Loading...
HomeMy WebLinkAbout8.1 Attch 1 Reso Appr'v CUP & SDR RESOLUTION NO. 13-xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A CONDITIONAL USE PERMIT TO ALLOW A CARWASH AND LIMITED OUTDOOR REPAIR WORK AND A SITE DEVELOPMENT REVIEW TO CONSTRUCT A CARWASH BUILDING AND RELATED SITE IMPROVEMENTS TO THE BUICK/GMC DEALERSHIP LOCATED AT4400 JOHN MONEGO COURT (APN 986-0016-002-01) PLPA-2013-00049&00050 WHEREAS, the Applicant, Inder Dosanjh, has requested approval of a Conditional Use Permit to allow an ancillary carwash and limited outdoor repair work and a Site Development Review for a carwash building and related site improvements to the Buick/GMC dealership located at 4400 John Monego Court; and WHEREAS, the Applicant has submitted project plans for the requested entitlements prepared by MacKay & Somps received by the Planning Division on September 17, 2013 and enclosed as Exhibit A; and; WHEREAS, the California Environmental Quality Act (CEQA), together with State Guidelines and City Environmental Regulations require that certain projects be reviewed for environmental impacts; and WHEREAS, the Planning Commission finds this project exempt from CEQA in accordance with Section 15301 (Existing Facilities); and WHEREAS, the Planning Commission held a public hearing on said application on November 12, 2013; and WHEREAS, a Staff Report was submitted to the City of Dublin Planning Commission recommending approval of the project; and WHEREAS, proper notice of said hearing was given in all respects as required by law; and WHEREAS, the Planning Commission did hear and consider all reports, recommendations and testimony herein above set forth and used its independent judgment to evaluate the project. NOW, THEREFORE, BE IT RESOLVED that the City of Dublin Planning Commission does hereby make the following findings and determinations regarding the Conditional Use Permit: A. The proposed use and related structures is compatible with other land uses, transportation and service facilities in the vicinity in that: 1) the proposed location of the project is within the General Motors Auto Mall, which has a wide variety of automobile related uses; 2) there is an existing Conditional Use Permit for the project site which allows vehicle sales and indoor repair work; 3) the majority of service will be conducted ATTACHMENT 1 indoors; 4) the outdoor lift shall only be used by trucks that are 35,000 pounds are larger and too large to fit inside the service building; 4) the carwash is an ancillary use for the GM Automall; and 5) the proposed use, as conditioned, will be compatible with the surrounding uses. B. It will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare in that the Project has been conditioned to comply with all State of California and Dublin Municipal Code requirements. C. It will not be injurious to property or improvements in the neighborhood in that-1) the proposed project will comply with all City of Dublin regulations and 2) Conditions of Approval have been included to ensure that the use is compatible with the surrounding neighborhood. D. There are adequate provisions for public access, water, sanitation, and public utilities and services to ensure that the proposed use and related structures would not be detrimental to the public health, safety, and welfare in that: 1) the Project will be located on a fully developed site that is served by existing utilities and services, and 2) the area was designed to accommodate automobile uses, and the proposed use fits in with the intended use of the area. E. The subject site is physically suitable for the type, density and intensity of the use and related structures being proposed in that: 1) access to the site will be from John Monego Court, which is an existing roadway; 2) the carwash will be located in an area which was designed to support a variety of auto related uses; 3) the existing Conditional Use Permit for the site is being amended to allow a carwash and limited outdoor repair work; and 4) the carwash will only be used solely by the GM Automall employees to wash the cars at the GM Automall. F. It will not be contrary to the specific intent clauses, development regulations, or performance standards established for the zoning district in which it is located in that: 1) there is an existing Conditional Use Permit which permits vehicle sales and indoor repair work; 2) Conditions of Approval have been applied to the project to ensure on-going compatibility with surrounding uses; 3) the carwash will be used solely by the GM Automall employees to wash the cars at the GM Automall; 4) only vehicles that are 35,000 pounds or greater may use the outdoor lift, repair of all other vehicles shall occur inside; and 5) adequate Best Management Practices shall be used when repair work occurs outside to minimize the potential for stormwater pollution. G. It is consistent with the Dublin General Plan and with any applicable Specific Plans in that. 1) the proposed project will result in improvements to the site which will provide a service to the community that is consistent with the intent of the General Commercial General Plan Land Use designation. 