HomeMy WebLinkAboutItem 4.08 G&O Status 1999 CITY CLERK # 100-80 AGENDA STATEMENT CITY COUNCIL MEETING DATE-: (September 7, 1999) SUBJECT: 1999 Goals & Objectives Status Report Report Prepared by: Richard C Ambrose, City Manager ATTACHMENTS: RECOMMENDATION: Report '~Receive Report FINANCIAL STATEMENT: None DESCRIPTION: Ou March 18, 1999, the City Council adopted its 1999 Goals & Objectives Program. In order to keep the City Council abreast of staff progress towards the objectives assigned by the City Council in March of 1999, staff has prepared a status report for the period ending July 31, 1999. As of that,date,'a total of 25 of 123 goals (20.3%) have been completed. With respect to high priority goals, a total of 23 out of 90 have been completed (25.5%). There 'have been an additional 11 major assortments since March 1999. 2 of the 11 have been completed as of July 31, 1999. It is staff's recommendation that the City 'Council receive the report. H/cc-forms/agdastmt. doc COPIES TO: ITEM NO. PROGRAM AREA/GOAL I COUNCIL i PERSON PRIORITY RESPONSIBLE I. GENERAL GOVERNMENT-: L': '" · .~' :,.~; A. ADMINISTRATION High Ambrose High Carter High Cader High Peabody Fligh Keck High Ambrose High Ambrose High Stevens High Cader High Keck High Keck Medium Stevens Medium Carter Medium Thuman I# ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07/31199 PAGE 1 tYEAR I PROPOSED OBJECTIVE FOR I STATUS ACCOMPLISHING GOALS . '.... ', :,,...',~ :.~::-'. ~;'.'~::~.:~ i!~;.r',.:~;~,~.'..;,:'~.;~:~,~.'.:.i;.":.:,":~,'. :.;!.=:'.!:=;-'.:';'..;'.~,~.*~..'..~.~:-:~ .i,,' .'.:.'.,'.i~::!~: ~...:'~!-~.".~,.' !~!.;!~;~;.~'!~~~".~!'~!:~;':.!;?-,~::$~..~ 1. 98 2. 98 3. 98 97 98 99 98 98 95 99 99 98 98 95 10. 11. 12. 13. Implement Civic Center Modifications to accommodate growth in City Renegotiate Cable Television .. Franchise Agreement Repod on all systems utilizing data processors to determine that the systems are Year 2000 compliant and that systems will function Complete implementation of Automated Permit Tracking System Identify and select the most appropriate records retention technology Complete Building Program and Schematic Design for New Library Negotiate transfer of existing Library building and land from County to City Evaluate adequacy of phone system and voice mail for City facilities outside Civic Center Update Performance Evaluation Process. Fund Sister City Reception Event Investigate membership in City Sister International Organization Develop an Information Systems Disaster Recovery Program Develop an Internet Use Policy Revisions to Parking Citation Program to Comply with Current Law (Revisions effective 111196) UNDERWAY; Council to consider bid award. UNDERWAY; First in a series of status reports sent to City Council. Next repod due 12/99. UNDERWAY; Y2K Web site information posted. Report to Council due September 1999. UNDERWAY; Estimated completion by July, 2000. UNDERWAY; Developed RFP for Council consideration in September 1999. UNDERWAY; Architect hired; Building program underway. COMPLETE; MOU to be presented to Council and Board of Supervisors. UNDERWAY; RFP issued for new maintenance contract. UNDERWAY Funds included in 1999-2000 Budget. Not currently aware of any pending visits. UNDERWAY NO PROGRESS NO PROGRESS NO PROGRESS PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE Medium Petersen/ Thompson Medium Keck Medium Cader/Stevens Medium Stevens ADDITIONAL OBJECTIVES (ADMINISTRATION) Keck Ambrose "S, FIN'~,i~i'CE High Ambrose/Lowart High Assistant City Manager High Ambrose High Ambrose/Peabody High Assistant City Manager Medium Assistant City Manager 15. 16. 17. 18. 19 20 3. 4. 5. ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 2 YEAR 93 98 99 98 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Undertake Americans Disability Act (ADA) Self-Evaluation of Facilities. Investigate feasibility of expanding Sister City Program to include other cities Expand information on City's Website Develop a Geographic Information System (GIS) including the integration of existing City information systems 99 99 Undertake study of Commission compensation Work with Library on Developing funding proposal for Library materials 96 97 98 99 97 96 Develop Implementation Guidelines for Public Facility Fees Complete installation of a new Financial Accounting System Develop Financial Plan for funding Civic Center Library Undedake Formation of Dublin Ranch Infrastructure Financing District Develop Financial Plan which assures that Equipment Fire Apparatus and Major Building Components will be replaced in a timely manner Report on cost effective alternatives for processing small purchases. (Cal Card Program- Sponsored by the State of California) STATUS (See Engineering#2 & #3). UNDERWAY UNDERWAY UNDERWAY; hardware purchase complete; pending consultant installation. UNDERWAY UNDERWAY UNDERWAY; draft guidelines complete; meeting with development community 9/99; guidelines to City Council 10/99. NEARLY COMPLETE. Will install computerized cash register at Shannon in September, the last remaining item to be installed. COMPLETE UNDERWAY; Financing team being selected. COMPLETE NO PROGRESS PROGRAM AREA/GOAL COUNCIL PRIORITY Medium Medium Low PERSON RESPONSIBLE Assistant City Manager Assistant City Manager , Peabody ADDITIONAL OBJECTIVES (FINANCE) C. I~:rERG0~/ER~NTA[. RELAtiONS High Assistant City Manager All Depts High All Depts High Ambrose/Lowad ADDITIONAL OBJECTIVES (INTERGOVERNMENTAL RELATIONS I D. PUBLIC hELA'TION~ , High Lowart High Carter High Carter # 7. 8. 10 , ADOPTED '1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07/31199 PAGE 3 YEAR 98 91 99 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Repod to Council on local preference purchasing practices Update the Purchasing Ordinance (incorporates policy related to the purchase of recycled products) Revise/amend Public Art Policy to require development to pay a 1% impact fee for Public Art 99 Prepare modification to purchasing ordinance to raise threshold of minor purchases and incorporate language regarding local vendors 99 99 99 98 99 98 Aggressively monitor activities of other regional local agencies which directly impact Dublin. Meet jointly with representatives from other agencies. Study Joint Use Agreement with School District for Joint Technology Project & After School Daycare Update Cultural/Leisure Service and Facility Promotional BrOchures Coordinate production of one Video Newsletter Upgrade Council meeting presentations STATUS COMPLETE NO PROGRESS NO PROGRESS NO PROGRESS UNDERWAY UNDERWAY UNDERWAY; Report to Council on technology September 1999. I COMPLETE NO PROGRESS; due March 2000. NEARLY COMPLETE - Equipment purchased and City employee training underway. ADOPTED 1999 GOALS & OBJECTIVES BI~MONTHLY REPORT AS OF 07131199 PAGE 4 PROGRAM AREA/GOAL COUNCIL PERSON # YEAR PRIORITY RESPONSIBLE High Cader 4. 99 Medium Cader ' 5. 99 Medium Cader 6. 99 ADDITIONAL OBJECTIVES (PUBLIC RELATIONS) E. CONTRA~T.~,D(~INISTRA~'ION High PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Support Sponsorship of Teacher Participation in League of California Cities "Participating in Local Government Program" Publish a City Newsletter Develop a plan to implement "Know Your City Week" I I I STATUS UNDERWAY; Coordinating Efforts with DUSD for advertising August. 2000 program. NO PROGRESS- Not funded in 1999-2000 Budget. NO PROGRESS Perform contractor evaluation on the following service contracts: Carter 1. 