HomeMy WebLinkAboutReso 107-03 w/Plsntn 580 IC Ph1 RESOLUTION NO. 107 - 03
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING FUNDING AGREEMENT WITH THE CITY OF PLEASANTON
FOR FINAL DESIGN AND CONSTRUCTION OF THE 1-580 FREEWAY/FALLON ROAD/
EL CHARRO ROAD INTERCHANGE IMPROVEMENT PROJECT-PHASE I
WHEREAS, the Cities of Pleasanton and Dublin have mutual interest in performing physical
modifications to the 1-580 Freeway/Fallon Road/E1 Charro Road interchange; and
WHEREAS, in 2001, Dublin prepared a draft Project Report/Environmental Document (PR/ED)
for proposed improvements to the 1-580/Fallon Road/E1 Charro Road interchange as required mitigation
associated with recently approved development in Dublin; and
WHEREAS, Pleasanton desired to have the draft PR/ED amended to include additional
improvements to the interchange as required mitigation associated with proposed developments in
Pleasanton; and
WHEREAS, Pleasanton and Dublin approved a funding agreement for preliminary engineering and
environmental analysis for the Pleasanton-related work on December 18, 2001; and
WHEREAS, In order to finalize the design and construct the project, Dublin and Pleasanton must
approve a funding reimbursement agreement for final design and construction of the interchange
improvement project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does
hereby adopt this resolution approving the funding agreement with Pleasanton for final design and
construction of the 1-580/Fallon Road/E1 Charro Road Interchange Improvement Project - Phase I.
BE IT FURTHER RESOLVED that the City Manager is authorized to execute the agreement.
PASSED, ,APPROVED AND ADOPTED 'this 3rd day of June, 2003.
AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika, and Mayor Lockhart
NOES: None
ABSENT: None
l/
/ 'Mayor
ATTEST:
Deput~ City Clerk
GSCC-MTGS'G003-qtr2XJun56-03-03~eso-Pleas Funding A~t. doc (It~ 4.10)