2of14 r BE IT FURTHER RESOLVED that the City of Dublin Planning Commission does hereby make the following findings and determinations regarding the Site Development Review Permit: A. The Project, as conditioned, is consistent with the purpose of Chapter 8.104, with the General Plan and with any applicable Specific Plans and design guidelines in that: 1) auto sales and services is a conditionally permitted use; 2) there is an existing Conditional Use Permit for the dealership; 3) the proposed project will enhance the appearance of the existing dealership; 4) the proposed carwash/storage building uses materials consistent with the existing dealership building; 5) the proposed project is well designed and is compatible with the surrounding area; and 6) adequate vehicular and pedestrian access to the site is provided. B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the zoning for the site is PD (Planned Development) and the existing dealership is a conditionally permitted use type; 2) the existing use permit as amended allows a carwash and limited outdoor repair work; 3) the overall design of the project is compatible with the neighborhood in which it is located; 4) the existing dealership building has adequate parking to support the facility as required by Chapter 8.76, Off-street Parking Regulations; and 5) the project is consistent with the development standards of the PD zoning district. C. The design of the project is appropriate to the City, the vicinity, surrounding properties and the lot in which the project is proposed because: 1) the project site is located in an urbanized area that is currently developed with a variety of building types and uses; 2) adequate access is provided to the site from John Monego Court; and 3) the site is currently developed with an automobile dealership. D. The subject site is physically suitable for the type and intensity of the approved development because the site. 1) the site has been designed for automobile uses; 2) access to the site is provided from John Monego Court, which is an existing roadway; 3) the proposed new carwash/storage building uses materials consistent with the existing dealership building; and 4) the proposed use will have adequate parking to support the facility as required by Chapter 8.76, Off-street Parking Regulations. E. The Project, will not impact existing slopes and topographic features because: the project site is relatively flat and has existing improvements. F. Architectural considerations including the character, scale, and quality of the design, site layout, the architectural relationship with the site and other buildings, screening of unsightly uses, lighting, building materials and colors and similar elements, result in a project that is harmonious with its surroundings and compatible with other developments in the vicinity because: 1) the project has been well designed to complement the surrounding neighborhood; 2) the materials for the carwash/storage building consists of materials that are consistent with the existing dealership building; and 3) the project will add value to the project site. G. Landscape considerations including the location, type, size, color, texture and coverage of plant materials and similar elements have been incorporated into the project to ensure visual relief, adequate screening and an attractive environment for the public because: 1) 3of14 the project site has been previously improved and has existing landscaping; 2) the new carwash/storage building will result in the removal of an existing landscaping median that has several trees and the applicant will planting two trees elsewhere on the site for every tree that is removed. H. The site has been adequately designed to ensure proper circulation for bicyclists, pedestrians and automobiles because: 1) access to the site is currently provided from a driveway on John Monego Court; and 2) the project has been reviewed by the Public Works Department and Fire Prevention Bureau and adequate access and circulation has been provided on-site. BE IT FURTHER RESOLVED that the Planning Commission does hereby approve a Conditional Use Permit and Site Development Review for the carwash/storage building as shown on the Project Plans date-stamped "Received by Dublin Planning on September 17, 2013" and included as Exhibit A, subject to the following conditions: CONDITIONS OF APPROVAL Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City Attorney, [FIN] Finance, [F] Fire Department, [DSR] Dublin San Ramon Services District, [CO] Alameda County Flood Control and Water Conservation District, [Zone 7]. CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: GENERAL -SITE DEVELOPMENT REVIEW 1. Approval. This approval is for the Buick/GMC PL On-going Planning Dealership building located at 4400 John Monego Court, PLPA-2013-00049/00050 and includes a Conditional Use Permit to allow the use of an ancillary carwash for the GM Automall, outdoor repair of vehicles that are over 35,000 pounds and too large to fit inside the service building, and a Site Development Review Permit to construct a new carwash and storage building in addition to site modifications. This Site Development Review generally shall conform to the project plans submitted by MacKay and Somps received September 17, 2013, on file in the Community Development Department, and other plans, text, and diagrams relating to this Conditional Use Permit and Site Development Review, unless modified by the Conditions of Approval contained herein. 