Loading...
HomeMy WebLinkAboutItem 7.1 Emrld Glen Rec & Aquatic Concept Planor 19 82 /ii � 111 DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL April 16, 2013 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -30 Emerald Glen Recreation and Aquatic Complex Conceptual Plan Prepared by Herma Lichtenstein, Parks and Facilities Development Manager EXECUTIVE SUMMARY: On October 16, 2012, the City Council approved the updated building and phasing plan for the Emerald Glen Recreation and Aquatic Complex. Staff is seeking City Council approval on the proposed conceptual site plan. FINANCIAL IMPACT: The 2012 -2017 Capital Improvement Program includes funding for the design and construction of the Recreation and Aquatic Complex. RECOMMENDATION: Staff recommends the City Council receive the presentation from Staff and the Consultant, and approve the proposed conceptual site plan. Submitted B Reviewed By Director of Parkzand Assistant City Manager Community Services DESCRIPTION: On October 16, 2012, the City Council approved the update to the building and phasing plan for the Emerald Glen Recreation and Aquatic Complex and directed Staff to move forward with the update to the Park Master Plan and the design of Phase I. The following is the building and phasing plan approved by the City Council: Phase 1 (27,230 square feet) • Indoor pool for year round lessons, lap swim, exercise and recreational swim • Outdoor shallow beach entry pool with a water playground for seasonal use Page 1 of 2 ITEM NO. 7.1 • Outdoor waterslide with splash down pool for seasonal use • Multi- purpose room that is dividable for party rentals and classes • Locker Rooms with showers, changing areas and restrooms • Special Need /Unisex Restrooms • Lobby and Reception Area • Administrative Offices • First Aid and Lifeguard Rooms • Aquatic Storage, Mechanical and Chemical Rooms Phase II (10,690 square feet) • Outdoor sport pool for seasonal lessons, lap swim, exercise and recreational swim • Fitness Room with cardio machines • Group Exercise / Dance Studio • Game Lounge /Room • Additional Locker Rooms • Special needs changing room • General Building Receiving /Maintenance Phase III (13,440 square feet) • Gymnasium with one full size court (same size as Stager Community Gym) • Preschool with two classrooms, support spaces and outdoor play area (replaces modular building) • Multi- Purpose Room for classes that use mats (tumbling, gymnastics, martial arts) On December 4, 2012, the City Council amended the Agreement for architectural services with Dahlin Group based on the new scope of improvements for Phase I. Staff has been meeting with Dahlin Group and their sub - consultants over the past two months to refine the program and to develop a conceptual site plan that addresses the phasing plan adopted by the City Council. Attachment 1 is the proposed conceptual site plan for the buildings and remaining park amenities. Attachment 2 is the Phase 1 site plan and the Pedestrian Access. Parks and Community Services Commission At the March 18, 2013 meeting, the Parks and Community Services Commission received a report on the proposed conceptual site plan. The Commissioners expressed a preference for maximizing pedestrian walkability within the park and the quantity of green open space where possible. Although the Commissioners understood the need for vehicle access roads and parking areas in the park, the Commission emphasized a desire for as few parking spaces within the park as possible, in order to maintain a park -like ambience within the park. After receiving public comment, the Parks and Community Services Commission unanimously recommended approval to the City Council of the proposed conceptual site plan as recommended by Staff. NOTICING REQUIREMENTS /PUBLIC OUTREACH: A public meeting notice was mailed to the residents near Emerald Glen Park. A copy of the Staff Report was sent to the Parks and Community Services Commission. ATTACHMENTS: 1. Proposed Park and Facility Conceptual Site Plan 2. Phase I Site Plan and Pedestrian Access Page 2 of 2 l76'ai "w CITY OF NDUBLINd DT ti P "N IL.4u W I�Y0�1�.[(n Ge AQl1ATl G.