Loading...
HomeMy WebLinkAboutReso 176-03 AprvSiteDevDubHonda RESOLUTION NO. 176 - 03 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING SITE DEVELOPMENT RENEW FOR ~N HARVEY/DUBL!N HONDA FOR EXPANSION AND RENOVATI°N °FTHE HONDA AUTO DE~ERSHIP i LOCATED AT 7099 AMADOR PLAZA ROAD PA 02-031 WHEREAS, the Applicant/Property Owner has requested approval of a Site Development Review in conjunction with a PD Planned Development rezoning and Stage 2 Development Plan and Master Sign Program to expand and renovate the Dublin Honda auto dealership located at 7099 Amador Plaza Road, within the Downtown Core Specific Plan area and the PD Planned Development Zoning District; and WHEREAS, the proposal is to remodel and expand the showroom area of the dealership, and renovate the exterior of the building to meet the requirements of the Honda Corporation for their franchises (see Attachment 2, Exhibit A-2, Project Plans prepared by Michael Zucker & Associates, dated June 12, 2003). Additionally, approximately 19,000 square feet would be constructed for a larger service area with an open parking area on the second level for vehicle storage and overflow parking, and the vehicle drop-off area is proposed to be expanded and covered to provide two entry lanes and one exit lane, resulting in a total square footage of approximately 33,100; and WHEREAS, a complete application for the above noted entitlement request is available and on file in the Community Development Department; and WHEREAS, the project has been reviewed in accordance with the California Environmental Quality Act (CEQA), the State CEQA Guidelines and the City of Dublin Environmental Guidelines and is Categorically Exempt from the provisions of CEQA, the State CEQA Guidelines and the City of Dublin Environmental Guidelines, under Section 15061 (b)(3) and Section 15332, as there is no potential for significant environmental effects to occur as a result of the project and the project would be located on an infill site which was previously improved with structures, utility service and other improvements; and WHEREAS, the City adopted the Downtown Core Specific Plan on December 19, 2000 which was prepared pursuant to Government Code Sec. 65450 et seq.; and, WHEREAS, the Specific Plan includes permitted land uses, development standards, urban design guidelines, transportation improvements and implementation programs to achieve the goals of the Dublin General Plan; and, WHEREAS, the Specific Plan land use category/designation for the Honda auto dealership site is R/A Retail/Auto land use, which includes sales and service of new and used vehicles. The Specific Plan established increased Floor-Area-Ratios (FARs) for properties within the Plan area, including the Dublin Honda property, which is the maximum FAR of.79 or 79 %. With the expansion of the showroom and the new service and repair center, the resulting FAR will be .55 or 55%; therefore, the project would be consistent with the maximum allowable FAR established by the Downtown Core Specific Plan; and, WHEREAS, the project is consistent with the Dublin General Plan as the land use designation for the site is Retail/Office, which allows certain automotive uses that are new or existing. Approval of the project would allow the existing Honda auto sales and service at the site to continue operations, and also expand the facility to provide improved auto related sales and services to the community. Additionally, the project is consistent with the Land Use Element of the General Plan, which contains Guiding Policy 2.2.2A stating that the City's policy is to keep automobile dealers in Dublin; and WHEREAS, the Planning Commission did hold a public hearing on the project on July 8, 2003 on the PD Planned Development Rezoning, Site Development Review, and Master Sign Program, and recommended approval of the project to the City Council; and WHEREAS, proper notice of said public hearing was given in ali respects as required by law; and WHEREAS, a Staff Report was submitted to the Planning Commission recommending that the City Council approve the application; and WHEREAS, the Planning Commission did hear and use their independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth; and WHEREAS, the City Council did hold a public hearing on the project on August 19, 2003 on the PD Planned Development Rezoning, Site Development Review, and Master Sign Program; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted to the City Council recommending approval of the application; and WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth; and WHEREAS, the City Council has determined that the proposed project is appropriate for the subject site. NOW, THEREFORE, BE IT RESOLVED THAT THE City Council of the City of Dublin does hereby adopt a Resolution approving PA 02-031, the Site Development Review for the Ken HarVey/ Dublin Honda Auto Dealership, and does hereby make the following findings: 1. The Ken Harvey~ublin Honda project is consistent with the intent and purpose of Chapter 8.104 Site Development Review of the Zoning Ordinance. 