2. Permit Expiration. Approval of this Conditional Use PL One year After DMC Permit and Site Development Review Permit shall be Effective Date 8.96.020. valid for one year from the effective date. Construction D shall commence within one (1) year of Permit approval or the Permit shall lapse and become null and void. If 4 of 14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: there is a dispute as to whether the Permit has expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a Permit expires, a new application must be made and processed according to the requirements of this Ordinance. 3. Time Extension. The original approving decision- PL Prior to DMC maker may, upon the Applicant's written request for Expiration 8.96.020. an extension of approval prior to expiration, upon the Date E determination that all Conditions of Approval remain adequate and all applicable findings of approval will continue to be met, grant an extension of the approval for a period not to exceed six (6) months. All time extension requests shall be noticed and a public hearing shall be held before the original hearing body. 4. Compliance. The Applicant/Property Owner shall PL On-going DMC operate this use in compliance with the Conditions of 8.96.020.F Approval of this Conditional Use Permit and Site Development Review, the approved plans and the regulations established in the Zoning Ordinance. Any violation of the terms or conditions specified may be subject to enforcement action. Operating of the use is subject to compliance with the existing Conditional Use Permit. 5. Revocation of Permit. The Conditional Use Permit PL On-going DMC and Site Development Review approval shall be 8.96.020.1 revocable for cause in accordance with Section 8.96.020.1 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this permit shall be subj ect to citation. 6. Null and Void. The Conditional Use Permit approval PL On-going Planning to operate a car wash and perform limited outdoor work shall become null and void in the event that the approved use has ceased or was suspended for 12 more consecutive months after the use commences. 7. Requirements and Standard Conditions. The Various Building Permit Standard Applicant/ Developer shall comply with applicable City Issuance of Dublin Fire Prevention Bureau, Dublin Public Works Department, Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. 5of14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: 8. Required Permits. Developer shall obtain all permits PW Building Permit Standard required by other agencies including, but not limited to Issuance Alameda County Flood Control and Water Conservation District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans and provide copies of the permits to the Public Works Department. 9. Fees. Applicant/Developer shall pay all applicable Various Building Permit Various fees in effect at the time of building permit issuance, Issuance including, but not limited to, Planning fees, Building fees, Traffic Impact Fees, TVTC fees, Dublin San Ramon Services District fees, Public Facilities fees, Dublin Unified School District School Impact fees, Fire Facilities Impact fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees; or any other fee that may be adopted and applicable. 10. Indemnification. The Developer shall defend, ADM On-going Administra indemnify, and hold harmless the City of Dublin and its tion/City agents, officers, and employees from any claim, Attorney action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that the Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or proceedings. 11. Clarification of Conditions. In the event that there PW On-going Public needs to be clarification to the Conditions of Approval, Works the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The Director of Community Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Developer to fulfill needed improvements or mitigations resulting from impacts to this project. 12. Clean-up. The Applicant/Developer shall be PL On-going Planning responsible for clean-up and disposal of project related trash to maintain a safe, clean & litter-free site. 13. Modifications. Modifications or changes to this Site PL On-going DMC Development Review approval may be considered by 8.104.100 the Community Development Director if the 6of14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: modifications or changes proposed comply with Section 8.104.100 of the Zoning Ordinance. 14. Minor Amendments. Modifications or changes to the PL On-going Planning Conditional Use Permit approval may be considered and approved by the Community Development Director, if the proposed modifications or changes comply with Section 8.100.080 of the Zoning Ordinance. 15. Security Requirements. The Applicant/Developer PL Issuance of Planning shall comply with all applicable City of Dublin Non- Building Residential Security requirements. Permits/ On-going 16. Annual Review. On an annual basis, the Conditional PL On-going Planning Use Permit approval may be subject to review by the Community Development Director to determine compliance with the Conditions of Approval. PROJECT SPECIFIC 17. Outdoor Storage Containers. The outdoor storage PL Final Planning containers currently located on the project site shall be removed once the carwash building/storage building is completed. The contents of the storage container shall be relocated to the new storage building. 18. Detailing Area. The washing of vehicles in the PL Occupancy Planning detailing area of the existing Service Building shall be prohibited following completion of the car wash. This area is permitted to be used solely for car detailing and/or vacuuming. 