99 Crossing Guards COMPLETE Peabody 2. 99 Building & Safety UNDERWAY Rankin 3. 98 Animal Shelter Services UNDERWAY Thompson 4. 99 Public Works Maintenance COMPLETE High Ambrose 5. 96 Report to Council on Countywide NO PROGRESS review of Library Services ADDITIONAL OBJECTIVES (CONTRACT ADMINISTRATION) A, PLANNING High Peabody 1, 99 Process $250 million in building valuation Specific Plan for Village Parkway Land Use. Plan Work with BART and Pleasanton to develop Specific Plan for Western BART Station area High Peabody/Thompson 4. 99 Prepare Plan for downtown physical UNDERWAY improvements High Peabody 2. 99 High Peabody/Ambrose , 3. 99 UNbERWAY; $34,6 million processed to date, UNDERWAY UNDERWAY PROGRAM AREA/GOAL COUNCIL PRIORITY High High High High High High High Medium Mediurn Medium Medium Low Low ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07/31199 PAGE 5 PERSON # YEAR RESPONSIBLE Peabody 5. 99 Peabody/Thompson 6. 98 Peabody 7. 99 Peabody 8. 99 Peabody 9. 99 Ambrose 10. 99 Peabody 11. 98 Peabody 12. 96 Peabody 13. 99 Peabody/ThompSon 14. 96 Peabody 15. 97 Peabody/Ambrose 16. 99 Peabody 17. 98 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Implementation Program for Inclusionary Housing Ordinance (include review of Senior Housing) Develop Street Landscape Master Plan for eastern Dublin Undertake General Plan Study or proposed Western Dublin Urban Limit Line Specific Plan for Downtown Core Shopping Area (Montgomery Wards Shopping Center) Study establishment of a Redevelopmerit Design Review Committee for project areas identified by City Council Send letter requesting land from Camp Parks for a Cemetery for Dublin Report to Council on Heritage Tree Ordinance Housing Element Update Revise General Plan and Zoning Maps and create new City maps Develop City Talecommunication Policy beyond Zoning Ordinance amendments for wireless communication Update & conduct 5 year review of Dublin's General Plan Undertake General Plan Amendment for eastern Dublin Transit Center Develop and implement a Camp Parks Affordable Housing Project STATUS UNDERWAY UNDERWAY; Enabling Ordinance to Council in Sept 1999. UNDERWAY- DUE MAY, 2000 UNDERWAY Scheduled after approval of Redevelopment Feasibility Study (Spring, 2000) NO PROGRESS Complete repod to City Council September 1999, NO PROGRESS NO PROGRESS UNDERWAY; Due Aug, 2000 NO PROGRESS : NO PROGRESS; Not filed by Alameda County Surplus Property Authority. NO PROGRESS PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE LOw Peabody ADDITIONAL OBJECTIVES(PLANNING) Peabody B. BUILDING & SAFETY High Peabody High Peabody ADDITIONAL OBJECTIVES (BUILDING & SAFETY) C. Ei'IGli'iF=~RihG High Thompson Medium Thompson Medium Thompson ADDITIONAL OBJECTIVES (~:NGINEERING) D. ECONOMIC DEVELOPMENT High Foss High Foss 19 I ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 6 YEAR 98 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Study feasibility of developing a recreational vehicle storage facility in Dublin 99 99 98 Prepare work program for accomplishing all assigned advanced planning studies, Provide three building code seminars for the counter staff and inspectors Adopt 1997 UBC, UPC, UMC, and 1995 NEC Ordinances (include review of wood burning fireplaces) 98 98 96 Develop plan for completion of handicap ramp project Evaluate need for Traffic Signal Audio Warning Devices Update and expand standard street improvement detail (street lights, decorative paving median landscaping) 99 99 Prepare and distribute "Space Available" repods three times a year Make 400 business retention contacts for the City STATUS NO PROGRESS COMPLETE UNDERWAY - 1" seminar scheduled in Sept. 1999. COMPLETE COMPLETE; Report to Council in January 2000 with next CDBG grant funding cycle. UNDERWAY; One signal scheduled for audio signals-completed installation. Study underway. NO PROGRESS IIII UNDERWAY; 1't report available in September 1999. UNDERWAY; 20 contacts made. PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE High Foss High Ambrose/Foss High Foss High Silver High Foss High Foss High Foss Medium Foss Medium Foss Mediunl Foss/Cader Medium Foss Low Peabody ADDITIONAL OBJECTIVES (ECONOMIC DEVELOPMENT) Ijl.': C~jLTdRE & LEISURE?;i?:! ,:-: ,: A. PARKS & COMMUNITY SERVICES High Lowad High Lowart # 3. 