HomeMy WebLinkAboutReso 055-03 WA Infrastructure RESOLUTION NO. 55 - 03
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT NO. 4 TO AGREEMENT WITH
WASHINGTON INFRASTRUCTURE SERVICES, INC. (FORMERLY MK CENTENNIAL),
FOR CONSULTING SERVICES FOR THE WIDENING OF
DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT
WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary
Engineering and Environmental Services with Washington Infrastructure Services, Inc., for the Dublin
Boulevard project from Village Parkway to Sierra Court, on November 16, 1999; and
WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of
services to include the preparation of Plans, Specifications and Estimates for the said project with an
additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and
WHEREAS, the agreement was further amended on November 20, 2001, to expand the Scope of
Work to include additional right-of-way survey work, bike path wall and creek slope protection design,
additional landscaping and signal interconnect design, other miscellaneous work, and design services during
construction at a cost of $139,164; and
WHEREAS, the agreement was further amended on July 1.6, 2002, to expand the Scope of Work to
include design services during construction at a cost of $30,000; and
WHEREAS, it is proposed to amend the agreement to expand the Scope of Work to allow the
consultant to respond to additional requests from the contractor performing the construction of said project
for information and design clarification at a not-to-exceed amount of $50,000;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve Amendment No. 4 to the agreement with Washington Infrastructure Services to expand the scope of
work, as described in Exhibit "A", which is attached to this resolution.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement.
PASSED, APPROVED AND ADOPTED thisl st day of April, 2003.
AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart
NOES: None
ABSENT: None
ATTEST:
City Clerk
K2/G/4-1-03/reso-washington.doc (Item 4.8) g:[engr[WashingtontResoAmend4~4pr~ll-200$
EXHIBIT "A" OF RESOLUTION ~'~ -03
AMENDMENT NO. 4 TO AGREEMENT BETWEEN CITY OF DUBLIN AND
WASHINGTON INFRASTRUCTURE SERVICES, INC., FOR THE WIDENING
OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Washington
Infrastructure Services, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on
November 16, 1999, for Preliminary Engineering and Environmental Services for the Dublin Boulevard
Widening Project between Village Parkway and Sierra Court; and
WHEREAS, the City amended the agreement on July 18, 2000, to extend the scope of
work to include the preparation of Plans, Specifications and Estimates; and
WHEREAS, the City further amended the agreement on November 20, 2001, and again on
July 16, 2002, to extend the Scope of Work to include additional design work; and
WHEREAS, the Scope of Work to be performed is proposed to be extended to allow the
consultant to respond to requests from the contractor performing the construction of the Dublin Boulevard
Widening for additional information and design clarification;
NOW, THEREFORE, the parties hereto agree as follows:
Scope of Work
The Scope of Work shall be modified as described in Consultant's Amended Scope of Services
dated February 28, 2003, for the Dublin Boulevard Widening Project between Village Parkway and Sierra
Court (attached).
Extension of Term
The total cost for work covered by this amendment shall not exceed $50,000.
CITY OF DUBLIN
'~? Mayor
ATTEST:
~- -City (~lerk
WASHINGTON INFRASTRUCTU ~R~ SERVICES
,/ James H. Lundeli, Vice President