Loading...
HomeMy WebLinkAbout3.2 Transportation Expenditure Planor 19 82 /ii � 111 DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL March 18, 2014 Honorable Mayor and City Councilmembers CITY CLERK File #660 -30 Christopher L. Foss, Acting City Manager " Approval of the 2014 Alameda County Transportation xpencliture Plan and Recommendation for the Board of Supervisors to Place a 30 -year Extension and Augmentation of the Existing Transportation Sales Tax on the November 4, 2014 General Election Ballot Prepared by Obaid Khan, Senior Civil Engineer (Traffic /Transportation) EXECUTIVE SUMMARY: The City Council will consider approval of the 2014 Alameda County Transportation Expenditure Plan, as well as a request that the Alameda County Board of Supervisors place the reauthorization and augmentation of Measure B on the November 4, 2014, ballot. The ballot measure supported by this Plan will augment and extend the existing half -cent sales tax for transportation programs and projects in Alameda County for a 30 -year term to fund the transportation programs and projects described in the 2014 Plan. FINANCIAL IMPACT: There is no financial impact associated with this item. If voters approve the reauthorization of Measure B in November 2014, significant funds would be available to the City of Dublin for transportation programs and projects. RECOMMENDATION: Staff recommends that City Council adopt the Resolution Approving the 2014 Alameda County Transportation Expenditure Plan (Attachment 1) and request that the Alameda County Board of Supervisors place the reauthorization and augmentation of Measure B, to fund the Plan, on the November 4, 2014 ballot. ubmitte` By Public Works Director \ Reviewed By Acting Assistant City Manager Page 1 of 6 ITEM NO. 3.2 DESCRIPTION: In 1986, voters approved Measure B, a half -cent sales tax, to fund transportation improvements and programs throughout Alameda County. In November 2000, Alameda County voters approved an extension of the first sales tax through 2022 to fund a new set of project and program investments throughout the County. All of the major projects promised to and approved by the voters in the 2000 Measure are either underway or complete. Funds that go to cities and other local jurisdictions to maintain and improve local streets, provide critical transit service, provide transportation services for seniors and persons with disabilities, as well as implement bicycle and pedestrian safety projects, will continue until the current Measure B expenditure plan ends in 2022. In November 2012, Alameda County voters turned down the 2012 Transportation Expenditure Plan by the narrowest of margins, only 721 votes shy of the two - thirds majority required to pass. Similar to the 2014 Plan, the 2012 Transportation Expenditure Plan was proposed to augment the existing half cent sales tax by a half cent, but unlike the current Plan's sunset date of 2045, it was recommended to be in place in perpetuity. Because of the strong voter support and the ongoing and growing need for transportation investments in Alameda County, the Alameda County Transportation Commission (Alameda CTC) unanimously approved a slightly revised 2014 Alameda County Transportation Expenditure Plan (Plan) that includes a sunset date. Alameda CTC is recommending the Plan for approval by the cities in Alameda County and the Board of Supervisors, so that voters will have an opportunity to reauthorize and augment Measure B to fund critical transportation projects included in the detailed Plan (Attachment 2) that directly benefit every city and the County. Without new transportation investments, Alameda County will lose jobs, experience increased traffic, suffer potential service cuts on buses and BART, and see more costly transportation services for seniors and people with disabilities. Over the term of the Plan, Alameda County's population will grow by almost 30 percent, and the senior population will double —this growth demands investments to meet current and future transportation needs in Alameda County. For over 25 years, Alameda CTC has successfully delivered transportation projects throughout Alameda County that create good quality, local jobs while delivering transportation solutions. These projects were funded in large part by Measure B. Alameda CTC combined agencies, saving millions of dollars per year, and earned AAA financial credit ratings —the highest possible —and 100 percent of its annual audits have been verified by independent auditors and a citizens watchdog committee made up of Alameda County residents. These ratings underscore the strong financial management and accountability measures at Alameda CTC. Reauthorizing and augmenting Measure B is critical to meet local and countywide transportation needs, and the 2014 Plan has the highest level of accountability, including strict limits and oversight of the funds. The Plan was developed in conjunction with the Alameda Countywide Transportation Plan (CWTP), the long -range policy document that guides transportation investments, programs, policies, and advocacy for Alameda County. The Plan benefited from a performance -based project evaluation process undertaken for the CWTP. This allowed policies and goals to be expressed in quantifiable terms and competing transportation investments to be compared to one another objectively by using performance criteria. This led to a more systematic and analytical selection process for effective investment priorities. A steering committee and two Page 2 of 6 working groups (technical and community) were established to guide development of both the CWTP and the Plan. Public engagement and transparency were the foundations of the development of these plans. A wide variety of stakeholders, including businesses, technical experts, environmental and social justice organizations, seniors, and people with disabilities, helped shape the Plan to ensure that it serves the County's diverse transportation needs. Thousands of Alameda County residents participated through public workshops and facilitated small -group dialogues; a website allowed for online questionnaires, access to all project information, and submittal of comments; and advisory committees that represent diverse constituencies were integrally involved in the plan development process from the beginning. The ballot measure supported by the 2014 Plan will augment the existing half -cent transportation sales tax by a half cent thus making it a full one cent sales tax, and extend it through March 31, 2045. Recognizing that transportation needs, technology, and circumstances change over time, the Plan covers the period from approval in 2014 and subsequent sales tax collections for 30 years, programming nearly $8 billion in new transportation funding. All funding decisions by Alameda CTC and the jurisdictions that receive these funds will be made through open and transparent public processes. All expenditures, as well as performance and cost - effectiveness measures will be reviewed by an Independent Watchdog Committee made up of Alameda County residents. In addition, annual independent audits will be performed on expenditures by Alameda CTC and all jurisdictions that receive these funds to ensure they are spent in accordance with the 2014 Plan. The Alameda CTC unanimously approved the Plan on January 23, 2014. The 2014 Plan will: • Expand BART, bus and commuter rail for reliable, safe and fast services, including BART expansion and improvements within Alameda County, bus service expansion, and commuter rail service improvements. • Keep fares affordable for seniors, youth and people with disabilities, including affordable senior shuttles, vans and services that help keep seniors independent, and critical funding for student transit passes to ensure youth can affordably get to school. It also funds reliable and inexpensive transportation for people with disabilities. • Provide traffic relief, including funds to every city in the County to repave streets, fill potholes, and upgrade local transportation infrastructure. It also invests in aging highway corridors to upgrade on and off ramps, using modern technology to manage traffic and improve safety. • Improve air quality and provide clean transportation by reducing pollution using innovative technology and expanding bike and pedestrian paths, and BART, bus and commuter rail expansion and operations. • Create good jobs within Alameda County by requiring local contracting that supports residents and businesses in Alameda County. Strict Accountability and Performance Measures The 30 -year Plan includes strict accountability measures to ensure all $8 billion for County transportation improvements are spent on approved projects. It requires open and transparent public processes to allocate funds, annual independent audits, an independent watchdog committee made up of people who live in Alameda County, and annual compliance reports to Page 3 of 6 the public that detail costs, including strict limits on administrative expenses, and document how specific performance measures are met. The Independent Watchdog Committee and Alameda CTC will evaluate performance and cost - effectiveness of projects funded in the 2014 Plan as they are being implemented. A key feature of the local transportation sales tax is that it cannot be used for any purpose other than local transportation needs. It cannot be taken by the state or by any other governmental agency under any circumstance, and over the life of this Plan can only be used for the purposes described in the Plan, or as amended. Transportation Investment Summary Over the course of the 30 -year Plan, total investments of nearly $8 billion will fund the types of transportation investments as shown in the chart and described in further detail as follows. $8 Billion in Total Investments 2015 to 2045* BART, Bus, Ferry a Commuter Rai $2,768 Millior Technology and Innova $77M Community Developme Improve Access to Jobs and Schools $300M Clean Transportation, Community Development, Technology and Innovation $1.A2A Mll111__ Affordable Transit for Youth, Seniors and People with Disabilities ion Bicycle and Pedestrian Paths and Safety $651 M *Estimated funds from 2015 to 2045 are anticipated to be nearly $8 billion. 19 • Relief on Streets and Highways $3,025 Million BART, bus, ferry and commuter rail investments will ensure transit operators can provide reliable, safe, and fast services. These operations, maintenance, and capital projects were guided by the principles of enhancing safety, convenience, and reliability to maximize the number of people who can use the transit system. By doubling the amount of local sales tax funds available for transit operations and maintenance, this plan represents a major investment in Alameda County's transit system to increase transit services and expand access to transit throughout the County, and to help avoid further service cuts while preserving the affordability of transit. Recipients: AC Transit, Altamont Commuter Express, BART, Livermore Amador Valley Transit Authority, San Francisco Bay Area Water Emergency Transportation Authority, and Union City Transit. Page 4 of 6 Affordable Transit for Youth, Seniors and People with Disabilities Investment in an Affordable Student Transit Pass Program and innovative grant funds for successful student and innovative transit programs will support affordable access to schools for students and youth in Alameda County. Investments in city -based and federally mandated and East Bay Paratransit services from AC Transit and BART, along with coordination and service grants, will provide affordable transit for seniors and people with disabilities. By doubling the amount of local sales tax funds available for transit service and programs for youth, seniors and people with disabilities, Alameda County is investing in its youth and helping seniors and people with disabilities remain independent. Traffic Relief on Streets and Highways Alameda County has more than 3,400 road miles of aging city and County streets. These streets are essential to cars, trucks, buses, bicycles, and pedestrians. Investing in local streets maintenance and safety will fund much - needed repair, fix potholes, improve intersections and improve the flow of traffic, including transit on our local roadways. Fifteen percent of city and County streets funding will support bicycle and pedestrian improvements on local streets to increase safety and accessibility, and to close gaps. Highway investments focus on improving safety, relieving bottlenecks at interchanges, improving on and off ramps, closing gaps, improving efficiency through the use of modern technology, and increasing safety on major truck route corridors. * Investments fund traffic relief, local bridge seismic safety, and direct allocations to the cities and County for their local streets maintenance and safety program. Local cities and the County will set their priorities within a framework that supports complete streets —all users of city and County streets, including cars, trucks, walkers, bikers, seniors, youth, and people with disabilities. Investments will fund bicycle and pedestrian paths and safety; community developments to improve transportation choices and access to jobs, housing, and school; and new technological advances in transportation management and information. Alameda County's bicycle and pedestrian infrastructure extends the reach of transit service and expands safety for youth, seniors, and all users of the County's streets. These investments support non - polluting and sustainable travel, and contribute to public health and quality of life. Investments will improve bicycle and pedestrian paths and other infrastructure and provide programs that encourage people to bike and walk. In particular, the Safe Routes to School Program encourages the County's youth to adopt safe and healthy habits for their transportation to school. Community development investments will improve every part of the County, enhancing areas around BART stations and bus transfer hubs slated for new development, and support communities to improve connections between transportation, housing, jobs, and education. For transportation projects in the 2014 Plan that promote the development of housing and jobs near transit areas, project sponsors will mitigate direct displacement as a result of projects. Page 5 of 6 Investments in technological innovations will support investments that reduce greenhouse gases and pollution by increasing the use of non -auto types of transportation. New Investments Will Restore Services, Meet Growing Transportation Needs, and Create Good Jobs The detailed 2014 Transportation Expenditure Plan will expand BART, bus, and rail services within Alameda County; keep transit fares affordable for youth, seniors, and people with disabilities; provide traffic relief on city streets and highways using new technology; improve air quality; and create good quality, local jobs. The 2014 Plan supports an environmentally sustainable future and will transform our transportation network over the coming decades to meet our growing needs, while supporting jobs as our local economy continues to recover. To implement the Plan, the Alameda CTC will create policies supporting the hiring of local contractors, businesses, and residents from Alameda County as applicable in the expenditure of these funds. Funding for the City of Dublin If voters approve the reauthorization of Measure B in November 2014, significant funds would be available to the City of Dublin for transportation programs and projects by way of direct pass - through funds as well as discretionary grant funding opportunities. The table below provides a summary of estimated pass- through revenues increase for Local Streets and Roads and Bicycle and Pedestrian programs. Additional funding detail for various other projects is included in Attachment 3. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Copy of this staff report was provided to James Paxson. Mr. Paxson is a member of the Measure B Citizen Watchdog Committee. ATTACHMENTS: 1. Resolution Approving the 2014 Alameda County Transportation Expenditure Plan 2. Exhibit A to the Resolution Alameda County Transportation Expenditure Plan 2014 -2045 3. City of Dublin Fact Sheet - 2014 Transportation Expenditure Plan 4. Alameda CTC Presentation Slides Page 6 of 6 RESOLUTION NO. - 14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE 2014 ALAMEDA COUNTY TRANSPORTATION EXPENDITURE PLAN WHEREAS, the Alameda County Transportation Commission has unanimously approved the 2014 Alameda County Transportation Expenditure Plan pursuant to the authority of Public Utilities Code Section 180000 et seq., and WHEREAS, the Transportation Expenditure Plan review and update was guided by a Transportation Expenditure Plan Steering Committee comprised of 13 representatives from Alameda County Cities, the Board of Supervisors, AC Transit, and BART; and WHEREAS, the Transportation Expenditure Plan was developed in conjunction with the Alameda Countywide Transportation Plan, the long -range policy document that guides transportation investments, programs, policies, and advocacy for Alameda County; a steering committee, technical working group, and community working group guided development of both plans using performance based criteria; and WHEREAS, the 2014 Transportation Expenditure Plan was unanimously approved by the governing body of the Alameda County Transportation Commission on January 23, 2014; and WHEREAS, the detailed, 30 -year Transportation Expenditure Plan will expand BART, bus, and rail services within Alameda County; keep transit fares affordable for youth, seniors, and people with disabilities; provide traffic relief on city streets and highways using new technology; improve air quality, reduce greenhouse gas emissions, and support an environmentally sustainable future; create good jobs within Alameda County and meet the County's growing transportation needs; and WHEREAS, the interests of Alameda County and its residents and businesses will benefit by the implementation of the 30 -year Transportation Expenditure Plan through the augmentation and extension of the existing half -cent sales tax for transportation in Alameda County; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the 2014 Alameda County Transportation Expenditure Plan, attached hereto as Exhibit A, and request that the Alameda County Board of Supervisors place it on the November 4, 2014 ballot. PASSED, APPROVED AND ADOPTED this 18th day of March, 2014, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk ..... ,.,...,,,L„,...,,-„„,„..,.:,. •, ,..,),..",-,,.r.,:74,,n•,.,-. ,,,..._. .._ ..... :........ .,...,71i TABLE OF CON- ' ' '' Page INTRODUCTION 1 BACKGROUND 7 TRANSPORTATION INVESTMENTS 11 GOVERNING BODY AND ORGANIZATIONAL STRUCTURE 35 IMPLEMENTING GUID PLAN APPROVALS 37 40 I ; Berkeley I bany Emeryvil ` -Pledm nt "-Ptcl--"\_..\% Alameda, `t, Castro Dublin k.San Volley l pandr San Nvermore or Hayvrard Pleasanton ' 1111112. ,, ,,,,z,2 Unbi1, CNy AL ED)tr — UNTY kemoM Newark Y - ‘...„.„..--(‘*'.1-- _v.• ,- 2oi4 Alameda County Transportation Expenditure Plan i• n= New transportation investments are needed throughout Alameda County. Over the term of this Plan,Alameda County's population will grow by almost 30%, and the senior population will double.This means more demand on our streets,highways and transit.Without new funding,Alameda County will lose job opportunities,experience increased traffic on degraded streets and highways,suffer potential service cuts on buses and BART and see more costly transportation services for youth, seniors and people with disabilities. Transportation projects create jobs. For over 25 years,the Alameda County Transportation Commission(Alameda CTC)has successfully delivered projects that create good quality,local jobs while delivering transportation solutions.It is funding BART to the Oakland Airport and an extension toward Silicon Valley,local street maintenance,bicycle and walking safety programs for youth and seniors,bus operations and maintenance,and highway efficiency projects to relieve traffic and provide commuter choices.Alameda CTC combined agencies,saving millions of dollars per year, and earned AAA financial credit ratings—the highest possible—and 100%of its annual audits have been verified by independent auditors and a citizens watchdog committee made up of Alameda County residents. This Plan benefits people who live in Alameda County. This detailed Plan will expand BART,bus, and rail services within Alameda County, keep transit fares affordable for youth, seniors,and people with disabilities,provide traffic relief on city streets and highways using new technology,improve air quality,and create good quality,local jobs. It supports an environmentally sustainable future,transforming our transportation network over the coming decades to meet our growing needs,while supporting jobs as our local economy continues to recover.This Plan will: • Expand BART,bus and commuter rail for reliable, safe and fast services,including BART expansion and improvements within Alameda County,bus service expansion, and commuter rail service improvements. • Keep fares affordable for seniors,youth and people with disabilities,including affordable senior shuttles,vans and services that help keep seniors independent,and critical funding for student transit passes to ensure youth can affordably get to school.It also funds reliable and inexpensive transportation for people with disabilities. • Provide traffic relief,including funds to every city in the County to repave streets,fill potholes, and upgrade local transportation infrastructure.It also invests in aging highway corridors to upgrade on and off ramps,using modern technology to manage traffic and improve safety. • Improve air quality and provide clean transportation by reducing pollution using innovative technology and expanding bike and pedestrian paths,and BART,bus and commuter rail expansion and operations. • Create good jobs within Alameda County by requiring local contracting that supports residents and businesses in Alameda County. Strict accountability and performance measures ensure delivery. The 30-year Plan includes strict accountability measures to ensure all$8 billion for County transportation improvements are spent on approved projects.It requires open and transparent public processes to allocate funds, annual independent audits,an independent watchdog committee made up of people who live in Alameda County, and annual compliance reports distributed to the public that detail costs and how specific performance measures are met. 2014 Alameda County Transportation Expenditure Plan INTRODUCTION ALAMEDA COUNTY TRANSPORTATION EXPENDITURE PLAN SUMMARY FUNDS ALLOCATION' Summary of Investments (s x million) BART, Bus, Ferry and Commuter Rail for Reliable, Safe and Fast Services $2,768 BART Expansion and Maintenance $749 Bus Operations,Maintenance and Rapid Bus Projects $1,548 Commuter Rail Improvements $432 Ferry Services in Alameda County $39 Affordable Transit for Youth, Seniors and People with Disabilities $964 Affordable Youth Transit to School and Transit Innovation $190 Affordable Transit for Seniors and People with Disabilities $774 Traffic Relief on Streets and Highways $3,025 City and County Streets* $2,348 Highway Safety and Efficiency $677 Clean Transportation,Community Development,Technology and Innovation $1,028 Bicycle and Pedestrian Paths and Safety Projects and Educational Programs* $651 Community Development Projects to Improve Access to Jobs and Schools $300 Technology and Innovation $77 TOTAL INVESTMENTS (YEAR 2015 TO 2045)"'` $7,785 Notes: *15%of city and county streets funding will support bicycle and pedestrian paths and safety improvements on local streets. **Estimated funds from 2015 to 2045 are anticipated to be almost$8 billion. $7,785 in Total Investments Year 2015 to 2045 Affordable Transit for Youth,Seniors and People with Disabilities BART,Bus,Ferry and $964 Million Commuter RaR $2.768 BiMon Local Streets Technology and / G ; MiEihea�e�and sally Innovation PAMPA Community Development to improve/ Traffic ReNef on Community Access to.lob,and schoob Streets and Highways 5300M Skye!,and red.shtan Highway gamy $3.025 Billion Clean Transportation, rains and safety and Diclency Community Development, sum sunM Technology and Innovation $1.028 Billion See Table 1 for a detailed list of transportation investments. 2 I 2014 Alameda County Transportation Expenditure Plan INTRODUCTION Table 1:List of Investments Investment Amount %of Total Type Category Project/Program (S x millions) Funds AC Transit $1,455.15 18.8% Altamont Commuter Express $77.40 1.0% BART Maintenance $38.70 0.5% Transit San Francisco Bay Area Water Emergency Operations, Transportation Authority $38.70 0.5% Maintenance,and Livermore Amador Valley Transit $38 70 0.5% Safety Program Authority Union City Transit $19.35 0.25% Innovative grant funds,including successful student transportation programs $174'63 2'2496 Affordable Transit Program for Affordable Student Transit Pass Program $15.00 0.19% Students and Youth Subtotal $1,857.63 24% • City-based and Locally Mandated $232.20 3.0% • • Affordable Transit East Bay Paratransit-AC Transit $348.31 4.5% for Seniors and East Bay Paratransit-BART $116.10 1.5% People with Disabilities Coordination and Service Grants $77.40 1.0% BART,Bus, Subtotal $774.01 10% Senior,and Telegraph Avenue/East 14th/International Youth Boulevard project $10,0 Transit Alameda to Fruitvale BART Rapid Bus $9.0 (4896) Rapid Bus Projects Grand/MacArthur BRT $6.0 College/Broadway Corridor Transit $10.0 Priority Subtotal $35.0 Irvington BART Station $120.0 BART System Bay Fair Connector/BART METRO $100.0 Modernization and BART Station Modernization and $90.0 Expansion Capacity Program 14% BART to Livermore $400.0 Subtotal $71o.o Dumbarton Corridor Area Transportation Improvements $120.0 Major Transit Union City Intermodal Station $75.0 Corridor Railroad Corridor Right of Way Enhancements and Preservation and Track Improvements $110.0 Rail Connections Oakland Broadway Corridor Transit $10.0 Capitol Corridor Service Expansion $40.0 Subtotal $355.0 TOTAL $3,731.64 Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be determined as part of the Capital Improvement Program developed through a public process and adopted by Alameda CTC every two years and will include geographic equity provisions. BART Maintenance funds will require an equal amount of matching funds and must be spent in Alameda County. All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability measures. 2014 Alameda County Transportation Expenditure Plan I 3 gimaimmerwissul INTRODUCTION Table r List of Investments Type Investment Project/Program Amount %of Total Category ($x millions) Funds North County Example Projects Solano Avenue Pavement resurfacing and beautification;San Pablo Avenue Improvements;State Route(SR)13/Ashby Avenue Corridor;Marin Avenue local road safety;Gilman railroad crossing;Park Street,High Street,and Fruitvale Bridge Replacement Powell Street Bridge widening at Christie;East 14th Street; Oakland Army Base transportation infrastructure improvements Central County Example Projects Crow Canyon Road safety;San Leandro streets*;Lewelling Blvd./Hesperian Blvd.; Tennyson Road Grade Separation South County Example Projects Congestion Relief, East-West Connector in North Fremont Local Local Bridge and Union City;I-680/1-880 cross 10% Streets Seismic Safety connectors;widen Fremont Boulevard Maintenance from I-880 to Grimmer Boulevard; and Safety upgrades to relinquished Route 84 in (30%) Fremont;Central Avenue overcrossing; Thornton Ave widening;Newark streets East County Example Projects El Charro road improvements;Dougherty Road widening;Dublin Boulevard widening;Greenville Road widening; Bernal Bridge Construction Subtotal $639.00 Countywide Freight Corridors Outer Harbor Intermodal Terminal;7th Street Grade Separation and Roadway Improvement;Truck Routes serving the Port of Oakland Subtotal $161.00 Direct Allocation Local streets maintenance and safety to Cities and $1,548.03 20% County program TOTAL $2,348.03 30% Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be determined as part of the Capital Improvement Program developed through a public process and adopted by the Alameda CTC every two years and will include geographic equity provisions. All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability measures. *This includes$30 million for San Leandro local streets maintenance and safety improvements. 