Loading...
HomeMy WebLinkAbout4.02 Accpt StLightPolePh1CITY CLERK File # E1n16d_&01 AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 17, 2003 SUBJECT: Acceptance of Work — Street Light Pole Replacement Phase 1, Contract 02-20 Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: None RECOMMENDATION: Accept improvements constructed under Contract 02-20 and authorize final payment to Steiny & Co., less retention to be paid in 35 days if no subcontractor or supplier claims are received. FINANCIAL STATEMENT: BUDGET EXPENDITURE Printing and Legal: 1,000.00 103.26 Inspection (Alameda Co. contract) 1,000.00 (est.) 1,000.00 Construction 100,000.00 56,000.00 Total: $102,000.00 $57,103.26 This project was completed within funds budgeted. DESCRIPTION: This project was the first phase of a -proposed six -year project to replace deteriorated street light poles in some of the older Dublin neighborhoods. These poles, which were originally installed for PG&E in the 1960's, are made of ungalvanized steel and have become corroded over time. Several poles were replaced under the street lighting maintenance budget prior to this project. A total of forty (40) poles were replaced under Contract 02-20. The new poles are galvanized steel, which has a longer life span and does not require painting. This project was funded from reserves in the Citywide Street Light Maintenance Assessment District, 83-1. The contract price was substantially under budget, and the remaining funds are proposed to be utilized for the next phase of the project in Fiscal Year 2003-04. Staff recommends that the City Council accept the improvements constructed under Contract 02-20 and authorize final payment to Steiny and Co., less retention to be paid in 35 days if no subcontractor or supplier claims are received. COPIES TO: Steiny & Co. ITEM NO. 44 2 g:\miscproj\stlitepole\agstaccept