2. The approval of this application, as conditioned, is in the best interest of the public health, safety and general welfare. The proposed site development, including site layout, structures, vehicular access, circulation, setbacks, height, fencing, public safety and similar elements has been designed to provide a desirable environment for the development and the public. 4, The proposed parking lot will provide sufficient parking for the auto dealership use with a total of 180 parking spaces, where 121 parking spaces are required for the dealership based on the various 2 uses in the building. Therefore, adequate on-site parking would be provided to meet parking demand for the various land uses and activities proposed for the project. Architectural considerations, including the character, scale and quality of the design, the architectural relationship with the site and other buildings; building materials and colors; screening of exterior appurtenances; and exterior lighting and similar elements have been incorporated into the project in order to insure compatibility of this commercial development with the development's design concept or theme and the architectural character of the surrounding retail and commercial uses. o The proposed signage for the project is compatible with the design of the auto dealership, surrounding uses, and other design elements in the project, and a Master Sign Program is part of the project application submitted for approval. The approval of the SDIL as conditioned, will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and general welfare because it promotes a design quality and well-developed sign program that provides effective and attractive identification of Honda auto dealership without detrimentally impacting traffic or circulation visibility. The proposed SDR considered site layout, vehicular access, circulation and parking, setbacks, height, walls, public safety and similar elements, to ensure a desirable environment for the development. o Landscape considerations, including the location, type, size, color, texture and increased coverage of plant materials, the proposed pedestrian access areas and similar enhanced landscaping elements have been considered to ensure visual relief and ~ attractive enviro ~nment fo[ the public. BE IT FURTHER RESOLVED THAT THE Dublin City Council hereby approves PA 02-031, the Ken Harvey/Dublin Honda Site Development Review request to construct an approximately 23,500 square foot expanded area.and renovate the interior and exterior of the existing building at 7099 Amador Plaza Road for a total of approximately 33,100 square feet, as generally depicted by the plans, labeled Exhibit A-2 of the PD Planned Development and Stage 2 Development Plan, consisting of 13 sheets prepared by Michael Zucker & Associates, dated received by the Planning Department on June 12, 2003, subject to the approval of the PD Planned Development and Stage 2 Development Plan, and compliance with the following conditions: CONDITIONS OF APPROVAL Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Department of Community Development review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL] Planning, lB] Building, [PO] Police, [PW] Public Works [ADM] Administration/City Attorney, [FIN] Finance, IF] Alameda County Fire Department, IDSR] DUblin San Ramon Services District, [CO] Alameda County Department of Environmental Health. 3 AGENCY REQ~D (P~0r to) GENERAL CONDITIONS 1. Planned Development Rezoning. 'This approval shall be PL Building Permit as generally depicted on the project plans and Development Plan labeled Exhibit A-1 ~and A-2 of the PD Planned Development Rezoning and Stage 2 Development Plan, dated received June 12, 2003, and prepared by Michael Zucker & Associates, consisting of 13 sheets. 2. Fees. Prior to the issuance of a buiiding permit, all B, PL, Building Permit applicable fees shall be paid. These fees shall include, ADM but not be limited to, those fees required by City Ordinances such as Traffic Impact Contribution Fees, School Impact fees, Fire Impact fees, Regional Transportation Fees, or any other that may be adopted. In addition, all fees required by DSRSD, ACF, Zone 7, shall be paid in accordance with those Agencies' ordinances and regulations. 