HomeMy WebLinkAbout8.2 Attch 2 Reso Appvg SDR RESOLUTION NO. 14 - XX
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING SITE DEVELOPMENT REVIEW FOR A 1,186 SQUARE FOOT BUILDING
ADDITION, A 10,282 SQUARE FOOT SALES BUILDING CARPORT/CANOPY, A 1,760
SQUARE FOOT SERVICE BUILDING CARPORT/CANOPY, FACADE MODIFICATIONS,
AND RELATED SITE IMPROVEMENTS AT THE DUBLIN TOYOTA AUTO DEALERSHIP AT
4321 TOYOTA DRIVE
(APN 986-0016-024-00)
PLPA-2013-00059
WHEREAS, Jeremy Deng of AAI Design (Applicant) and HAMCOR, Inc., DBA Dublin
Toyota (Property Owner), have requested Site Development Review approval of a 1,186 square
foot building addition and a 10,282 square foot sales building carport/canopy to the existing
sales building; a 1,760 square foot carport/canopy to the existing service building, fapade
modifications, and related site improvements to the property at 4321 Toyota Drive (the
"Project"); and
WHEREAS, the Project is located in a PD (Planned Development) Zoning District, which
has a General Plan and Eastern Dublin Specific Plan Land Use designation of General
Commercial, and which conditionally permits automobile sales and service uses; and
WHEREAS, the Project has an existing Conditional Use Permit for automobile sales and
service that was approved by the Planning Commission in 1997 (Resolution 97-05) and a Site
Development Review Permit that was approved by the City Council (Resolution 16-97); and
WHEREAS, the California Environmental Quality Act (CEQA), together with State
Guidelines and City Environmental Regulations require that certain projects be reviewed for
environmental impacts; and
WHEREAS, the project site is a component of a larger project ("the Santa Rita
Commercial Center Project") that the City previously approved on January 31, 1995. The Santa
Rita Commercial Center Project was within the scope of the Eastern Dublin Specific Plan and
General Plan Amendment, for which a Program EIR was previously certified (SCH No.
91103064). A Mitigated Negative Declaration (SCH No. 94113020) was previously approved for
the Santa Rita Commercial Center Project, which together with the Program EIR adequately
describes this project for the purposes of the California Environmental Quality Act (CEQA). The
project is within the scope of the Program EIR and Mitigated Negative Declaration and
therefore, no further environmental analysis is necessary; and
WHEREAS, a Staff Report was submitted to the City of Dublin Planning Commission
recommending Site Development Review approval of the project; and
WHEREAS, the Planning Commission held a public hearing on said application on March
11, 2014; and
WHEREAS, proper notice of said hearing was given in all respects as required by law;
and
ATTACHMENT 2
WHEREAS, the Planning Commission did hear and consider all reports,
recommendations and testimony herein above set forth and used its independent judgment to
evaluate the project.
NOW, THEREFORE, BE IT RESOLVED that the City of Dublin Planning Commission
does hereby make the following findings and determinations regarding the Site Development
Review:
A. The proposal is consistent with the purposes of Chapter 8.104 (Site Development
Review), with the General Plan and with any applicable Specific Plans and Design
Guidelines in that: 1) automobile sales and service is a conditionally permitted use; 2)
there is an existing Conditional Use Permit for the dealership; 3) the proposed project will
modernize and enhance the architectural appearance of the buildings; 4) the proposed
project is well designed and compatible with the existing buildings and surrounding area;
and 5) automobile sales and service uses are consistent with the General Plan and
Eastern Dublin Specific Plan Land Use designation of General Commercial.
B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance in that: 1) the
zoning for the site is PD, Planned Development, and the proposed dealership is a
conditionally permitted use type; 2) a Conditional Use Permit has previously been
approved and remains in effect to allow an automobile dealership to operate at this
location; 3) the dealership, as conditioned, is compatible with surrounding uses; 4) the
overall design of the Project is compatible with the neighborhood in which it is located;
and 5) the project is consistent with development standards of the PD zoning district.
C. The design of the project is appropriate to the City, the vicinity, surrounding properties,
and the lot in which the project is proposed in that: 1) the project site is located in an
urbanized area that is currently developed with a variety of building types and uses; 2)
adequate access to the site is provided from Toyota Drive; 3) the site is currently
developed with an automobile dealership, which is compatible with the adjacent uses;
and 4) operation of the use is subject to compliance with the existing Conditional Use
Permit.