4, 5. 6, 7. 8. e 10. 11. 12, 13. 14. ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07/31199 PAGE 7 YEAR 99 98 99 98 99 99' 98' 97 98 99 99 95 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Target 200 mailings to attract business to Dublin Undertake a Redevelopment Feasibility Study Participate in selectedtrade shows to market properties in Dublin Report on options related to private landowner lease/deed restrictions Implement 2"4 year Farmers' Market Create video to distribute to · business/realtors to attract home buyers & businesses to Dublin Work with Chamber on "Discover Dublin" Program Update Eastern Dublin Development Brochure Participate in Tri-Valley Visioning Project Suppod/subsidize "One Stop" Career Center Program Increase Mailings from 200 to 300 to attract business to Dublin Locate & procure site for "Welcome to Dublin" sign in western Dublin STATUS UNDERWAY; 21 letters sent to prospective businesses. UNDERWAY; RFP issued; recommendation to City Council in late September, 1999. UNDERWAY; Reviewing 2000 event schedule. COMPLETE Market UNDERWAY; July status report to be submitted in August. UNDERWAY; Met with several vendors regarding video project. UNDERWAY NO PROGRES~ NO PROGRESS COMPLETE; Included in 1999-2000 Budget. UNDERWAY; See Item 3. NO PROGRESS I 98 97 Prepare Park Development Standards Evaluate Dublin Library for use as a Senior Center COMPLETE. NEARLY COMPLETE; Draft Report to City Council once response has been received from Alameda County on future of existing Library. PROGRAM AREA/GOAL COUNCIL PRIORITY High High High High High High High High High High PERSON RESPONSIBLE Thompson Lowart Lowart Lowad Lowart Ambrose Lowart Lowart Lowad 3. ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 8 YEAR 92 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Work with EBRPD and Alameda County to complete development of unbuilt portion of Iron Horse Trail go 10, 11, 12. 98 95. 99 99 99 99 99 g7 99 Complete design for Dublin Ranch Phase I Neighborhood Park Develop a Parks Implementation Plan for eastern Dublin Develop a marketing plan for Old St. Raymond's Church and increase ~entals by 25% Pursue construction of a storage unit on the Dublin Heritage Center grounds Work with Dublin Fine Ads Foundation to complete pending "Art in the Park" projects Conduct Feasibility Study analyzing costs associated with increased Library hours Establish Heritage & Cultural Ads Commission (combine Dublin Fine Arts & Heritage Committee) Pursue development of additional athletic fields at Dublin Elementary School, provided funding is available Evaluate the needs for afterschool and summer programming for middle school students and implement recommended programs STATUS UNDERWAY; Portions from Amador Valley Blvd, to Alamo Creek Trail Junction and from the Junction to Doughedy Rd are under construction. Scheduled for Spring 2000 completion. The City has received and reviewed preliminary County plans for third segment from Doughedy Rd to BART- Scheduled for Summer 2000 completion. COMPLETE. NO PROGRESS UNDERWAY - Marketing Plan complete; too early to assess impact on rentals, NO PROGRESS UNDERWAY; projects for Mape Memorial and Kolb Parks approved by City Council; DFAF fundraising drive underway. COMPLETE COMPLETE COMPLETE COMPLETE PROGRAM AREA/GOAL COUNCIL PRIORITY High PERSON RESPONSIBLE High High Lowart Ambrose/Lowart High Lowart High Peabody Medium Lowad Medium LowartFrhompson Medium Lowart ADDITIONAL OBJECTIVES (PARKS & COMMUNITY SERVICES Lowad . ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 9 14. 15. 16. 17, 18. 19. 20. 21. 22. YEAR 98 99 97 94 99 99 99 99 9g 99 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Investigate the feasibility of contracting for concessions ai the Dublin Swim Center Snack Bar Evaluate the feasibility of developing a "sidewalk caffi" for summedime barbecue lunches at the Dublin Senior Center Work with U.S. Army to secure conveyance/lease for a 20 acre sports park at Camp Parks Update the Agreement between City & Dublin Unified School District regarding use of school facilities Work with County & EBRPD to evaluate possibility of purchasing parklands or landswap for land outside Urban Limit Line in Western Dublin Evaluate what hours the Heritage Center should be open to maximize public visits and increase open hours Investigate the feasibility of relocating the Holiday Tree Lighting outdoors on the Civic Center Grounds Expand Dublin Swim Center season through September Oversee contract with Good Times Promotions, Inc. for City sponsorship of 1999 Pasta Festival. Undertake an assessment of community interest in arts and heritage programming. STATUS COMPLETE COMPLETE UNDERWAY; Will discuss with new Camp Parks Commander. UNDERWAY - draft agreement complete. UNDERWAY; Open Space Study will be complete May, 2000 NO PROGRESS- NOT FUNDED in 1999-2000 Budget. UNDERWAY; Report on feasibility and cost to City Council 9/99. Funding included in FY99-O0 Budget but due to need to repair plaster, season will not be expanded this year. UNDERWAY - plans proceeding according to schedule. NO PROGRESS PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE Lowart IV. PUBLIC SAFETY A. POLICE High Thumar~ High Thuman High Thuman Medium Thuman ADDITIONAL OBJECTIVES (POLICE) Thuman Thuman e. Ai, I'~'M~,E~ON~,OL ADDITIONAL OBJECTIVES (ANIMAL CONTROL) C. FIRE SERVICES High McCammon High Peabody/ McCammon High Ambrose/ McCammon ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 10 YEAR 99 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Undedake feasibility study for a BMX park. 98 98 97 99 99 99 Develop and implement a Citizens Volunteer Program for Dublin Police Services Explore the feasibility of a Police Youth Academy Develop a Police Officer Trading Card Program (ADOPT-A-COP) Develop and implement a taxi-cab safety inspection program in conjunction with the Dublin Police Services Traffic Unit Complete evaluation of Smart Kids/Safe Kids program Repod to Council on Police dispatch service alternatives 9g 98 g9 Adopt 1997 Uniform Fire Code with City amendments Finalize future locations for fire stations in eastern Dublin Establish financing and time line for new fire station construction STATUS UNDERWAY UNDERWAY; Considerable research has been completed. COMPLETE UNDERWAY; Cost estimates have been received; preliminary proposal has been drafted for ChieFs review. UNDERWAY; Minor progress has been made; Some contact has been made with other law enforcement agencies to determine their approach to the taxicab safety inspection program. UNDERWAY UNDERWAY COMPLETE UNDERWAY; 2"" Draft to City Manager 9/99 - due to be complete 9/99, UNDERWAY PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE High Ambrose High Ambrose/ McCammon ADDITIONAL OBJECTIVES (FIRE SERVICES) I I D. DISASTER PREPAREDNESS High Carter Low Carter ADDII'IONAL OBJECTIVES (DISASTER PREPAREDNESS) E. High Carter High Carter High Cader