HomeMy WebLinkAboutReso 003-94 MCE Amend RESOLUTION NO. 03-94
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT WITH MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WHEREAS, on June 14, 1993, the City Council approved an agreement with MCE
Corporation for Public Works Maintenance Services; and
WHEREAS, said agreement provided a detailed scope of work and labor rates for
Fiscal Year 1993-94; and
WHEREAS, on December 13, 1993, the City Council reviewed the scope of work,
approved an increase in labor rates, and reinstated or approved increases in specific maintenance
activities;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Dublin does hereby approve the amendment to the agreement with MCE Corporation attached hereto
as "Exhibit A, " with an effective date of January 1, 1994.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the-
amendment.
PASSED, APPROVED, AND ADOFrED this 10th day of January, 1994.
AYES: Councilmembers Burton, Howard, Moffatt
and Mayor Snyder
NOES: CouncilmemberHouston
ABSENT: None
a: (contractsl ) IntaintXresoamnd
EXHIBIT "A" OF RESOLUTION 03-94
AMENDMENT TO AGREEMENT BETWEEN
CITY OF DUBLIN AND MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WHEREAS, on June 14, 1993, the City of Dublin (hereinafter referred to as "CITY" and
MCE Corporation (hereinafter referred to as "CONTRACTOR") entered into an agreement to provide
Public Works Maintenance Services to CITY (hereinafter referred to as "AGREEMENT); and
WHEREAS, Exhibit "B" of said Agreement provided for a specific schedule of work,
including activities and rates to be charged; and
WHEREAS, on December 13, 1993, the City Council determined that an increase of rates
and adjustment in scope of work is appropriate;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1. Exhibit B, "Payment Schedule," of the Agreement shall be amended by
replacing Attachment 1 in the current Agreement with Attachment 1 of this Amendment, said Attachment
1 being identified as "Council Revised December 13, 1993."
Section 2.
This Amendment shall be effective as of January 1, 1994.
CITY OF DUBLIN
Mayor
MCE CORPORATION
President
ATTEST:
ATTEST:
Secretary
a:(contracts) lmaint~amndment
EXHIBIT B
ATTACHMENT 1 - SCHEDULE OF WORK
CITY OF DUBLIN
PRELIMINARY CITY BUDGET
FISCAL YEAR 1993-94
COUNCIL REVISED
DECEMBER 13, 1993
A. SCOPE OF WORK
The following breakdown identifies tasks which are anticipated to be conducted as part of
the Annual Public Works Maintenance Agreement for the Fiscal Year 1993-94. Annual
estimated costs include management fees as provided in Section C. Contractor shall
schedule work to adhere to these expenditure levels as provided for in this Agreement.
ACT IVI TY/S U B - AC TI VI TY
SPILL CLEAN UP
1993-94
ESTIMATED ANNUAL
EXPENDITURE
6,450
STREET MAINTENANCE
·
e
·
·
·
·
·
·
Street Repair
Drainage Maintenance
Storm Patrol/Clean Up
Curb & Gutter/Sidewalks
Sign Repair/Maintenance
Striping/Marking
Weed Abatement
Bike Path Maintenance
Activity Total $
7,060
13,800
10,230
1,010
15,115
4,715
8,630
4,755
65,31 5
MAINTENANCE SUPERVISION
84,875
STREET TREE MAINTENANCE
· In-House Tree Maintenance
· Contract Tree Pruning
· Contract Tree Fungus Spraying
· Stagecoach Assessment District
· Dougherty Assessment District
Activity Total $
35 800
7 910
5 250
3 370
7 980
60 31 0
NEIGHBORHOOD WATCH SIGNS $ 575
PAGE 1 OF 5
STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION)
· Existing Streets
· Stagecoach Assessment District
· Dougherty Assessment District
PARKS MAINTENANCE
· Stagecoach Park
· Kolb Park
· Dolan Park
· Alamo Creek Park
· Dougherty Hills
· Dublin Sports Ground
· Mape Park
· Shannon Park
· Valley Swim Center
· Civic Center
· Dublin High School
· Senior Center
Activity Total
$
$
Activity Total $
BUILDING MANAGEMENT $
HERITAGE CENTER MAINTENANCE $
123,890
31,340
40,225
195,455
11 650
46.085
28 285
40 485
15 915
123 445
16 985
54 530
20 950
46 975
18 350
500
424, 155
91,350
8,950
Total 1993-94 Estimated Annual Expenditure
$ 937,435
UNIT PRICES
The following activities shall be completed at the Unit Prices indicated. The unit prices
are inclusive of all labor, materials, equipment, overhead and management fees.