19. Outdoor Service Bays & Stormwater Pollution PL On-going Planning Prevention. The Applicant/Property Owner shall follow best management practices to minimize the potential of stormwater pollution occurring from the outdoor lift. The following practices shall be adhered to at all times: • Drip pans shall be placed under vehicles to catch any accidental spills. • If a spill occurs, dry cleanup methods, such as sweeping, vacuuming, and/or a damp mop shall be used. Vehicle equipment maintenance and repair areas shall never be hosed down unless all of the washwater is collected and disposed to the sanitary sewer. • Following the completion of any outdoor work, the area shall be swept and the materials disposed of properly. • Outdoor vehicle repair is not permitted during a rain event. 20. Outdoor Material Storage. No materials associated PL On-going Planning with the carwash building are permitted to be stored outside. All materials, including spare soap and wash fluids, shall be stored inside the storage building adjacent to the carwash. 7of14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: 21. Outdoor Services. The outdoor lift is permitted to be PL On-going Planning used solely for large trucks that do not fit inside the service building. All other service work shall be conducted indoors. 22. Noise/Nuisance. The Applicant/Developer shall PL On-going Planning control all business activity so as not to create a public or private nuisance to the existing and surrounding businesses and residents. No amplified sounds, loudspeakers or music shall be permitted outside the building. 23. Tree Replanting. The removal of the island located PL Final Planning adjacent to the proposed carwash will result in the loss of trees. Trees shall be re-planted elsewhere on the site (2 to 1 ratio). The type of tree and location shall be approved by the Planning Division. 24. Colors. The exterior paint colors of the buildings are PL Final Planning subject to City review and approval. The Applicant shall paint a portion of the building the proposed colors for review and approval by the Director of Community Development prior to painting the buildings, whose approval shall not be unreasonably withheld. PROJECT SPECIFIC SIGNS 25. Temporary Promotional Banners and Balloons. PL On-going Chapter Temporary Promotional Banner Signs and Balloons 8.884 of shall only be permitted after first securing an approved DMC Temporary Promotional Sign Permit. Any signage on site shall be subject to the sign requirements contained in the Dublin Municipal Code. 26. A-Frame Signs. The use of any A-Frame, portable, PL On-going Chapter sandwich-board, pennants, or human-held signs on 8.884 of the premises is strictly prohibited. Said signs and any DMC form of off-site advertising signs shall also be prohibited upon any public property, including City streets and sidewalks. 27. Outdoor Events. Any outside events shall be subject PL On-going Chapter to the Temporary Use Permit requirements contained 8.884 of in the City of Dublin Municipal Code, specifically DMC Section 8.108.020. 28. Master Sign Program. Prior to the installation of any PL Installation of Chapter on-site signage, the Applicant/Developer shall apply Project 8.884 of for and receive approval to amend the existing GM Related DMC Automall Master Sign Program. Si na e BUILDING -GENERAL 29. Building Codes and Ordinances. All project B Through Building construction shall conform to all building codes and Completion ordinances in effect at the time of building permit. 30. Building Permits. To apply for building permits, B Issuance of Building Applicant/Developer shall submit five (5) sets of Building construction plans to the Building Division for plan Permits check. Each set of plans shall have attached an 8of14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non-City agencies prior to the issuance of building permits. 31. Construction Drawings. Construction plans shall be B Issuance of Building fully dimensioned accurately drawn (depicting all Building existing & proposed conditions), and prepared and Permits signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plan and details shall be consistent with each other. 32. Addressing. Addresses will be required on all doors B Occupancy Building leading to the exterior of the new storage building. Addresses shall be illuminated and be able to be seen from the street, 5 inches in height minimum. 33. Air Conditioning Units. Air Conditioning units and B Occupancy Building ventilation ducts shall be screened from public view with materials compatible to the main building. Units shall be installed on concrete pads or other non- movable materials to be approved by the Building Official and Director of Community Development. FIRE —GENERAL CONDITIONS 34. Fire Codes. Project shall comply with the applicable F On-going Fire Building and Fire Codes in effect at the time of submittal of plan check and permit. PUBLIC WORKS —STANDARD CONDITIONS 35. Public Improvements. All public improvements shall PW Issuance of Public conform to the City of Dublin Standard Plans and Grading/ Works design requirements and as approved by the City Sitework Engineer. Permit 36. Water and Sewer Facilities. Applicant/Developer PW Issuance of Public shall construct all potable and recycled water and Grading/ Works sanitary sewer facilities required to serve the project in Sitework accordance with DSRSD master plans, standards, Permit specifications and requirements. PUBLIC WORKS — PROJECT SPECIFIC 37. Standard Public Works Conditions of Approval. PW On-going Public Applicant/Developer shall comply with all applicable Works City of Dublin Public Works Standard Conditions of Approval. In the event of a conflict between the Public Works Standard Conditions of Approval and these Conditions, these Conditions shall prevail. 