3. Compliance with Agencies.' The Applicant/Developer. F, PW, PO, priOr to issuance Of shall comply with applicable Alameda County Fire, Z7, DSR, Building Permits Dublin Public Works Department, Dublin Building PL Department, Dublin Police Service, Alameda County Flood Control District Zone 7, Alameda County Public Health, and Dublin San Ramon Services District requirements. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. 4. Building Code and Ordinance c0mpli~'nce, All Project B Through Completion construction shall comply with all requirements of the Building Code and Ordinances in effect at the time of building permit approval. 5. BUilding permits. Building permits 'for the expansiOn PL, B On-going and remodeling of the buildings shall be secured and construction commenced within one (1) year after the effective date of this approval or said approval shall be void. This one (1) year period may be extended an additional one (1) year after thc expiration date of this approval (a written request for the extension must be . .submitted prior to the expiration date) by the Community . 4 ~ I' T T' CONDIT'ON ~ EX · ............ '~ ...... RESP.' WHEN # AGENCY REQUIRED · (Prior to) Development Director upon the d~termination that the Conditions of Approval remain adequate to assure that the above stated Findings of Approval will continue to be met. 6. Addressing. Addressing will be required On all doors B' Prio~ to Occupancy leading to the exterior of the building. Addresses shall be illuminated, be able to be seen from the street, and be a minimum height of 5 inches. 71 Application for Building permits/Submittal of PL, B Prior to issuance of Materials. To apply for building permits, the Building Permits Applicant/Developer shall submit eight (8) sets of construction plans to the Building Division for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will no.t be accepted w[.thout the annotated conditions attached to each set of plans. The Applicant will be responsible for obtaining the approvals of all participating non-City agencies prior to the issuance of building permits. 8. Construction Plans. Con'stmction plans 'shall be'fully B Prior to issuance of dimensioned (including building elevations) accurately Building Plans drawn (depicting all existing and proposed conditions on site), and prepared and signed by a licensed civil engineer, architect or landscape architect. The site plan, landscape plan and details shall be consistent with each other. 9. Operation of Uses. The Applicant/ProPerty Owner shall B, PL On-going develop this project and operate all uses in compliance with the Conditions of Approval of this Site Development Review and the regulations established in the Planned Development (PD) Zoning Ordinance. Any violation of the terms or conditions specified may be subject to enforcement action. 10. Revocability. The permit shall be revocabl~ for cause in PL On-going accordance with Section 8.132 of the Dublin Zoning Ordinance. 11. Modifications to Planned Development. No further PL On-going approvals shall be granted to increase the service area, . 9ffice. spa.c.e or sho.wroo~, unless.an amendment to the 5 '# AGENCY REQU~D (Prior to) Planned D~velopment Rez0ning DeveJoPment P1an is' submitted for approval by the Planning Commission. Minor modifications may be submitted for approval by the Community Development Director at his/her discretion. 12. Effective Date. No development shall be permitted until PL On-going the Planned Development Stage 2 Development Plan rezoning submittal has been approved by the City Council. 13. Siting and DeSign. The proposed buildings shall be PL Prior tO issuance of generally located as shown on the Site Plan of the Project Building Permits Plans, Exhibit A. The architectural design of the buildings shall emphasize low profiles and rooflines, the use of colors shown on the plans, non-reflective surfaces, compatibility with existing structures on the site, and appropriate landscape screening. The architectural guidelines in the Development Plan for the project, Exhibit A-l, shall be reflected in the overall design of the new facilities. '14. Roof Equipment screening. All 'roof equipment shall be PL, B Prior to issuance of completely screened from view by a parapet. Equipment Building Permits not screened by a parapet shall be screened by materials architecturally compatible with the building, as approved by the Community Development Director. 