Loading...
HomeMy WebLinkAbout7.1 GraniteConst BidAward CI'TY CLERK File # AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 6 2003 SUBJECT: Award of Bid -Village Parkway Improvements, Amador Valley Boulevard to Dublin Boulevard, Contract No. 03-01 Report Prepared by: Lee S. Thompson, Public V~orks Director ATTACHMENTS: 1) Budget Change Form 2) Resolution 3) Bid Results RECOMMENDATION: ,/Y?~ ,,~ 1) Approve budget transfer in the amount of $10,672 ~ ~?~! **~ 2) Adopt resolution awarding bid to Granite Construction FINANCIAL STA~-E~_~//~7~'ENT: This contract includes improvements for the following capital projects: Improvements Project Budget Low Bid Village Parkway/Lewis Avenue $198,000 $161,879.00 Intersection Improvements & Plaza Village Parkway Left-Turn Lane $ 57,380 $ 21,120.00 Extension at Lewis Ave. Village Parkway Median Landscaping $ 31,763 $ 38,577.00 TOTAL: $287,143 $ 221,576.00 The Village Parkway/Lewis Avenue Intersection Improvements (part of CIP #94060, Downtown Improvement Implementation), Village Parkway Left-Turn Lane Extension at Lewis Avenue (CIP #96300) and Village Parkway Median Landscaping between Dublin Boulevard and Amador Valley Boulevard (CIP #94615) are funded through the General Fund (001). A budget transfer in the amount of $10,672 (which includes a 10% contingency) from the Village Parkway Left-Turn Lane Extension at Lewis Avenue project to the Village Parkway Median Landscaping project is necessary to fully fund all of the projects. These projects were incorporated into one contract as a cost savings measure due to the close proximity and similar scope of work between the projects. DESCRIPTION: On April 10, 2003, Staff received and opened bids for Contract No. 03-01, Village Parkway Improvements - Amador Valley Boulevard to Dublin Boulevard. This contract consists of improvements for three separate capital projects: Village Parkway/Lewis Avenue Intersection COPIES TO: Bidders g:\miscprojXvpw-lewis improvements\AS award Improvements (part of CIP #94060, Downtown Improvement Implementation), Village Parkway Left- Turn Lane Extension at Lewis Avenue (CIP #96300) and Village Parkway Median Landscaping between Dublin Boulevard and Amador Valley Boulevard (CIP #94615). The Village Parkway/Lewis Avenue Intersection Improvements, which is part of the Downtown Improvement Implementation capital project, includes pedestrian enhancements by constructing sidewalk bulbouts (extending the sidewalk comers at the intersection into the roadway) and constructing a pedestrian plaza with landscaping and sitting benches at the northeast comer of the intersection. The Village Parkway Left-Turn Lane Extension at Lewis Avenue improvements will increase the storage capacity of the northbound