Loading...
HomeMy WebLinkAbout4.09 Golden Gate Dr St Enchanceor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL September 18, 2012 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 SUBJECT: Award of Bid - Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project (CIP No. 960027) Prepared by Ferd Del Rosario, Senior Civil Engineer EXECUTIVE SUMMARY: The Golden Gate Drive Streetscape Enhancement Project will enhance pedestrian and bicycle access from Dublin Boulevard to the end of Golden Gate Drive adjacent to the West Dublin BART Station; provide a new street overlay; and install pedestrian - scaled lighting, street trees and median landscaping. The City has advertised the project, solicited bids from contractors and is now ready to award the contract to Suarez & Munoz Construction, Inc., the lowest responsible bidder. FINANCIAL IMPACT: The adopted Five -Year Capital Improvement Program (2012 -2017) (CIP) estimated a total project cost of $1,398,276 for the construction of the Golden Gate Drive Streetscape Enhancement Project (CIP No. 960027). The expenses were programmed over multiple years and included design, construction, inspection, project management, etc. The current funding was from Transportation grants and State Gas Tax. The overall project costs have been evaluated including budgeted expenses for utility connection fees and contract project management. The amount of the project budget remaining for improvements is $1,007,667. The low bid received for the construction of the improvements is $1,329,186 and with an additional 10% contingency for contract change orders will require total funding of $1,462,105. In order to award the bid, an additional appropriation is proposed from the Measure B Local Streets Program ($165,836) and Measure B Bike /Pedestrian Program ($288,602). Staff has prepared a Budget Change which will appropriate an additional $454,438 from reserves in the two Measure B transportation funds. RECOMMENDATION: Staff recommends that the City Council: 1) Adopt the Resolution Awarding Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to Suarez & Munoz Construction, Inc. as the lowest responsible bidder and authorizing the City Manager or her designee to approve Change Orders for the project up to the contingency amount of $132,919; and 2) Approve the Budget Change authorizing additional Measure B Bike /Pedestrian and Local Streets Program funds for the Golden Gate Drive Streetscape Enhancement Project. Page 1 of 3 ITEM NO. 4.9 x Submit ed By Public Works Director DESCRIPTION: Submitted By Administrative Services Director Reviewed By Assistant City Manager On July 17, 2012, the City Council authorized staff to solicit bids for Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project (CIP No. 960027). The Notice inviting bids was advertised on August 4, 2012 and a total of 3 bids were submitted by contractors. The bids were publicly opened on August 29, 2012 and the low