Loading...
HomeMy WebLinkAboutItem 7.1 DrvwyReqMoretPropertySUBJECT: CITY OF DUBLIN AGENDA STATEMENT Council Meeting Date: March 10, 1986 ~ City San Ramon Road Improvements Related to Parcel 941-040-001 EXHIBITS ATTACHED: 1) Letter dated 3/3/86 from Roy J. Moret 2) Map of Parcel 3) San Ramon Road Improvement Plan to be available at meeting RECOMMENDATION: FINANCIAL STATEMENT: 1) Allow Mr. Roy Motet to address the City Council and note his concerns. 2) Direct Staff to leave the road design in its present location and conceptual, iy allow a driveway at the south~r~.~n~ of the Motet property, · ~0"~e finally approved if warranted at the Planned Development zoning approval stage. DESCRiPTiON: Mr. Motet is concerned about the effect San Ramon Road Phase II improvements will. have on his parcel, and is requesting an opportunity to address the City Council. He has indicated to the City Engineer that he would like to locate a driveway for his property at the northern end of his parcel, adjacent to Martin Canyon Creek. Mr. Moret's contention is that the site plan presently being proposed for his parcel is more effective with the driveway to the north, and should that project not go through, he still wants the flexibility of being able to have driveway access at any point. Staff, in reports to the City Council for the San Ramon Road Specific Plan and San Ramon Road Alignment, has indicated that an auxiliary southbound access lane would begin just after the end of the 84" diameter pipe headwall and bikeway bridge at Martin Canyon Creek. This lane would become full width near the southern end of the Mr. Moret's property. Staff recommends from a safety standpoint that this is the first location at which a driveway opening should be placed. The second option, to allow the driveway as Mr. Motet requeshs, would be to move the beginning of the auxiliary lane to the north. This would require the removal of two large, old walnut trees and a total reconstruction of the upper end of the pipe and bridge, at an estimated cost of $50,000 to $100,000. Staff recommends that the design be substantially left as-is and that a driveway be allowed at Mr. Moret's southern boundary if warranted through the approval of a development plan for the property. : None if Staff's recommendation is accepted. ,,~,~' ~_~-~ ITEM NO._~_~__ COPIES TO: Mr. Roy Moret March 3, 1986 Lee Thompson City Engineer City of Dublin 6500 Dublin Blvd. Dublin, CA 94568 Subject: City Council Agenda, March 10, 1986 Concerns Regarding San Ramon Road Improvements This is to request an opportunity to address my concerns regarding the proposed San Ramon Road improvement~ as they affect parcel 941-040-001-2 in both its current and intended future use. Placement of this item on the agenda would be greatly appreciated. Thank you, RECEIVED MAR 1986 PUBLIC .WORKS C,D~TO I'~EILSEN SCHOOL