15. standard Public works conditions of APprOval. P W Prior to Issuance Applicant/Developer shall comply with all applicable Building Permits City of Dublin Standard Public Works Conditions of Approval (Attached to this Resolution). In the event of a conflict between thc Standard Public Works Conditions of Approval and these Conditions, these conditions shall prevail. 16. 'Master Sign Program/Sign Site Development Review. p On-going All signage shall conform to the Master Sign Program reviewed and approved as part of the project. Individual signage shall be subject to Sign Site Development Reviews. Modifications may be considered by the Zoning Administrator upon application for a Sign Site Development Review pursuant to Section 8.104 Site Development Review. 17, Tempora .ry Coa.stl-UC~°n Fencing. The USe of PW, B During ConstrUcti'on 6 ' ' CO~I'TION TEXT ..... ........... i .......... RESP. WHEN # AGENCY REQUIRED (Prior to) ' ' temporary construction fencing shall be installed to safeguard the public during construction of the new building and site improvements. Said fencing shall be subject to the review and approval of the Public Works Director and the Building Official. 18. ADA Requirements/Handicap Ramps. All handicap B Prior to issuance of ramps shall comply with all current State ADA Building Permits requirements and City of Dublin Standards. LIGHTING/LANDSCAPING 19. Exterior Lighting. All exterior light fixtures shall be PL Prior to issuance of equipped with cut-off lenses, directed downward, and Building Permits limited in height to the maximum necessary for adequate illumination to minimize excess light and glare. 20. Lighting. The Developer/Applicant shall submit for approval a photometric lighting plan that demonstrates Building Permits that all exterior areas of the site will have a lighting level not less than 1.0 foot-candles at the ground surface. Lighting in landscaped areas throughout the project shall be subject to review and approval of City's Landscape Architect, Planning, and Public Works Departments, in consideration of IES standards for lighting in public/community areas. 21. Final Lighting Plan. The applicant shall submit a final PO,' PW ' Prior to 0eeupancy lighting plan for approval by the Dublin Police Services. At a minimum the plan should include: 1.0 foot candle lighting at all doors, and lighting fixtures should be of a vandal-resistant type. 22. Water Efficient Landscape RegulatiOns. DSR, PW On-going Applicant/Developer shall comply with all implementation of the "Water Efficient Landscape Regulations" of the Zoning Ordinance. ' 23. Final Landscape and Irrigation Plan. A Final pL' Prior to'Issuance of' Landscape and Irrigation Plan prepared and stamped by a Building Permits State licensed landscape architect or registered engineer, generally consistent with the preliminary landscape plan prepared by Michael Zucker & Associates, dated received June 12, 2003 (see Exhibit A-l, Sheet L-l), along with a cost estimate of the work and materials proposed, shall be submitted for review and approval by the Community De. velopment Director. . . 7 " CO~ITION T~ .......... '~ REsP. WHeN # AGENCY REQUIRED. ...... (prior t,o) 24. Standard Plant Material, Irrigation and Maintenance PL, PW Prior to Issuance of Agreement. The Applicant/Developer shall complete Building Permits and submit to the Dublin Planning Department the Standard Plant Material, irrigation and Maintenance Agreement. PUBLIC SAFETY 25. Fire Department. The Applicant shall comply with all F Prior to Occupancy applicable regulations and requirements of the Alameda County Fire Department (ACFD), including payment of all appropriate fees. 26. Fire Extinguishers' and Alarms. Fire SxtingUishers and F Prior to Occupancy alarms are required in all buildings and in accordance with the regulations and requirements of the Alameda County Fire Departxnem (ACFD), including payment of all appropriate fees. 27. Fire Hydrants. All fire hydrants shall be shown on final F Prior to issuance of plans. Building Permits 28. Security. All secUrity for th~ use must comply with th~ PO ' Prior to Ocsdpancy City of Dublin Non-Residential Security Requirements. 29. Graffiti. The ApPlicant/Property owner shall keep ~the PO On-going ' site clear of graffiti vandalism on a regular and continuous basis at all times. Graffiti resistant paints for the structures and film for windows or glass shotfld be used: 30. Exit Paths. The proposed parking shall not impede PW, B On-going required exit paths or encroach into pedestrian pathways. PUBLIC WORKS 31. Traffic Mitigation Contribution. The PW Prior to issuance of Developer/Applicant shall pay Voluntm'y Tmftic Building Permits Mitigation Contributions based on the number of daily vehicle trips generated by the project. The contribution or fee shall be collected for each phase of developmem based on the number of daily vehicle trips generated by said use, and assuming t 18 total vehicle trips for all uses. The total contribution for both phases of the project shall be $34,928. 