bid of $1,329,186.00 was submitted by Suarez & Munoz Construction, Incorporated (SMC). On September 4, 2012, Staff received one timely protest from the second lowest bidder, Redgwick Construction Company protesting the bid submitted by SMC. The basis for the protest was Redgwick's assertion that SMC's bid did not include a notarized Affidavit of Noncollusion as required by the instructions to bidders, and was thus non - responsive. Staff reviewed SMC's bid materials and determined that the bid did, in fact, include a notarized Affidavit of Noncollusion. The Affidavit provided by the City in its bid package materials included a note stating that "[t]he above Noncollusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Noncollusion Affidavit." (Emphasis added.) The signature page of the Proposal likewise notes that the signer "further certify[ies], under penalty of perjury under the laws of the State of California and the United States of America, that the Noncollusion Affidavit required by Title 23 United States Code, Section 112 and Public Contract Code Section 7106 ... [is] true and correct." The page immediately after the signature page provided by SMC was an "All- Purpose Acknowledgment" notarizing SMC's signature on the proposal." Staff further reviewed the bid results (Attachment 2), checked the bid documents for federal compliance, and verified the required contractor licenses. The low bid amount exceeds the funds available in the Improvements line item of this project as shown below: Low Bid Presented By SMC: $ 1,329,186 10% Contingency 132,919 TOTAL IMPROVEMENTS $ 1,462,105 Improvement Budget Available ($1,007,667) Additional Appropriation Required $ 454,438 Staff is proposing that the City Council authorize an additional appropriation from Measure B Reserves. This will include both Measure B Bike /Pedestrian Funds and Measure B Local Streets Program funds. The Alameda County Transportation Commission has approved the use of these funds specifically for the bike /pedestrian and street overlay bid items of the project (Attachment 3). The 10% contingency is being added to the contract amount to fund any unforeseen work. It is requested that the City Manager be authorized to approve change orders Page 2 of 3 up to the contingency amount of $132,919. The Resolution (Attachment 4) will authorize this change as it relates to this Project. The following Table summarizes the impact of the proposed budget change to the Improvements line item in Project 960027: CURRENT AND PROPOSED PROJECT BUDGET (CIP #960027) Improvements Line Item Attachment 5 is a Project change form for approval by the City Council. Staff recommends that the City Council: 1) Adopt the Resolution Awarding Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to Suarez & Munoz Construction, Inc. as the lowest responsible bidder and authorizing the City Manager or her designee to approve Change Orders for the project up to the contingency amount of $132,919; and 2) Approve the Budget Change authorizing additional Measure B Bike /Pedestrian and Local Streets Program funds for the Golden Gate Drive Streetscape Enhancement Project. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Copy of Staff Report sent to: 1. Suarez & Munoz Construction, Inc. 2. Redgwick Construction Company 3. Alameda County Transportation Commission ATTACHMENTS: 1. Location Map 2. Bid Results 3. Low Bidder's Bid Results with Measure B Bid Item Itemization 4. Resolution Awarding Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to Suarez & Munoz Construction, I nc. 5. Budget Change Page 3 of 3 Federal Highway Safety State Gas Measure B Measure B TE Funds Traffic Tax Funds Local Bike /Ped TOTAL (2202) Reduction (2201) Streets Funds Bond (2210) (2204) (2205) Present $646,000 $259,009 $102,658 $0 $0 $1,007,667 Budget Low Bid +10% Contingency $646,000 $259,009 $102,658 $165,836 $288,602 $1,462,105 Budget Change None None None $165,836 $288,602 $ 454,438 Attachment 5 is a Project change form for approval by the City Council. Staff recommends that the City Council: 1) Adopt the Resolution Awarding Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to Suarez & Munoz Construction, Inc. as the lowest responsible bidder and authorizing the City Manager or her designee to approve Change Orders for the project up to the contingency amount of $132,919; and 2) Approve the Budget Change authorizing additional Measure B Bike /Pedestrian and Local Streets Program funds for the Golden Gate Drive Streetscape Enhancement Project. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Copy of Staff Report sent to: 1. Suarez & Munoz Construction, Inc. 2. Redgwick Construction Company 3. Alameda County Transportation Commission ATTACHMENTS: 1. Location Map 2. Bid Results 3. Low Bidder's Bid Results with Measure B Bid Item Itemization 4. Resolution Awarding Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to Suarez & Munoz Construction, I nc. 5. Budget Change Page 3 of 3 F,,la StAan A plos W'p%% 1%pi 0 vo 001 a II rn Gala ViVo Shopp4ig Cvv' 6 Pla" y AroAxa r P4T cl Po Pot Dc(r �o `3 Safeway 000 Aquarum Gx; Safeway "s UX� in asalon Breed, Jr FwY 02012 Google - Map data 'b2012 Google LOCATION MAP GOLDEN GATE DRIVE STREETSCAPE ENHANCEMENT PROJECT QoViRe'W ce, o F,d Whwj. Da'; B."i West Dijt:.rV Pleassilon � y Steakhouse ow UX� in asalon Breed, Jr FwY 02012 Google - Map data 'b2012 Google LOCATION MAP GOLDEN GATE DRIVE STREETSCAPE ENHANCEMENT PROJECT SUMMARY OF BID RESULTS - August 29, 2012 CONTRACT 12 -11, GOLDEN GATE DRIVE STREETSCAPE ENHANCEMENT PROJECT Page 1. ENGINEER'S ESTIMATE SUAREZ & MUNOZ REDGWICK CONSTRUCTION ROBERT A. BOTHMAN, INC. BID ITEM ITEM DESCRIPTION UNIT MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Contractor Mobilization LS 1 $ 30, 000.00 $ 30, 000.00 $ 54, 000.00 $ 54, 000.00 $ 42, 800.00 $ 42, 800.00 $ 70, 000.00 $ 70, 000.00 2 Construction Staking LS 1 $ 10, 000.00 $ 