4 2014 Alameda County Transportation Expenditure Plan INTRODUCTION Tablet List of Investments Investment Amount %of Total Type Category Project/Program ($x millions) Funds I-80 Gilman Street Interchange I-8o improvements $24.00 Improvements I-80 Ashby Interchange improvements $52.00 Subtotal $76.00 SR-84/I-680 Interchange and SR-84 $122.00 Widening SR-84 SR-84 Expressway Widening(Pigeon Pass Improvements $10.00 to Jack London) Subtotal $132.00 I-580/1-680 Interchange improvements $20.00 I-580 Local Interchange Improvement -580 Program Interchange improvements- I Improvements Greenville,Vasco,Isabel Avenue(Phase 2); $28.00 Central County I-580 spot intersection • improvements Subtotal $48.00 I-680 High Occupancy Vehicle/Toll I-680 (HOV/HOT)Lane between SR-237 $60.00 Traffic Improvements and Alcosta 8% Relief on Subtotal $60.00 Highways I-880 NB HOV/HOT Extension from A St. $20.0 (9%) to Hegenberger I-880 Broadway/Jackson multimodal transportation and circulation $75.0 improvements Whipple Road/Industrial Parkway $60.0 1-880 Southwest Interchange improvements Improvements 1-880 Industrial Parkway Interchange $44.0 improvements I-880 Local Access and Safety:Interchange improvements at Winton Avenue; 23rd/29th Ave.,Oakland;42nd Street/High $85.00 Street;Route 262(Mission)improvements and grade separation;Oak Street Subtotal $284.00 Highway Capital Subtotal $600.00 Projects Freight& Freight and economic development Economic $77.40 1% Development program TOTAL $677.40 9 ' Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be determined as part of the Capital Improvement Program developed through a public process and adopted by the Alameda CTC every two years and will include geographic equity provisions. All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability measures. 2014 Alameda County Transportation Expenditure Plan I 5 INTRODUCTION Table 1:List of Investments Investment Amount %of Total Type Category Project/Program ($x millions) Funds Gap Closure on Three Major Trails:Iron Horse,Bay Trail,and East Bay $264.00 3% (Opt Bicycle and Greenway/UPRR Corridor Pedestrian Infrastructure& Bicycle and pedestrian direct allocation to Bicycle and Safety cities and Alameda County $232.20 3% Pedestrian Bicycle and pedestrian grant program for Paths and regional projects and trail maintenance $154.80 2% Safety(8%) TOTAL $651.00 8% North County Example Projects* Broadway Valdez Priority Development Area;Eastmont Mall Priority Development Area;BART station areas:Oakland Coliseum;Lake Merritt;West Oakland; 19th St;MacArthur;Ashby;Berkeley Downtown Central County Example Projects t. Downtown San Leandro Transit Oriented Development(TOD);Bay Fair BART Community Transit Village;San Leandro City Community Investments That Streetscape Project;South Hayward BART Develop- Improve Transit Station Area 4% ment Connections to South County Example Projects Investments Jobs and Schools BART Warm Springs West Side Access (4%) Improvements;Fremont Boulevard Streetscape Project;Union City Intermodal Infrastructure Improvements;Dumbarton TOD Infrastructure Improvements East County Example Projects West Dublin BART Station and Area Improvements;Downtown Dublin TOD; East Dublin/Pleasanton BART Station and Area Improvements Subtotal $300.00 TOTAL $300.00 Technology Technology, Technology,Innovation,and Innovation,and $77,40 (1%) Development Development program TOTAL NEW NET FUNDING(2015-45) $7,785 Notes:Priority implementation of specific investments and amounts for fully defined capital projects and phases will be determined as part of the Capital Improvement Program developed through a public process and adopted by the Alameda CTC every two years and will include geographic equity provisions. All recipients of sales tax funds will be required to enter into agreements which will include performance and accountability measures. *Preliminary allocation of North County Funds subject to change by Alameda CTC: Coliseum BART Area($40 M),Broadway Valdez($20 M),Lake Merritt($20 M),West Oakland($20 M),Eastmont Mall($20 M),19th Street($20 M),MacArthur($20 M), Ashby($18.5 M),Berkeley Downtown($20 M).These funds may also be used to fund shuttles that serve Alameda County residents and businesses. 6 2014 Alameda County Transportation Expenditure Plan THE 2014 ALAMEDA COUNTY • Provide traffic relief.The Plan provides critical TRANSPORTATION EXPENDITURE funds to every city in the County to repave PLAN streets,fill potholes,and upgrade local transportation infrastructure.The Plan also The 2014 Alameda County Transportation invests in key aging highway corridors to Expenditure Plan(referred to throughout this upgrade on and off ramps and uses modern document as the Plan)responds to the county's technology to manage traffic and improve safety. continued transportation needs through the extension and augmentation of a locally generated and • Improve air quality and clean transportation. protected funding stream.These funds cannot be used for any purpose other than local transportation The Plan reduces pollution by using innovative needs.It cannot be taken by the State or by any other technology and investing in alternatives to governmental agency under any circumstance,and driving,including significant improvements in over the life of this Plan can only be used for the bike and pedestrian facilities and BART,bus and purposes described in the Plan,or as may be commuter rail expansion and operations. amended. • Create good jobs within Alameda County.The The 2014 ballot measure supported by this Plan expenditure plan requires local contracting to augments and extends the existing Alameda County create good quality jobs that support residents Measure B half-cent transportation sales tax by a half- and businesses in Alameda County. cent to April 1,2045.It is anticipated that the sales tax extension and augmentation in this ballot measure TAXPAYER SAFEGUARDS would generate about$8 billion for essential transportation improvements in every city and The commitments in this expenditure plan are throughout Alameda County. underpinned by a set of strong taxpayer safeguards to ensure that they are met.These include: The 2014 Transportation Expenditure Plan funds critical improvements that will: • An annual independent audit and report to the Expand BART,bus and commuter rail for taxpayers on expenditures and performance • reliable,safe and fast services.The Plan includes measures; expansions and improvements to BART within • Ongoing monitoring and review by an Alameda County,bus service expansion and Independent Watchdog Committee;and commuter rail service improvements. • Strict limits on administrative expenses charged • Keep fares affordable for seniors,youth and to these funds. people with disabilities.The Plan funds affordable senior shuttles,vans and services that expand transportation choices and help keep seniors independent.The Plan provides critical funding for student transit passes to ensure youth can affordably get to school.It also expands funding for reliable and inexpensive transportation for people with disabilities. 2014 Alameda County Transportation Expenditure Plan I 7 LOCAL FUNDS SPENT LOCALLY VISION AND GOALS The revenue generated through this transportation The development of the Countywide Transportation sales tax will be spent exclusively on projects and Plan and the Transportation Expenditure Plan began programs in Alameda County.All of the projects and by establishing a vision and set of goals for the programs included in the expenditure plan are County's transportation system: considered essential for the transportation needs of Alameda County. Vision:Alameda County will be served by a premier THE 2014 TRANSPORTATION transportation system that supports a vibrant and EXPENDITURE PLAN WAS DEVELOPED livable Alameda County through a connected and integrated multimodal transportation system WITH FULL PUBLIC INVOLVEMENT promoting sustainability,access,transit operations, public health and economic opportunities. This expenditure plan was developed in conjunction with the Alameda Countywide Transportation Plan (CWTP),the long range policy document that guides The vision recognizes the need to maintain and transportation investments,programs,policies and operate the County's existing transportation advocacy for Alameda County.A Steering infrastructure and services while developing new Committee and two working groups(technical and investments that are targeted,effective,financially community)were established to guide development sound and supported by appropriate land uses. of both the CWTP and this Plan. Transportation in Alameda County will be guided by transparent decision-making and measureable performance indicators,and will be supported by Public engagement and transparency were the these goals: foundations of the development of these plans.A wide variety of stakeholders,including businesses, Goals:Alameda County's transportation system technical experts,environmental and social justice will be: organizations,and seniors and people with • Multimodal(BART,bus,train,ferry,bicycle, disabilities,helped shape the plan to ensure that it walking and driving) serves the county's diverse transportation needs. Thousands of Alameda County residents participated • Accessible,affordable and equitable for people through public workshops and facilitated small of all ages,incomes,abilities and geographic group dialogues;a website allowed for online locations questionnaires,access to all project information,and • Integrated with land use patterns and local submittal of comments;and advisory committees that represent diverse constituencies were integrally decision making involved in the plan development process from the • Connected across the county,within and across beginning. the network of streets,highways,transit,bicycle and pedestrian routes The 2014 Plan benefited from a performance-based • Reliable and efficient project evaluation process undertaken for the CWTP. This allowed policies and goals to be expressed in • Cost effective quantifiable terms and competing transportation • Well maintained investments to be compared to one another objectively.This led to a more systematic and • Safe analytical selection process for effective investment • Supportive of a healthy and clean environment priorities. City councils in the county and the County Board of Supervisors each held public meetings and voted to approve this Plan and recommended submission of the sales tax measure to the voters. 8 2014 Alameda County Transportation Expenditure Plan BACKGROUND WHY EXTEND AND AUGMENT A provided congestion relief throughout Alameda MEASURE NOW? County by widening Interstate(I)238,constructing the 1-680 express lane,improving 1-580 and I-880,and While the existing measure will remain intact upgrading surface streets and arterial roadways. through 2022,the 2014 Plan has been developed for several reasons: Most of the 27 major projects in the 2000 Plan have • Most capital projects in the existing measure been completed or are under construction,many ahead of schedule.Annual audits by independent have been completed ahead of schedule. certified public accountants have verified that 100% Without a new plan,the County will be unable to of the public funds authorized in the 2000 Plan have fund any new major projects to address pressing been spent as promised. mobility needs. • Bus services in Alameda County have been cut BENEFITS FROM THE 2000 MEASURE B significantly,and the gap between road EXPENDITURE PLAN maintenance needs and available funding is at an all-time high.The 2014 Plan will allow local The 2000 Plan local transportation sales tax has funding to fill in the gaps created by declining provided a substantial share of the total funding state and federal revenue,keep needed services available for transportation projects in Alameda County,far exceeding annual state and federal in place and restore service cuts for many commitments.State and federal sources have providers. diminished over time,and local sources have come to • The demand on Alameda County's roads, represent over 60%of the money available for highways,BART and buses is increasing. transportation in the county.The 2000 measure has Alameda County's population is growing,and as been indispensable in helping to meet the county's the economy improves,more people and goods growing needs in an era of shrinking resources. are moving on roads and transit.Investments are needed to maintain and improve the current The county's ability to keep up with street transportation system to ensure it can effectively maintenance needs,such as filling potholes and accommodate current and future growth. repaving roadways,is fundamentally dependent on these local funds.Targeted improvements funded STATUS OF THE 2000 MEASURE B through the 2000 Plan such as the new express lane EXPENDITURE PLAN-FULFILLING THE on I-680 and the widening of I-238 have relieved congestion on critical county commute corridors.A PROMISE TO VOTERS new Warm Springs BART station will open soon in Voters in Alameda County have always recognized the southern part of the county as the beginning of a the need to provide stable and local funding for the new connection to Silicon Valley.The 2000 Plan has County's transportation needs.In 1986,Alameda supported transit operations,improved the safety of County voters authorized a half-cent transportation children getting to schools throughout the county and sales tax to finance improvements to the county's funded special transportation services that provide overburdened transportation infrastructure.An even over 900,000 trips for seniors and people with wider margin of voters reauthorized this tax in 2000, disabilities every year. with over 81.5%support.Detailed expenditure plans have guided the use of these funds.The 2000 Plan These local funds have also allowed the county to provides over$120 million each year for essential compete effectively for outside funds by providing a operations,maintenance and construction of local match fund source.The 2000 Plan has attracted transportation projects.It authorized the expenditure over$3 billion of additional funds from outside of funds for the extension of BART to Warm Springs, sources for Alameda County transportation transit operations,rapid bus improvements investments. throughout the county,bicycle and pedestrian trails and bridges,a countywide Safe Routes to School Program,and affordable transportation services for seniors and people with disabilities.It has also 2014 Alameda County Transportation Expenditure Nan I 9 BACKGROUND -Albany 1. Berkeley Emeryvill `' =Fledm nt • ` r aslro Dublin •;San Volley 1andr• „ San Uvermore Lorenzo Hayward Pleasanton Union., yrr ""1 AL = • ED • * LINTY Fremont Newark • io I 2014 Alameda County Transportation Expenditure Plan 3 .. .. `r' -- j a i This Transportation Expenditure Plan includes BART, BUS,SENIOR AND YOUTH