ACTIVITY/SUB -ACTIVITY
RIGHT OF WAY MAINTENANCE
· Chemical Weed Control
TURF MAINTENANCE
· Fertilize/Weed Control
· Streets & Stagecoach Park
· Valley Swim Center, Civic Center
and High School Football Field
· All Other Parks
Aeration
· Streets & Stagecoach Park
· Valley Swim Center, Civic Center
and High School Football Field
· All Other Parks ,
PAGE 2 OF 5
1993-94 UNIT PRICE
$ 173.00 per Acre
$ 104.50 per Acre
$ 99.00 per Acre
$ .93.50 per Acre
$ 143.00 per Acre
$ 126.50 per Acre
$ 110.00 per Acre
ACTIVITY/SUB -ACTIVITY
® Mowing Tuff
® Streets & Stagecoach Park
® Valley Swim Center, Civic Center
and High School Football Field
· All Other Parks
· Edging
TREE MAINTENANCE
Street Trees
· Pruning City Median Trees
· Trim for Clearance Only (Under 30')
· Trim for Clearance & Balance
(Under 30')
· Trim for Clearance Only (Over 30')
· Trim for Clerance & Balance
(Over 30')
· Fungus Spraying
Park Trees
· Prune and Shape (Over 20')
· Fungus Spraying
~993-94 UNIT PRICE
$
$
$
$
68.00 per Acre
58.50 per Acre
50.30 per Acre
11.70 per 1,000 L.F.
18.70 per Tree
20.95 per Tree
41.90 per Tree
38.50 per Tree
77.00 per Tree
4.83 per Tree
$ 54.40 per Tree
4.83 per Tree
PAGE 3 OF 5
DUBLATT1 :MCE:C:WK1 :SPS:I 2/28/93
TIME AND MATERIALS RATES
The following rates shall be applied to work performed by the Contractor which
is not specified in Section B (Unit Prices). At all times the Contractor shall
strive to utilize the most cost effective elements possible to complete a project.
Appropriate overhead and management fees are included in the labor and
equipment rates listed below.
DESCRIPTION
LABOR RATES
Dublin Crew
Maintenance Superintendent
Landscape Foreman
Landscape Laborer I
Landscape Laborer II
Landscape Laborer Ill
Building Laborer III
HOURLY
RATES
41.10
28.8O
24.35
2O.6O
16.55
12.40
OVERTIME
HOURLY
RATES
$ 61.65
43.20
36.53
30.90
24.83
18.60
HOLIDAY
HOURLY
RATES
$ 82.20
57.60
48.70
41.20
33.10
24.80
MCE Crew
Superintendent
Loader/Backhoe Operator
Asphalt Paver Operator
Roller Operator
Truck Driver 8-12 C.Y.
Truck Driver 4-6 C.Y.
Truck Driver 3 C.Y. Transit
Cement Finisher
Laborer Foreman
Laborer l
Laborer I I
Laborer III
62.50
61.30
59.10
59.10
50.2O
49.35
49,50
48.10
44.65
43.30
43.05
42.90
93.75
91.95
88.65
88.65
75.30
74.03
74.25
72.15
66.98
64.95
64.58
64.35
$ 125.00
122.60
118.20
118.20
100.40
98.70
99.00
96.20
89.30
86.60
86.10
85.80
DESCRIPTION
EQUIP.
COST
HOURLY
RATE
EQUIPMENT RATES
Dublin Crew
* Flatbed Dump
* Pickup
Mower (21 ")
Mower (36")
Mower (72")
Chain Saw
Brush Cutter
7.00
5.85
2.35
3.50
11.10
4.70
4.10
PAGE 4 OF 5
DESCRIPTION
EQUIPMENT RATES (CONTINUED)
Power Blower
Power Edger
Power Hedge Trimmer
Power Vacuum (30")
Trailer - Large (18')
Trailer - Small (8')
Power Washer
Electric Welder
Portable Generator
Water Trailer
EQUIP.
COST
HOURLY
RATE
$ 1.75
1.75
2.90
2.90
2.90
2.10
10.50
5.85
4.70
8.20
MCE Crew
Large Asphalt Paver
Asphalt Paver
Backhoe
Loader
Roller-Vibratory 3-5 Tons
Roller-Vibratory 1-3 Tons
Dump Truck 8-12 C.Y.
Dump Truck 4-6 C.Y.
Transit Truck 3 C.Y.
Saw Truck
Pickup Crew Cab
Pickup
Concrete Saw-Self Propelled
Concrete Saw - Small
Air Compressor
Bitumal Pot
Vibra Plate
Wacker
Power Berm Machine
51.20
43,85
43.85
38.00
26.30
23.40
32.20
29.25
29.25
16.10
10.55
9.95
17.55
5.85
17.55
9.95
8.20
8.20
17.55
OVERHEAD AND MANAGEMENT FEES
Applied to Subcontract Work and
Material Costs
10 percent
* NOTE:
Dublin Flatbed and Pickup rates include cost of two way radios and hand tools.