WHEREAS, the City of Dublin has adopted the "Downtown Specific Plan" in which, as
part of the circulation element, a new two-lane roadway was included to be located south of and parallel to
Dublin Boulevard connecting Amador Plaza Road, Golden Gate Drive and Regional Street (Parallel Road);
and
WHEREAS, the City Council has adopted a Specific Plan Line for the alignment of this
roadway; and
WHEREAS, due to the timing of obtaining funding and due to the priority needs of the
roadway segments, this roadway construction is proposed to be phased into two projects, one from
Amador Plaza Road to Golden Gate Drive and the second from Golden Gate Drive to Regional Street; and
WHEREAS, the segment of this parallel road between Amador Plaza Road and Golden
Gate Drive (Phase I) is prioritized as the first phase as this segment will connect the proposed 1-680
freeway ramps to the future West Dublin BART Station; and
WHEREAS, the San Francisco Bay Area Rapid Transit District (BART), as part of the
traffic mitigations for its West Dublin Station, included the commitment to pay for improvements up to
24% of improvements for the widening of Dublin Boulevard between Donlon Way and Village Parkway,
and for the construction of the Parallel Road; and
WHEREAS, the Alameda County Transit Authority (ACTA) has included the Phase I
segment of the Parallel Road as an integral part of their 1-580/I-680 Flyover Project (which includes "hook
ramps"). ACTA is looking to the local jurisdictions to fund $10 million of the approximately $117 million
1-580/I-680 Flyover Project. To date, local jurisdictions have contributed approximately $4.4 million in
matching money; and
WHEREAS, the City Council adopted a Traffic Impact Fee by Resolution 01-95 for
Eastern Dublin development which imposed a fee on new development in Eastern Dublin to pay $672,000
toward the 1-580/1-680 Flyover Project; and
WHEREAS, the City Council has agreed to fund a study to develop a regional
transportation fee through the Tri-Valley Transportation Council (TVTC), which fee would fund the
1-580/I-680 Flyover Project.
-1-
NOW, THEREFORE, BE IT RESOLVED that the City of Dublin hereby commits to
the portion of the ACTA project to construct the "Parallel Road" between Amador Plaza Road and Golden
Gate Drive the following funding:
1)
The 68-foot right-of-way between Amador Valley Boulevard and a point on the
property line approximately 330 feet westerly of the westerly fight-of-way line of
Amador Plaza Road.
2) Traffic Impact Fees collected for this Parallel Road ( now approximately $75,000)
from properties within the Downtown Specific Plan area.
3)
The monies from BART for the Parallel Road traffic mitigation for the West
Dublin BART Station.
4)
Up to $672,000 from the "Section 3 fees" collected pursuant to the Eastern Dublin
Traffic Impact Fee (Resolution 01-95).
5) Any Regional Traffic Impact Fees collected through an area-wide regional
traffic impact fee resulting from the TVTC fee study for the 1-580/1-680 Flyover
Project.
6)
Additional monies as may be required to complete the Phase I segment of the
Parallel Road as determined by ACTA and agreed to by the City of Dublin.
PASSED, APPROVED, AND ADOPTED this 241h day of October, 1995.