D. The subject site is physically suitable for the type and intensity of the approved
development in that: 1) the site has been designed for automobile sales and service
uses; 2) access to the site is provided from Toyota Drive, which is an existing roadway;
and 3) the proposed building addition, canopies, and facade and site modifications
constitute a negligible expansion of an existing use.
E. Impacts to existing slopes and topographic features are addressed in that. the project is
located on a fully developed site that is generally flat.
F. Architectural considerations including the character, scale and quality of the design, site
layout, the architectural relationship with the site and other buildings, screening of
unsightly uses, lighting, building materials and colors and similar elements result in a
project that is harmonious with its surroundings and compatible with other development in
the vicinity in that: 1) the project has been well designed to complement the surrounding
area; 2) the materials used in the building addition and facade modifications are of a high
quality, including aluminum composite paneling and illuminated translucent glass; and 3)
2of13
the proposed architectural modifications enhance the site by introducing new materials to
the existing buildings.
G. Landscape considerations, including the location, type, size, color, texture and coverage
of plant materials, and similar elements have been incorporated into the project to ensure
visual relief, adequate screening and an attractive environment for the public in that: 1)
there is no new landscaping proposed for this project.
H. The site has been adequately designed to ensure proper circulation for bicyclists,
pedestrians and automobiles in that: 1) access to the site is currently provided from two
driveways along Toyota Drive; and 2) the project consists of site improvements that
include accessible walkways and paths of travel along and between both the sales
building and the service building.
BE IT FURTHER RESOLVED that the Planning Commission does hereby approve a Site
Development Review for the Dublin Toyota project at 4321 Toyota Drive as shown on the Project
Plans date-stamped "Received by Dublin Planning on December 27, 2013", included as Exhibit A
to this Resolution, subject to the following conditions:
CONDITIONS OF APPROVAL
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance
of building permits or establishment of use, and shall be subject to Planning Division review and
approval. The following codes represent those departments/agencies responsible for
monitoring compliance of the conditions of approval: [PL] Planning; [B] Building; [PO] Police;
[PW] Public Works; [ADM] Administration/City Attorney; [FIN] Finance; [PCS] Parks and
Community Services; [F] Dublin Fire Prevention; [DSR] Dublin San Ramon Services District;
[LDD] Livermore Dublin Disposal; [CO] Alameda County Department of Environmental Health,
[Zone 7] Alameda County Flood Control and Water Conservation District, Zone 7; [LAVTA]
Livermore Amador Valley Transit Authority; and [CHS] California Department of Health
Services.
Agency When Source
NO. CONDITIONS OF APPROVAL Required,
Prior to:
GENERAL
1. Approval. This Site Development Review PL On-going Planning
approval is for the Dublin Toyota building
additions, fagade modifications, and related site
improvements at 4321 Toyota Drive (PLPA-2013-
00059). This approval shall be as generally
depicted and indicated on the plans prepared by
AAI Architects dated received by Dublin Planning
on December 27, 2013, and other plans, text, and
diagrams relating to this approval, stamped
approved and on file in the Community
Development Department, except as modified by
the following Conditions of Approval.
2. Effective Date. This Site Development Review PL On-going DMC
Permit approval becomes effective 10 days after 8.96.020.H
3of13
action by the Planning Commission (10 days after and 8.136
the date of this Resolution) unless appealed
before that time in accordance with the Zoning
Ordinance.
3. Permit Expiration. Construction or use shall PL 1 year from DMC
commence within one (1) year of Permit approval approval 8.96.020.D
or the Permit shall lapse and become null and
void.
4. Time Extension. The original approving PL 1 year from DMC
decision-maker may, upon the Applicant's written approval 8.96.020.E
request for an extension of approval prior to
expiration, and upon the determination that any
Conditions of Approval remain adequate to
assure that applicable findings of approval will
continue to be met, grant a time extension of
approval for a period not to exceed six (6)
months. All time extension requests shall be
noticed and a public hearing or public meeting
shall be held as required by the particular Permit.
5. Modifications. The Community Development PL On-going DMC
Director may consider modifications or changes 8.104
to this Permit approval if the modifications or
changes proposed comply with applicable
sections of the Zoning Ordinance.
6. Revocation of Permit. The Permit approval PL On-going DMC
shall be revocable for cause in accordance with 8.96.020.1
Section 8.96.020.1 of the Dublin Zoning
Ordinance. Any violation of the terms or
conditions of this permit shall be subject to
citation.
