak demand periods. Consequently, a focused parking demand analysis has been conducted for the proposed project based on City code requirements and parking surveys conducted for both existing and proposed uses. The following sections outline existing conditions at the project site,City parking code requirements,parking surveys conducted for both existing and proposed uses,and the likely parking demand during the weekday period. Existing Uses/Parking Demand The proposed project site is located at the southeast quadrant of the Village Parkway/Amador Valley Boulevard intersection. The site is vacant with the exception of a paved parking area on the southern end of the site that accommodates 10 parking spaces currently used by the adjacent retail center located to the west of the project site. The existing center includes a Starbuck's coffee shop, Café Art, Optometrist, We Buy Gold, and Salon uses totaling 8,539 square feet. Access to the site is provided by two right-turn-only driveways; one off Village Parkway and one off Amador Valley Boulevard. The retail center currently has 32 striped parking spaces on-site (19 standard, 11 compact, 2 accessible). In addition, there are approximately ten(10)parking spaces(5 striped and 5 un-striped)on the proposed pre-school project site where patrons or employees can currently park for an overall total supply of 42 on-site spaces. On-street parking adjacent to the site includes 11 parallel parking spaces; four (4) parallel spaces on Village Parkway and approximately seven(7)spaces on Amador Valley Boulevard. 1901 Olympic Blvd.,Suite 120,Walnut Creek,CA 94596 - (925) 935-2230 fax(925) 935-2247 ROSEVILLE REDDING VISALIA WALNUT CREEK ATTACHMENT 5 • . Ms.Jaimee Bourgeois Page 2 Apri119,2012 Existing Retail Center Parking demand surveys for all existing and proposed uses were conducted during the morning (7:00- 10:00 a.m., mid-day (11:30 a.m.-12:30 p.m.), mid-afternoon (2:30-3:30 p.m.) and evening (4:00-6:15 p.m.) periods'. (A complete summary is provided in Table A in 15 minute increments for all parking survey results and estimated parking demand has been attached). For existing retail uses adjacent to the proposed project site,overall parking demand peaked during the mid-afternoon period(around 3:30 p.m.) at 39 spaces. This included 37 spaces on-site and two (2) off-site spaces on Village Parkway. Of those patrons parking on-site, 32 patrons were parked in dedicated (striped) spaces for existing retail and five (5) patrons in the striped spaces on the pre-school site. As shown in Table 1 below, parking demand at the existing retail center was over capacity during the mid-day, mid-afternoon, and evening periods resulting in overflow parking onto the proposed pre-school project site. Existing Springfield-Montessori Pre-School To evaluate the parking demand characteristics of the proposed project, a comparable pre-school in the City of Dublin was surveyed for overall parking characteristics. The Springfield-Montessori pre-school is located at 5100 Brannigan Street. A self-contained facility, the pre-school has an on-site parking supply of 53 spaces (51 standard, 2 accessible) and an attendance of 150 students the day of the survey." As shown in Table 1, the pre-school had their peak demand period during the mid-afternoon period with 46 spaces occupied. During the mid-afternoon period, parents arrive slightly before pick-up times and park in the lot for approximately 10-15 minutes. Once the students are released, parents leave the site and demand drops. The entire process was observed to last approximately 20 minutes for the peak demand period. Table 1 Existing Parking Demand; Existing Retail Center& Springfield-Montessori Pre-School Morning,Mid-Day,Mid-Afternoon,and Evening Demand Periods Existing Retail Center Springfield Montessori Pre-School Peak Time Period Peak Surplus/ Peak Surplus/ Demand (Deficit) Demand (Deficit) Morning: 7-10 AM 26 +6 33 +20 Mid-Day: 11:30 AM-12:30 PM 37 (-5) 22 +31 Mid-Afternoon: 2:30-3:30 PM 39 (-7) 46 +7 Evening: 4:00-6:15 PM 35 (-3) 19 +34 Source: Omni-Means Engineers and Planners,Parking surveys at the Starbuck's Retail Center and Springfield-Montessori Pre- School(7:00-10:00 a.m., 11:30-12:30 p.m.,2:30-3:30 p.m.,4:00-6:15 p.m.),March 21 and 