HomeMy WebLinkAbout8.2 Fallon Gateway Gas Station (Phase 4) or iy/ r"i✓�0 STAFF REPORT PLANNING COMMISSION DATE: August 13, 2013 TO: Planning Commission SUBJECT: PUBLIC HEARING: PLPA 2012-00049 - Fallon Gateway (Phase 4 - Gas Station) Site Development Review, Conditional Use Permit to amend the Planned Development Zoning Stage 2 Development Plan, and Conditional Use Permit for a Service Station with a convenience store and car wash Report prepared by: Mike Porto, Consulting Planner EXECUTIVE SUMMARY: The Applicant, CJC Fallon Gateway LLC, proposes a Conditional Use Permit to amend the Planned Development Zoning Stage 2 Development Plan to revise the land plan in Phase 4 of Fallon Gateway. The application also includes a Conditional Use Permit and Site Development Review to construct and operate a motor vehicle fueling station, a 2,520 square foot, full-line convenience store, and a 1,050 square foot car wash on approximately .8 acres within Phase 4 of the Fallon Gateway commercial center. RECOMMENDATION: Staff recommends that the Planning Commission: 1) Receive Staff presentation; 2) Open the public hearing; 3) Take testimony from the Applicant and the public; 4) Close the public hearing and deliberate; and 5) Adopt a Resolution approving a Conditional Use Permit for a Minor Amendment to the Planned Development Zoning for Fallon Gateway (PA 08-034) to revise the land plan and a Conditional Use Permit for a Service Station with a full-line convenience store and car wash on approximately .8 acres within Phase 4 replacing the sites identified and approved as Shops 1 and 1B along the south side of Dublin Boulevard; and 6) Adopt a Resolution approving a Site Development Review to allow a service station with a full-line convenience store and car wash on approximately .8 acres within Phase 4 of Fallon Gateway. Submitted By Rev ewes. Consulting Planner Assistant Community Development Director COPIES TO: Applicant File ITEM NO.: Page 1 of 8 G:IPA#120121PLPA-2012-00049 Shell Gas St at Fallon Gateway\PCSR Fallon Gtwy Gas Station 8.13 13 doc BACKGROUND: Fallon Gateway commercial center is located within the Eastern Dublin Specific Plan (EDSP) area. The General Plan and EDSP land use designation is General Commercial. The 33.91- acre site is located along the west side of Fallon Road between Dublin Boulevard on the north and 1-580 on the south as shown on the vicinity map below. Uses surrounding the Fallon Gateway project include: 1) to the north across Dublin Boulevard - General Commercial, Medium Density Residential, and Open Space; 2) to the south - 1-580 right-of-way; 3) to the east across Fallon Road - vacant land designated for General Commercial use; and 4) to the west is vacant property owned by Kaiser Permanente and designated for Campus Office use for the anticipated and eventual construction of a medical facility. Planned Development Zoning for the project site was approved on November 18, 1997 (Resolution 141-97 and Ordinance 24-97). In June 2009, the City Council adopted Planned Development (PD) Rezone Ordinance 09-09 which amended the Planned Development district. The Development Plan for Fallon Gateway limited the potential development on the site to 379,053 square feet distributed among 19 building sites to be developed in four phases. The PD Ordinance also established: 1) architectural and landscape design criteria; 2) specific parking standards; and 3) permitted, conditional, and temporary uses for the all phases of the Fallon Gateway project site. Among other things, the PD allows drive-through facilities with approval of a Conditional Use Permit (CUP) by the Planning Commission. The Development Plan fulfilled the requirements for specifying the circulation system, defining development sites or parcels, refining the development standards, and specifying the infrastructure requirements and their sequencing. A Site Development Review (SDR) for the Fallon Gateway commercial project (PA 08-034) was approved by the Planning Commission on April 28, 2009 (Resolution 09-18). The approved SDR addressed the initial Phases 1, 2, and 3 for development of 311,553 square feet specific to four major tenant spaces (Major A, Major B, Major C, and Major D) and 6 smaller retail buildings (Shop 5 through 10). It also provided a master landscape plan. The remaining areas of the shopping center would be addressed by a future Site Development Review application for Phase 4 (Shop/Pads 1 through 4) and Major E. VOk �,, " .b F rY � t 3,3 PROGOSEU 4 ♦ �REVS,ON f I ( _ t _ t 6 9 v Z �iw'•f F 1, .t »$ il. N(}l' A PART y, Site Plan 2 of 8 Subsequently the SDR for Fallon Gateway was amended on August 19, 2010 by Planning Commission Resolution 10-32. The amendment revised the sequencing from four to five phases and addressed changes in proposed exterior building profiles, surfaces