10, 000.00 $ 9)000.00 $ 9)000.00 $ 4)600.00 $ 4)600.00 $ 5)000.00 $ 5)000.00 3 Water Pollution Control Work LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5500.00 $ 5500.00 $ 10500.00 $ 10500.00 4 Project Signs LS 1 $ 1)000.00 $ 1)000.00 $ 2)000.00 $ 2)000.00 $ 1)600.00 $ 1)600.00 $ 2)800.00 $ 2)800.00 5 Traffic Control LS 1 $ 7)000.00 $ 7)000.00 $ 35, 000.00 $ 35, 000.00 $ 87,100.00 $ 87,100.00 $ 65, 000.00 $ 65, 000.00 6 Remove Concrete Curb & Gutter LF 1560 $ 3.000 $ 4,680.00 $ 5.00 $ 7,800.00 $ 6.25 $ 9750.00 $ 5.00 $ 7,800.00 7 Remove & Salvage Signs EA 14 $ 100.00 $ 1400.00 $ 85.000 $ 1,190.00 $ 90.00 $ 1,260.00 $ 180.00 $ 2520.00 8 Remove & Salvage Streetlights EA 4 $ 500.00 $ 2,000.00 $ 1500.00 $ 6,000.00 $ 850.00 $ 3400.00 $ 1,600.00 $ 6400.00 9 Remove Concrete Sidewalk & Drivewal SF 10,810 $ 1.00 $ 10,810.00 $ 2.00 $ 21,620.00 $ 1.60 $ 17,296.00 $ 1.30 $ 14,053.00 10 Remove Storm Drain Structures EA 1 $ 500.00 $ 500.00 $ 1500.00 $ 1500.00 $ 4,100.00 $ 4,100.00 $ 835.00 $ 835.00 11 Pavement Grinding SF 18,000 $ 0.45 $ 8,100.00 $ 0.50 $ 9,000.00 $ 0.60 $ 10,800.00 $ 0.50 $ 9,000.00 12 Remove AC Pavement SF 14,800 $ 0.75 $ 11,100.00 $ 2.50 $ 37,000.00 $ 1.25 $ 18500.00 $ 1.40 $ 20720.00 13 Roadway Excavation & Offhaul CY 150 $ 55.00 $ 8,250.00 $ 80.00 $ 12,000.00 $ 155.00 $ 23,250.00 $ 100.00 $ 15,000.00 14 Asphalt Concrete Pavement TON 515 $ 90.00 $ 46,350.00 $ 150.00 $ 77,250.00 $ 127.00 $ 65405.00 $ 179.00 $ 92,185.00 15 Pavement Base Repair SF 400 $ 5.00 $ 2,000.00 $ 15.00 $ 6,000.00 $ 9.00 $ 3,600.00 $ 25.00 $ 10,000.00 16 Aggregate Base TON 129 $ 18.00 $ 2,322.00 $ 37.00 $ 4773.00 $ 51.00 $ 6579.00 $ 58.00 $ 7482.00 17 Concrete Curb & Gutter LF 1,620 $ 25.00 $ 40500.00 $ 45.00 $ 72,900.00 $ 40.00 $ 64,800.00 $ 59.00 $ 95580.00 18 Concrete Driveway SF 1460 $ 7.00 $ 10,220.00 $ 18.00 $ 26,280.00 $ 11.00 $ 16,060.00 $ 20.00 $ 29,200.00 19 Driveway & Walkway Conforms LS 1 $ 8)000.00 $ 8)000.00 $ 3)000.00 $ 3)000.00 $ 3500.00 $ 3500.00 $ 2500.00 $ 2500.00 20 Concrete Median Vertical LF 1,140 $ 58.00 $ 66,120.00 $ 62.00 $ 70,680.00 $ 102.00 $ 116,280.00 $ 95.00 $ 108,300.00 21 Mountable Curbe LF 140 $ 30.00 $ 4,200.00 $ 55.00 $ 7700.00 $ 45.00 $ 6,300.00 $ 33.00 $ 4,620.00 22 Roundabout Planter Wall LS 1 $ 5,000.00 $ 5,000.00 $ 8500.00 $ 8500.00 $ 8,100.00 $ 8,100.00 $ 3,900.00 $ 3,900.00 23 Concrete Pedestrian Ramp EA 7 $ 1500.00 $ 10, 500.00 $ 1)800.00 $ 12, 600.00 $ 2,100.00 $ 14, 700.00 $ 1)670.00 $ 11, 690.00 24 Concrete Sidewalk SF 13,000 $ 5.00 $ 65,000.00 $ 10.00 $ 130,000.00 $ 6.50 $ 84500.00 $ 7.00 $ 91,000.00 25 Concrete Retaining Curb (6 ") LF 25 $ 25.00 $ 625.00 $ 80.00 $ 2,000.00 $ 65.00 $ 1,625.00 $ 106.00 $ 2,650.00 26 Enhanced AC Crosswalk SF 6740 $ 15.00 $ 101,100.00 $ 6.00 $ 40440.00 $ 4.25 $ 28,645.00 $ 7.00 $ 47,180.00 27 Enhanced AC Bike Lane SF 9410 $ 1.70 $ 15,997.00 $ 2.20 $ 20702.00 $ 2.50 $ 23525.00 $ 2.00 $ 18,820.00 28 Enhanced AC Bike Box SF 600 $ 12.30 $ 7,380.00 $ 2.50 $ 1500.00 $ 2.75 $ 1,650.00 $ 3.00 $ 1,800.00 29 Roundabout Colored Concrete SF 1,070 $ 8.00 $ 8560.00 $ 15.00 $ 16,050.00 $ 15.00 $ 16,050.00 $ 10.00 $ 10700.00 30 Median Pavers SF 50 $ 10.00 $ 500.00 $ 30.00 $ 1500.00 $ 19.00 $ 950.00 $ 16.00 $ 800.00 31 Curb Painting LS 1 $ 1500.00 $ 1500.00 $ 850.00 $ 850.00 $ 900.00 $ 900.00 $ 926.00 $ 926.00 32 Roadway Sign age EA 17 $ 500.00 $ 8500.00 $ 325.00 $ 5525.00 $ 350.00 $ 5)950.00 $ 354.00 $ 6)018.00 33 Wayfinding Sign EA 1 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 6,100.00 $ 6,100.00 $ 5462.00 $ 5462.00 34 Crosswalk Striping LF 1,360 $ 3.00 $ 4,080.00 $ 3.85 $ 5,236.00 $ 4.00 $ 5440.00 $ 4.00 $ 5440.00 35 Lane Striping LF 4,930 $ 2.50 $ 12,325.00 $ 1.30 $ 6409.00 $ 1.30 $ 6409.00 $ 1.30 $ 6409.00 36 Loading Zone Striping SF 430 $ 3.00 $ 1,290.00 $ 1.20 $ 516.00 $ 1.20 $ 516.00 $ 1.40 $ 602.00 37 Word Pavement Marking EA 7 $ 500.00 $ 3500.00 $ 110.00 $ 770.00 $ 110.00 $ 770.00 $ 120.00 $ 840.00 38 Numeral Pavement Marking EA 1 $ 300.00 $ 300.00 $ 85.00 $ 85.00 $ 90.00 $ 90.00 $ 93.00 $ 93.00 39 Yield Line Pavement Marking EA 1 $ 300.00 $ 300.00 $ 120.00 $ 120.00 $ 125.00 $ 125.00 $ 131.00 $ 131.00 40 Arrow Pavement Marking EA 17 $ 200.00 $ 3400.00 $ 60.00 $ 1,020.00 $ 61.00 $ 1,037.00 $ 65.00 $ 1,105.00 41 Shared Lane Pavement Marking EA 3 $ 300.00 $ 900.00 $ 65.00 $ 195.00 $ 66.00 $ 198.00 $ 71.00 $ 213.00 42 Bike Symbol Pavement Marking EA 13 $ 200.00 $ 2,600.00 $ 55.00 $ 715.00 $ 56.00 $ 728.00 $ 60.00 $ 780.00 43 Bike Lane Arrow Pavement Marking EA 12 $ 150.00 $ 1,800.00 $ 30.00 $ 360.00 $ 31.00 $ 372.00 $ 33.00 $ 396.00 44 Hydrant Location Marker EA 4 $ 20.00 $ 80.00 $ 15.00 $ 60.00 $ 16.00 $ 64.00 $ 1584.00 $ 6,336.00 45 12" RCP Pipe LF 310 $ 100.00 $ 31,000.00 $ 100.00 $ 31,000.00 $ 146.00 $ 45,260.00 $ 100.00 $ 31,000.00 SUMMARY OF BID RESULTS - August 29, 2 CONTRACT 12 -11, GOLDEN GATE DRIVE STREETSCAPE ENHANCEMENT PROJECT Page 2. 46 18" RCP Pipe LF 40 $ 120.00 $ 4,800.00 $ 150.00 $ 6,000.00 $ 158.00 $ 6,320.00 $ 135.00 $ 5400.00 47 Rain Garden Overflow Drain EA 2 $ 2500.00 $ 5,000.00 $ 2,200.00 $ 4400.00 $ 1700.00 $ 3400.00 $ 3500.00 $ 7,000.00 48 Overflow Drain Conversion EA 1 $ 1500.00 $ 1500.00 $ 2,200.00 $ 2,200.00 $ 1,600.00 $ 1,600.00 $ 1,350.00 $ 1,350.00 49 Storm Drain Type A Grated Inlet EA 1 $ 3)000.00 $ 3)000.00 $ 2700.00 $ 2700.00 $ 3,100.00 $ 3,100.00 $ 3,100.00 $ 3,100.00 50 Storm Drain Manhole EA 1 $ 5)000.00 $ 5)000.00 $ 6)800.00 $ 6)800.00 $ 4)300.00 $ 4)300.00 $ 6)000.00 $ 6)000.00 51 Rain Garden Treatment Structure SF 560 $ 60.00 $ 33,600.00 $ 70.00 $ 39,200.00 $ 85.00 $ 47,600.00 $ 100.00 $ 56,000.00 52 Streetlights EA 8 $ 4500.00 $ 36, 000.00 $ 2700.00 $ 21, 600.00 $ 2)800.00 $ 22400.00 $ 4)339.00 $ 34, 712.00 53 Pedestrian Lights EA 20 $ 3500.00 $ 70,000.00 $ 2700.00 $ 54,000.00 $ 2,800.00 $ 56,000.00 $ 4,122.00 $ 82440.00 54 Pull Box EA 30 $ 500.00 $ 15, 000.00 $ 460.00 $ 13, 800.00 $ 500.00 $ 15, 000.00 $ 