22,2012. Based on total parking supply of 32 spaces for existing retail uses and 53 spaces for existing Springfield-Montessori Pre-School uses. Proposed Project Description The proposed Pre-School project would be situated in the eastern half of the site as shown in the project site plan (attached). The actual site would be situated on a vacant parcel adjacent to existing onsite parking areas. Existing retail uses (shown as Parcel A) are located directly west of the project site and both existing and proposed uses would share common access driveways. The pre-school would have a • • Ms.Jaimee Bourgeois Page 3 April 19,2012 capacity for 60 students and would supply 17 parking spaces (including 10 existing spaces). Proposed parking spaces would be located immediately south of the pre-school building. City Code Requirements Parking code requirements for"day-care center"have been based on the City's zoning/municipal code for off-street parking and loading regulations.' Based on proposed uses, the parking code requirements would be as follows: Day Care Center(15+): 1 space per employee, 1 space per company vehicle,plus a loading space for every 5 children; Based on the City code requirements the parking requirements have been calculated below: Day Care Center: 60 children x 1 space/5 children= 12 spaces 5 employees x 1 space/employee= 5 spaces Total: 17 spaces As calculated above,the proposed pre-school project would require 17 parking spaces and this would exactly match proposed supply. Proposed Project Parking Demand with Existing Retail Uses Methodology The proposed project's parking demand has been based on parking surveys for the Springfield-Montessori Pre-School adjusted proportionately for lower student enrollment and staffing level. Specifically, surveyed Springfield-Montessori Pre-School parking demand reflects a total attendance of 150 students and 20 staff members for a combined head count of 170. The proposed project would consist of 60 students and 5 staff members for a combined head count of 65. The total proposed project head count of 65 represents 38% (65 divided by 170) of the existing head count for the Springfield Montessori. Therefore, the parking demand for the proposed Pre-School was estimated by multiplying the measured parking demand found at the existing Springfield-Montessori Pre-School by 38%. With the addition of the proposed project and associated parking spaces, there would be a total of 49 parking spaces on-site for both retail uses and proposed project uses. This supply would reflect 17 spaces for the proposed project and 32 spaces for existing retail uses. As noted previously, parking demand for existing retail uses has encroached beyond the 32 space limit during peak demand periods. Project Parking Demand Expected parking demand for the proposed project and the existing retail center has been shown in Table 2 (next page). As calculated, the proposed project's parking demand would peak during the mid- afternoon period(around 3:30 p.m.) at 17 spaces. Supply for the proposed project would be sufficient to meet the peak demand. At the same time,the existing retail center would have a demand for 39 parking spaces, which is 7 more than the parking supply of 32. During various other times of the day as well (mid-day and evening), the existing retail center parking demand would exceed its available on-site supply. • • Ms.Jaimee Bourgeois Page 4 April 19,2012 Table 2 Proposed Project Parking Demand With Existing Retail Center Uses Morning,Mid-Day,Mid-Afternoon,and Evening Demand Periods Existing Retail Center Proposed Dublin Pre-School Peak Time Period Peak Supply Surplus/ Peak Supply Surplus/ Demand 32 (Deficit) Demand 17 (Deficit) Morning: 7-10 AM 26 32 6 13 17 4 Mid-Day: 11:30 AM-12:30 PM 37 32 (-5) 8 17 9 Mid-Afternoon: 2:30-3:30 PM 39 32 (-7) 17 17 0 Evening: 4:00-6:15 PM 35 32 (-3) 7 17 10 Source: Omni-Means Engineers and Planners,Parking surveys at the Starbuck's Retail Center and Springfield-Montessori Pre- School(7:00-10:00 a.m., 11:30-12:30 p.m.,2:30-3:30 p.m.,4:00-6:15 p.m.),March 21 and 22,2012. A 38%weighted average was applied to surveyed Springfield-Montessori Pre-School parking demand to generate proposed project parking demand. Based on a total parking supply of 49 on-site parking