8 CONDITION TEXT' ......... REsP. WHEN # AGENCY REQUIRED (Prior to) 32. Existing Underground Utilities and Associated PW On-going Easements. According to the Preliminary Title Report for the project site, several existing easements encumber the site. The Applicant/Developer shall assure that the rights of each easement holder are not compromised as a result of the proposed improvements. If any existing utilities or other improvements protected by said easements are altered or removed, the Applicant/Developer shall submit evidence that the easement holder consents to said work. 33. Storm D~-ainage. The Applicant/Developer sl~all modify PW Prior to issuance of or replace the existing storm drainage system to convey Building Permits the on-site storm runoff to the existing public storm drain system. Not more than ¼ acre of the site will be allowed to surface drain to the abutting public streets through the driveway, and in no event shall storm runoff flow across the public sidewalks. 34. Parking. The parking lot shall be constructed in PW Prior to Occupancy" accordance with the Exhibits approved with this application. All parking stalls shall be built in accordance with Building Code and Municipal Code requirements. In addition, all customer stalls shall be clearly identified with signs and pavement marking. 351 Pavement Slopes. Pavement slopes within the Parking PW Grading field shall not exceed 5% in any direction, and shall not be flatter than 1%. Within any parking stall designated for the physically disabled, the slope shall not exceed 2% in any direction. 36. Physically Challenged Tow-Away Sign. An R100B PW' ' ' On-going (Disabled Parking Regulations) sign shall be installed at each driveway entrance to the site with amended text as follows, "towed vehicles may be reclaimed at DUBLIN POLICE or by telephoning 833-6670". 37. Public Improvements. The Applicant/Developer shall PW Prior to Occupancy replace all damaged improvements, along the project frontage, within the public right-of-way, including curb, gutter, sidewalks, driveways, paving and utilities to the satisfaction of the Director of Public Works. Any improvement constructed within the public right-of-way shall be constructed in accordance with the City's approved stap., dards. An encroachment permit will be 9 " ' CONDITION TEXT ' RESP. 'i WHEN # AGENCY REQUIRED (PriOr to), 'neede'd from tl~e City of Dublin for any 'work Within the public fights of way. The Applicant/Developer shall replace damaged sidewalk on the Amador Plaza Road frontage, and replace pavement markings as needed. 38. Easements. The existing Drainage Easement, Storm PW On-going Drain Easement, and Sanitary Sewer Easement (recorded as Series No. 85-235999, 72-34582, and 70-28781) shall be maintained as clear and open and no part of any building shall interfere with said easements. 39. Maintenance Covenant and Agreement. The ' PW Prior to issuance of Applicant/Developer shall contact the Building Official in Building Permits regards to getting permission to move the Covenant and Agreement Regarding Maintenance of Yards for Over- Sized Building Easement (recorded as Series No. 90- 324662 on 12/11/90) westerly to accommodate the new proposed building. This said easement should be recorded with the Alameda County Recorders Office prior to obtaining Building Permit. 40. Utility Boxes. All Sewer clean-outs, water mete~ boxes, PW Prior to Occupancy and other utility boxes shall be set to grade to the approval of the Director of Public Works. 41. Bicycle parking. The applicant/Developer shall install PW Prior to Occupancy one Bicycle parking space in a rack for every 40 vehicular parking spaces near several entries to the satisfaction of the Director of Public Works. Bicycle racks shall be located near the building entrances for convenient surveillance by the employees and patrons. GEOTECHNICAL 42. 