7. Requirements and Standard Conditions. The Various Issuance of Various
Applicant/Developer shall comply with applicable building
City of Dublin Fire Prevention Bureau, Dublin permits or
Public Works Department, Dublin Building installation of
Department, Dublin Police Services, Alameda improvements
County Flood Control District Zone 7, Livermore
Amador Valley Transit Authority, Alameda County
Public and Environmental Health, Dublin San
Ramon Services District and the California
Department of Health Services requirements and
standard conditions. Prior to issuance of building
permits or the installation of any improvements
related to this project, the Developer shall supply
written statements from each such agency or
department to the Planning Department,
indicating that all applicable conditions required
have been or will be met.
4of13
8. Fees. Applicant/Developer shall pay all Various Issuance of Various
applicable fees in effect, including, but not limited building
to, Planning fees, Building fees, Traffic Impact permits
Fees, TVTC fees, Dublin San Ramon Services
District fees, Public Facilities fees, Dublin Unified
School District School Impact fees (per
agreement between Developer and School
District), Fire Facilities Impact fees, Noise
Mitigation fees, Inclusionary Housing In-Lieu
fees, Alameda County Flood and Water
Conservation District (Zone 7) Drainage and
Water Connection fees; or any other fee that may
be adopted and applicable.
9. Indemnification. The Developer shall defend, ADM On-going Admin/City
indemnify, and hold harmless the City of Dublin Attorney
and its agents, officers, and employees from any
claim, action, or proceeding against the City of
Dublin or its agents, officers, or employees to
attack, set aside, void, or annul an approval of
the City of Dublin or its advisory agency, appeal
board, Planning Commission, City Council,
Community Development Director, Zoning
Administrator, or any other department,
committee, or agency of the City to the extent
such actions are brought within the time period
required by Government Code Section 66499.37
or other applicable law; provided, however, that
The Developer's duty to so defend, indemnify,
and hold harmless shall be subject to the City's
promptly notifying The Developer of any said
claim, action, or proceeding and the City's full
cooperation in the defense of such actions or
proceedings.
10. Clarifications to the Conditions of Approval. PL On-going Planning
In the event that there needs to be clarification to
the Conditions of Approval, the Community
Development Director has the authority to clarify
the intent of these Conditions of Approval to the
Applicant without going to a public hearing. The
Community Development Director also has the
authority to make minor modifications to these
Conditions of Approval without going to a public
hearing in order for the Applicant to fulfill needed
improvements or mitigations resulting from
impacts to this project.
11. Controlling Activities. The Applicant/Developer PL Through Planning
shall control all activities on the project site so as construction
not to create a nuisance to existing/surrounding and on-going
businesses and/or residences.
5of13
12. Clean-up. The Applicant/Developer shall be PL Through Planning
responsible for clean-up and disposal of project construction
related trash to maintain a safe, clean, and litter-
free site.
13. Property Maintenance. The PL On-going DMC
Applicant/Developer and property owner shall be 5.64.050
responsible for maintaining the site in a clean and
litter free condition during construction and
through completion. Per the City of Dublin Non-
Residential Property Maintenance Ordinance,
DMC Section 5.64.050, the Applicant/ Property
Owner shall maintain the building, site and all
signage in good condition and shall keep the site
clear of trash, debris and graffiti vandalism on a
regular and continuous basis.
14. Construction Trailers, Storage Containers and PL Through Planning
Equipment/Materials Storage Yard. Prior to the Completion
placement of any construction trailer, storage
container or equipment/ materials storage yard
related to construction activities, a Temporary
Use Permit shall be applied for and approved.
PLANNING DIVISION — GENERAL
15. Temporary Promotional Signs. Temporary PL On-going DMC
Promotional Signs, including but not limited to, 8.84
banner signs and balloons, are subject to
compliance with Chapter 8.84 of the Dublin
Zoning Ordinance and require a Zoning
Clearance from the Planning Division prior to
installation.
16. Prohibited Signage. The use of any A-Frame, PL Ongoing DMC
portable or sandwich board signs on-site or within 8.84
the publ ic right-of-way is prohibited.
17. Equipment Screening. All electrical and/or PL Issuance of Planning
mechanical equipment shall be screened from building
public view. Any roof-mounted equipment shall permits
be completely screened from view by materials
architecturally compatible with the building and to
the satisfaction of the Community Development
Director. The Building Permit plans shall show
the location of all equipment and screening for
review and approval by the Community
Development Director.