Village Parkway left-turn lane at Lewis Avenue. Currently, during the peak times, vehicles are stacking beyond the turning lane and blocking the northbound through-traffic. The Village Parkway Median Landscaping improvements include removal of existing vegetation, addition of topsoil to existing planting beds to match the gu'ade of the paving stones, replacement of irrigation spray heads and replanting median islands on Village Parkway between Amador Valley Boulevard and Dublin Boulevard. A total of two (2) bids were received (see Attachment 2). The low bidder is Granite Construction Company with a bid of $221,576.00. Staff has reviewed the bids and determined that Granite Construction Company has satisfactorily performed similar projects for other public agencies. Staff recommends that the City Council adopt the resolution awarding Contract No. 03-01 to Granite Construction Company and approve the budget transfer in the amount of $10,672. Page 2 RESOLUTION NO. - 03 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 03-01 VILLAGE PARKWAY IMPROVEMENTS - AMADOR VALLEY BOULEVARD TO DUBLIN BOULEVARD WHEREAS, the City of Dublin did, on April 17, 2003, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 03-01, Village Parkway Improvements - Amador Valley Boulevard to Dublin Boulevard, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 03-01 to the lowest responsible bidder therefor, to wit, Granite Construction Company, at a bid of Two Hundred Twenty-One Thousand, Five Hundred Seventy-Six Dollars and No Cents ($221,576.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 6th day of May, 2003. AYE S: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g:miscprolvpw-lewis improvementslresolution of award CITY OF DUBLIN ~:3 ~ BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: From Unappropriated Reserves. From Budgeted Contingent Reserve (10800-799.000) (If Other than General Fund, Fund No - Within Same Department Activity From New Revenues ,' ,' ,' ,'~., Between Departments (City Council Approval Required) Other Name: Improvements - Village Parkway Left- Name: Improvements - Village Parkway Turn Extension at Lewis Avenue $10,672 Median Landscaping $10,672 Account#: 001-96300-750-050 Account#: 001-94615-750-050 Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: ASD/Fin Mgr ' ~f-~~[,. · ¢x~-'r,-,'~ Signature REASON FOR BUDGET CHANGE ENTRY: Transfer necessary to fully fund both projects as part of Contract No. 03-01. City Manager: Date: Signature As approved at the City Council Meeting on: Date: Mayor: Date: Signature Posted By: Date: Signature H: ICC-FORM$iFORM-budget SUMMARY OF BID RESULTS -April 17, 2003 CONTRACT 0-O'13, VILLAGE PARKVVAY IMPROVEMENTS, AMADOR VALLEY BOULEVARD TO DUBLIN BOULEVARD ENGINEER'S