almost$8 billion in funding over 30 years.The TRANSIT (48%) investments described in this Plan will be made from 2015 to 2045,if voters approve the ballot Increasing the number of people that can be served measure in 2014.These improvements are necessary by BART,buses,commuter rail,and senior and youth to address current and projected transportation needs transit is critical to all residents of Alameda County to A in Alameda County,current legislative mandates, provide transportation choices,relieve congestion J and reflect the best efforts to achieve consensus and support a vibrant economy.The investments t among varied interests and communities in identified in this Plan were guided by the principles Alameda County. of enhancing safety,convenience and reliability to maximize the number of people who can make use of The projects in this Plan are designed to strengthen the transit system.This Plan represents a major Jr the economy and improve quality of life in Alameda investment in Alameda County's transit system to County,reduce traffic congestion,improve air quality increase transit services and expand access to transit and create jobs.They include maintenance of existing throughout the County,and to help avoid further _:: infrastructure,targeted investments to improve service cuts and preserve affordability of transit. r highway safety,remove bottlenecks on major 1 commute corridors,enhance rail,bus and ferry transit LOCAL STREETS MAINTENANCE AND systems,and make it safer and easier to bike and SAFETY (30%) walk throughout the county. Local streets are the essential building blocks of Two types of investments are funded in this Plan: Alameda County's transportation system.Virtually j capital investments which are allocated specific dollar every trip begins or ends on a local street.Alameda amounts in the Plan,and operations and maintenance County has more than 3,400 miles of aging streets investments which are allocated a percentage of net and roads,many of which are in need of repair: revenues to be distributed on a monthly or periodic intersections need to be reconfigured,traffic lights basis.Capital investments will be made based upon need to be synchronized and potholes need to be clearly defined project descriptions and limits filled.Most importantly,these streets are essential to resulting from the outcomes of environmental every mode of transportation from cars and trucks,to f analyses,as applicable.Examples of operations and buses,bikes and pedestrians. $ maintenance investments include providing funds to local jurisdictions to complete ongoing operations TRAFFIC RELIEF ON HIGHWAYS (9%) and maintenance tasks such as transit operations and local street maintenance.The following summarizes Aging highway systems continue to operate under total expenditures by type including both capital and substantial pressure as travel patterns become more operations and maintenance investments. diverse and the demand for moving goods and people increases.While the era of major highway 1. construction has come to an end in the Bay Area, } there are many opportunities to increase the safety and efficiency of highway corridors in Alameda County.The highway investments included in this Plan focus on improving safety,relieving bottlenecks k at interchanges,closing gaps and improving t fr. 2014 Alameda County Transportation Expenditure Plan 1 11 TRANSPORTATION INVESTMENTS efficiency with carpool and high occupancy vehicle enhancing areas around BART stations and bus infrastructure,and increasing safety on major truck transfer hubs that are slated for new development, route corridors.In highway corridors where sales tax and supporting communities where biking,walking investments will be made to implement high and transit riding are all desirable options. occupancy toll(HOT)or express lanes,the net toll revenues generated will be used to fund additional 41. improvements within those corridors,including transit capital projects and operations. In addition to focusing on highway efficiencies,this Plan recognizes the need to move goods safely and iN /, effectively.Recognizing the economic importance of a I i the Port of Oakland,highways must provide j ' connections between goods and market,and do so / e with minimal impacts to residential neighborhoods. 0 r BICYCLE AND PEDESTRIAN PATHS AND SAFETY(8%) i I Most trips begin or end on foot.Alameda County's bicycle and pedestrian infrastructure is the"glue" that holds the network together by extending the reach of transit service,providing a non-polluting ' and sustainable travel mode,and contributing to For transportation projects funded in this Plan to public health and quality of life.A particular focus is promote the development of housing and jobs near transit areas,project sponsors will mitigate direct on the County's youth to encourage adoption of safe and healthy habits through Safe Routes to Schools. displacement as a result of projects. tIn addition,a Technology,Innovation and Development Program will support technological advances in transportation management and information. • k The map on the following page shows the SW t4- investments planned in all areas of the County. k ice COMMUNITY DEVELOPMENT INVESTMENTS (4%)AND TECHNOLOGY AND INNOVATION (1%) Transportation investments in local communities are strengthened when development focuses on bringing together transportation choices,housing and expanded access to jobs and schools.This Plan includes investments in every part of the County, TRANSPORTATION INVESTMENTS v :c3 Q f 3 0 a c .� o cn E o .4 u, a .� ° v v a o ¢" E as as rte.. G v .* " G :a.., . E .°)..), O I5 U .O 4 h ... S cz .2 , �cu W .4 .� g �. co A v ° ,1 � � � " Q,, �y, 3 v M y ar 'o a > 0E oA J i� G O O V i i ar ° +± v X U ; o o " °4 a ° ea t) n3 U ° Q zEL, Qww a s. H E ' k--.1F t - * , Ipi je3,st' 1 71,..1" ,,c' .. "E ow, 2. v F es Ew — r3..) U C at e (I C II: J zg C 0 iis> (6 C x T Clit c 11 O I as C: �,.. 79<31 a.. o 41 a 40 >• 0 it C f`C C C Cl1:6iC..• tt 0 2014 Alameda County Transportation Expenditure Plan I 13 BART, BUS, SENIOR AND YOUTH TRANSIT A total of 48%of net percentage of net revenue being allocated to these revenue will be dedicated agencies is as follows: to BART, bus,commuter %of Net Total 2015- rail,and senior and youth Total 2045(est.) Q transit investments.Funds Agency Revenue $Millions for operations and AC Transit 18.8% $1,455 maintenance will be ACE 1.0% $77 provided to transit operators in the county BART Maintenance 0.5% $39 (AC Transit, BART, Union City Transit and WETA(ferries) o.5°%° $39 Livermore Amador Valley Transit Authority LAVTA(WHEELS) 0.5% $39 (LAVTA))as well as to ferries and the Union City Transit 0.25% $19 Total Transit 21.55% $1,668 Altamont Commuter Express(ACE) rail Operations service. In addition,these funds will substantially increase Alameda County's Affordable Youth Transit Pass Program commitment to the growing transportation ($15 million) needs of older adults and people with This program is for the purposes of funding one or disabilities,essentially doubling the funds more models for a student transit pass program.The available for targeted services for this program would be designed to account for important group.Grant funds are also geographic differences within the county.Successful available to support affordable models determined through periodic reviews will transportation access to schools. Major have the first call for funding within the innovative capital investments include upgrades to the grant program,as described below. existing BART system and BART extensions, Innovative Grant Program including successful adding bus rapid transit routes to improve student transportation programs(2.24%of net the utility and efficiency of transit,and revenue,estimated at$175 M) providing funding for transit improvements These grant funds,administered by Alameda CTC, will be used for the purposes of funding innovative serving the Dumbarton Corridor Area. and emerging transit projects,including TRANSIT OPERATIONS, MAINTENANCE, implementing successful models aimed at increasing the use of transit among junior high and high school AND SAFETY PROGRAM (24% OF NET students,including a transit pass program for REVENUE, $1,857 M) students in Alameda County.Successful models will This program provides transit operators with a receive the first priority for funding from this consistent funding source for maintaining,restoring category. and improving transit services in Alameda County. Funds will be periodically distributed by Transit operators will allocate these funds in Alameda CTC for projects and programs with proven consultation with their riders and policy makers with the goal of creating a world class transit system that abilities to accomplish the goals listed below: is an efficient,effective,safe and affordable • Increase the use of public transit by youth riders alternative to driving. (first priority for funding)and increase youth access to school This funding will support the following: • Enhance the quality of service for transit riders Transit Operations and Maintenance Program (21.55%of net revenue,estimated at$1.668 M) • Reduce costs or improve operating efficiency Funds are disbursed to AC Transit,BART,ACE,the • Increase transit ridership by improving the rider Water Emergency Transportation Authority(WETA), experience LAVTA and Union City Transit.The relative • Enhance rider safety and security 14 I 2014 Alameda County Transportation Expenditure Plan BART, BUS, SLNIOR AND YOU TI I TRANSI-i • Enhance rider information and education about disabilities.Funds will be distributed monthly based transit options on the percentage of the population over age 70 in • Enhance affordability for transit riders each of four planning areas for city-based and mandated paratransit services of local bus transit • Implement recommendations for transit service providers: improvements from Community Based •Transportation Plans and the County's transit North County—including the cities of Albany, plan Alameda,Berkeley,Emeryville,Oakland and Piedmont. These funds will be distributed periodically by • Central County—including the cities of Hayward Alameda CTC.Grant awards will emphasize and San Leandro or unincorporated areas. demonstrations or pilot projects which can leverage other funds. • South County—including the cities of Fremont, Union City,and Newark,as well as Union City AFFORDABLE TRANSIT FOR SENIORS Transit. AND PEOPLE WITH DISABILITIES(10% • East County—including the cities of Livermore, OF NET REVENUE,$774 M) Dublin,Pleasanton,unincorporated areas,and This program provides funds for local solutions to LAVTA. the growing transportation needs of older adults and people with disabilities.Funds will be provided to Funds can be further allocated to individual cities transit operators to provide specialized within each planning area based on a formula refined transportation service mandated by the Americans by Alameda CTC's Paratransit Advisory and with Disabilities Act(ADA).In addition,funds will Planning Committee(PAPCO),a group of seniors be provided to each part of the County based on its and people with disabilities that advises population of residents over age 70 for local Alameda CTC.In East County,funding provided to programs aimed at improving mobility for seniors Livermore and Dublin will be assigned to LAVTA for and people with disabilities.The program includes their ADA mandated paratransit program.In Central three components. County,funding will be provided to Hayward to serve the unincorporated areas. Funding for East Bay Paratransit Consortium (6%of net revenue,estimated at$464 M) Coordination and Service Grants(1%of net revenue,estimated at$77 M) This funding will assist the East Bay Paratransit These funds,administered by Alameda CTC,will be Consortium in meeting the requirements of the ADA. These funds will be disbursed to and directed by the used for the purposes of coordinating services across two agencies that operate the East Bay Paratransit jurisdictional lines or filling gaps in the system to Consortium: meet the mobility needs of seniors and people with disabilities.These funds will be periodically • AC Transit will receive 4.5%of net proceeds distributed by Alameda CTC for projects and annually,estimated at$348 M from 2015 to 2045, programs with proven ability to: towards meeting its responsibilities under the ADA. • Improve mobility for seniors and people with disabilities by filling gaps in the services • BART will receive 1.5%of net proceeds annually, available to this population. estimated at$116 M from 2015 to 2045,towards • Provide education and encouragement to seniors meeting its responsibilities under the ADA. and people with disabilities who are able to use City and local Transit Operator funding(3%of standard public transit to do so. net revenue,estimated at$232 M) • Improve the quality and affordability of transit Funding provided to each of the four subareas of the and paratransit services for those who are County will be used for implementation of locally dependent on them. developed solutions to address the mobility • Improve the efficiency and effectiveness of ADA- challenges of older adults and people with mandated and local services. 2014 Alameda County Transportation Expenditure Plan I 15 BART, BUS, SENIOR AND YOUTH TRANSIT RAPID BUS AND TRANSIT IMPROVEMENTS ($35 M) A total of$35 M in sales tax funds will be allocated to projects that enhance the reliability and speed of bus _ 10 transit services in the East Bay.These projects include the implementation of Bus Rapid Transit and transit F --, priority projects on some of the busiest corridors in aawsomr 0 fi' the AC Transit system. rill!a - AC Transit East Bay Bus Rapid Transit(BRT) ,. Projects($25 M) Bus Rapid Transit is a technology that reduces bus travel times,improves the efficiency of transit service and reduces conflicts between bus service and auto travel on major streets.Three BRT corridors are proposed: • The Telegraph Avenue/East 14th/International Boulevard project will provide enhanced transit service connecting the Cities of San Leandro and Oakland with potential improved rapid bus services to UC Berkeley. • The Grand/MacArthur BRT project will enhance transit service and allow for significant reliability improvements in this critical corridor as well as enhancing access to regional services at the MacArthur BART station. • The Alameda to Fruitvale BART Rapid Bus service will provide a fast and reliable connection between the City of Alameda and the Fruitvale BART station,providing service to new development proposed for the City of Alameda. Funds may be used for project development,design, construction,access and enhancement of the rapid transit corridors.These sales tax funds will allow the Telegraph/East 14th/International project to be completed and will provide the needed leverage as local matching funds to attract outside funds to the other corridors which are currently under development. College/Broadway Corridor Transit Priority ($io M) Funding will be provided for the implementation of transit priority treatments to improve transit reliability,reduce travel times and encourage more transit riders on the well-utilized College/Broadway corridor. i6 I 2014 Alameda County Transportation Expenditure Plan BART, BUS, SENIOR AND YOUTH TRANSIT RAPID BUS TRANSIT INVESTMENTS L �/ A A.