PLANNING DIVISION — SITE DEVELOPMENT REVIEW
18. Exterior Maintenance and Repair. All buildings, PL On-going Planning
exterior furniture, and finishes on-site shall be
regularly maintained and any damages repaired
on an on-going basis. Buildings which have
faded, cracked, chipped or peeling exterior paint
shall be repainted and maintained in good
6of13
condition at all times. Exterior paint colors are
subject to review and approval by the Community
Development Director in accordance with
Chapter 8.104.
19. Landscaping. All landscaping shall be PL On-going Planning
maintained in good condition at all times.
Irrigation shall be provided and utilized as needed
to maintain healthy and viable plant material.
Dead, decayed, diseased or other vegetation
constituting an unsightly appearance shall be
removed and replaced with viable plant material
of the same or comparable type.
20. Occupancy Permits. Final inspection or PL, B Occupancy Planning &
occupancy permits will not be granted until all Building
construction is complete in accordance with
approved plans and the conditions required by
the City.
21. Non-Residential Security Requirements. The PL On-going Planning
property owner and/or their designee shall
comply with the City of Dublin Non-Residential
Security Requirements.
BUILDING
22. Building Codes and Ordinances. All project B Through Building
construction shall conform to all building codes Completion
and ordinances in effect at the time of building
permit.
23. Building Permits. To apply for building permits, B Issuance of Building
Applicant/ Developer shall submit five (5) sets of Building
construction plans, to the Building Division for Permits
plan check. Each set of plans shall have
attached an annotated copy of these Conditions
of Approval. The notations shall clearly indicate
how all Conditions of Approval will or have been
complied with. Construction plans will not be
accepted without the annotated resolutions
attached to each set of plans.
Applicant/Developer will be responsible for
obtaining the approvals of all participation non-
City agencies prior to the issuance of building
permits.
24. Construction Drawings. Construction plans B Issuance of Building
shall be fully dimensioned (including building Building
elevations) accurately drawn (depicting all Permits
existing and proposed conditions on site), and
prepared and signed by a California licensed
Architect or Engineer. All structural calculations
shall be prepared and signed by a California
licensed Architect or Engineer. Provide a
complete building analysis that shows the new
7of13
addition is within the allowable area and all
occupancy separations per the CBC Section 508.
The site plan, landscape plan and details shall be
consistent with each other.
25. Engineer Observation. The Engineer of record B Frame Building
shall be retained to provide observation services Inspection
for all components of the lateral and vertical
design of the building addition, including nailing,
holddowns, straps, shear, roof diaphragm and
structural frame of building. A written report shall
be submitted to the City Inspector prior to
scheduling the final frame inspection.
PUBLIC WORKS
26. Clarifications and Changes to the Conditions. PW Prior to Public
In the event that there needs to be clarification to Approval of Works
these Conditions of Approval, the Directors of Improvement
Community Development and Public Works Plans
have the authority to clarify the intent of these
Conditions of Approval to the
Applicant/Developer by a written document
signed by the Directors of Community
Development and Public Works and placed in
the project file. The Directors also have the
authority to make minor modifications to these
conditions without going to a public hearing in
order for the Applicant to fulfill needed
improvements or mitigations resulting from
impacts of this project.
27. Standard Public Works Conditions of PW Prior to Public
Approval. Applicant/Developer shall comply Approval of Works
with all applicable City of Dublin Public Works Improvement
Standard Conditions of Approval. In the event Plans
of a conflict between the Public Works Standard
Conditions of Approval and these Conditions,
these Conditions shall prevail.
28. Improvement and Grading Plans. All PW Prior to Public
improvement and grading plans submitted to the Issuance of Works
Public Works Department for review/approval Grading/Site-
shall be prepared in accordance with the work Permit
approved preliminary plan, these Conditions of
Approval, and the City of Dublin Municipal Code
including Chapter 7.16 (Grading Ordinance). All
printing and lettering shall be 1/8" minimum
height and such shape and weight as to be
readily legible on prints and microfilm
reproductions. For on-site improvements, the
Applicant/Developer shall adhere to the City's
On-site Checklist (eight 8-1/2" x 11" pages). All
of these reference documents are available from
8 of 13
the Public Works Department (call telephone
925-833-6630) for more information.