spaces for existing retail and proposed project uses. It is noted that off-site parking spaces located on Village Parkway and Amador Valley Boulevard were not included in the assumed parking supply for the existing retail center; however, the 11 on-street parking spaces would be sufficient to accommodate the excess demand from the retail center and allow for a four(4)space parking surplus during the peak mid-afternoon(2:30-3:30 p.m.)demand period. Summary/Conclusions The proposed Pre-School project would meet City parking code requirements for 17 parking spaces. Parking surveys conducted for existing retail uses adjacent to the project site indicate that peak demand occurs during the mid-afternoon (2:30-3:30 p.m.) period for 39 parking spaces. Based on surveys conducted for a representative pre-school in the City of Dublin, the Springfield-Montessori Pre-School has a peak parking demand during the same mid-afternoon period of 46 spaces. Applying a head count adjustment factor of 38%, the proposed project would have an estimated peak parking demand of 17 spaces during the mid-afternoon (2:30-3:30 p.m.) period. This 17-space project demand can be accommodated on-site. The existing retail center parking demand at this same time would exceed available supply by seven parking spaces. However,based on the findings of the prior Starbuck's parking demand study (where on-street parking was counted toward the available supply for the purpose of demonstrating that the Starbuck's use would not negatively impact the surrounding environment); the total center demand can be accommodated on-site and/or within the adjacent on-street parking supply. The result is that there would be a four-space surplus during the same mid-afternoon (2:30-3:30 p.m.) period. Based on the parking demand analysis for existing and proposed pre-school uses, it is likely that competition for parking spaces will be at a premium during the peak mid-day,mid-afternoon,and evening periods. It is important to note that an adequate parking supply usually reflects the availability of additional parking spaces in order to function at an acceptable level. Most parking areas/lots function best at approximately 90% of capacity. This essentially provides an efficiency factor of 10% to accommodate prospective parkers looking for a parking space. Without such a buffer, users would find themselves competing for the last available spaces. Those waiting for a space to open would slow traffic in the lot's aisles. Given the small size of the project's parking lot, a 95% effective parking ratio would • • Ms.Jaimee Bourgeois Page 5 April 19,2012 likely be sufficient. This would mean that an additional 2-3 parking spaces would be needed on-site so that retail customers and parents do not need to drive through the parking lot in search of a parking space during peak demand periods. Exacerbating the problem would be existing"cut-through"traffic using the parking lot to by-pass the Village Parkway/Amador Valley Boulevard intersection. Northbound motorists on Village Parkway currently cut-through the existing parking lot and continue eastbound on Amador Valley Boulevard to avoid turning right and/or delays at the signal-controlled intersection. All of these factors would contribute to increased on-site congestion during peak parking demand periods. Potential measures that could be implemented by the project applicant to improve circulation and parking include the following: • Similar to Village Parkway, delineate the on-street parking spaces on Amador Valley Boulevard with striped "T"'s to insure maximum efficiency. A 15-foot red curb is recommended immediately adjacent to the driveway; • Execute a reciprocal parking agreement with the existing retail center property owner to allow for the sharing of parking when uses are not peaking at the same time. If such an agreement were executed, signage might be needed to reserve the pre-school parking during peak periods so that parents would not end up having to park far from the school entrance. It is noted that(should the proposed project be approved),much of the existing cut-through traffic would likely be reduced. During peak parking demand periods of the retail center and proposed pre-school project,the parking drive aisles would not provide a convenient or fast option to Village Parkway. Please call if you have any questions. Sincerely, OMNI-MEANS,Ltd. Engineers&Planners I % I 4 actiekry Peter G loway Transp rtation Planner Cc: George W.Nickelson,P.E.