HomeMy WebLinkAboutReso 091-95 MCE AmendAgmt RESOLUTION NO. 91 - 95
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT WITH MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WHEREAS, on June 14, 1993, the Ciiy Council approved an agreement with MCE
Corporation for Public Works Maintenance Services; and
WHEREAS, said agreement provided a detailed scope of work and labor rates for Fiscal
Year 1993-94; and
WHEREAS, on December 13, 1993, June 21, 1994, August 22, 1994, and June 27, 1995,
the City Council reviewed and approved amendments to the agreement; and
WHEREAS, as part of the budget approval process for 1995-96, the City Council
approved a higher level of service which affects MCE's Schedule of Work;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin
does hereby approve the amendment to the agreement with MCE Corporation attached hereto as "Exhibit
A," with an effective date of July 1, 1995.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment.
PASSED, APPROVED, AND ADOPTED this 8th day of August, 1995.
AYES:
Councilmembers BarneS, Burton, Howard, Moffatt and Mayor Houston
NOES: None
ABSENT: None
Mayor
ATTEST:
g:lcontractlmcelresoamd2
IC /8-8-95/reso-mce. doc
EXamXT "A" Or RESOLUTION !
AMENDMENT TO AGREEMENT BETWEEN
CITY OF DUBLIN AND MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WHEREAS, on June 14, 1993, the City of Dublin (hereinafter referred to as "CITY" and
MCE Corporation (hereinaf~er referred to as "CONTRACTOR") entered into an agreement to provide Public
Works Maintenance Services to CITY (hereinafter referred to as "AGREEMENT); and
WHEREAS, on December 13, 1993, June 21, 1994, August 22, 1994, and June 27, 1995, the
City Council approved amendments to Exhibit "B" of said Agreement, which provides for a specific schedule
of work, including activities and rates to be charged; and
WHEREAS, during the budget approval process for 1995-96, the City Council approved
higher levels of service that affect the Schedule of Work for MCE Corporation;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1. Exhibit B, "Payment Schedule," of the Agreement shall be amended by
replacing Attachment 1 in the current Agreement with Attachment 1 of this Amendment, said Attachment 1
being identified as "Exhibit B - Attachment 1 - Schedule of Work... Fiscal Year 1995-96 - August 8, 1995."
Section 2.
Said revision in Exhibit B "Payment Schedule" shall be effective as of July 1,
1995.
CITY OF DUBLIN
MCE CORPORATION
M or
President
ATTEST:
ATTEST:
Secretary
g:~contractXmce~amndmt2
EXHIBIT B
ATTACHMENT 1 - SCHEDULE OF WORK
CITY OF DUBLIN
FINAL APPROVED CITY BUDGET
FISCAL YEAR 1995-96
AUGUST 8, 1995
A. SCOPE OF WORK
The folio'wing breakdown identifies tasks which are anticipated to be conducted as part of
the Annual Public Works Maintenance Agreement for the Fiscal Year 1995-96. Annual
estimated costs include management fees as provided in Section C. Contractor shall
schedule work to adhere to these expenditure levels as provided for in this Agreement.
ACTIVITY/SUB-ACTIVITY
1995- 96
ESTI MATED ANNUAL
EXPENDITURE
STREET MAINTENANCE
Street Repair
· Drainage Maintenance
NPDES Drainage Maintenance
Storm Patrol/Clean Up
Curb & Gutter/Sidewalks
Sign Repair/Maintenance
· Neighborhood Watch Signs
· Striping/Marking
· Weed Abatement
Guardrail Repair
· Bike Path Maintenance
Spill Clean Up
Activity Total
$
$
6,560
2,390
3,610
12,140
820
22,660
860
3,270
21,140
200
7,430
5,390
86,470
MAINTENANCE SUPERVISION
85,650
STREET TREE MAINTENANCE
In-House Tree Maintenance
Contract Tree Pruning
· Contract Tree Fungus Spraying
· Stagecoach Assessment District
· Dougherty Assessment District
Activity Total
$
$
35,665
6,900
6,050
2,125
6,982
57,722
PAGE 1 OF 5
STREET LANDSCAPE MAIN'I FNANCE (BEAUTIFICATION)
· Existing Streets
Stagecoach Assessment District
Dougherty Assessment District
PARKS MAINTENANCE
· Stagecoach Park
Kolb Park
· Dolan Park
· Alamo Creek Park
Dougherty Hills
· Dublin Sports Ground
· Mape Park
Shannon Park
· Valley Swim Center
Civic Center
Senior Center
BUILDING MANAGEMENT
HERITAGE CENTER MAINTENANCE
Activity Total
Activity Total
CEMETERY / GROUNDS
Total 1995-96 Estimated Annual Expenditure
$
$
$
$
$
$
$
145,520
32,490
39,720
217,730
12 530
48 790
27 800
44 360
21 370
130 000
14 070
55 530
22,490
53,670
760
431,370
90,720
3,570
18,900
992,132
UNIT PRICES
The following activities shall be completed at the Unit Prices indicated. The unit prices
are inclusive of all labor, materials, equipment, overhead and management fees.
