Loading...
HomeMy WebLinkAbout4.05 DoughertyRdTree00-15CITY CLERK FILE # 600-35 SUBJECT: 'CITY COUNCIL AGENDA STATEMENT MEETING DATE: November 21, 2000 Award of Bid - Contract No. 00-15, Dougherty Road Tree Planting Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) 2) 3) Resolution Budget Change Form Summary of Bid Results RECOMMENDATION: Adopt resolution awarding bid to Greenline Landscaping and approve a budget increase from unallocated General Fund Reserves in the amount of $3,358.00 FINANCIAL STATEMENT: Budget Low Bid Improvements: 10% Contingency: $20,240 $21,453 $ 2,145 TOTAL: $23,598 The cost of this project is paid 'from the City's General Fund (001). The low bid received was $21,453.00. Due to additional conduits required for irrigation wiring, a budget increase of $3,358 (including a 10% contingency) from General Fund (001 ) Reserves is necessary to complete this project. DESCRIPTION: On October 17, 2000, the City Council authorized Staff to solicit bids for Contract No. 00-15, Dougherty Road Tree Planting. This project will plant approximately 54 Sycamore trees (15-gallon size) along the east side of Dougherty Road between Amador Valley Boulevard and 350 feet north of Willow Creek Drive. Work will also include extending the irrigation system with bubblers to service the trees. At present, the east side of Dougherty Road is landscaped with trees from the Camp Parks entrance to Amador Valley Boulevard. This project will continue the row of trees north along Dougherty Road to an existing drainage swale just north of Willow Creek Drive. The land past this location to the northern City limit line drops away from the road and cannot be planted with trees until the roadway is widened to its ultimate configuration. A total of 5 bids were received (see Attachment 3). The qualified low bidder is Greenline Landscaping, with a bid of $21,453. DB Landscape's bid did not include a signed addendum, and thus, is disqualified as being unresponsive. Staff has reviewed the bids, determined that the low bid contractor has successfully performed similar projects, and recommends that the City Council adopt the resolution awarding Contract No. 00-15 to Greenline Landscaping and approve budget increase of $3,358 from General Fund (001) Reserves. COPIES TO: g:\miscproj\Dougherty Rd Tree PlantingXAS Award Bidders ITEM NO. RESOLUTION NO. -00 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 00-15 DOUGHERTY ROAD TREE. PLANTING TO GREENLINE LANDSCAPING. WHEREAS, the City of Dublin did, on November 14, 2000, publicly open, examine, and declar~ all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 00-15, Dougherty Road Tree Planting, authorized by the City Council on October 17, 2000, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 00-15 to the lowest responsible bidder therefor, to wit Greenline Landscaping, with a bid of Twenty One Thousand Four Hundred Fifty Three Dollars ($21,453), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 21 st day of November, 2000. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g.' tmiscprojlDougherty Rd Tree Planting~resoawrd CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): From Unappropriated Reserves {If Other than General Fund, Fund No - From New Revenues DECREASE BUDGET ':~iCCO.UNT . Name: A~TO U~'T Account #: Name: CHANGE FORM # 1 Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other INCREASE BUI)GET ACCOUNT AMOUNT 'Name: Dougherty Road Tree Planting - Improvements Account #: 001~94192-750-050 $3,358.00 Account #: Name: Account #: Name: Nallle: Account #: Name: Account #: Account #: Name: Account #: City Manager: ASD/Fin Mgr ~L~#.~ ~. Signature '~~ature REASON FOR BUDGET CHANGE ENTRY: 1) Low bid for improvements, plus 10% contingency, is higher than budgeted amount. Date: Date: Mayor: Posted By: HACC-FORMSXFORM-budget change. doe Signature Signature Date: Date: TOTAL TOTAL PRICE UNIT PRICE PRICE $ 8,100.00 $ 206.00 $11,124.00 $25,80~.0~0 $ 3~,029.00 $37,029.00 $ 33,900.00 $ 48, 153.00 luded. BID RESULTS - DOUGHERTY ROAD TREE PLANTING, CONTRACT NO. 00-15 BID OPENING DATE - NOVEMBER 14, 2000 _ " ENGINEER'S ESTIMATE * D.B. LANDSCAPE GREENLINE LNDSCPG PACHECO BROTHERS BLO~S(: BID UNIT TOTAL TOTAL TOTAL TOTAL ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE I 15-Gallon Sycamore Tree EA 54 $ 100.00 $ 5,400.00 $ 100.00 $ 5,400.00 $ 79.00 $'4,266.00 $ 195.00 $10,530.00 $ 150.00 2 Irrigation System LS I $17,800.00 $17,800.00 $10,000.00 $10,000.00 $17,1~7.00 $17,187.00 $11+710.00 $11,710.00 $25,800.00 TOTAL BID: $23,200.00 * $15,400.00 $21,453.00 $22,240.00 · D.B. Landscape's bid was declared non-responsive as the addendum was not I