(Omni-Means) Rob Tuma,Transportation Planner(Omni-Means) Enc. Project Site Plan,Parking Survey and Demand Summary Table A(15 min. increments) C1588LTR002.docx/35-2807-54 • • Ms.Jaimee Bourgeois Page 6 April 19,2012 Omni-Means Engineers and Planners,Existing parking demand surveys at the Starbuck's Retail Center and Springfield-Montessori Pre-School, (7:00-10:00 a.m., 11:30 a.m.-12:30 p.m., 2:30-3:30 p.m., 4:00-6:15 p.m.), March 21, 22, 2012. Ms.Laura Russ,Director, Springfield-Montessori Pre-School,Personal communication on March 21,2012. "'City of Dublin, Zoning/Municipal Code, Chapter 8.76, Off-Street Parking and Loading Regulations,Parking requirements by use type(8.76.080), Revised October, 2011. • / \ � / 1 // !J!!! /1!! �`\ 1 CCt4i " . 1 �g I € € cue ii ii of O 01 gusalti,r . ...,w.i_ iio °alit 1 . . , MI Ali — z ta .3 ei am./ co__ .El 15,,,,1„,.... , ciitarlqh well- ,i 1 AA 40 -1 i Nallp i , , ...,,,,, .....,,,, ........, D 1! it i � 1 1 €11 I ! ` mwei . : 1 •. t II r 11 1 � S 11 t.no o r► 11 will 1 1 t 1 < , 1 �: Ig I m ! r 1 I Ix 71• 1! !! 1t ® _ v 1 S y ii' t g,fir*N11.1...., ,,,i• ..' 4 . ' I II 11 I'``�� qp j �w i► ! C 211k-Ari / y aa-r / \ Iva _� mw k r° 4: Illi 1 /7>111111111-111111:41111111 —7—--1 -11 li miNa ,--el-: 1p,,,,,T1 iz , , ,.. , . . r .■ -I I • '01 ^-n. I i l� ate. _ I411I� 1STEI'�SEM.211t111111 11211 9.9 1 a..aZ �� 1 -1 A r �� € NH. / :2111 I^I !11 111 . 'i �P ii!• I '' M1 I +tri 1 FEN r■ %fie:::\.{. I ° ��t g 1 1 ------1114111111112141111111011211/14 . -46:44141 11 I ill 11 1- A/ , 1 II 1 Y pli 1a i t' A ! R/ K \W A Y`------ E € 7 1 `\ ;'t . 1 WILLIAM WOOD �17I►1�I�l�lel►:■ ■ DUBLIN PRESCHOOL 1:•)) ���������1y j A 25 7250 AMADOR VALLEY BLVD li 19�e�82v DUBLW,G , 111111110 ` • • 1/1 O V_ a a co M M M N. M N en N M N N 0 N .-I rpa ep-I .-I rl n In rt N N t-I CO 00,1 vii N N 1./1 f•••• N N L/1 m N y + F + h 0 CU r .0 0 p 4 yo in ~ 8888888888888 lC t0 LC?) lO tD lO (0 LO 10 LO �D tD �C tO tO W tO tD lG tD a C o C y G eF a n to lA 111 lO N N CO O IA lli Cl a 00 N 01 M N I M O1 n n � N-1 a0-1 r�i e�-I e '46 M C M N N N N N N N N N N N N Q H H 2. N N Y Y C c 3 h a cre a 0 0 " 1N C1 Cl Cl 01 01 01 01 Cl C1 01 01 01 01 01 01 Ol 01 01 Ol 01 01 Cl 01 01 01 Cl 01 C1 01 01 01 01 C1 c a n. .r .r .t V d .t Cr .r Mt el' .Cr .7 t' . a v v . . a . v d' er v .' 0 v 0' a 0' 0' U 0 h C 'd .W F g — p L C y E .0 -0 00 g 111 111 N Cr Cr a M n n ei 01 01' CI' O 00 rl Cr d' LO n M U1 LO 0 01 N N CO n tit M n ei St C E rl N N N N N N N M 0 1 N r rn d' M Cr V' a Ch 0' U1 LA d' Cr M Cr 4 r n n M Pit M • Q O 'R ad. -- `-' O W 01 9 E E 01 G N p c c m n n rl (<=11 M V L11 et V ea rl et 111 t0 LO LO t0 r; N p M M O O N M O M N v W a-1 r1 rl 01 ti :at rl W ei ri LO tD N -0 p LC U 0 C Ln E — 0 1 h 01 U 1m m N m N 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o C - M M M M M M M MM M M M M M M M M M M M M M M r M er ry M rn M M M N Q d Ln at o -O LU N Lb m ze C '•c-�, m t y U1 LA r1 M O co _co n 00 CO to to M O M LO n CO CO 00 00 01 0' N W 111 N N O 01 N 01 y r1 ri N N N N r1 rI N N N N N M M M M M M M M M M rn M an M n r M N M N 0 W E p TO -p 0 a C 0) w m m ai G O .m H 7 n w b' nn1tD 01 N ei .-i 0-I n at a t0 Cl Q1 C1 O1 C1 O 01 00 N O - ei O O O r1 N N M N to a-I ei ei rl 0-1 al ei ei .-1 rl rl H 0. :0 00 p m C N W o L „7 h co 0- c v a1 o PS . Q u c n n n n n n n n n n n n n n n n n n n n n n n n n n n N N n n n n 0I '^ tw W r1 e-I ei e-I r! r1 ei ai r1 rI rI ei ei ri r1 rt si e-1 rl ey ei ,1 e� ei e-i ei ei r1 ei r1 ei ei ei $ w 9. Q I—co 00 as 0 L^ a v v N 5; o C a) w) c d C y 0 G O O a-1 e-1 .r 111 U1 Oa N N ,, co 0o n 00 00 00 n 00 01 ay N N LO n n N to 111 in a' IA N v 2 m c S. ... u - _ C v 70 0 TOc _ m c O rl M N O M M n M M W N O 01 e-I r1 N 01 O M t0 C1 ID 01 CO 00 U1 .1' M r1 N LO .a d N N ey N M M N N N ei N N N rl N N Cr e-1 r1 rl ei rl al e-I r1 r1 N N 0 c o c N C ' _ W _ 00 S` o 00 cge`.iFAV?. 8OVIF,,'Mtfi.8 I °m `.28 3m400, 11'i. m Ein4o .. m Eg '-,1mao°l `'" "I 'i— A: r� 1■ n 0o Lid Cc; ao 01 t71 01 LT O eLi .N-I NN•1 .N-I Q N N m m m Ch v a Cr Ln I!i 1ri ui id l0 w