ESTIMATE GRANITE CONSTRUCTION GRADE TECH BID UNIT ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE I TOTAL PRICE 1 ~TrafficControl LS 1 $ 10.000.00 $ 10.000.00 $ 10,000.00 $ 10,000.00 $ 8,000.00! $ 6,000.00 2 P, emovals LS 1 $ 24.000.00 $ 24.000.00 $ 35,700.00 $ 35,700.00 $ 90,000.0015 90,000-.b0 3 Survey LS 1 $ 5.000.00 $ 5,000.00 $ 6,000.00 $ 6,000.00 $ 4,000.00 r~ $ 4,000.00 Village Pkwy/Lewis Ave. Intersection Improvements 4 [Relocate Business Sign LS ~ 1 . $ 5,000.00 $ 5,000.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 5 .Electrical LS . 1 . $ 10,000.00 $ 10,000.00. $10,000.000 $ .10.,(~00_..00 $ 16,000.00_ $ 16,000.00 6 Catch Basin . EA 3 $ 3.500.00 $ 10.500.00 $ 3.000.000 $ 9,000.00 $ 2,400.00 $ 7,200.00 7 Curb Inlet EA 1 $ 3.000.00 $ 3.000.00 $ 3,000.00 $ 3,000.00 $ 2,400.00 $ 2,400.00 8 12" HDPE Storm Drain Pipe LF . 157 , $ 30.00 $ 4,710.00 $ 145.00 $ 22,765.00 $ 155.00 _$ 24,335.00 9 12"Storm Drain Pipe Elbow EA 2 $ 200.00 $ 400.00 $ 71.00 $ 142.00 $ 300.00 $ 600.00 10 Manhole EA 1 $ 5.000.00 $ 5.000.00 $ 5,000.00 $ 5,000.00 $ 3,000.00 $ 3,000.00' 11 Concrete Curb & Gutter LF 240 $ 29.00 $ 6,960.00 $ 20.00 $ 4,800.00 $ 20.00 $ 4,800.00 12 Asphalt Concrete Pavement TON 98 $ 75.00 $ 7,350.00 $ 140.00 $ 13720.00 ~$ 75.005 7,350.00 13 Interlocbng Pawng Stones (Reuse) SF 550 $ 15.00 $ 8,250.00 $ 11.40 $ 6,270.00 $ 10.00 $ 5,500.00 14'lMedian Curb LF 190 $ 12.00 $ 2,280.00 $ 15.00 $ 2,850.00 $ 15.00. $ . 2,850.00 15 ~4"Color Concrete Pavement (w/AB) SF 1,814 $ 10.00 $ 18,140.00 $ 8.00 $ 14,512.00 $ 8.00 $ 14,512.00 16 ,4" C~ncretePavement (with AB) SF 24 $ 6.00 $ 144.00 $ 5.00 $ 120.00 $ 5.00 $ 120.00 17 Color Concrete Curb Ramp (w/AB) EA 6 $ 1.800.00 $ 10,800.00 $ 800.00 $ 4,800.00 $ 800.00 $ 4,800.00 18 .Concrete Driveway SF . 130 $ 9.00 $ 1,170.00. $ 7.00 $ 910.00 $ 7.00_ $ 910.00 19 12"White Line, Thermoplastic LF 286 $ 2.50 $ 715.00 $ 7.00 $ 2,002.00 $ 6.00 $ 1,716.00 20 6' Bench EA 2 $ 2,850.00 $ 5.700.00 $ 2,535.00 $ 5,070.00 $ 1,300.00. $ 2,600.00 S21 .UrnTypeA EA r 2 $ 1,000.00 ~ $ 2,000.00. $ 1,310.00 $ 2,620.00 $ 2,500.00 $ 5,000.00 S22 Urn Type B EA 1 $ 2,200.00 $ 2,200.00 $ 2,660.00 $ 2,660.00 $ 5,000.00 $ 5,000.00 S23 Tree - 36" Box EA : 4 $ 1,200.00 $ 4,800.00 $ 900.00 $ 3.600.00 $ 900.00 $ 3,600.00 S24 Shrubs-5 Gallon EA 37 $ 30,00 $ 1,110.00 $ 28.00 $ 1,036.00 $ 20.00 $ 740.00 S25 Shrubs- 1 Gallon EA 15 $ 15,00 $ 225.00 $ 12.00 $ 180.00 $ 10.00 $ 150,00 S26 Mulch-3" Depth SF 250 $ 1.00 $ 250.00 $ 1,90 $ 475.00 $ 1.00 $ 250.00 S27 Mexican Pebble- 3" Deep SF 54 $ 2.00 $ 108.00 $ 14.00 $ 756.00 $ 10,00 $ 540.00 S28 Root Barrier LF 105 $ 15,00 $ 1,575.00 $ 10.00 $ 1.050,00 $ 10.00 $ 1,050,00 S29 4,1mport Top Soil CY 6 $ 40,00 $ 240.00 $ 65.00 $ 390.00 $ 80,00 $ 480.00 S30 ~Irrigation Heads EA ; 53 $ 65.00 $ 3,445.00 $ 22.00 $ 1,166.00-- $ 30.00-$ 1,590.00 S31 ~lrdgati~n'Lateral-3/4" LF ' 160 $ 1.,~0'$ 240.00 $ 2.75 $ . 