HomeMy WebLinkAboutReso 028-93 ADATransPlanTitleIIRESOLUTION NO. 28 - 93
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
ADOPTING A TRANSITION PLAN AS REQUIRED BY THE
AMERICANS WITH DISABILITIES ACT, TITLE II
WHEREAS, the federal government enacted the Americans with Disabilities Act of 1990 (ADA)
to prevent discrimination of the physically and mentally disabled relating employment and access to
public facilities; and
WHEREAS, discrimination on the basis of a disability against an applicant or an employee
who is a qualified individual with a disability by a supervisor, management employee or co-worker is
prohibited; and
WHEREAS, the ADA requires that municipalities document barriers to accessibility which are
described in the Transition Plan; and
WHEREAS, the Transition Plan documents surveys of facilities identifying barriers and plans
to remove those barriers; and
WHEREAS, the Transition Plan should be adopted by the City Council; and
WHEREAS, the purpose of the Plan is to provide equal access to the disabled when providing
municipal services.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby
adopts the Transition Plan as required under the American with Disabilities Act of 1990
PASSED, APPROVED AND ADOPTED this 22nd day of February, 1993.
AYES:
Councilmember Houston, Howard, Moffatt, & Mayor Snyder
NOES:
Councilmember Burton
ABSENT: None
ABSTAIN: None
ATTEST:
t
City of Dublin
Americans
with
Disabilities Act
Title II
Transition Plan
Building Name:
Address:
Site
Characteristics
Building Access
1. Parking
2. Ramps
3. Sidewalks
4. Entrances
5. Doors
6. Thresholds
Civic Center
100 Civic Plaza
a. Handicap
City of Dublin
Transition Plan Checklist
Date: August 1, 1992
Inspector: Bo Barker
Complies
X
X
X
X
X
X
X
X
Doesn't
Comply
Anticipated See
N/A Correction Attachment
Building Attributes
1. Corridors
2. Elevators
3. Floor Surface
4. Obstacles
5. Work Areas
6. Payphones
7. Employee Areas
a. Audible Signals
b. Braille
c. Turning Area
d. Controls
a. Lounges
b. Training Room
X
X
X
X
X
X
X
X
X
X
X
X
X
4/1/93
Restrooms
1. Entry
2. Handles
3. Grab bars
4. Assesories
5. Water/Sinks
6. Fountains
X
X
X
X
X
X
City of Dublin
Transition Plan
Site Correction Specifications
Americans with Disabilities Act
Facility: Civic Center, 100 Civic Plaza, Dublin, California
Responsible Official: City Manager's Office
At least one pay phone in the Civic Center should have a volume control. The Americans with
Disabilities Act Architectural Guidelines (ADAAG) mandates that at least one pay phone in public
facilities must have a volume control.
There is no cost to add volume controls to the pay phones and it is anticipated that this will be
completed by April of 1993.
Building Name:
Address:
Site
Characteristics
Building Access
1. Parking
2. Ramps
3. Sidewalks
4. Entrances
5. Doors
6. Thresholds
City of Dublin
Transition Plan Checklist
Shannon Center
Date: August 1, 1992
1600 Shannon Avenue
Inspector: Bo Barker
a. Handicap
Complies
X
X
X
X
X
X
X
Doesn't
Comply
Anticipated See
N/A Correction Attachment
Building Attributes
1. Corridors
2. Elevators
3. Floor Surface
4. Obstacles
5. Work Areas
6. Payphones
7. Employee Areas
a. Audible Signals
b. Braille
c. Turning Area
d. Controls
a. Lounges
b. Training Room
X
X
X
X
X
X
X
X
X
X
X
X
X
4/1/93
X
Restrooms
1. Entry
2. Handles
3. Grab bars
4. Assesories
5. Water/Sinks
6. Fountains
X
X
X
X
X
X
City of Dublin
Transition Plan
Site Correction Specifications
Americans with Disabilities Act
Facility: Shannon Center, 1600 Shannon Avenue, Dublin, California
Responsible Official: City Manager's Office
No pay phone at the Shannon Center is currently equipped with a volume controls. The ADAAG
mandates that at least one public phone at each facility must be equipped with a volume control.
There is no cost to add volume controls to the pay phones and it is anticipated that this will be
completed by April of 1993.