- et,„:, • B ... C D mkt Oir Ofliftl low wilk try; - \ r' ' o Miles . Dm Soo..Na.+.a.County MTC.ESR For illustrative purposes only I A College/Broadway Corridor: City of Alameda to Fruitvale Transit Priority BART Bus Rapid Transit B -••• AC Transit Grand MacArthur Onuunui AC Transit Telegraph Ave/East 14th/ Bus Rapid Transit International Blvd Project Not Shown: -Affordable Transit for Seniors and Persons with Disabilities -Innovative grants including an affordable youth transit pass program -Transit Operations, Maintenance and Safety Investments 2014 Alameda County Transportation Expenditure Plan 1 17 BART, BUS, SENIOR AND YOUTH TRANSIT BART EXTENSION AND SYSTEM southern part of the county and beyond as Santa IMPROVEMENTS ($710 M) Clara County builds its own BART extension. The capital projects funded as part of the BART • The BART Station Modernization and Capacity System Modernization and Expansion investments Program will receive$90 M for improvements at include projects that increase the capacity and utility all BART stations in Alameda County, of the existing system,as well as provide local funding for a proposed BART extension in the addressing station site,building envelope, eastern part of the county. escalator and elevator rehabilitation/replacement, circulation and wayfinding,air conditioning, BART to Livermore($400 M) lighting and ambient environment,station This project funds the first phase of a BART reliability upgrades,and other station equipment Extension within the I-580 Corridor freeway replacement/upgrades. alignment to the vicinity of the 1-580/Isabel Avenue interchange using the most effective and efficient • The Irvington BART Station will receive$120 M technology.Funds for construction for any element of to provide an infill station on the soon-to-open this first phase project shall not be used until full Warm Springs extension south of the existing funding commitments are identified and approved, Fremont Station,creating new accessibility to and a project-specific environmental clearance is BART in the southern part of the County. obtained.The project-specific environmental process will include a detailed alternative assessment of all fundable and feasible alternatives,and be consistent with mandates,policies and guidance of federal, state,and regional agencies that have jurisdiction over the environmental and project development process. BART Station Upgrades and System Improvements($310 M) BART projections indicate that its system will need to carry over 700,000 daily riders by the end of this Plan period.New riders will affect the capacity of existing systems and stations,requiring focused capacity enhancements to keep the system moving as ridership increases occur. t :h PI:ti #gin: I ,. it if 1 • The Bay Fair Connector/BART METRO project • I will receive$100 M in sales tax funds for the 1 Alameda County portion of this project which will increase capacity and operational flexibility systemwide.One goal of these improvements will be to improve connections to jobs in the i 1 18 I 2014 Alameda County Transportation Expenditure Plan BART, BUS. SENIOR AND YOUTI I TRANSIT BART INVESTMENTS .. ' 80 1' • •-• j 1 • 1 880 Dublin y 590 •. S.r `N . Pleasanton ore 880 \\ • • ittor., Ir \olr C l BART 880 For illustrative purposes only QBay Fair Connector/BART METRO Not Shown: 0 -BART Station Modernization and BART Extension to Livermore Capacity Improvements (within the I-580 corridor) -Affordable Transit for Seniors and OIrvington BART Station People with Disabilities 2014 Alameda County Transportation Expenditure Plan I 19 BART, BUS, SENIOR AND YOUTH TRANSIT MAJOR TRANSIT CORRIDOR AND Capitol Corridor Service Expansion($40 M) COMMUTER RAIL IMPROVEMENTS This project supports track improvements and train ($355 M) car procurement which will enable the trains running between Oakland and San Jose to increase daily Investments include maintenance and service round trips,matching frequencies between enhancements on existing rail lines and the Sacramento and Oakland. development of transportation investments serving the Dumbarton Corridor Area.Funds will also be Railroad Corridor Right of Way Preservation allocated for preserving rail right of way for and Track Improvements(Silo M) transportation purposes,ensuring that service is Funds allocated by this project may be used to available for future generations.Finally,this funding maintain and enhance existing railroad corridors for category acknowledges the importance of connecting regional rail as well as to preserve the rights of way high speed rail to Alameda County and the Bay Area of rail corridors that could be used for other and seeks to prioritize targeted investments to ensure transportation purposes,such as major trails. strong connections to this future service. Dumbarton Corridor Area Transportation Oakland Broadway Corridor Transit($10 M) Improvements($120 M) This project will link neighborhoods to transit Dumbarton Corridor Area Transportation stations along Broadway,Oakland's major transit Improvement projects will support express bus spine,providing a frequent and reliable connection services in the Dumbarton Corridor connecting between the regional rail hub at Jack London Square, southern Alameda County and the Peninsula.The with Downtown Oakland,the Uptown Arts and projects will also support transit oriented Entertainment District,and adjoining neighborhoods, development and priority development areas,and utilizing the most efficient and effective technology. improve local streets and bicycle and pedestrian infrastructure within the cities of Fremont,Newark and Union City. Union City Intermodal Station($75 M) a This project funds the development of a new intermodal station in Union City to serve BART, Dumbarton Corridor services,Capitol Corridor,ACE and local and regional bus passengers.The project involves construction of a two-sided rail station and bus transit facility,accessible to a 30-acre transit oriented development site.Improvements will be made to pedestrian and bicycle access,BART parking,elevators,fare gates and other passenger amenities. 114 tor . r BART, BUS, SENIOR AND YOUTH TRANSIT MAJOR TRANSIT CORRIDOR AND COMMUTER RAIL IMPROVEMENTS • 1 1 \ _ ....„-- C BART and ACE ..,. - ewar 0 1 2 For illustrative purposes s Mmes , �...,.�,� P P onl Broadway Corridor Transit i mrnumwunummul , 0 Capitol Corridor Service Expansion am—am OUnion City Intermodal Station Dumbarton Corridor Area Transportation Improvements O Not Shown: i. -Railroad Corridor Right of Way Preservation and Track Improvements 2014 Alameda County Transportation Expenditure Plan I 21 LOCAL STREETS MAINTENANCE AND SAFETY OPPA total of 3o%of the net The Local Streets Maintenance and Safety program . revenue is dedicated to the provides funds directly to local jurisdictions to be improvement of local used on locally determined priorities.Twenty percent "010.2 ':- ' of net revenues will be aocad cities and the streets.These investments countqy based on a formula that inclu local des population o major and road miles for each jurisdiction,weighted that provides funding for m eually,consistent il with the ll 2000 Measure to B formula. The formula will be revisited within te the first five years of the plan to ensure overall geographic equity local jurisdictions to maintain streets and a in the Plan.This program is intended to augment, capital program that is focused on improving rather than replace,existing transportation funding. the performance of major commute routes and bridges throughout the County,including MAJOR COMMUTE CORRIDORS, LOCAL enhancing seismic safety. BRIDGE AND SEISMIC SAFETY INVESTMENTS ($800 M) The Local Streets program in this Plan Major commute routes,illustrated on the map on involves shared responsibility-local cities page 26,serve a high percentage of the daily and the County will set their local priorities commuters in Alameda County and the majority of within a framework that requires complete trips for other purposes.These roads are crucial for streets to serve all users and types of the movement of goods to stores and consumers, transportation,honors best practices and transit riders and motorists,and bicyclists and pedestrians.Concentrating improvements in these encourages agencies to work together.More corridors will improve access and efficiencies, specifically,streets expenditures will be increase safety and reduce congestion. designed to benefit all modes of travel by improving safety,accessibility,and This program focuses funding on improvements to convenience for all users of the street right- major roads,bridges,freight improvements and railroad grade separations or quiet zones.Examples of-way.The plan also focuses on important of commute corridors eligible for funding include, commute corridors that carry the majority of but are not limited to,the following: the driving public and cross city boundaries, ensuring enhanced cooperation and • North County Major Roadways:Solano Avenue coordination between agencies. Pavement resurfacing and beautification;San Pablo Avenue Improvements;State Route LOCAL STREETS MAINTENANCE AND 13/Ashby Avenue corridor;Marin Avenue local SAFETY PROGRAM (20% OF NET road safety;Gilman railroad crossing;Park REVENUES, $1,548 M) Street,High Street and Fruitvale Bridge replacements;Powell Street Bridge widening at In recognition that local streets are the backbone of Christie;East 14th Street improvements and our transportation system,this program provides Oakland Army Base transportation infrastructure funds to local cities and Alameda County for improvements. maintaining and improving local infrastructure. Funds may be used for any local transportation need • Central County Major Roadways:Crow Canyon based on local priorities,including street Road safety improvements,San Leandro local maintenance,bicycle and pedestrian projects,bus road resurfacing,Lewelling Road/Hesperian stops,and traffic calming.All projects implemented Boulevard improvements and Tennyson Road with these funds will support a"complete streets grade separation. , philosophy"where all types of transportation and users are considered in the development of the local • South County Major Roadways:East-west street system.A minimum of 15%of all local streets connector in North Fremont and Union City, funds will be spent on project elements directly I-680/1-880 cross connectors,Fremont Boulevard benefitting bicyclists and pedestrians. improvements,upgrades to the relinquished 1 x:22 I 2014 Alameda County Transportation Expenditure Plan LOCAL STREETS MAINTENANCE AND SAFETY Route 84 in Fremont,Central Avenue Overcrossing,Thornton Avenue widening, Mowry Avenue and Newark local streets. • • East County Major Roadways:Greenville Road widening,El Charro Road improvements, Dougherty Road widening,Dublin Boulevard .. r r, widening and Bernal Bridge construction. • Countywide Freight Corridors: Outer Harbor *S0.uRU } Intermodal Terminal at the Port of Oakland, mss° ; 7th Street grade separation and roadway '' improvement in Oakland,as well as truck routes serving the Port of Oakland. Projects will be developed by local agencies working in cooperation with neighboring jurisdictions and Alameda CTC to reduce congestion,remove bottlenecks,improve safety,enhance operations,and enhance alternatives to single occupant auto travel in these corridors.Projects will be funded based on project readiness,constructability,geographic equity, and cost effectiveness as determined by Alameda CTC working with local jurisdictions as part of the Alameda CTC Capital Improvement Program which is updated every two years. 2014 Alameda County Transportation Expenditure Plan I 23 LOCAL STREETS MAINTENANCE AND SAFETY Not Shown: 4A 1 �, ,*sit -Local streets maintenance and safety program funding • to cities and County 1 1 t1144' dAlSk , -, lr* ,' ;� lift 4.11-9. 0111r4P 111110 .W; lip" SAW IL V A....,'— — • li 1/4,444, , V 4 1 gr4 I ■ $ , For illustrative purposes on"' Examples of Major Commute Corridor Improvements: North County: Solano Ave., San Pablo Ave.,Ashby Ave., Marin Ave., Gilman Railroad Crossing, Park St., High St., Fruitvale Bridge, Powell St. Bridge, East 14th St., and Oakland Army Base transportation improvements Central County: Crow Canyon Rd., Hesperian Blvd., Lewelling Blvd.,Tennyson Rd., and San Leandro local streets South County: East-west connector, I-680/I-880 cross connectors, Fremont Blvd., Route 84 in Fremont,Central Ave.Overcrossing,Thornton Ave.,Mowry Ave., and Newark local streets East County: Greenville Rd., El Charro Rd., Dougherty Rd., Dublin Blvd., and Bernal Bridge Countywide Freight Corridors: Truck routes serving the Port of Oakland,Outer Harbor Intermodal Terminal and 7th St. Improvements 24 I 2014 Alameda County Transportation Expenditure Plan TRAFFIC RELIEF ON HIGHWAYS The County's aging Berkeley,which will improve conditions for all 0 highway system requires modes in both Emeryville and Berkeley. safety,access and gap The 1-80 Gilman project will receive funding to closure improvements to relieve a major bottleneck and safety problem at the I- enhance efficiencies and 80 Gilman interchange.The project includes both a reduce traffic on a largely major reconfiguration of the interchange and grade built-out system. Funding separation of the roadway and the railroad crossing has been allocated to each highway corridor which currently crosses Gilman at-grade impeding traffic flow to and from the freeway.Improvements in Alameda County for needed will also be made for pedestrians and bicyclists improvements.Specific projects have been crossing this location and accessing recreational identified based on project readiness, local opportunities west of the freeway,making this a true priority and the ability to leverage current multimodal improvement. investments and funds.A number of The Ashby Avenue corridor will receive funding to additional eligible projects have been fully reconstruct the Ashby Avenue Interchange by identified as candidates for corridor eliminating the substandard eastbound on-ramp in improvements,which will be selected for Berkeley's Aquatic Park.The interchange will be fully funding based on their contribution to the accessible to vehicles traveling to and from Emeryville and Berkeley and east and west on I-80, overall goals of improving system reliability, will reduce local traffic congestion in Berkeley and maximizing connectivity, improving the Emeryville,and will improve bicycle and pedestrian environment and reducing congestion. access.The project includes associated corridor Priority implementation of specific improvements on Ashby Avenue. investments and amounts will be determined , , ;- - as part of the Capital Improvement Program �''. ',- J--- It developed by Alameda CTC every two years. V,Y1 f Most of the projects that have been ■,\ , identified for funding are designed to ‘. improve the efficiency of and access to a ' 1 ., �l 1 � existing investments and to close gaps and �, \ remove bottlenecks. , ' \', -■ - i',J i A total of 9%of the net revenue is allocated 410, �-� to the highway system,including w0,or _ _=-; .