ACTIVITY/SU B - ACTIVITY
1995-96 UNIT PRICE
BEDDING WEED CONTROL
· Streets $
· Parks $
138.52 per Acre per Mo.
104.50 per Acre per Mo.
TURF
MAINTENANCE
· Fertilize $
· Broadleaf Spraying $
Aeration ~
· Streets & Stagecoach Park
· Valley Swim Center and Civic Center
· All Other Parks
$
$
$
137.50 per Acre
77.00 per Acre
145.85 per Acre
129.05 per Acre
112.20 per Acre
PAGE 2 OF 5
ACTIVITY/SUB-ACTIVITY
Mowing Tuff
Streets & Stagecoach Park
Valley Swim Center and Civic Center
All Other Parks
· Edging
TREE MAINTENANCE
Tree Pruning
· 0"- 4"
· 4"- 8"
· 8" - 16"
· Over 16"
Class 1
Class 1
Class 2
· Fungus Spraying
1995-96 UNIT PRICE
$ 70.05 per Acre
$ 60.25 per Acre
$ 51.80 per Acre
12.05 per 1 ;000 L.F.
16.50 per Tree
28.33 per Tree
99.00 per Tree
By Bid
4.58 per Tree
PAGE 3 OF 5
DUBLATTI:MCE:C:WK1 :SPS:8/2/95
C. TIME AND MATERIALS RA~'ES
The following rates shall be applied to work performed by the Contractor which
is not specified in Section B (Unit Prices). At all times the Contractor shall
strive to utilize the most cost effective elements possible to complete a project.
Appropriate overhead and management fees are included in the labor and
equipment rates listed below.
DESCRIPTION
LABOR RATES
Dublin Crew
Maintenance Superintendent
Landscape Foreman
Landscape Laborer l
Landscape Laborer II
Landscape Laborer III
Landscape Laborer IV
Building Laborer III
OVERTIME HOLIDAY
HOURLY HOURLY HOURLY
RATES RATES RATES
$ 40.70 $ 61.05 $ 81.40
31,20 46.80 62.40
26.35 39.53 52.70
22.25 33.38 44.50
17.90 26.85 35.80
13.40 20.10 26.80
13.40 20.10 26.80
MCE
Crew
Superintendent
Loader/Backhoe Operator
Asphalt Paver Operator
Roller Operator
Truck Driver 8-12 C.Y.
Truck Driver 4-6 C.Y.
Truck Driver 3 C.Y. Transit
Cement Finisher
Laborer Foreman
Laborer l
Laborer II
Laborer III
$ 64.00 $ 96.00 $ 128.00
62.80 94.20 125.60
60.65 90.98 1 21.30
60.65 90.98 1 21.30
51.70 77.55 103.40
50.85 76.28 1 01.70
51.35 77.03 102.70
49.70 74.55 99.40
45.90 68.85 91.80
44.60 66.90 89.20
44.35 66.53 88.70
44.20 66.30 88.40
DESCRIPTION
EQUIPMENT RATES
Dublin Crew
* Flatbed Dump
* Pickup
Mower (21 ")
Mower (36")
Mower (72")
Chain Saw
Brush Cutter
EQUIP.
COST
HOURLY
RATE
$ 7.00
5.85
2.35
3.50
11.10
4.7O
4.10
PAGE 4 OF 5
DESCRIPTION
EQUIPMENT RATES (CONTINUED)
Power Blower
Power Edger
Power Hedge Trimmer
Power Vacuum (30")
Trailer - Large (18')
Trailer- Small (8')
Power Washer
Electric Welder
Portable Generator
Water Trailer
EQUIP.
COST
HOURLY
RATE
$ 1.75
1.75
2.90
2.90
2.90
2.10
10.50
5.85
4.70
8.20
MCE Crew
Large Asphalt Paver
Asphalt Paver
Backhoe
Loader
Roller-Vibratory 3-5 Tons
Roller-Vibratory 1 - 3 Tons
Dump Truck 8-12 C.Y.
Dump Truck 4-6 C.Y.
Transit Truck 3 C.Y.
Saw Truck
Pickup Crew Cab
Pickup
Concrete Saw - Self Propel led
Concrete Saw - Small
Air Compressor
Bitumal Pot
Vibra Plate
Wacker
Power Berm Machine
58.50
43.85
43.85
38.00
32.20
29.25
35.10
32.20
32.20
17.50
11.70
10.50
23.40
5.85
20.50
10.50
9.35
9.35
17.55
OVERHEAD AND MANAGEMENT FEES
Applied to Subcontract Work and
Material Costs
l"p percent
* NOTE:
Dublin Flatbed and Pickup rates include cost of two way radios and hand tools.
PAGE 5 OF 5
DUBLATTC:MCE:C:WK1 :SPS:8/2/95