542.00 $ 16, 260.00 55 In Roadway Warning Light System LS 1 $ 40, 000.00 $ 40, 000.00 $ 28,100.00 $ 28,100.00 $ 29, 000.00 $ 29, 000.00 $ 55, 752.00 $ 55, 752.00 56 PGE Electrical Service LS 1 $ 3,000.00 $ 3,000.00 $ 3,100.00 $ 3,100.00 $ 3,100.00 $ 3,100.00 $ 5423.00 $ 5423.00 57 PGE Service Pedestal EA 1 $ 3,000.00 $ 3,000.00 $ 7,000.00 $ 7,000.00 $ 6,100.00 $ 6,100.00 $ 9762.00 $ 9762.00 58 Conduit & Conductors LF 1, 900 $ 30.00 $ 57, 000.00 $ 60.00 $ 114, 000.00 $ 64.00 $ 121, 600.00 $ 25.00 $ 47, 500.00 59 Vehicle Detectors LS 1 $ 5,000.00 $ 5,000.00 $ 6,100.00 $ 6,100.00 $ 6,200.00 $ 6,200.00 $ 7,050.00 $ 7,050.00 60 Street Trees (36" Box) EA 24 $ 750.00 $ 18,000.00 $ 550.00 $ 13,200.00 $ 900.00 $ 21,600.00 $ 1,100.00 $ 26400.00 61 Median Trees (24" Box) EA 19 $ 350.00 $ 6,650.00 $ 260.00 $ 4,940.00 $ 390.00 $ 7410.00 $ 350.00 $ 6,650.00 62 Tree Grates EA 24 $ 2700.00 $ 64, 800.00 $ 2400.00 $ 57, 600.00 $ 2)000.00 $ 48, 000.00 $ 2)200.00 $ 52, 800.00 63 Planting LS 1 $ 73, 000.00 $ 73, 000.00 $ 38, 000.00 $ 38, 000.00 $ 71, 000.00 $ 71, 000.00 $ 94, 042.00 $ 94, 042.00 64 Landscaping Maintenance LS 1 $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 $ 1,600.00 $ 1,600.00 $ 3,000.00 $ 3,000.00 65 Irrigation System LS 1 $ 20, 000.00 $ 20, 000.00 $ 75, 000.00 $ 75, 000.00 $ 65, 000.00 $ 65, 000.00 $ 85, 060.00 $ 85, 060.00 66 Irrigation B F P EA 1 $ 3)000.00 $ 3)000.00 $ 3)800.00 $ 3)800.00 $ 3,100.00 $ 3,100.00 $ 3)000.00 $ 3)000.00 67 Irrigation Controller EA 1 $ 16,000.00 $ 16,000.00 $ 24,000.00 $ 24,000.00 $ 17,900.00 $ 17,900.00 $ 20,000.00 $ 20,000.00 68 Bench EA 8 $ 3)600.00 $ 28, 800.00 $ 3)300.00 $ 26400.00 $ 2)600.00 $ 20, 800.00 $ 3,111.00 $ 24, 888.00 69 Trash Freceptacle EA 3 $ 2,000.00 $ 6,000.00 $ 1,800.00 $ 5400.00 $ 2,300.00 $ 6,900.00 $ 2,055.00 $ 6,165.00 70 Adjust to Grade Monument EA 2 $ 300.00 $ 600.00 $ 1,000.00 $ 2,000.00 $ 1,100.00 $ 2,200.00 $ 260.00 $ 520.00 71 Adjust to Grade Storm Drain Manhole EA 2 $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 1,200.00 $ 2400.00 $ 650.00 $ 1,300.00 TOTAL: $1,096,539.00 $1,329,186.00 $1,359,814.00 $1,495,360.00 * amount adjusted after verification of calculation Gxip /Golden Gate Drive Streetscape Improvements /BIDRSLTS 8888888$ 8 8 888 88 $$88$ 8 Z.3 N1 A r aD O r rah NP m w; ca N N N N N N M N H N N p p p 8 8 8 8 N M N N N N M N H N pp pp S O S O S O P S S O S 88 OO OI�^O fD Oi <DO itip Oi[)�pp N ONA O�-At7 N N N N N H H H H H H H M H H H yw p S O O O pp pp p O S O m; p N OaO08 pO p 08 00 =yyyLL 0 r N o N N N f0 AN m H HHH HH j HN S 0 0 0 0 p O O O o SpSpSS S S 0 0 0 0 0 0 0p Oppp O O op O S SO SS S$ W 8 OOOOOm� 0 8 0 S 0 S 0 8 0 8 0 pp Ol 0 N O O S S S n 0 a0D S(O NOO N O1� O) N O �O A 0 0 0 0 p N�G O{�y 8O �lSp� qpS O O N O M A m S O yO0)YfNY1A� mar � Oi�'rtD V nNM OIh aD'ON RN �N� Na0 Nt0 � M N N N N N M H H H H H H H H N H H N N N H H N M N N N N N H H H H H H H H H H H N H f o 8 o 8 pl.)Ol'�•- W p p SIS O° oNa1SSOSOOO o0O8000NOOOOOaND, aDp �S �Cr'I o opN QC$tON 1nO MNS SO °o o� °oO •-OWNW OOOOOnm �N �ONaOD 1O0 O �� aD l9 100 tO S .