materials, landscaping, and signage including Target (Phase 1/Major A). A Development Agreement between the City of Dublin and Stanforth Holding Company LLC also was adopted by Ordinance. In September 2011, a Conditional Use Permit for a minor amendment to the Planned Development Zoning was approved along with a Site Development Review (PLPA 2011-00031) to combine Shop Sites 8 and 9 and allow development of up to 8,376 square feet for a free- standing, full-service restaurant and micro-brewery (BJ's Restaurant and Brewhouse). The Fallon Gateway site is partially developed with approximately 236,000 square feet approved for Phases 1, 2 and 3: 1) The Target store (Phase I); 2) Dick's Sporting Goods (a portion of Phase II); 3) BJ's Restaurant and Brewhouse ( a portion of Phase III); and 4) a large portion of the overall parking area. Construction is currently underway on Shop Buildings 5, 6 and 10 (Phase 3). The Applicant currently proposes to construct and operate a motor vehicle fueling station with a 2,520 square foot, full-line convenience store and a 1.050 square foot car wash on approximately 0.08 acres within Phase 4. This would replace the building sites identified and approved for Shops1 (6,900 square feet) and Shops 1b (6,200 square feet). The project proposal would require an amendment to the Planned Development Zoning Stage 2 Development Plan to revise the site layout. Chapter 8.32.080 of the Planned Development Zoning Ordinance states that a CUP may be granted for a minor amendment to a Planned Development. A motor vehicle fueling station with convenience store and car wash is a permitted use with Planning Commission approval. The Applicant is currently requesting approval of two Conditional Use Permits (CUP): 1) a minor amendment to the PD relating to the proposed plan; and 2) approval of a service station (motor vehicle fueling station), full-line convenience store (including sales of alcohol and tobacco), and a car wash. The current application also includes a Site Development Review (SDR) to construct a service station, grading and drainage plan, on-site circulation, landscaping, exterior elevations, and parking areas. ANALYSIS: The proposed site plan, floor plan, elevations, landscape plans, and signage are shown in the Project Plans (Attachment 1). As appropriate, a comparison is shown below between the currently approved and the proposed site plans. 3 of 8 .:,i ' . , :f o ' p �4� t 41'''''''l . I I PRa?OSE 4: ri,? _ r;,'' -56 `;'' ' ''' . q V' `'im + 8' 7- ' .If ;C . I :0';`, I _ ,',Ir 1. 1'- ,.,':,'''• I. f NOT A PART 1 E t ' I rwh,31 r� Existing Site Plan Proposed Site Plan Conditional Use Permit— PD Amendment The requested Conditional Use Permits (CUP) would amend the Planned Development Zoning Stage 2 Development Plan approved previously. The applicant is proposing to locate the fueling station, convenience store and car wash on that portion of the site previously designated for Shops 1 and 1B. Because this will modify the site plan, which was adopted as a part of the Stage 2 Development Plan, a minor amendment to the Development Plan is necessary which is accomplished with the approval of a Conditional Use Permit Conditional Use Permit— Service Station Fueling Station Service Stations are specifically identified as a Conditional use. Although car washes specifically are not listed, the one proposed would be considered a part of the service station complex and therefore part of the Conditional Use Permit application. In addition, the sale of tobacco meets the recently adopted Ordinance requirement for distance in compliance with Chapter 8.43.040. A service station, by nature of its design and the unique vehicular circulation patterns, requires a more thorough review of the site plan than normally associated with a standard Site Development Review. To assure that extra level of scrutiny and to ensure compatibility with the remainder of the center the Conditional Use Permit establishes findings much broader in depth. Staff has worked with the project Applicant to orient the circulation system, both pedestrian and vehicular, so that all of the associate impacts are addressed. Additionally, to assure compatibility with the remainder of Fallon Gateway, all project materials will be those approved for the remainder of the center including the proposed color palette. Services stations and car washes are regulated by Chapter 8.76 pertaining to Off-Street Parking Regulations. The only applicable standard would involve stacking since the operations allow the driver to remain in the vehicle with automatic drying. Also, since there is no provision of self- serve vacuuming equipment, there would be no necessity for any car wash customer to leave his vehicle. The single lane drive-through exceeds 100 feet for adequate stacking which is screened from Dublin Boulevard by landscaping. 