\ approximately $77 M,allocated specifically to a� goods movement and related projects. �, � `\ ' L � (e, 1-80 CORRIDOR INVESTMENTS FROM 1Lk�- THE CONTRA COSTA COUNTY LINE TO � THE BAY BRIDGE ($76 M) 1 I-80 in the northern part of the County is the most congested stretch of freeway in the Bay Area. , �� Investments in the interchanges on this route were selected to relieve bottlenecks,improve safety and .' - r,Y improve conditions for cars,buses,trucks and -'-�� ' , bicyclists and pedestrians.Key investments will be for Blustrative purposes only made at the Ashby and Gilman interchanges in 2014 Alameda County Transportation Expenditure Plan I 25 TRAFFIC RELIEF ON HIGHWAYS I-80 Corri� dor 1 tri Improvement i Not Shown: Program € -Freight and Economic Development Program `! Albany '�. . ....._.. .... . _I ti�t 1 <24 Beckele J, - 80 ,0�� g tedmont 4 Oakland* 0 sao a .Ir.= I-580 Corridor 580 Improvement Program " San 20 Le ndro Castro ‘Dublin t valley i 520 lir 580 Pleasanton I-$80 Corridor Sa I-680 CorridorII n. Livermore Program mprovement Lorenzo`, Improvement Program �' ,,� ;_. Hayward CO 92 Co Uni: City SR-84 Corridor ���� Fremont � Improvement 1-80 Corridor , Improvements include: ....4, Newark . 880 Gilman St.Interchange Improvements r o z Ashby Ave.Interchange Improvements 680 Miles Dale Sources.Amman County.ESRI I-880 Co •0 1lnprovements include: For illustrative purposes only Broadway-Jackson Multimodal Transportation 1-580 Corridor Improvements include: and Circulation Improvements I-580/1-680 Interchange Improvements Oak St.Interchange Improvements Isabel Ave.Interchange Improvements 23rd/29th Ave.Interchange Improvements Greenville Rd.Interchange Improvements 42nd St./High St.Interchange Improvements Vasco Rd. Interchange Improvements Northbound High Occupancy Vehicle and High 1-680 Corridor Improvements include: Occupancy Toll Extension from A St. to Hegenberger P Winton Ave.Interchange Improvements High Occupancy Vehicle and High Occupancy Toll Lane from SR-237 to Alcosta(both directions) Industrial Pkwy.Interchange Improvements SR-84 Corridor Improvements include: Whipple Rd.Interchange Improvements SR-84 Expressway(Pigeon Pass to Jack London) Rte 262(Mission)Improvements and Grade Separation SR-84/I-680 Interchange and SR-84 Widening 26 I 2014 Alameda County Transportation Expenditure Plan 3 TRAFFIC RELIEF ON HIGHWAYS STATE ROUTE 84 FROM 1-580 TO 1-680 I-68o FROM CONTRA COSTA COUNTY ($132 M) LINE TO THE SANTA CLARA COUNTY LINE($60 M) Two significant improvements are planned for this corridor to complete improvements at the State Route Implementation of the I-680 high occupancy (SR)84 and I-680 interchange and widening SR 84 to vehicle/toll(HOV/HOT)lane in both directions from support safety,connectivity and efficiency. SR 237 to Alcosta Boulevard is the centerpiece of the improvements planned for this heavily traveled :�� 58 ' corridor.This project will receive$60 M to construct carpool/HOT lanes on 1-680 between Alcosta Boulevard and SR 237 in both directions. '''ate -h = ED seo 680 m 1-580 CORRIDOR INVESTMENTS FROM DUBLIN TO SAN JOAQUIN COUNTY LINE \ er-v-.. ---"---/ ($48 M) Investments in the 1-580 corridor include I-880 CORRIDOR INVESTMENTS FROM improvements to the I-580/1-680 Interchange to provide traffic relief on one of the most significant OAKLAND TO UNION CITY($284 M) bottlenecks on the freeway system.Additional funding is for interchange improvements in both East 1-880 corridor improvements include projects to and Central County,including improvements at upgrade and improve key interchanges throughout Vasco Road,Greenville Road and Isabel Avenue, the corridor beginning with the Broadway/Jackson which are needed for major transit investments in the interchange and Oak Street interchange in Oakland Livermore area,as well as interchange improvements and Alameda to the Whipple/Industrial Parkway in Central County,focusing on bottleneck relief and Southwest interchange in Hayward and to the safety improvements. County line.Many other interchange projects are also candidates for funding to relieve congestion and i improve safety. w V i Y rf_` \A \., 3‘-` ^. , m 880 580.— I\ For Illuelrallve purposes only Funds are included for I-880 Broadway-Jackson multimodal transportation and circulation improvements for Alameda Point,Oakland Chinatown,Downtown Oakland,and Jack London Square. a; ,, TRAFFIC RELIEF ON HIGHWAYS Funds for interchange improvements at Whipple Road and Industrial Parkway in the Central part of the County are also included,as well as making other improvements on I-880.The goals of these improvements are to remove bottlenecks and enhance safety at these critical interchanges,serving motorists,other road users,and goods movement in Central and Southern Alameda County. In addition,funding will support completion of the HOV/HOT carpool lanes on I-880 from A Street in Hayward to Hegenberger Road in Oakland,filling in this important gap in the HOV lane system. Additional funding on I-880 includes a number of critical access and interchange improvements in the north and central parts of the county including grade separations,bridge improvements and interchange enhancements. FREIGHT AND ECONOMIC DEVELOPMENT PROGRAM (1% OF NET REVENUE,$77 M) These discretionary funds will be administered by Alameda CTC for the purposes of developing innovative approaches to moving goods in a safe and healthy environment in support of a robust economy. Eligible expenditures in this category include planning,development and implementation of projects that: • Enhance the safe transport of freight by truck or rail in Alameda County,including projects that reduce conflicts between freight movement and other types of transportation. • Reduce greenhouse gas production in the transport of goods. • Mitigate environmental impacts of freight movement on residential neighborhoods. • Enhance coordination between the Port of Oakland,the Oakland Airport and local jurisdictions for the purposes of improving the efficiency,safety,and environmental and noise impacts of freight operations while promoting a vibrant economy. These funds will be distributed by Alameda CTC to eligible public agencies within Alameda County, including local jurisdictions such as cities, Alameda County,the Port of Oakland and the Oakland Airport. 28 2014 Alameda County Transportation Expenditure Plan BICYCLE AND PEDESTRIAN PATHS AND SAFETY Key investments in bicycle greenhouse gas emissions.Funds may be applied to and pedestrian paths and the construction and maintenance of the three major trails,as well as local connectors and access routes. (.... 7k) safety include completion of the major trails in the LOCAL BICYCLE AND PEDESTRIAN County. Funding will allow PATHS AND SAFETY (5% OF NET for the completion of REVENUE,$387 M) three key trails:the County's East Bay Greenway,which provides This program is designed to fund projects and a viable commute and community access provide operating funds that expand and enhance bicycle and pedestrian safety and facilities in route for many cyclists and pedestrians from Alameda County,focusing on projects that complete Oakland to Fremont, and the Bay Trail and the County's bicycle and pedestrian infrastructure Iron Horse Trail in Alameda County which system.The program consists of two components: provide important off street routes for both Bicycle and Pedestrian Direct Allocations to commute and recreational trips. Funding for Cities and Alameda County(3%of net revenue, priority projects in local and countywide estimated at$232 M) Bicycle and Pedestrian plans will also allow Funding will be provided on a monthly basis to the for investments that support the use of cities and to Alameda County for planning, these modes. construction and maintenance of bicycle and pedestrian projects and programs,focusing on A total of 8%of the funds available in this completing the high-priority projects described in plan are devoted to improving bicycle and their Bicycle and Pedestrian Master Plans.Funds will pedestrian infrastructure as well as providing be provided to each city within the county and to programs to encourage people to bike and Alameda County based on their share of the population.Jurisdictions will be expected to walk when possible and to support implement,operate and maintain projects from the accessibility for seniors and people with County's bicycle and pedestrian plans and to commit disabilities. It is important to note that in to a complete streets philosophy in their project addition to these dedicated funds, local design and implementation. bicycle and pedestrian projects will also be funded through the Local Streets Maintenance and Safety and Community Development Investments funding categories. 1 , Ilik •COMPLETION OF MAJOR TRAILS— '"' ! T\� � IRON HORSE TRAIL, BAY TRAIL AND ,� EAST BAY GREENWAY ($264 M) i N. i This project provides for increased pedestrian and ` bicycle transportation options,more open space,and - LI improved public safety in neighborhoods on these three major trails pictured on page 32.These projects have the potential to generate extensive and varied community benefits beyond creating infrastructure Bike and Pedestrian Grant Program(2%of net for bicycle and pedestrian travel including improving revenue,estimated at$154 M) neighborhood connectivity,improving access to transit,reducing traffic,improving safe access to These funds,administered by Alameda CTC,will be schools,supporting community health and reducing available for the purposes of implementing and maintaining regional bicycle and pedestrian facilities 2014 Alameda County Transportation Expenditure Plan I 29 BICYCLE AND PEDESTRIAN PATHS AND SAFETY and increasing safe bicycling.These funds will be periodically distributed by Alameda CTC for projects and programs that: E • Provide bicycle education and training • Increase the number of trips made by bicycle and on foot • Improve coordination between jurisdictions • Maintain existing trails • Implement major elements of the Alameda County Bicycle Master Plan and Pedestrian Master Plan • Implement bicycle and pedestrian elements of Community Based Transportation Plans • Support Safe Routes to Schools • Support school crossing guards • Provide bicycle and pedestrian infrastructure within and connecting to developments in priority development areas • Leverage other sources of funding Funds in this category will be used for a Countywide Bicycle and Pedestrian Coordinator position. 30 2014 Alameda County Transportation Expenditure Plan Amor BICYCLE AND PEDESTRIAN PATHS AND SAFETY it • A 41irr was .. xS 141 For illustrative purposes only A — — . ■■■■■■■■■. 0.......... East Bay Greenway Bay Trail Gap Closure Iron Horse Trail Gap Closure from Oakland to Fremont and Access projects and Access projects Not Shown: -Completion of other priority projects in local and countywide bicycle and pedestrian plans -Funding to cities and County -Grant program for regional projects and trail maintenance. 2014 Alameda County Transportation Expenditure Plan I 31 COMMUNITY DEVELOPMENT INVESTMENTS Investments in sustainable • 19th Street BART Station Area transportation that • MacArthur BART Station Area improve transit connections to jobs and Ashby BART Station Area 0Yschools recognize the • Berkeley Downtown Station Area Na i i 1111 need to plan our Central County Station Areas and Priority transportation system Development Areas along with the land uses that are going to • Downtown San Leandro Transit Oriented serve the growing demand for housing and Development(TOD) jobs in Alameda County.A total of 4%of net • Bay Fair BART Transit Village revenue or about$300 M is dedicated to • improvements that link our transportation San Leandro City Streetscape Project infrastructure with areas identified for new • South Hayward BART Station Area development.One percent of net revenue,or South County Station Areas and Priority about$77 M,is dedicated to investments in Development Areas new technology,innovation and • BART Warm Springs Westside Access development. Improvements • Fremont Boulevard Streetscape Project COMMUNITY DEVELOPMENT INVESTMENTS ($300 M) • Union City Intermodal Infrastructure Improvements These investments target immediate term • Dumbarton TOD Infrastructure improvements opportunities for enhancing access,improving safety fi and creating new infrastructure and supporting East County Station Areas construction at BART stations,as well as station area • West Dublin BART Station and Area development and transit oriented development at Improvements sites identified for early implementation throughout the County.Funds in this category may be spent on • Downtown Dublin TOD project development,design,and environmental • East Dublin/Pleasanton BART Station and Area clearance,as well as construction,operations and maintenance of new infrastructure in these areas. Improvements Funds may also be allocated to operate shuttles that serve Alameda County residents and local businesses.Priority implementation of specific investments and amounts will be determined as part of the Capital Improvement Program developed by Alameda CTC every two years.Examples of eligible station areas to be included in this category are: North County Station Areas and Priority Development Areas • Broadway Valdez Priority Development Area (PDA) • Coliseum BART Station Enhancements • Lake Merritt BART Station and Area Improvements • West Oakland BART Station Area • Eastmont Mall PDA 32 I 2014 Alameda County Transportation Expenditure Plan COMMUNITY DEVELOPMENT INVESTMENTS NORTH A Berkeley Downtown Station Area g Ashby BART Station Area Be A C MacArthur BART Station Area B c.