'Geotechnical Investigation. A site-specific geotechnical PW Grading investigation shall be required for each building constructed as part of the proposed expansion prepared by a California-registered geologist or California- registered engineering geologist. The report(s) shall address the potential for Geotechnical hazards and impacts to structures for active earthquake faults, expansive soils, and the potential for landslides on the site, pavement sections, and foundation design. Specific measures to reduce seismic hazards, expansive soils and landslide hazards to a less-than-significant level shall be included in the report(s) and implemented as part of the project during all phases. . ..... 10 cONDITIO~ TEXT ..... ' ' RESP. ' WHEN # AGENCY REQUIRED , , (Prior to) 43. Erosion And Sedimentation Control Plan. An erosion PW Grading and sedimentation control plan shall be prepared by a California-registered civil engineer for implementation during the rainy season (Generally from Oct 1st to April 15th). The plan should be prepared in accordance with City of Dublin and RWQCB design standards and shall be approved by the Dublin Public Works Director prior to issuance of a grading permit. It is recommended that this plan, at a minimum, include the following provisions: · Existing vegetated areas should be left undisturbed until construction of improvements on each portion of the development site is actually ready to commence; · All disturbed areas should be immediately revegetated or otherwise protected from both wind and water erosion upon the completion of grading activities; · Stormwater runoff should be collected into stable drainage channels, from small drainage basins, to prevent the buildup of large, potentially erosive stormwater flows; · Specific measures should be implemented to control erosion from stockpiled earth and exposed soil; · Runoff should be directed away frOm all areas disturbed by construction; · Sediment ponds or siltation basins should be used to trap eroded soils before nmoff is discharged into on-site or offsite drainage culverts and channels; · To the extent possible, major site development work involving excavation and earth moving shall be scheduled during the dry season. 44. National Pollution Discharges Elimination Permit. PW Grading Pursuant to the Alameda County's National Pollution Discharges Elimination Permit (NPDES) No. CAS0029831 with the California Regional Water Quality , Control Board, all grading and construction activities within the City of Dublin must comply with the provisions said permit. In particular, all storm drain inlets ... 11 # AGENCY REQUIRED (Prior to) sh~ll be fitted with 'Filter Devices tO remove Hydrocarbons and other contaminants and stenciled "No Dumping Flows to Bay" on the face of curb next to the inlet. 45. Hydrology Study. The project sponsor shall submit a PW Grading hydrology study for the proposed project, prepared by a California-registered civil engineer, documenting the amount of current stormwater runoff from the site, estimated furore quantities of runoff, and the ability of downstream facilities to accommodate increased stormwater quantities. The study shall be approved by the City of Dublin Public Works Department and Zone 7 District Engineer prior to issuance of a grading permit. (A permit from Zone 7 will be required for any connection to Zone 7's drainage network. CONSTRUCTION ' 46. Construction-Related Traffic. Construction-related PW On-going traffic shall be prohibited on Amador Valley Boulevard and other local streets, and shall instead use Dublin Boulevard exclusively during all work associated with the various phases oft he proposed expansion project. 47. Fees and Bonds. The applicant shall obtain all necessary PW On-going permits, pay all applicable fees and post bonds as required. 48. Constructi~m Practi'ces. The following construction PW On-going practices, based on BAAQMD standards, shall be required during all phases of construction on the project site: · Water all active construction areas as needed; · Watering or covering of stockpiles of debris, soil, sand or other materials that can be blown by the wind; · Cover all tracks hauling soil, sand, and other loose materials or require all trucks to maintain at least two feet of freeboard; · Pave, apply water three times daily, or apply (non- toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites; · Sweep daily (with water sweepers) all paved access road, parking areas and staging areas at . 9onstmction. sites; . . 12 # AGENCY REQUIRED (Prior to) · Sweep streets daily (with Water sweepers) if visible soil material is carried onto adjacent public streets; · Hydroseed or apply non-toxic soil stabilizers to inactive construction areas; · Enclose, cover, water twice daily or apply non- toxic soil binders to exposed stockpiles (dirt, sand, etc.); · Limit traffic speeds on unpaved roads to 15 mph; · Install sandbags or other erosion control measures to prevent silt runoff to public roadways; and ° Replant vegetation in disturbed areas as quickly as possible. 