Pollution Control Plan shall be included with the
improvement plan approval. The plan shall
include detailed design, location, and
maintenance criteria of all erosion and
sedimentation control measures.
29. Grading/Demolition/Sitework Permit. The PW Prior to Public
Applicant shall apply for and obtain a Issuance of Works
Grading/Sitework Permit from the Public Works Grading/Site-
Department for all site improvement or grading work Permit
work. The Grading/Sitework Permit will be based
on the final set of civil plans and will not be
issued until all of plan check comments have
been resolved. A copy of Grading/Sitework
Permit application may be found on the City's
website at:
https://ca-
dublin.civicplus.com/index.aspx?NID=340
The current cost of the permit is $102.00 and is
due at the time of permit issuance. The
Applicant will also be responsible for any
adopted increases to the fee amount or
additional fees for inspection of the work.
30. Site Plan. On-site improvements shall be PW Prior to Public
designed in accordance with the site plan entitled Issuance of Works
"Preliminary Improvement Plan Phase II" Grading/Site-
prepared by Ruggeri-Jensen-Azar, dated work Permit
December 26, 2013 and these Condition of
Approval.
31. Vehicle Parking. Prior to obtaining PW Prior to Public
grading/sitework permit, applicant shall submit a Occupancy Works
parking layout plan for the proposed parking lot
revisions.
Applicant should repair any distressed areas of
pavement within the proposed area of work. The
parking spaces striping that is in poor condition
shall be re-striped. All parking spaces shall be
double striped using 4" white lines set
approximately 2 feet apart according to City
standards and §8.76.070 (A) 17 of the Dublin
Municipal Code. All compact-sized parking
spaces shall have the word "COMPACT"
stenciled on the pavement within each space.
12"-wide concrete step-out curbs shall be
constructed at each parking space where one or
both sides abut a landscaped area or planter.
9of13
All customer and employee stalls shall be
clearly identified with signs and/or pavement
markings. The proposed parking shall not
impede required exit paths or encroach into
pedestrian pathways.
32. Parking Prohibitions/Restrictions. Vehicle PW On-going and Public
parking shall be prohibited or restricted at Addressed Works
locations deemed reasonably necessary by the Prior to Final
City Engineer during final design and/or
construction.
33. Site Accessibility Requirements. All parking PW Prior to Public
spaces for the disabled and other physical site Occupancy Works
improvements shall comply with current UBC
Title 24 requirements and City of Dublin
Standards for accessibility.
34. ADA Access. The Applicant/Developer shall PW Prior to Public
upgrade facilities to comply with current ADA Issuance of Works
standards. Building Permit
a) Install Accessibility signs at Disabled
Access Parking spaces per CBC Section
1129B.4.
b) Upgrade curb ramps with ramps
conforming to current standards for grade
and tactile elements (truncated domes).
c) Upgrade accessible path of travel to
conform to the current standards for
grades — cross slope not exceeding 2%
and longitudinal slopes not exceeding
8.33% with hand rails or 5% without hand
rails.
d) Proposed improvements associated with
the new Car Delivery facility indicates
removal of existing accessible path from
the accessible van parking stall located
east of the Parts/Service building.
Provide accessible path from the
accessible van parking stall to the existing
Customer Lounge area within the
Parts/Service building.
e) Display vehicles shall not block required
paths of travel.
35. Occupancy Permit Requirements. Prior to PW Prior to Public
issuance of an Occupancy Permit, the physical Occupancy Works
condition of the project site shall meet minimum
health and safety standards including, but not
limited to the following:
a. Lighting for the building and parking lot
shall be adequate for safety and security.
10 of 13
Exterior lighting shall be provided for
building entrances/exits and pedestrian
walkways. Security lighting shall be
provided as required by Dublin Police.
b. All construction equipment, materials, or
on-going work shall be separated from the
public by use of fencing, barricades,
caution ribbon, or other means
reasonably approved by the City
Engineer/Public Works Director.
c. All site features designed to serve the
disabled (i.e. H/C parking stalls,
accessible walkways, signage) for the
building shall be installed and fully
functional.
36. Stormwater Runoff Calculations. PW Prior to Public
Applicant/Developer shall provide the stormwater Issuance of Works
runoff, conveyance and treatment details. The Grading/Site-
calculations shall demonstrate adequate capacity work Permit
in the existing or proposed storm drainage
system.