High Cader ADDITIONAL OBJECTIVES (WASTE MANAGEMENT) I Cader o 5 ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 1 '1 YEAR 98 99 1 99 97 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Complete agreement with Alameda County and City of San Leandro to share reserve fire truck Padicipate in joint fire station design process with Alameda County and the City of San Leandro I Undedake Multi-functional Disaster Training EXercise Develop a formal Disaster Service Worker Program 99 98 98 93 99 Monitor and evaluate effectiveness of the expanded Commercial Recycling Program Develop school recycling program within parameter of commercial recycling program Work with selected consultant to complete review of progress toward meeting AB939 ~ Year 2000 diversion goals Conduct a survey related to participation in the curbside/multifamily recycling programs IInvestigate use of Construction Recycling Trailer STATUS COMPLETE UNDERWAY UNDERWAY; Exercise scheduled for 10/99. NO PROGRESS UNDERWAY; Next status report from Waste Management due November 30, 1999. UNDERWAY; Completed distribution of containers. Implementation to begin in conjunction with new school year (September 1999 ). UNDERWAY; Report to Council 10/99.. COMPLETE - Results and response to citizen survey published in Waste Management newsletter and additional issues to be addressed in above AB939 report. UNDERWAY; Investigating possible venues. PROGRAM AREA/GOAL _~COUNCIL. PERSON PRIORITY RESPONSIBLE V..TI~NSPORTATION ':: :~':':!.~i.~; .":'.i :~' :::!:~ ': :'i~..': ' ~'~; :~' A. MAINTENANCE High Thompson High Thompson Medium Thompson/Peabody ADDITIONAL OBJECTIVES (MAINTENANCE) I B. TR~N~PORTA~IO~ High Thompson High High High High ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 12 IYEAR 99 IPROPOSED OBJECTIVE FOR ~ STATUS ACCOMPLISHING GOALS '= ~:: =';. :;!:~, ~:;::.i.:, :-":';i': .,: ': !: ". :,: ~.i '::::: ;! ~: ·i~, :i .. · .~;,~::.'i.i:~::: :: i. =i~:; :' :!~.:.. · ;=:, 98 92 97 Implement five (5) new community volunteer projects Develop Street Lighting Assessment District for eastern Dublin Identify potential locations for new City maintenance yard facility COMPLETE; 1) Eagle Scout Project- John Monego Memorial Plaque 2) Eagle Scout Project - Dolan Park: Refurbished playground equipment, painted gazebo & bike racks/railings, replaced boards in picnic area 3) Eagle Scout Project - Flag Retirement Ceremony 4) Eadh Day - Creek Cleanup 5) Heritage Center - Ivy cle.~.ned up by 2 high school students COMPLETE UNDERWAY; Have made contact with Camp Parks & GSA (County) with no success yet. Thompson 2. 97 Ambrose/Peabody 3. 97 Ambrose/ 4. 97 Thompson Thompson 5. 95 Monitor Caltrans and ACTA on the construction of the 1-580/I-680 Interchange and downtown hook ramps Update Eastern DUblin Traffic Impact Fee Work with BART to develop additional parking. Work with Contra Costa County to pay for needed roadway improvements in Dublin Complete alignment studies for Eastern Dublin major aderials (Fallon Rd) UNDERWAY UNDERWAY; Draft fee study complete. UNDERWAY; To be included as part of transit area proposal by County. NEGOTIATIONS UNDERWAY UNDERWAY; Have received preliminary alignment study from developer. PROGRAM AREA/GOAL COUNCIL PERSON PRIORITY RESPONSIBLE High Thompson Medium Thompson ADDITIONAL OBJECTIVES (TRANSPORTATION) J Thompson H:~G&O\CM~jason-asof7-31-99.doc 9/3/gg 1:30 PM ADOPTED 1999 GOALS & OBJECTIVES BI-MONTHLY REPORT AS OF 07131199 PAGE 13 # 6. 7. j8 YEAR 99 88 99 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOALS Padicipate in development of Measure B Reauthorization Program Report to City Council on Downtown Traffic Impact Fee Report to Council on handicap access to BART STATUS UNDERWAY NO PROGRESS COMPLETE