4 of 8 The structures proposed for the Service Station and related uses would not result in building area that exceeds the approved total and would not materially change the provision or intent of the Planned Development zoning. A Resolution recommending approval of the Conditional Use Permits is included as Attachment 2. Site Development Review Site Plan The proposed Site Plan described above is accompanied by a landscape plan which shows the planting concept, planter areas, plant materials, hardscape, screening, and irrigation to be installed as part of the project. The plans also include grading and drainage for the efficient and clean operation of a potentially problematic use. The convenience store is approximately 2,520 square feet and set back from Dublin Boulevard behind the monument entry sign for Fallon Gateway. The entry would be oriented towards the fueling area. The site is served by 12 on-site parking spaces immediately adjacent to the convenience store building entry. Access to the Service Station site is from a drive aisle off of the primary access drive on Dublin Boulevard. The fueling facilities are defined by an 84-foot by 39-foot fueling canopy covering six Multi-Product Dispenser (MDP) islands. Fueling activities essentially would operate as self- serve. The canopy would likely be visible from major roadways, but set back behind perimeter landscaping. To minimize conflicts, the tanker bay is located within a turn-out adjacent to the drive aisle. No auto repair facilities are proposed and none would operate on site. Like the fueling facilities, the car wash also operates as self-serve handling vehicles in single file while allowing the driver to remain inside to navigate through to the exit. Coverage for the car wash tunnel is approximately 750 square feet (50 feet x 15 feet) with stacking area located between the rear of the convenience store structure parallel to the Fallon Gateway entrance drive. That car wash structure is screened from off-site visibility by the convenience store building and on-site landscaping. The trash enclosure and equipment also would be screened by inward orientation and landscaping. Elevations Elevations are provided for all three related structures which are consistent with the design guidelines, including color and materials, adopted previously for Fallon Gateway or proposed for updating by a concurrent minor amendment to the Planned Development Plan associated with a drive-through restaurant in Phase 3. The fueling canopy consists of a metal ribbed panel and a recessed flat panel with the colors and logo of the vendor. Canopy columns would be clad in brick veneer to match the storefront and other materials approved for the shopping center. Exterior materials for the convenience store and car wash structures primarily are cement plaster with aluminum reveal accents in horizontal or lattice patterns. The exterior elevations are articulated with vertical pilasters clad in the same brick veneer identified above. Roof parapets are proposed as horizontally ribbed metal panels. The convenience store features a tower element and storefront of glass to mirror the look of the tower elements on the major stores and on shop buildings 2, 3, 5 and 6 that are at each project entry. 5 of 8 Parking The Fallon Gateway project originally provided for 1,518 surface parking spaces. Based on proposed occupancies and uses within each building, the required parking would be 1,291 spaces (a surplus of 227 parking spaces). This requirement is based on all 379,053 square feet of the space in all five phases of the project as retail use with parking required at one space per 300 square feet. Modifications to the approved parking lot design will be included with this proposal. The service station site will eliminate parking shown on the approved plan but the amount of building square footage included in approved Buildings 1 and 1 b will also be eliminated and therefore, the parking demand will be less. Signage The Fallon Gateway project is subject to a Master Signage program. The proposed location and general appearance of signage specific to the Service Station complex, including price reader boards required by State law, are shown on Sheets BNA-1 and CA-1 of Attachment 1 and would be a part of the application approval. Public Art The project remains subject to the approved Public Art Compliance Plan. The original Condition of Approval pertaining to the payment of fees for Public Art states that the fee is to be paid at the time of building permit issuance subject to the Dublin Municipal Code. The specific amount of the pro rata fee for the gas station will be calculated along with the building fees at the time that building permits are issued. A Resolution recommending approval of a Site