38. Encroachment Permit. An encroachment permit Issuance of Public from the Public Works Department may be required Building Works for any work done within the public right-of-way even Permits & on- if covered under an Improvement Agreement. going 9of14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: 39. Storm Drain Improvements. A Triton Filter shall be PW Final Public installed within the inlet located adjacent to the Works existing outdoor lift (as shown on Sheet C-3). 40. Storm Water Treatment Measures Maintenance PW Final Public Agreement. Applicant/Developer shall enter into an Works agreement with the City of Dublin that guarantees the property owner's perpetual maintenance obligation for all storm water treatment measures installed as part of the project. Said agreement is required pursuant to Provision C.3 of the Municipal Regional Stormwater NPDES Permit, Order No. R2-2009-0074. Said permit requires the City to provide verification and assurance that all treatment devices will be properly operated and maintained. 41. Grad i ng/Sitework Permit. All site improvement PW Issuance of Public work and public right-of-way work must be performed Grading/ Works per a Grading/Sitework Permit issued by the Public Sitework Works Department. Said permit will be based on the Permit final set of improvement plans to be approved once all of the plan check comments have been resolved. Please refer to the handout titled Grading/Site Improvement Permit Application Instructions and attached application (three 8-1/2" x 11" pages) for more information. The Applicant/Developer must fill in and return the applicant information contained on pages 2 and 3. The current cost of the permit is $10.00 due at the time of permit issuance, although the Applicant/Developer will be responsible for any adopted increases to the fee amount. 42. Vehicle Parking. All parking stalls shall be PW Final Public constructed in accordance with Building and Works Municipal Code requirements. In addition, all customer and employee stalls shall be clearly identified with signs and pavement markings. The proposed parking shall not impede required exit paths or encroach onto pedestrian pathways. 43. Parking Prohibitions/Restrictions. Vehicle parking PW On-going and Public shall be prohibited or restricted at locations deemed Installed Prior Works reasonably necessary by the City Engineer/Public to Final Works Director during final design and/or construction. 44. Site Accessibility Requirements. All disabled PW Final Public access ramps, parking spaces for the disabled, and Works other physical site improvements shall comply with current UBC Title 24 requirements and City of Dublin Standards for accessibility. 45. Relocation of Existing Improvements/ Utilities. PW Final Public Any necessary relocation of existing improvements or Works utilities shall be accomplished at no expense to the City. 10 of 14 CONDITION TEXT RESPON. WHEN REQ'b SOURCE AGENCY Prior to: 46. Damage/Repairs. The Applicant/Developer shall be PW Final Public responsible for the repair of any damaged pavement, Works curb & gutter, sidewalk, or other public street facility resulting from construction activities associated with the development of the project, to the reasonable satisfaction of the City Engineer/Public Works Director. 47. Lighting. The Applicant/Developer shall prepare a PW Occupancy Public photometric plan to the satisfaction of the City Works Engineer and Director of Community Development. A minimum of one-foot candle of light shall be provided and maintained across the surface of the parking lot. Any illumination, including security lighting, shall be directed away from adjoining properties, businesses or vehicular traffic so as not to cause any glare. 48. Trash Enclosure. The trash bin shall be stored inside PW Building Public the building or a trash enclosure shall be constructed Permits Works to be consistent with City's enclosure ordinance. If the Applicant chooses to store the trash enclosure inside the building, it shall only be moved outside on trash pick-up days and the relocation of the trash bin shall be coordinated with the City's trash hauler. 49. Graffiti. The Applicant/Developer and/or building PL, PW On-going Public tenant(s) shall keep the site clear of graffiti vandalism Works on a regular and continuous basis. Graffiti resistant paint for the structures and film for windows or glass shall be used whenever possible. CONSTRUCTION 50. Erosion Control During Construction. PW During Public Applicant/Developer shall include an Erosion and Construction Works Sediment Control Plan with the Grading and and Grading Improvement plans for review and approval by the Activities City Engineer/Public Works Director. Said plan shall be designed, implemented, and continually maintained pursuant to the City's NPDES permit between October 1St and April 15th or beyond these dates if dictated by rainy weather, or as otherwise directed by the City Engineer/Public Works Director. 