City Council Meeting Date: August 11, 1986
SUBJEC~:
Revised Striping and Signal Phasing -
Amador Valley Blvd./Village Parkway Intersection
EXHIBITS ATTACHED:
RECOX~qENDATION'~
FINANCIAL STATEMENT:
Report from TJKM
Diagram of Intersection
Authorize Staff to Implement Revision
Cost of revised striping and signing is estimated at
$1,500.00. Sufficient funds are budgeted.
DESCRIPTION:
Due to increased traffic volume on Amador Valley Blvd., Staff has
investigated the possibility of converting the northerly eastbound through
lane on Amador Valley Blvd. at Village Parkway to a shared through/left-turn
lane. This measure would allow two lanes to turn left from Amador Valley
Blvd. onto Village Parkway and alleviate some of the backup in the existing
single left-turn lane.
Signal phasing would be changed from the current six-phase to four-
phase; in other words, east- and westbound traffic would travel through the
intersection separately rather than at the same time as they do now.
Based on TJKM's study of the intersection, Staff recommends that the
City Council authorize implementation of this change.
ITEM NO. COPIES TO:
£-
TJKM
TRANSPORTATION CONSULTANTS
PLEASANTON
SACRAMENTO
FRESNO
CONCORD
July 7, 1986
Mr. Lee Thompson
City of Dublin
Public Works Department
6500 Dublin Boulevard, Suite 101
Dublin, CA 94568
JUL ,': 1986
'PUBI.; WORKS[
Subject:
Revised striping and phasing at the Amador Valley
Boulevard/Village Parkway intersection.
Dear Lee:
The possibility of converting the northerly eastbound through lane on Amador
Valley Boulevard at Village Parkway to a shared through/left-turn lane has been
reviewed.
Volume-to-capacity (V/C) calculations were performed for the Amador Valley
Boulevard/Village Parkway intersection. The result indicates that this intersection
would remain at Level of Service A (LOS A) indicating stable flow and very slight
delay after the modification. The V/C ratio would drop from 0.56 to 0.54 (see
attachment).
Based on V/C calculations and field investigation, we recommend modifying the
existing 6-phase signal to a 4-phase signal as shown in the attached drawing. This
would involve some signing and striping modifications.
As noted in the drawing, we are recommending the placement of a YIELD sign in
the northeast quadrant of the intersection. The sign would control westbound
traffic that is turning right. The need for this sign is based on the presence of
two lanes of eastbound left turning traffic merging with the westbound right
turning traffic and the need to assign the right-of-way to the left turners.
I hope this letter provides the information you need. If you have any further
questions, please call.
Yours very truly,
Ty /~T~kkawa
DY/psw
Attachment
157-030
4637 Chabot Drive, Suite 214 / Pleasanton, California 94566 · (415) 463-0611
TJKM INTERSECTION CAPACITY ANALYSIS
2/4/86
INTERSECTION 5 VILLAGE PKWY. and AMADOR VALLEY DUBLIN
COUNT DATE/TIME: 1/15/86 4:00-5:45 PM PEAK HOUR: 4:15-5:15 PM
CONDITION : PM PEAK - EXISTING FILE 15728
========================================================================
RIGHT THRU LEFT
271 263 6O
^ , , ' ^ NORTH
' (--- v ---)
LEFT 306 --- 1.0 1.5 2.0 1.0 1.5 --- 67 RIGHT
STREET NAME:
THRU 443 ---) 2.0 (NO. OF LANES) 2.0(--- 240 THRU AMADOR VALLEY
RIGHT 78 --- 1.5 2.1 2.1 1.5 1.0 --- 108 LEFT SPLIT PHASE?
, (--- ^ ---) ' N
m !
i
! !