37. Stormwater Management. The preliminary PW Prior to Public
Stormwater Treatment Plan submitted with this Issuance of Works
SDR application is approved in concept only. Grading/Site-
The final Stormwater Management Plan is work Permit
subject to City Engineer's approval prior to the
issuance of Grading/Sitework Permit. Approval
is subject to the developer providing the
necessary plans, details, and calculations that
demonstrate the plan complies with the standards
established by the San Francisco Bay Regional
Water Quality Control Board (RWQCB) National
Pollutant Discharge Elimination System (NPDES)
Municipal Regional Permit (MRP).
The Applicant shall install "No Dumping Drains
To Creek" storm drain markers on all existing
catch basins on site per City Standard Plan CD-
704.
38. Storm Water Treatment Measures PW Final Public
Maintenance Agreement. Applicant/Developer Works
shall enter into an agreement with the City of
Dublin that guarantees the property owner's
perpetual maintenance obligation for all storm
water treatment measures installed as part of the
project. Said agreement is required pursuant to
Provision C.3 of the Municipal Regional
Stormwater NPDES Permit, Order No. R2-2009-
0074. Said permit requires the City to provide
11 of 13
verification and assurance that all treatment
devices will be properly operated and
maintained.
39. Erosion Control During Construction. PW Prior to Public
Applicant/Developer shall include an Erosion Issuance of Works
and Sediment Control Plan with the Grading and Grading/Site-
Improvement plans for review and approval by work Permit
the City Engineer/Public Works Director. Said and During
plan shall be designed, implemented, and Construction
continually maintained pursuant to the City's
NPDES permit between October Vt and April
15th or beyond these dates if dictated by rainy
weather, or as otherwise directed by the City
En ineer/Public Works Director.
40. Construction Hours. Construction and grading PW During Public
operations shall be limited to weekdays (Monday Construction Works
through Friday) and non-City holidays between
the hours of 7:30 a.m. and 5:00 p.m. The
Applicant/Developer may request permission to
work on Saturdays and/or holidays between the
hours of 8:30 am and 5:00 pm by submitting a
request form to the City Engineer no later than
5:00 pm the prior Wednesday. Overtime
inspection rates will apply for all Saturday and/or
holiday work.
41. Temporary Fencing. Temporary construction PW During Public
fencing shall be installed along perimeter of all Construction Works
work under construction to separate the and
construction operation from the public. All Occupancy
construction activities shall be confined to within
the fenced area. Construction materials and/or
equipment shall not be operated or stored outside
of the fenced area or within the public right-of-
way unless approved in advance by the City
Engine r/Public Works Director.
42. Construction Noise Management Plan. PW During Public
Developer shall prepare a Construction Noise Construction Works
Management Plan, to be approved by the City and Grading
Engineer and Community Development Director, Activities
that identifies measures to be taken to minimize
construction noise on surrounding developed
properties. The Plan shall include hours of
construction operation, use of mufflers on
construction equipment, speed limit for
construction traffic, haul routes and identify a
noise monitor. Specific noise management
measures shall be included in the project plans
and specifications.
12 of 13
43. Damage/Repairs. The Applicant/Developer shall PW Prior to Public
be responsible for the repair of any damaged Occupancy Works
pavement, curb & gutter, sidewalk, or other public
street facility resulting from construction activities
associated with the development of the project.
44. Lighting. The Applicant/Developer shall PW Prior to Public
prepare a photometric plan to the satisfaction of Occupancy Works
the City Engineer, Director of Community
Development, the City's Consulting Landscape
Architect and Dublin Police Services. A minimum
of one foot-candle of light shall be provided and
maintained across the surface of the parking lot.
Any illumination, including security lighting, shall
be directed away from adjoining properties,
businesses or vehicular traffic so as not to cause
any gla re.
45. Geotechnical Report & Recommendations. PW Prior to Public
The Applicant/Developer shall provide a site Issuance of Works
specific geotechnical report prepared by a Building
reputable geotechnical engineer. The Permit
Geotechnical Engineer shall certify that the
project design conforms to the report
recommendations prior to issuance of a
Grading/Sitework Permit or Building Permit. All
report recommendations shall be followed during
the course of grading and construction.
PASSED, APPROVED AND ADOPTED this 11th day of March 2014 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chair
ATTEST:
Assistant Community Development Director
G:IPAM20131PLPA-2013-00059 Dublin Toyota SDR-Phase 11 PC 3.11.141PC Reso SDR 3.11.14.doc
13 of 13