51. Construction Hours. City acknowledges that this site PW During Public is within a commercial district, with no surrounding Construction Works residential areas. Standard construction and grading and Grading hours shall be limited to weekdays (Monday through Activities Friday) and non-City holidays between the hours of 7:30 a.m. and 5:00 p.m. The Applicant/Developer may request reasonable modifications to such determined days and hours, taking into account the seasons, impacts on neighboring properties, and other appropriate factors, by submitting a request form to the City Engineer/Public Works Director. For work on Saturdays, said request shall be submitted no later than 5:00 p.m. the prior Wednesday. Overtime 11 of 14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: inspection rates will apply for all after-hours, Saturday, and/or holiday work. 52. Construction Noise Management Plan. Developer PW During Public shall prepare a Construction Noise Management Plan, Construction Works to be approved by the City Engineer and Community and Grading Development Director that identifies measures to be Activities taken to minimize construction noise on surrounding developed properties. The Plan shall include hours of construction operation, use of mufflers on construction equipment, speed limit for construction traffic, haul routes and identify a noise monitor. Specific noise management measures shall be included in the protect plans and specifications. 53. Dust Control. The Developer shall be responsible for PW During Public watering or other dust-palliative measures to control Construction Works dust as conditions warrant or as directed by the City and Grading Engineer. Activities 54. Temporary Construction Fencing. Temporary Various During Public Construction fencing shall be installed along the Construction Works perimeter of all work under construction to separate and Grading the construction operation from the public. All Activities construction activities shall be confined to within the fenced area. Construction materials and/or equipment shall not be operated or stored outside of the fenced area or within the public right-of-way unless approved in advance by the City Engineer/Public Works Director. 55. Fire Access. Access roads, turnarounds, pullouts, Various During Fire and fire operation areas are Fire Lanes and shall be Construction maintained clear and free of obstructions, including and Grading the parking of vehicles. Activities 56. Entrances. Entrances to job sites shall not be Various During Various blocked, including after hours, other than by approved Construction gates/barriers that provide for emergency access. and Grading Activities DUBLIN SAN RAMON SERVICES DISTRICT (DSRSD) 57. Prior to issuance of any building permits, complete DSRSD Issuance of DSRSD improvement plans shall be submitted to DSRSD that Building conform to the requirements of the Dublin San Ramon Permits Services District Code, the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water Wastewater Facilities," all applicable DSRSD Master Plans and all DSRSD policies. 58. Prior to issuance by the City of any Building Permit or DSRSD Issuance of DSRSD Construction Permit by the Dublin San Ramon Building Services District, whichever comes first, all utility Permits connection fees including DSRSD and Zone 7, plan checking fees, inspection fees, connection fees and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and scheduled established in the DSRSD Code. 12 of 14 CONDITION TEXT RESPON. WHEN REQ'D SOURCE AGENCY Prior to: 59. Prior to issuance by the City of any Building Permit or DSRSD Issuance of DSRSD Construction Permit by the Dublin San Ramon Building Services District, whichever comes first, all Permits improvement plans for DSRSD facilities shall be signed by the District Engineer. Each drawing of improvement plans shall contain a signature block for the District Engineer indicating approval of the sanitary sewer or water facilities shown. Prior to approval by the District Engineer, the Applicant shall pay all required DSRSD fees, and provide an engineer's estimate of construction costs for the sewer and water systems, a performance bond, a one-year maintenance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The Applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before si nature by the District Engineer. 60. No sewer line or waterline construction shall be DSRSD Issuance of DSRSD permitted unless the proper utility construction permit Building has been issued by DSRSD. A construction permit will Permits only be issued after all of the items in Condition 9 have been satisfied. 61. The Applicant shall hold DSRSD, its Board of DSRSD On-going DSRSD Directors, commissions, employees and agents of DSRSD harmless and indemnify and defend the same from any litigation, claims or fines resulting from the construction and completion of the project. 62. Improvement plans shall include recycled water DSRSD Issuance of DSRSD improvements as required by DSRSD. Services for Building landscape irrigation shall connect to recycled water Permits & on- mains. Applicant must obtain a copy of the DSRSD going Recycled Water Use Guidelines and conform to the requirements therein. 63. DSRSD encourages the Applicant to install a carwash DSRSD On-going DSRSD station that has a built-in recycling system to minimize water consumption. 13 of 14 PASSED, APPROVED AND ADOPTED this 12th day of November 2013 by the following vote: AYES: NOES: ABSENT: ABSTA IN: Planning Commission Chair ATTEST: Acting Community Development Director G:IPA#120131PLPA-2013-00049 Buick GMC CarWashlPC Reso SDR.CUP.doc 14 of 14