Loading...
HomeMy WebLinkAboutReso 055-03 WA Infrastructure RESOLUTION NO. 55 - 03 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDMENT NO. 4 TO AGREEMENT WITH WASHINGTON INFRASTRUCTURE SERVICES, INC. (FORMERLY MK CENTENNIAL), FOR CONSULTING SERVICES FOR THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City Council of the City of Dublin approved an agreement for Preliminary Engineering and Environmental Services with Washington Infrastructure Services, Inc., for the Dublin Boulevard project from Village Parkway to Sierra Court, on November 16, 1999; and WHEREAS, the City of Dublin amended the agreement on July 18, 2000, to extend the scope of services to include the preparation of Plans, Specifications and Estimates for the said project with an additional compensation in the amount of $267,000 for a total aggregate amount of $411,000; and WHEREAS, the agreement was further amended on November 20, 2001, to expand the Scope of Work to include additional right-of-way survey work, bike path wall and creek slope protection design, additional landscaping and signal interconnect design, other miscellaneous work, and design services during construction at a cost of $139,164; and WHEREAS, the agreement was further amended on July 1.6, 2002, to expand the Scope of Work to include design services during construction at a cost of $30,000; and WHEREAS, it is proposed to amend the agreement to expand the Scope of Work to allow the consultant to respond to additional requests from the contractor performing the construction of said project for information and design clarification at a not-to-exceed amount of $50,000; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment No. 4 to the agreement with Washington Infrastructure Services to expand the scope of work, as described in Exhibit "A", which is attached to this resolution. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amended agreement. PASSED, APPROVED AND ADOPTED thisl st day of April, 2003. AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart NOES: None ABSENT: None ATTEST: City Clerk K2/G/4-1-03/reso-washington.doc (Item 4.8) g:[engr[WashingtontResoAmend4~4pr~ll-200$ EXHIBIT "A" OF RESOLUTION ~'~ -03 AMENDMENT NO. 4 TO AGREEMENT BETWEEN CITY OF DUBLIN AND WASHINGTON INFRASTRUCTURE SERVICES, INC., FOR THE WIDENING OF DUBLIN BOULEVARD FROM VILLAGE PARKWAY TO SIERRA COURT WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Washington Infrastructure Services, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on November 16, 1999, for Preliminary Engineering and Environmental Services for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court; and WHEREAS, the City amended the agreement on July 18, 2000, to extend the scope of work to include the preparation of Plans, Specifications and Estimates; and WHEREAS, the City further amended the agreement on November 20, 2001, and again on July 16, 2002, to extend the Scope of Work to include additional design work; and WHEREAS, the Scope of Work to be performed is proposed to be extended to allow the consultant to respond to requests from the contractor performing the construction of the Dublin Boulevard Widening for additional information and design clarification; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work The Scope of Work shall be modified as described in Consultant's Amended Scope of Services dated February 28, 2003, for the Dublin Boulevard Widening Project between Village Parkway and Sierra Court (attached). Extension of Term The total cost for work covered by this amendment shall not exceed $50,000. CITY OF DUBLIN '~? Mayor ATTEST: ~- -City (~lerk WASHINGTON INFRASTRUCTU ~R~ SERVICES ,/ James H. Lundeli, Vice President