- tS+f ia0 O N � N N N M N N H t9 H H H H H H H H H H H HRH H N N H H N N'.H N N N H H H H H H H H H H H H H -A � O a �QaOC N ?N W �� YY�A8NY �f'1 V SCI 0 OfOONe Obi Z Q W W J 55 25 J J QQ JQ 6;5 W 1 LLLL {{�� J y QQQQ QQ QQQQQQ W J J W W J U- o fO co W N W W W W W W N S N S W {Y N aO 2 Ts c� mQ j2 a£ °a �'m 2 OE �� gym o rn:Z'eW rn��m 7 � U -Mw "too fN W D c OEi c N 'm o m E m m W K W p.�� $N c m m rn E a m U >. > rng cm�mQ: mc. m m v >> m m a6 3- m 2 2 c m m m w m m 2 `�umm2� mc'���o�e a d y Ot m m y m m c I- U m m (g@ m m S E m y g "��m >ma c- E c m m 3 o a in c E m ma 7 !!� g p 4,a9 qNN mm� €ca a�am'm p o�U W OmmU�b iU �ai�KQ QQ S i._ip cO1.c mm>maa rnN mo m m¢m. w c 6 a m N N p 0. a Cg (JJ of o8 Upps� (%l c a yy>ao. U c m m tam tamv�dmePc'f0aca a n0 m m m 0 p a s C ° N a m J E J cam camJavam'cU y. 005 oEo3mErnm m Lmcc uuu m mc! - � -20 i.w m y O c o3ai- �¢¢X�a¢�aaavUOCi�;�UC E E E E> E m n> rn c c, c m m m m m m O 0 m m O >> O c c c O O O O wwww v iU�� Q EO sj IL C N (O 1� OO!0�N(� �- N NN V' �O Ip I�mNO N N N N N N N Ol OI Nmpp l7 in.A m.o.N M M M t 1 M M t7 V< d' O d' V q 888888$888888 $8$$8$$$8$ 8 M5�p�p�Ra 8180 RURmR���(�p� � 10♦ NNfCMNN� N A^ � (�Y N(�uf ^l7 NfON tV A wl N N N N N N N N N N H H H N N N N M N H N N N 8 r 8 8 O O �pNp CD 0 ell Yf N N N N 8 s m N 11 888888888008 N 8 585�88885�885�8Q85�88S5�SQ 2S�g826gdSn- 88— ugggg2m52525gS '�pM 3 fOONNtOSN �' NM f IOM V � A. AHNN uJ N N N N N N N M N N N N H H M H H H N N N N N N H N H N W 8 8 8 8 8 8 8$ 8 8 8 8 o 8 8 8 8 8 8 8 8 999 A A A -8 «SO N D 9 85 7 S U pN ��aDNOr r «OWN Oi CD M N N yW ujZ �y J W W ��L Q W 41 QQ W QQ W QQ W J J W ((��Q J J W Q<< W W J y�O J J QQaaaa W W W W W W K 4~1 ,J F 6 0 0 e � c r 9 g�a$ m°� oo 2 cw Lp .E c%•�y� p0 �M CC pjj4m9 iO il ww .pC j � aaUO.-D�U� p.W � �UKggS c� c w Is ~« .4 tm « (N r� w' w' J C3 0UOs U Qmmo �_ '$ + N SrC i m a$x _U aa0 m._ P i; ZFa� RESOLUTION NO. - 12 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 12 -11, GOLDEN GATE DRIVE STREETSCAPE ENHANCEMENT PROJECT, TO SUAREZ & MUNOZ CONSTRUCTION, INC. WHEREAS, the City of Dublin did, on August 29, 2012, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has recommended that the bid hereinafter is the lowest and best bid for doing said work; WHEREAS, in order to facilitate the approval of project Contract Change Orders and avoid construction delay, it is proposed that the City Council authorize the City Manager or her designee to approve Contract Change Orders based on the appropriated funds designated for Contract No. 12 -11 up to the contingency amount of $132,919. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 12 -11, Golden Gate Drive Streetscape Enhancement Project, to the lowest responsible bidder therefore, to wit, Suarez & Munoz Construction, Inc. at a bid of One Million Three Hundred Twenty Nine Thousand, One Hundred and Eighty Six Dollars, and No cents ($1,329,186.00), the particulars of which bid are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or her designee to approve the project Contract Change Orders based on the appropriated funds designated for Contract No. 12 -11 up to the contingency amount of $132,919. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 18th day of September, 2012, by the following vote- AYES- NOES- ABSENT- ABSTAIN: ATTEST: City Clerk Mayor CITY OF DUBLIN BUDGET CHANGE FORM FISCAL YEAR 2012/2013 CHANGE FORM # New Appropriations (City Council Approval Required): X From Un- Appropriated Reserves $165,836 Measure B Local Streets $ 288,602 Measure B Bike / Ped From New Revenues Budget Transfers: From Budgeted Contingent Reserve (Approval Req'd) Within Same Department Activity Between Departments (City Council Approval Req'd) Other: BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT AMOUNT REASON FOR BUDGET CHANGE ENTRY: Additional funds are necessary to complete the project based on the low bid for the construction improvements from Suarez & Munoz Construction, Inc. Reserves from the two Measure B transportation funds (Local Streets and Bicycle /Pedestrian) will be utilized as approved by the City Council. As Presented at the City Council Meeting on: Date: 9/18/2012 # # # # # # # # # # # # # # ## #(Finance Use Only) # # # # # # # # # # # # # # # # # ## Posted By: Date: City Council Minutes Excerpt Attached Reviewed By: G: Budget Change / FY 2013 #3 ATTACHMENT 5 Name: Streets CIP Projects — Streets CIP Projects — Improvements not Building (Measure B — Local Streets) $165,836 Proj Acct #: 960027.9400.9401.2204 GL Account #: 3600.9601.73103 Name: Streets CIP Projects — Streets CIP Projects — Improvements not Building (Measure B — Bike / Ped) $288,602 Proj Acct #: 960027.9400.9401.2205 GL Account #: 3600.9601.73103 TRANSFERS IN TRANSFERS OUT Name: Streets CIP Projects — Streets Name: Measure B - Local Streets — CIP Projects — Transfer In Streets CIP Projects — Transfer Out $165,836 $165,836 Proj Acct #: 960027.9605 GL Account #: 2204.9601.89101 GL Account #: 3600.9601.49999 Name: Streets CIP Projects — Streets Name: Measure B - Bicycle/ CIP Projects — Transfer In Pedestrian Funds — Streets CIP Proj Acct #: 960027.9606 $288,602 Projects — Transfer Out $288,602 GL Account #: 3600.9601.49999 GL Account #: 2205.9601.89101 REASON FOR BUDGET CHANGE ENTRY: Additional funds are necessary to complete the project based on the low bid for the construction improvements from Suarez & Munoz Construction, Inc. Reserves from the two Measure B transportation funds (Local Streets and Bicycle /Pedestrian) will be utilized as approved by the City Council. As Presented at the City Council Meeting on: Date: 9/18/2012 # # # # # # # # # # # # # # ## #(Finance Use Only) # # # # # # # # # # # # # # # # # ## Posted By: Date: City Council Minutes Excerpt Attached Reviewed By: G: Budget Change / FY 2013 #3 ATTACHMENT 5