` D Broadway Valdez PDA " % C E 19th St BART Station Area F E D'y . ,. . _ F West Oakland BART Station Area G O Lake Merritt BART Station and Area \ \\ H Improvements Eastmont Mall PDA 3 Coliseum BART Station Enhancements K Ls. R S PPP M , \ 'IlLiftilve N IIPPP "Silk O' N BART Q P CENTRAL . 6 ,i'` Dw SoYrcx A4nwJ Camty.BART 6981 +i Downtown San Leandro TOD For Illustrative purposes only San Leandro City Streetscape EAST Bay Fair BART Transit Village 0 West Dublin BART Station and Area Improvements South Hayward BART Station Area Downtown Dublin TOD SOUTH © East Dublin/Pleasanton BART Station and Area Improvements 0 Union City Intermodal Infrastructure Improvements Not Shown: -Technology,Innovation,and Development Program O Fremont Boulevard Streetscape P BART Warm Springs West Side Access Improvements The locations drawn on this map are general locations of eligible types of investments Q Dumbarton TOD Infrastructure Improvements 2014 Alameda County Transportation Expenditure Plan 1 33 COMMUNITY DEVELOPMENT INVESTMENTS INVESTMENTS IN NEW TECHNOLOGY, INNOVATION AND DEVELOPMENT(1% OF NET REVENUE,$77 M) s-- These discretionary funds are designed to be administered by Alameda CTC to develop innovative approaches to meet the County's transportation vision,emphasizing the use of new and emerging technologies to better manage the transportation system.Eligible expenditures in this category include planning,development,implementation and maintenance of technology to: • Increase utilization of non-auto types of transportation or to increase the occupancy of autos with the goal of reducing congestion,air pollution and greenhouse gas production. • Reduce transportation-related greenhouse gases through the utilization of a cleaner vehicle fleet including alternative fuels and/or locally produced energy. • Use demand management strategies designed to reduce congestion,increase use of non-auto transportation,manage existing infrastructure and reduce greenhouse gas emissions. • Inform consumers of their transportation choices and improve the efficiency or effectiveness of the County's transportation system. • Manage parking supply to improve availability, utilization and to reduce congestion and greenhouse gas production. • Support environmental mitigation for transportation projects including land banking. These funds will be distributed periodically by Alameda CTC to eligible public agencies within Alameda County. *,1-• Alan. da • n Tr-,-t„ ',• '..,v. ." '. M1,• ._ NIP ' . /- , r l , O., ../ f. t�. i1 { � It v n � ' . , -:. - )4-1 , 11 11„0 Implementation of this sales tax is authorized under INDEPENDENT WATCHDOG the Local Transportation Authority and Improvement COMMITTEE Act,California Public Utilities Code Section 180000 et seq.In enacting this ordinance,voters will authorize The Independent Watchdog Committee will have the Alameda CTC to have the responsibility to responsibility of reviewing and overseeing all administer the tax proceeds in accordance with all expenditures of sales tax funds by Alameda CTC. applicable laws and with the Plan.Funds collected The Independent Watchdog Committee reports for this tax may be spent only for the purposes directly to the public and has the following identified in the Plan,as it may be amended as responsibilities: described in the implementation guidelines.Under no circumstances may the proceeds of this • The Independent Watchdog Committee must transportation sales tax be applied to any purpose hold public hearings and issue reports,on at least other than for transportation improvements an annual basis,to inform Alameda County benefitting Alameda County.Under no circumstances residents about how the sales tax funds are being may these funds be appropriated by the State of spent.The hearings will be open to the public California or any other governmental agency. and must be held in compliance with the Brown Act,California's open meeting law,with GOVERNING BODY AND information announcing the hearings well- ADMINISTRATION publicized and posted in advance. • The Independent Watchdog Committee will have Alameda CTC is governed by a Commission full access to Alameda CTC's independent composed of 22 members,with the following auditor and will have the authority to request representation: and review specific information regarding use of • Representatives from each city in the sales tax funds and to comment on the Alameda County auditor's reports. • All five Alameda County Supervisors • The Independent Watchdog Committee will • BART publish an independent annual report,including any concerns the committee has about audits it • AC Transit reviews.The report will be published in local newspapers and will be made available to the The Commission is assisted by staff dedicated to public in a variety of forums to ensure access to implementation and monitoring of sales tax projects this information. and programs.The total cost assigned for salaries and benefits for administrative employees shall not Independent Watchdog Committee members are exceed 1%of the net revenues generated by the sales private citizens who are not elected officials at any tax.The total cost of administration of this tax, level of government,nor public employees from including all rent,supplies,consulting services and agencies that either oversee or benefit from the other overhead costs will not exceed 4%of the net proceeds of the sales tax.Membership is limited to proceeds of the sales tax.Repayment of election individuals who live in Alameda County.Members costs to put the measure on the ballot is included in this Plan. are required to submit a statement of financial disclosure annually,and membership is restricted to individuals with no economic interest in any of Alameda CTC's projects or programs. 2014 Alameda County Transportation Expenditure Plan I 35 GOVERNING BODY AND ORGANIZATIONAL STRUCTURE The Independent Watchdog Committee is designed provide technical expertise,analysis and to reflect the diversity of Alameda County. recommendations related to transportation planning, Membership is as follows: programming and funding with the Alameda CTC Executive Director functioning as Chair. • Two members are chosen at-large from each of the five supervisorial districts in the county(total of 10 at large members).One member is Paratransit Advisory and Planning Committee nominated by each member of the Board of (PAPCO) Supervisors and one additional member in each PAPCO addresses funding planning,and supervisorial district is selected by the Alameda coordination issues regarding specialized County Mayors'Conference. transportation services for seniors and persons with disabilities in Alameda County.PAPCO has the • Seven members are selected to reflect a balance responsibility of making direct recommendations to of viewpoints across the county.These members the Alameda CTC Commission on funding are nominated by their respective organizations, transportation services for seniors and people with and each has one representative: disabilities.PAPCO is supported by a Technical Advisory Committee comprised of paratransit o League of Women's Voters providers in Alameda County funded by local o Alameda County Taxpayer's Association transportation sales tax funds. o Sierra Club Bicycle and Pedestrian Advisory Committee o Alameda County Labor Council (BPAC) o East Bay Economic Development Alliance BPAC reviews and provides input on updates to the o Alameda County Paratransit Advisory and Alameda Countywide Pedestrian and Bicycle Plans Planning Committee(PAPCO) and makes recommendations to Alameda CTC.The BPAC also provides input on countywide educational o East Bay Bicycle Coalition and promotional programs and other projects of countywide significance. The members of the Independent Watchdog Committee are expected to provide a balance of Other Committees viewpoints,geography,age,gender,ethnicity and Alameda CTC may establish other community and income status,to represent the different perspectives technical advisory committees as necessary to of the residents of the county.The Independent implement the projects and programs in the Plan and Watchdog Committee is the same committee as the Citizens Watchdog Committee,as defined in the to inform and educate the public on the use of funds 2000 Plan. for projects and programs in the Plan. ADVISORY COMMITTEES Alameda CTC is assisted by the advice of technical and public advisory committees.These committees, described below,meet regularly and are charged with carrying out important functions on behalf of Alameda CTC. Alameda County Technical Advisory Committee (ACTAC) ACTAC is the technical advisory committee to Alameda CTC made up of representatives from Alameda County jurisdictions.ACTAC members 36 I 2014 Alameda County Transportation Expenditure Plan This Transportation Expenditure Plan(Plan)is The total of all administrative costs for this tax guided by principles that ensure that the revenue including overhead costs such as rent and generated by the sales tax is spent only for the supplies will be limited to no more than 4%of purposes outlined in this Plan,in the most efficient the net proceeds of this sales tax. and effective manner possible,consistent with serving the transportation needs of Alameda County. The allocated cost of Alameda CTC staff who directly implement specific projects or DURATION OF THE PLAN programs are not included in administrative costs. The duration of the Plan will be 30 years from April 2015 through March 31,2045. 4. Amendments Require 2/3 Support:To modify and amend this Plan,an amendment must be ADMINISTRATION OF THE PLAN adopted by a two-thirds vote of the 1. Funds only Projects and Programs in the Plan: Alameda CTC Commissioners.All jurisdictions within the county will be given a minimum of Funds collected under this measure may be 45 days to comment on any proposed Plan spent only for the purposes identified in the amendment. Plan,as it may be amended by the Alameda CTC governing body. 5. Augment Transportation Funds:Pursuant to California Public Utilities Code 180001(e),it is 2. All Decisions Made in Public Process: the intent of this Plan that funds generated by Alameda CTC is given the fiduciary duty of the transportation sales tax be used to administering the transportation sales tax supplement and not replace existing local proceeds in accordance with all applicable laws revenues used for transportation purposes. and with the Plan.Activities of the Alameda CTC Commission will be conducted TAXPAYER SAFEGUARDS,AUDITS AND in public according to state law,through publicly noticed meetings.The annual budgets ACCOUNTABILITY of Alameda CTC,strategic plans and annual Accountability is of utmost importance in delivering reports will all be prepared for public review. public investments with public dollars.Alameda CTC The interests of the public will be further is committed to transparency and accountability as a protected by an Independent Watchdog public agency along with its many jurisdictional Committee,described previously in this Plan. partners.Many safeguards are built into this measure 3. Salary and Administration Cost Caps: to ensure voter accountability in expenditure Alameda CTC will have the authority to hire of funds. professional staff and consultants to deliver the 6. Annual Audits and Independent Watchdog projects and programs included in this Plan in Committee Review:Alameda CTC's financial the most efficient and cost-effective manner. reports are subject to an independent audit by The salaries and benefits for administrative a Certified Public Accountant(CPA)firm,on staff hired by Alameda CTC for this tax will an annual basis.Expenditures are also subject not exceed 1%of the net proceeds of the sales tax. to an annual review by an Independent Watchdog Committee. 2014 Alameda County Transportation Expenditure Plan I 37 IMPLEMENTING GUIDELINES tx The Independent Watchdog Committee will 11. Commitments from Fund Recipients:All prepare an annual report on spending and recipients of funds allocated in this progress in implementing the Plan that will be expenditure plan will be required to sign a published and distributed throughout Master Funding Agreement,which details Alameda County.On a periodic basis,the their roles and responsibilities in spending Independent Watchdog Committee will review sales tax funds and includes local hiring the performance and benefit of projects and requirements.Funding agreements will programs based on performance criteria include performance and accountability established by Alameda CTC as appropriate. measures.All funds will be allocated through open and transparent public processes.In 7. Performance and Cost-Effectiveness:To addition,fund recipients will be required to maximize transportation investments in the have an annual audit conducted by an Plan,Alameda CTC will evaluate performance independent CPA to ensure that funds are and cost-effectiveness of programs and managed and spent according to the projects,as they are being implemented. requirements of this Plan. 8. Strict Project Deadlines:To ensure that the 12. Capital Improvement Program Updates: projects promised in this plan can be Project descriptions will be detailed and fully completed in a timely manner,each project will defined for inclusion in the Alameda CTC be given a period of seven years from the first Capital Improvement Program which will be year of revenue collection(up to December 31, updated every two years and will provide for 2022)to receive environmental clearance geographic equity in overall funding approvals and to have a full funding plan for allocations.All allocations will be made each project.Project sponsors may appeal to through a public process. the Alameda CTC Commissioners for one-year time extensions. 