Development Review is included as Attachment 3. CONSISTENCY WITH THE GENERAL PLAN, SPECIFIC PLAN AND ZONING ORDINANCE: The presence of a service station and related uses were anticipated for the Fallon Gateway project. In accordance with Planned Development Zoning Ordinance 09-09, the Service Station and complementary uses are a conditional use requiring a CUP. The use is consistent with the General Commercial zoning and land use designation, and development would serve the intent of community-oriented commercial retail and transportation services in proximity to 1-580. The proposed building size and configuration would not exceed the allowable building area or create adverse conditions on-site or for surrounding properties, but would expand fueling options in the area and keep traffic moving. The proposed exterior design elements are consistent with the Area C Development Plan and the Design Guidelines for Fallon Gateway. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, Dublin Police Services and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the Project is established in compliance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution (Attachment 3). 6 of 8 NOTICING REQUIREMENTS/PUBLIC OUTREACH: In accordance with State law, a Public Notice was mailed to all property owners and occupants within 300 feet of the proposed project. A Public Notice was also published in the Valley Times and posted at several locations throughout the City. To date, the City has received no objections from surrounding property owners regarding the Project. A copy of this Staff Report was provided to the Applicant. ENVIRONMENTAL REVIEW: The project is located within the Eastern Dublin Specific Plan area, which was the subject of an Environmental Impact Report (EIR) for the General Plan Amendment and Eastern Dublin Specific Plan (SCH # 91103064), certified by the City Council in Resolution No. 51-93 and Addenda dated May 4, 1993 and August 22, 1994. The General Plan Amendment/Specific Plan EIR is a program EIR, which anticipated several subsequent actions related to future development in Eastern Dublin. The EIR identified some impacts of implementation of the General Plan Amendment/Specific Plan that could not be mitigated. Upon certification of the EIR, the City adopted a Statement of Overriding Considerations for such impacts. The City also adopted a Mitigation-Monitoring Program, which included numerous measures intended to reduce impacts from the development of the Eastern Dublin area. In 1997, a Negative Declaration was approved by the City Council in Resolution No. 140-97 for the Planned Development Rezoning of Dublin Ranch Areas B-E, which includes the Fallon Gateway site. After completing an Initial Study, it was determined that the rezoning would not have any significant environmental impacts which were not already adequately described and analyzed in the Program EIR. The project as proposed does not exceed the thresholds identified in the Negative Declaration. No further environmental document is needed because the environmental impacts of this project were fully addressed and within the scope of the Final EIR for the Eastern Dublin General Plan Amendment, Specific Plan and subsequent Addenda, and the 1997 Negative Declaration. ATTACHMENTS: 1. Project Plans dated received June 24, 2013. 2. Resolution approving a Conditional Use Permit for a Minor Amendment to the Planned Development Zoning for Fallon Gateway (PA 08-034) to revise the land plan and a Conditional Use Permit for a Service Station with a full-line convenience store and car wash on approximately .8 acres within Phase 4 replacing the sites identified and approved as Shops 1 and 1B along the south side of Dublin Boulevard. 3. Resolution approving a Site Development Review to allow a service station with a full-line convenience store and car wash on approximately .8 acres within Phase 4 of Fallon Gateway. 7 of 8 APPLICANT: CJC Fallon Gateway LLC 4431 Stoneridge Drive Pleasanton, CA 94588 Attn: Don Maday (925) 484-3837 PROPERTY OWNER: Stanforth Holdings Company LLC 4080 Grafton Street, Suite 200 Dublin, CA 94568 Attn: James Tong (925) 463-1666 LOCATION: South side of Dublin Boulevard west of Fallon Road ASSESSORS PARCEL NUMBER: A portion of APN 985-0079-003-00 GENERAL PLAN LAND USE DESIGNATION: General Commercial SPECIFIC PLAN LAND USE DESIGNATION: General Commercial SURROUNDING USES: LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE OF PROPERTY [north of Dublin Boulevard] North PD Medium Density Vacant Residential/General Commercial/Open Space South PD General Commercial Vacant and parking area within Fallon Gateway East PD General Commercial Vacant— remaining portion of Phase 4 within Fallon Gateway West PD General Commercial Vacant— Site for Major tenant (Phase 5 of Fallon Gateway) 8 of 8