Loading...
HomeMy WebLinkAboutItem 4.09 Median Paver 99-14CITY CLERK File# 600-35 AGENDA STATEMENT CZTY COUNCZL MEETZNG DATE: December 21, 1999 SUBJECT: Award of Bid - Contract No. 99-14, Median Paver Repair Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: RECOMMENDATION: 1 ) Resolution of Award 2) Bid Results Adopt Resolution awarding bid to WSP Trucking, Inc. FINANCIAL STATEMENT: Project Budget Low Bid Design/Inspection: Paver Repair (Improvement): Miscellaneous: TOTAL: $ 4,900 $ 98,600 $ 500 $104,000 $84,262.50 The Median Paver Repair project is budgeted in the General Fund (001). DESCRIPTION: On November 16, 1999, the City Council authorized Staff to solicit bids for Contract No. 99-14, Median Paver Repair. Median Paver Repair project will re-set paver stones in raised medians that have sunken or been displaced by tree roots. The scope of work includes removing existing paver stones, trimming tree roots, installing root barriers as necessary, reconstructing wood headers at tree wells, and re-setting pavers to grade. Locations of paver repair will be in medians on the follgwing major arterial streets: Dublin Boulevard from San Ramon Road to Dougherty Road, Amador Valley Boulevard from San Ramon Road to Dougherty Road and Village Parkway from Amador Valley Boulevard to City limit line at Kimball Avenue. A total of 5 bids were received for the project (Attachment 2). Low bidder was WSP Trucking; Inc., with a bid of $84,262.50, Staff recommends that the City Council adopt the resolution awarding Contract No. 99-14, Median Paver Repair, to WSP Trucking, Inc. COPIES TO: WSP Trucking, Inc. G :\m iscproj\heritage\agstauth2 ITEM NO. RESOLUTION NO. -99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 99-14 MEDIAN PAVER REPAIR TO WSP TRUCKING, INC. WHEREAS, the City of Dublin did, on December 14, 1999, publicly open, examine, and declare all sealed bid for doing the work described in the approved Specifications, for Contract 99-I4, Median Paver Repair, which Plans and Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 99-14 to the lowest responsible bidder therefor, to wit WSP Trucking, Inc. with a bid of Eighty-four Thousand T~vo Hundred Sixty-two Dollars and Fifty Cents ($84,262.50), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 21 st day of December, 1999. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor" City Clerk g: lmiscprojtmedian., Iresoawrd BID RESULTS - MEDIAN PAVER REPAIR, CONTRACT 99-14 BID OPENING DATE - DECEMBER 14, 1999 BID ITEM 1 2 3 4 5 6 7 BID ITEM 1 2 3 4 5 6 7 ' "UNIT ITEM DESCRIPTION MEAS. Paver Repair at Tree Wells SF Paver Repair/Tree Root Damage SF Paver Repair/Settled Areas SF Root Shield LF 2" x 8" Wood Header at Tree Well LF 2" x 4" Wood Header at Tree Well LF 2" x 4" Wood Header at Turf LF ENGINEER'S ESTIMATE TOTAL QTY UNIT PRICE PRICE UNIT PRICE 1,900 $ 6.00 $ 11,400.00 $ 6.50 3,000 $ 7.00 $ 21,000.00 $ 6.50 7,000 $ 6.00 $ 42,000.00 $ 5.50 200 $ 10.00 $ 2,000.00 $ 12.00 950 $ 5.00 $ 4,750.00 $ 4.75 950 $ 3.00 $ 2,850.00 $ 4.00 800 $' 3.50 $ 2,800.00 $ 4.00 TOTAL BID: $ 86,800.00 UNIT ITEM DESCRIPTION MEAS. Paver Repair at Tree Wells SF Paver Repair/Tree Root Damage SF Paver Repair/Settled Areas SF Root Shield LF 2" x 8" Wood Header at TreeWell LF 2" x 4" Wood Header at Tree Well" LF 2" x 4" Wood Header at Turf LF TOTAL BID: DURANGO PIPELINE TOTAL QTY UNIT PRICE PRICE 1,900 $ 7.00 $ 13,300.00 3,000 $ 7:00 $ 21,000.00 7,000 $ 7.00 $ 49,000.00 200 $ 5.00 $ 1,000.00 950 $ 3.00 $ 2,850.00 '950 $ 3.00 $ 2,850.00 8O0 $ 3.00 $ 2,400.00 WSP TRUCKING, INC. LONE STAR LANDSCAPE TOTAL PRICE $ 12,350.00 $ 19,500.00 $ 38,500.00 $ 2,400.00 $ 4,512.50 $ 3,800.00 $ 3,200.00 $ 84,262.50 VANGUARD CONSTR. UNIT PRICE TOTAL PRICE $ 5.40 $ 10,260.00 $ 7.00 $ 21,000.00 $ 5.30 $ 37,100.00 $ 30.00 $ 6,000.00 7.50 $ 7,125.00 6.00 $ 5,700.00 6.00 $ 4,800.00 $ 91,985.00 BILAND CONSTR. UNIT PRICE $ 5.00 $ 10.00 $ 6.oo $ 15.00 $ 6.oo $ 5.oo $ 5.oo TOTAL PRICE $ 9 500.00 $ 30 000.00 $ 42.000.00 $ 3000.00 $ 5 700.00 $ 4 750.00 $ 4 000.00 $ 98,950.00 UNIT PRICE $ $ $ $ $ $ $ TOTAL PRICE 15.00 $ 28,500.00 15.00 $ 45,000.00 10.00 $ 70,000.00 10.00 $ 2,000.00 6.00 $ 5,700.00 4.70 $ 4,465.00 4.70 $ 3,760.00 ............. .$j. 59,_4._2_5_.0_0__ Page 1