440.0.0 . $ 3.00~$ 480.00 S32 Irrigation Lateral- 1" LF 30 $ 2.00 $ 60.00 $ 3.000 $ 90.00 $ 4.00 $ 120.00 S33 *Lateral- 11/4" - LF 5 $ 2.25 ' $ 11.25 $ 4.00 $ 20.00 ~ 5.00-$ 25.00 S34 Irrigation Main Line with trench) LF 90 $ 16.00 $ 1,440.00 $ 16.00 $ 1,440.00 5 6.00 $ 540.00 S35 Remote Control Valve EA 3 $ 250.00 $ 750.00 $ 450.00 $ 1,350.00 ~ S36 Quick Coupler Valve EA $ 85.00 $ 85.00 $ 265.00 $ 265.00 $ 150.00 $ 150.00 S37 12" Conduit tO Controller (under Paving) , LF 180 $ 14.00 $ 2.520.00 $ 30.00 $ 5,400.00 $ 50.00 $ 9,000.00 S38 ,2" Conduit to Controller (under Planting) LF . 385 $ 2.50 $ 962.50. $ 2.00 $ 7'70.00_ _ $ 6.00 . $ 2,310.00 S39 Wiring to Existing Controller LF 565 $ 0.50 $ 282.50 $ 2.00 $ 1,130.00 $ 3.00 . $ 1,695.00 Village Parkway Median Landscaping Improvements S40 Adjust Utility/Irrigation Box to Grade EA . 8 $ 100.00 $ 800.00 $ 100.00 $ 800.00 $ 300.00 $ 2,400.00 S41 Drain Rock at Utility Pole EA 6 $ 200.00 $ 1,200.00 $ 330.00 $ 1,980.00 $ 300.00 $ 1,800.00 S42 Drain Rock at Tree EA 3 $ 200.00 $ 600.00 $ 330.00 $ 990.00 $ 300.00 $ 900.00 S43 ,Headerboard-2"x12" LF 110 $ 9.00 $ 990.00 $ 5.00 $ 550.00 $ 10.00 $ 1,100.00 S44 Maintenance Path with Pavers SF 30 $ 15.00 ' $ 450.00 $ 36.90' $ 1.107.00 $ 33.00 $ 990.00 S45 Adjust Drain Pipe EA 8 $ 50.00 $ 400.00 $ 250.00 $ 2.000.00 $ 300.00 $ 2,400.00 S46 Import Top Soil CY 46 $ 40.00 i $ 1,840.00 $ 22.00. $ 1,012.00 ~ $ . 50:00, $ 2300.00. S47 Soil Amendment with Fine Grading SF 6.440 $ 0.40 $ 2.576.00 $ 0.25 $ 1.610.00 $ 0.30 $ 1,932.00 S48 T~ee- 24" Box EA 17 · $ 275.00 ' $ 4,675.00 $ 225.00 ' $ 3.825.00 ' ' $ 300.00 $ 5~100-00 S49 Shrubs - 5 Gallon EA 234 $ 25.00 . $ 5.850.00 $ 28.00. $ 6.552.00 . . $ 25.00 $ 5,850.00 . S50 Shrubs- 1 Gallon EA 479 $ 8.00 $ 3,832.00 $ 12.00 $ 5,748.00 $ 10.00 $ 4,790.00 S51 6rbun~lcover- Flats ' SF 4,400 ' $ 0.50 r $ 2,200.00 $ 0.40 i $ 1.760.00 ~ S52 'Mulch- 2"Depth SF 6,440 $ 0.35 . $ 2,254.00 $ 0.30 . $ 1,932.00 $ 0.75 . $ 4,830.00 S53 Headerboard - 2" x 8" LF 95 $ 8.00 $ 760.00 $ 5.00 $ 475.00 $ 8.00 $ 760.00 S54 Root Barrier LF 45 $ 8.00 $ 360.00 $ 11.00 , $ 495.00 . $ 10.00 _$ 450.00 S55 Annuals SF 350 $ 0.50 $ 175.00 $ 3.00 $ 1,050.00 $ 1.00 $ 350.00 i ~ i 124 $ 40.00 ' $ 4.960.00 $ 34.00 ' $ 4,216.00 ~ $ 30.00 '$ 3,720.00 S56 Irrigation Spray Heads EA S57 irrigation Lateral - 3/4" . LF 380 $ 4.00 $ 1.520.00 $ 2.75 $ 1,045.00 $ 3.00 S58 Quick Coupling Valve EA 2 $ 140.00 $ 280.00 $ 265.00 $ 530.00 $ 15.00 $ 30.00 . S59 Rem(~telCon~rolValve EA 2 $ 240.00 $ 480.00 $ 450.00 $ 900.00 $ 400.00 $ 800.00 ..... $ 197.825.25 ' $ 221,576.00 TOTAL: $ 279,015.00