Building Name:
Address:
Site
Characteristics
Building Access
1. Parking
2. Ramps
3. Sidewalks
4. Entrances
5. Doors
6. Thresholds
City of Dublin
Transition Plan Checklist
Dublin Swim Center
Date: August 1, 1992
8157 Village Parkway
Inspector: Bo Barker
a. Handicap
Complies
X
X
X
X
X
Doesn't
Comply
X
X
Anticipated See
N/A Correction Attachment
Dec-93
Dec-93
X
X
Building Attributes
1. Corridors
2. Elevators
3. Floor Surface
4. Obstacles
5. Work Areas
6. Payphones
7. Employee Areas
a. Audible Signals
b. Braille
c. Turning Area
d. Controls
a. Lounges
b. Training Room
X
X
X
X
X
X
X
X
X
Dec-93
Dec-93
Dec-93
Dec-93
Dec-93
X
X
X
X
X
Restrooms
1. Entry
2. Handles
3. Grab bars
4. Assesories
~. Water/Sinks
6. Fountains
X
X
X
X
X
X
Dec-93
Dec-93
Deco93
Dec-93
Dec-93
Dec-93
X
X
X
X
X
X
City of Dublin
Transition Plan
Site Correction Specifications
Americans with Disabilities Act
Under Title II of the ADA, the Transition Plan states that barriers must be identified, methods to achieve
compliance must be presented and the interim steps to offer accessibly must be identified. The following list
accomplishes these requirements of the Transition Plan
Facility: Dublin Swim Center, 8157 Village Parkway, Dublin, California.
Responsible Official: City Manager's Office
The parking lot as now configured does not conform to all the handicap parking specifications under
the ADA. The Recreation Department is currently working with the School District, who actually own
the parking lot, to meet this requirement. Uniform Federal Accessibility Standards (UFAS) and
ADAAG standards require that at least one parking spot be at least 96 inches wide.
The threshold upon entering the building must be no higher than 1/2". The current threshold is
higher than allowed by the ADAAG and UFAS requirements. Additionally, the grade from the
parking lot to the entrance is higher than the required 1:15 gradient standard.
The current building does not have adequate corridors in which wheelchairs can maneuver. These
corridors consist of small turning areas which render parts of the current building non-accessible. The
turning areas must be at least 60" x 60".
There are obstacles producing barriers to accessibility. These include items such as small work areas
and counters which prohibit easy access to parts of the building.
5. The pay phone must be equipped with volume controls.
Employee areas, specifically located in the center of the building are non-accessible for the disabled.
These areas are required to be at least 60" by 60". This also relates to the work areas not being in
compliance as noted in the Transition Plan checklist.
6. The pool does not have a lift.
The restrooms are not handicap accessible. The entry way is too small, there are no grab bars or
handles, and the sinks do not meet ADA standards.
8. Drinking fountains do not have space underneath them so wheelchairs can access them.
The Swim Center is due to be renovated starting in Fall 1993 All of the above barriers will be addressed and
the new construction will conform to ADA guidelines. The exact cost of the renovation is unknown, but is
estimated to cost in the area of $68,350. The Recreation Department is expecting to utilize grant funds to
complete this project and more accurate cost estimates will be formulated at that time. The current
completion date is estimated for December, 1993.
The center will once again be utilized for summer recreation programs in 1992. Any QID will still have
accessibility to the center entering through a side gate. Other issues such as access to the pool will be
addressed by the pool manager using employees and other temporary methods to accommodate any QID.
The Swim Center has been accommodating many disabled individuals over the past summers and will be
able to provide adequate service to the disabled prior to the renovation.
Building Name:
Address:
Site
Characteristics
Building Access
1. Parking
2. Ramps
3. Sidewalks
4. Entrances
5. Doors
6. Thresholds
Senior Center
7437 Larkdale
a. Handicap
City of Dublin
Transition Plan Checklist
Date: August 1, 1992
Inspector: Bo Barker
Complies
X
X
X
X
X
X
X
Doesn't
Comply
Anticipated See
N/A Correction Attachment
Building Attributes
1. Corridors
2. Elevators/Lift
3. Floor Surface
4. Obstacles
5. Work Areas
6. Payphones
7. Employee Areas
a. Audible Signals
b. Braille
c. Turning Area
d. Controls
a. Lounges
b. Training Room
X
X
X
X
X
X
X
X
X
X
X
X
X
Restrooms
1. Entry
2. Handles
3. Grab bars
4. Assesories
5. Water/Sinks
6. Fountains
X
X
X
X
X
X
Building Name:
Address:
Site
Characteristics
Building Access
1. Parking
2. Ramps
3. Sidewalks
4. Entrances
5. Doors
6. Thresholds
City of Dublin
Transition Plan Checklist
Corporation Yard
Date: August 1, 1992
5600 Scarlett Court
Inspector: Bo Barker
a. Handicap
Complies
X
X
X
X
X
Doesn't
Comply
N/A
X
X
Anticipated
Correction
See
Attachment
Building Attributes
1. Corridors
2. Elevators
3. Floor Surface
4. Obstacles
5. Work Areas
6. Payphones
7. Employee Areas
a. Audible Signals
b. Braille
c. Turning Area
d. Controls
a. Lounges
b. Training Room
X
X
X
X
X
X
X
X
X
Restrooms
1. Entry
2. Handles
3. Grab bars
4. Assesories
5. Water/Sinks
6. Fountains
X
X
X
X
X
X