! I I
334 288 148
LEFT THRU RIGHI
STREET NAME: VILLAGE PKWY. SPLIT PHASE? Y
::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
ORIGINAL ADJUSTED V/C CRITICAL
MOVEMENT VOLUME VOLUME* CAPACITY RATIO V/C
NB
SB
RIGHT (R)
THRU (T)
LEFT {L)
T+L
148 40 * 1650 0.0242
288 288 3375 0.0853
334 334 2970 0.1125
622 4695 0.1325
271 0 * 1650 O.O00D
263 263 3450 0.0762
60 60 1650 0.0364
RIGHT (R)
THRU (T)
LEFT (L)
0.1325
0.0762
EB RIGHT (R) 78 0 * 1650 0.0000
THRU (T) 443 443 3450 0.1284
LEFT (L) 306 306 1650 0.1855
WB RIGHT (R) 67 0 * 1650 0.0000
THRU (T) 240 240 3450 0.0696
LEFT (L) 108 108 1650 0.0655
0.1855
0.0696
========================================================================
VOLUME-TO-CAPACITY RATIO FOR THE INTERSECTION: 0.46
ADJUSTMENT FOR LOST YELLOW TIME: 0.10
TOTAL VOLUME-TO-CAPACITY RATIO:
INTERSECTION LEVEL OF SERVICE:
* ADJUSTED FOR RIGHT TURN ON RED
RECEI¥ T)
JUL 7 1986
PUBLIC- WORKS
0.56
A
TJKM INTERSECTION CAPACITY ANALYSIS
6/3o/86
INTERSECTION I VILLAGE PkWY and AMADOR VALLEY CITY OF DUBLIN
COUNT DATE/TIME: 1/15/86 4:00-5:45 PM PEAK HOUR: 4:15-5:15 PM
CONDITION : P.M. PEAK - EXISTING FILE 157001
RIGHT THRU LEFT
271 263 60
' <--- v --->
LEFT 306 --- 2.1 1.5 2.0 1.0 1.5 67 RIGHT
STREET NAME:
THRU 443 ---) 2.1 (NO. OF LANES) 2.0<--- 240 THRU AMADOR VALLEY
RIGHT 78 --- 1.5 2.1 2.1 1.5 1.0 --- 108 LEFT SPLIT PHASE?
, (--- ,' ___> , y
334 288 148
LEFT THRU RIGHT
NORTH
STREET NAME: VILLAGE PKWY SPLIT PHASE? Y
ORIGINAL AD3USTED V/C CRITICAL
MOVEHENT VOLUHE VOLUME~ CAPACITY RATIO V/C
NB RIGHT (R) 148 40 ~ 1650 0.0242
THRU (T) 288 288 3375 0.0853
LEFT (L) 334 334 2970 0.1125
T + L 622 4695 0.1325 0.1325
SB RIGHT (R) 271 101 $ 1650 0.0612
THRU (T) 263 263 3450 0.0762 0.0762
LEFT (L) 60 60 1650 0.0364
EB RIGHT (R) 78 0 *
THRU (T) 443 443
LEFT (L) 306 306
T + L 749
WB RIGHT (R) 67 0 ~
THRU (T) 240 240
LEFT (L) 108 108
1650 0.0000
3375 0.1313
2970 0.1030
4695 0.1595 0.1595
1650 0.0000
3450 0.0696 0.0696
1650 0.0655
TOTAL VOLUME-TO-CAPACITY RATIO:
INTERSECTION LEVEL OF SERVICE:
VOLUME-TO-CAPACITY RATIO FOR THE INTERSECTION: 0.44
AD3USTMENT FOR LOST YELLOW TIME: 0.10
0.54
A
ADJUSTED FOR RIGttT TURN ON RED
RECEIVED
JUL ? 1986
PUBLIC':, WORKS
>~L ZEy
?',C/1££1( 5,,.b.,;:q2 .~,'5-c~'~zv/,d~ Aw,'.,
1 ', 1 i .C..~:T,',';' hJA/,'~ ~;V,9 , ~./.'/>.:.~,"~ .4 7/(:,.V'.
/(I//10,')%' ~/~..'L: ',, /. q V,.~ .... '~:.