49. Public Works Checklist. The applicant shall use the PW On-going Public Works Checklist to comply with other Public Works Conditions for this project. ARCHAEOLOGICAL 50. Archaeological. If an archeological 'or Native American PL On-going ' artifact is identified during Sitework and preparation, grading, or construction, work on the project shall cease immediately until a resource protection plan conforming to CEQA Guideline Section 15064.5 (e) is prepared by a qualified archeologist and approved by the Dublin Community Development Director. Project work may be resumed in compliance with such plan. If human remains are encountered, a native American descendant and the County Coroner shall be contacted immediately. NOISE 51.' Noise Reduction Measures. The foilowing construction PW On-gc~ing noise reduction measures shall be implemented as part of all construction. · Limit construction time to 7:00 a.m. to 5:30p.m. Monday-Friday, except state and federal holidays. Exceptions may be granted in writing by the City Engineer for emergency or extenuating circumstances · All construction equipment should be in good working condition, and the mufflers should be inspected for proper functioning. Designate a construction noise coordinator. This coordinator shall be available to respond to 13 " ' CONDITiON"~XT ' RESP. WHEN # AGENCY REQUIRED (Prior to) . complaints from neighbors and take appropriate measures to reduce noise. WATER/SEWER 52. Improvement Plans. Compiete improvement plans shall DSR Prior to issuance of be submitted to DSRSD that conform to the requirements Building Permits of the DSRSD Code, the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities", all applicable DSRSD Master Plans and policies and all Recycled Water Design and Construction Standards. 53. Waterline Systems. Should water lines be e~tended to DSR Occupancy serve the project, domestic and fire protection waterline systems for Tracts or Commercial Developments shall be designed to be looped or interconnected to avoid dead end sections in accordance with requirements of the DSRSD Standard Specifications and sound engineering practice. 54. Extension of Water/Sewer Lines. Should water/sewer DSR Occupancy lines be extended to serve the project, DSRSD policy requires public water and sewer lines to be located in public streets rather than in off-street locations to the fullest extent possible. If unavoidable, then public sewer or water easements must be established over the alignment of each public sewer or water line in an off- street or private street location to provide access for furore maintenance and/or replacement. 55. Submittal to DSRSD. Should Water/sewer lines need to DSR Occupancy be extended to serve the project, the locations and widths of all proposed easement dedications for water and sewer lines shall be submitted to DSRSD. 56.' Easement Dedication. Should water/sewer lines need to DSR Occupancy be extended to serve the project, all easement dedications for DSRSD facilities shall be by separate instrument irrevocably offered to DSRSD or by offer of dedication on the Parcel Map. 57. Utility Construction Permit. Should water or sewer DSR Prior to issuance of facilities be extended for the project, no sewerline or Building Permits water line construction shall be permitted unless the proper utility construction permit has been issued by DSRSD. A construction permit will only be issued after all of fees and permits have been obtained. 14 AGENCY REQUI~D (Prior to) $8.' ' Hoid Ha~leSs. The'~pplicant~sha~l h0idDSR~D, its DSR '" ongoing. Board of Directors, commissions, employees, and agents of DSRSD harmless and indemnify the same from any litigation, claims, or fines resulting from completion of the project. 59. ' SUbstitution of Materials. All exterior architectural PL Prior to issuance of' elements visible from view and detailed on the plans shall Building Permits be in a style and in materials in harmony with the exterior of the building. Any substitutions of materials are subject to the approval of the Community Development Director, and must be of a quality and appearance similar to that approved with this Site Development Review approval. PASSED AND ADOPTED BY the City Council oft he City of Dublin, on this 19th day of August 2003, by the following votes: AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ATTEST: K2/G/8- 19-03/reso-honda-sdr. doc (Item 6.2 - 2) G:\paL2002\pa 02-03 I\CC-SDR Reso 15