13. Geographic Equity:Funding formulas for all programs will be revisited within the first five 9. Timely Use of Funds:Jurisdictions receiving years of the Plan implementation to ensure funds for transit operations,ongoing street overall geographic equity based on population maintenance,services for seniors and people and/or other equity factors.Funding for capital with disabilities,and bicycle and pedestrian projects will be evaluated through the biennial safety projects and programs must expend the capital improvement planning process which funds expeditiously and report annually on the will include an evaluation of geographic equity expenditure,their benefits and future planned by planning area. expenditures.These reports will be made available to the public at the beginning of each RESTRICTIONS ON FUNDS calendar year. 14. No Expenditures Outside of Alameda 10. Annual Budget and Strategic Plan:Each year, County:Under no circumstances may the Alameda CTC will adopt an annual budget proceeds of this transportation sales tax be that projects expected sales tax receipts,other applied to any purpose other than for anticipated revenues and planned transportation improvements benefitting expenditures for administration,programs and Alameda County.Under no circumstances may projects.Alameda CTC will also prepare a these funds be appropriated by the State of strategic plan which will identify the priority California or any other governmental agency, for projects and dates for project as defined in the implementation guidelines. implementation based on project readiness, ability to generate leveraged funds and other 15. Environmental and Equity Reviews:All relevant criteria.Both the budget and the projects funded by sales tax proceeds are strategic plan will be adopted at a public subject to laws and regulations of federal,state meeting of the Alameda CTC Commissioners. and local government,including but not limited to the requirements of the California Environmental Quality Act(CEQA),and 38 I 2014 Alameda County Transportation Expenditure Plan IMPLEMENTING GUIDELINES Title VI of the Civil Rights Act,as applicable. outlined in this Plan and will be subject to All projects and programs funded in this Plan audits. will be required to conform to the requirements of these regulations,as 20. Project and Program Financing:Alameda CTC applicable.All projects that go through will have the authority to bond for the environmental review analyses will select the purposes of expediting the delivery of most efficient and effective project alternative transportation projects and programs.The and technology for implementation to meet the bonds will be repaid with the proceeds of this objective of the project,and will have clearly sales tax.The costs associated with bonding, defined project descriptions,limits and including interest payments,will be borne only locations as a result of the environmental by the capital projects or any programs process. included in the Plan that utilize bond proceeds. The costs and risks associated with bonding 16. Complete Streets:It is the policy of will be presented in Alameda CTC's strategic Alameda CTC that all transportation plan and will be subject to public comment investment decisions shall consider the needs before any bond sale is approved. of all types of transportation and all users.All investments will conform to Complete Streets 21. Programming of Funds:Actual revenues may, requirements and Alameda County guidelines at times,be higher than expected in this Plan to ensure that all transportation types and due to changes in receipts and additional funds users are considered in the expenditure of may become available due to increased funds so that there are appropriate investments opportunities for leveraging or project costs that fit the function and context of facilities that less than expected.Revenue may be lower than will be constructed. expected as the economy fluctuates.Estimates of actual revenue will be calculated annually 17. Local Contracting and Good Jobs: by Alameda CTC during its annual budget Alameda CTC will develop a policy supporting process.Any excess revenue will be the hiring of local contractors,businesses and programmed in a manner that will accelerate residents from Alameda County as applicable the implementation of the projects and in the expenditure of these funds. programs described in this Plan,at the direction of the Alameda CTC Commission. 18. New Agencies:New cities or new entities (such as new transit agencies)that come into 22. Fund Allocations:Should a planned project existence in Alameda County during the life of become undeliverable,infeasible or the Plan may be considered as eligible unfundable due to circumstances unforeseen at recipients of funds through a Plan amendment. the time this Plan was created,or should a project not require all funds programmed for PROJECT FINANCING GUIDELINES AND that project or have excess funding,funding for MANAGING REVENUE FLUCTUATIONS that project will be reallocated to another project or program of the same type,such as 19. Fiduciary Duty:By augmenting and extending Transit,Streets,Highways,Community the transportation sales tax,Alameda CTC is Development Investments,or Bicycle and ( given the fiduciary duty of administering the Pedestrian Safety,at the discretion of proceeds of this tax for the benefit of the Alameda CTC. residents and businesses of Alameda County. Funds may be accumulated by Alameda CTC 23. Leveraging Funds:Leveraging or matching of or by recipient agencies over a period of time outside funding sources is strongly to pay for larger and longer-term projects encouraged.Any additional transportation pursuant to the policies adopted by sales tax revenues made available through e Alameda CTC.All interest income generated their replacement by matching funds will be fi by these proceeds will be used for the purposes spent based on the principles outlined for fund allocations described above. i 2014 Alameda County Transportation Expenditure Plan l 39 y t`'k' xSfr � r The Alameda CTC Commissioners unanimously approved this Plan on January 23,2014: COMMISSIONERS COUNTY/CITIES/TRANSIT AGENCIES 4 Commission Chair,Supervisor Scott Haggerty Alameda County District 1 Commission Vice Chair,Councilmember City of Oakland Rebecca Kaplan Supervisor Richard Valle Alameda County District 2 Supervisor Wilma Chan Alameda County District 3 Supervisor Nate Miley Alameda County District 4 Supervisor Keith Carson Alameda County District 5 Mayor Marie Gilmore City of Alameda Mayor Peggy Thomsen City of Albany Councilmember Laurie Capitelli City of Berkeley Mayor Tim Sbranti City of Dublin Vice Mayor Ruth Atkin City of Emeryville Mayor Bill Harrison City of Fremont Councilmember Marvin Peixoto City of Hayward Mayor John Marchand City of Livermore Councilmember Luis Freitas City of Newark Vice Mayor Larry Reid City of Oakland Mayor John Chiang City of Piedmont Mayor Jerry Thorne City of Pleasanton Councilmember Michael Gregory City of San Leandro Mayor Carol Dutra-Vernaci City of Union City,Union City Transit Director Elsa Ortiz AC Transit Director Thomas Blalock BART 40 2014 Alameda County Transportation Expenditure Plan i o b • - i Innovative Transportation Solutions Transportation Expenditure Plan on November 2014 ballot The 2014 Transportation Expenditure Plan (Plan) and ballot measure wi I Igo before voters in November 2014 to provide essential funding for BART expansion and upgrades, local street maintenance, bicycle and pedestrian paths and safety, affordable transportation for seniors, youth and peoplewith disabilities, and local community investmentsthat create jobs, improveair quality and providetraffic relief. 2014 Plan priorities Expand BART, bus and commuter rail for reliable, safe and fast services, including BART expansion and improvements 4,Q within Alameda County, busserviceexpansion and commuter rail servi ce i m p rovemen ts. Keep fares affordable for seniors, youth and people with disabilities, including affordable senior shuttles, vans and services that help keep seniors independent, critical funding for student transit passes to ensure youth can affordably get to school. The Plan also funds reliableand inexpensive transportation for peoplewith disabilities. Provide traffic relief, including funds to every city in the County to repave streets, fill potholes and upgrade local transportation infrastructure. The Plan also invests in aging highway corridorsto upgradeon- and off - ramps, using modern technology to manage trafficand improvesafety. Improve air quality and provide clean transportation by reducing pollution using innovative technology and expanding bike and pedestrian paths, and BART, bus and commuter rail expansion and operations. Create good jobs within Alameda County by requiring local contracting that supports residents and businesses in Alameda County. LC)CALIRANSPORTAIION FUNDING The 2014 Plan hasbeen developed for important reasons: • Most capital projects a pp roved in the 2000 Measure B by 81.5 percent of votersin Alameda County have been completed ahead of schedule. Without a new plan, the County will be unable to fund any new majorprojectsto address growing transportation needs. • Busservicesin Alameda County have been cut significantly, and the gap between road maintenance needsand available funding isat an all -time high. • The demand on Alameda County-s roads, highways, BARTand buses isincreasing. The 2014 Plan will help close these gapsand keep Dublin and Alameda County moving. SIRICTACCOUNTABILJIY AND PERFORMANCE MEASURES ENSURE DELIVERY The 30- yearPlan includesstrict accountability measuresto ensure all $8 billion forCounty transportation improvementsare spent on approved projects. The 2014 Plan requires: ,/Open and transparent public processesto allocate funds. Annual independent audits. ,/An independentwatchdog committee made up of people who live in Alameda County. Annual compliance reports distributed to the public that detail costsand how specific performance measuresare met ® facebook.com /AlamedaCTC J @AlamedaCTC 2014 Plan will strengthen economy and improve quality of life The projects in the 2014 Plan are designed to strengthen the economy and improve quality of Iifein Dublin, reduce traffic congestion, improve air quality and createjobs. Targeted investmentswill maintain existing infrastructure, improve safety, remove bottlenecks on major commute corridors, enhance and expand BART, commuter rail, bus and ferry transit systems; keep fares affordable for seniors, youth and peoplewith disabilities; and make it safer and easier to bike and walk throughout Dublin. Projected City of Dublin transportation funding Local streets maintenance $370,000 $710,000 92% $22,680,000 and safety Elcycle and pedestrian $130,000 $240,000 85% $7,130,000 paths and safety Tota I: 1 $29,810,000 BA RT • BARTexpansion and modernization and BARTextension to Livermore Bus • Operating fundsfor LAVTA for Wheels transit service Affordable Seniorand Youth Transportation • Affordable and accessible transit forseniorsand people with disabilities • Affordable student transit passprogram and Safe Routesto Schools Traffic Relief • Bernal Bridge construction • Freight and interchange improvementson 1 -580 • Improvementson majorcommute corridorssuch asEICharro Rd., Dublin Blvd. and Dougherty Rd. • 1- 580/1 -680 interchange improvements • 1 -680 carpool /express lanes from Alcosta Blvd. to State Route (SR) -237 • SR84 /1 -680 interchange improvementsand SR84widening Community Development and Clean Transportation • Improvementsto support transit oriented development at West Dublin and East Dublin /Pleasanton BARTstations • Iron Horse Trail bicycle and pedestrian projects Alameda County Transportation Commission ALAMEDA 1 1 1 1 Broadway, Suite 800 Oakland CA 94607 ^���� 510.208.7400 • www.AlamedaCTC.org • Alameda CTC seeksyour approval of the 2014 Transportation Expenditure Plan • 30 -year, $8 billion investment in transportation • 2014 Plan includesmajor investmentsfor City of Dublin 2014 TRANSPO RTATO N EXPEN DITURE PLA N ■ • Projected population .. growth of 30% in Alameda County - • Senior population will double • Decreased funding has resulted in service cuts - aED VNTY • Freeway d e la y s i n c re a se d by _.._....__.._._.._ 23% in 2013 • Increasing demand on existing roads and transit systems • Economic downturn affected jobsin Alameda County 2014 TRANSPO RTATO N EXPENDITURE PLAN • BART, Bus, Ferry and CommuterRailfor reliable, safe and fast services Tvuh- 5--tnd Pe wllh Diwbilifle3 • Affordable Transit for BART. B°3. F —0! 5464 Commvlr Rul Youth, Seniorsand 52'be 6lll c" People with Disabilities • Traffic Relief on Streets ^- «w.Nr woe +emk wwr : - TfOft RCIIIf On and Highways nb Kw a Shc$Z.025 Billion Clew nn—nn D, Gf pm, me mry C°mmunily Development. �MS'a • Clean Transportation, 'eCh° $1028 g " ° " °" Community Development, Technology and Innovation • Investmentsthat create good jobs 2014 TRANSPORTATION EXPENDITUREPLAN 2 Continued transportation funding for: Loc a I streets maintenance $370,000 $710,000 92% $22,680,000 and safety Elcycle and pedestrian $130,000 $240,000 85% $7,130,000 pa the a nd safety W mL• 1 $29,810,000 2014 TRANSPO RTATO N EXPEN DITURE PLA N BA R1 • BARTexpansion and modernization and BARTextension to Livermore Bus • Operating fundsforLAVTA for Wheels transit service Affordable Seniorand Youth Transportation • Affordable and accessible transit forseniorsand people with disabilities • Affordable student transit passprogram and safe Routesto Schools 2014 TRANSPO RTATO N EXPEN DITURE PLA N 3 Traffic Relief • Bernal Bridge construction • Freight and interchange improvementson 1 -580 • Improvementson majorcommute corridorssuch asEJCharro Road, Dublin Boulevard and Dougherty Road 1- 580/1 -680 interchange improvements 1 -680 carpool /expresslanesfrom Alcosta Boulevard to State Route (SR) -237 SR84 /1- 680interchange improvements and SR84widening Community Development and Clean Transportation • Improvementsto support transit oriented development at West Dublin and East Dublin /Pleasanton BARTstations • Iron Horse Trail bicycle and pedestrian projects 2014 TRANSPO RTATO N EXPENDITURE PLAN Recommendation: Approve and support 2014 Transportation Expenditure Plan Now through July 2014: Alameda CTC seeksapproval of the new plan by Alameda County city councils and the Board of Supervisors City Cbunal Approvals August through Noxember 2014 L t gridril rfjNAru-A.rsfj'k6. NOVENBBR4, 2014 r 9ji1'd6r. 5AT Spring2014 .Uly 2014 t s'rai t q�F 4ijj §MAC QAdj�id Err a sAj'rg L's l4 sr nrr Cis L'FyC 2014 TRANSPO RTATlO N EXPENDITURE PLAN 11