HomeMy WebLinkAboutReso 053-93 EDub GPA & SP RESOLUTION NO. 53 - 93 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN RESOLUTION ADOPTING THE EASTERN DUBLIN GENERAL PLAN AMENDMENT AND EASTERN DUBLIN SPECIFIC PLAN; MAKING FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT AND ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS FOR THE EASTERN DUBLIN GENERAL PLAN AMENDMENT AND SPECIFIC PLAN; AND ADOPTING A MITIGATION MONITORING PROGRAM FOR THE EASTERN DUBLIN GENERAL PLAN AMENDMENT AND SPECIFIC PLAN Recitals 1. In response to a proposal for residential development of the Dublin Ranch property, the City of Dublin undertook the Eastern Dublin Study to plan for the future development of the eastern Dublin area. 2. The City Council and Planning Commission conducted three joint public study sessions and three workshops relating to planning issues in eastern Dublin. a. The April 18, 1990, study session considered a land use concept report containing four land use scenarios and the consistency of each land use concept with existing general plan policies. Alternative #4 was considered the preferred land use concept for environmental study by informal consensus. b. The August 22, 1990, study session considered Alternative #4 and a fifth concept (based on the 1986 annexation agreement with Alameda County). The "Town Center" concept, types of streets, location and types of parks were discussed. c. The November 15, 1990, workshop solicited comments from the public regarding the existing and desired life style qualities in Dublin and what the public wanted to see in a new community. d. The December 6, 1990, workshop continued with a similar discussion of desired types of commercial development and discussed circulation systems and parks and open space. e. The December 18, 1990, workshop presented a preliminary conceptual land use plan. Input was received on the transit spine, location of civic center, types of residential uses, location of commercial uses, the concentration of high density residential uses, and jobs/housing balance. f. The February 14, 1991, study session considered a land use plan that incorporated comments made at the three workshops and included a discussion of major issues, such as the location of a high school, connection to existing Dublin, size of streets and types of parks. 3. With the identification of a preferred alternative on February 14, 1991, the City prepared a Draft General PlanAmendment for approximately 6,920 acres to plan for future development of a mixed use community of single- and multiple-family residences, commercial uses (general commercial, neighborhood commercial, campus office and industrial park), public and semi-public facilities (including schools), parks and open space. Draft General Plan Amendment 4. The Draft General Plan Amendment, dated May 27, 1992, designates the proposed general distribution and general location and extent of the uses of Eastern Dublin for residential, commercial, industrial, public, open space and parks, and other categories of public and private uses of land. 5. The Draft General Plan Amendment includes a statement of standards of population density and standards of building intensity for Eastern Dublin. 6. Pursuant to the provisions of State Planning and Zoning Law, it is the function and duty of the Planning Commission of the City of Dublin to review and recommend action on proposed amendments to the City's General Plan. 7. The Planning Commission held a duly noticed public hearing on the Eastern Dublin Draft General Plan Amendment on October 1, 1992, which hearing was continued to October 6, 1992, October 12, 1992, and October 15, 1992. 8. Based on comments received during the public hearing, related text revisions, dated December 21, 1992, were made to the Draft General Plan Amendment and were reviewed by the Planning Commission on December 21, 1992. 9. The Draft General Plan Amendment was reviewed by the Planning Commission in accordance with the provisions of the California Environmental Quality Act through the preparation and review of an Environmental Impact Report. On December 21, 1992, by Resolution No. 92-060, the Planning Commission recommended certification of the Final Environmental Impact Report. 10. On December 21, 1992, the Planning Commission, after considering all written and oral testimony submitted at the public hearing, adopted of Resolution No. 92-061, recommending City Council adoption of the Draft General Plan Amendment, as revised December 21,1992. Draft Specific Plan 11. The Draft Specific Plan, dated May 27, 1992, implements an approximately 3,328-acre portion of the Eastern Dublin General Plan Amendment by providing a detailed framework, including policies, standards and implementation programs, for evaluation of development projects proposed in the portion of eastern Dublin covered by the Draft Specific Plan. 12. Pursuant to State Law, the Eastern Dublin Draft Specific Plan was prepared and reviewed in the same manner as a general plan amendment. 13. The Planning Commission held a duly noticed public hearing on the Eastern Dublin Draft Specific Plan on October 6, 1992, which hearing was continued to October 12, 1992, and October 15, 1992. 14. Based on comments received during the public hearings, related text revisions, dated December 21, 1992, were made to the Draft Specific Plan and were reviewed by the Planning Commission on December 21, 1992. 15. The Draft Specific Plan was reviewed by the Planning Commission in accordance with the provisions of the California Environmental Quality Act through the preparation and review of a Final Environmental Impact Report. On December 21, 1992, by Resolution No. 92-060, the Planning Commission recommended certification of the Final Environmental Impact Report. 16. On December 21, 1992, the Planning Commission, after considering all written and oral testimony submitted at the public hearing, adopted Resolution No. 92-062, recommending City Council adoption of the Draft Specific Plan, dated May 27, 1992, as revised December 21, 1992. Council Public Hearing 17. The City Council held a duly noticed public hearing on the Eastern Dublin Draft General Plan Amendment and Draft Specific Plan on January 14, 1993, which hearing was continued to January 21, 1993, February 23, 1993, March 30, 1993, and April 27, 1993. 18. On April 27, 1993, the City Council, by Resolution No. 45-93, voted to refer Alternative 2: Reduced Planning Area ("Alternative 2") with modifications back to the Planning Commission for its recommendation, pursuant to Government Code section 65356. 3 19. The Planning Commission held a public hearing on May 3, 1993, to consider Alternative 2 with modifications and has reported back to the City Council by Planning Commission Resolution No. 93- 013. 20. The City Council considered all written and oral testimony submitted at the public hearing and all written testimony submitted prior to the public hearing and the recommendation of the Planning Commission as set forth in Planning Commission Resolution Nos. 92-061, 92-062 and 93-013. 21. On May 10, 1993 the Council held duly noticed a public hearing to hear testimony regarding the Planning Commission's recommendation as set forth in Planning Commission Resolution No. 93-013. 22. On May 10, 1993, the City Council adopted Resolution No. 51-93, certifying the Addendum to the Draft EIR and the Final Environmental Impact Report ("Final EIR") as adequate and complete. The Final EIR identified significant adverse environmental impacts which can be mitigated to a level of insignificance through changes or alterations in the project. Therefore, pursuant to CEQA, findings adopting the changes or alterations are required and are contained in this resolution. Some of the significant impacts cannot be mitigated to a level of insignificance and a statement of overriding considerations is therefore required pursuant to CEQA and is also contained in this resolution. 23. Upon consideration of the land use and environmental effects of the project, as described in the Final EIR, the Council has determined to adopt Alternative 2, as described in the Final EIR, with certain modifications which are described in the Addendum to the Draft EIR ("Alternative 2 With Modifications"). Alternative 2 With Modifications reduces land use impacts, does not disrupt the existing rural residential community in Doolan Canyon, potentially reduces growth-inducing impacts on agricultural lands, reduces certain traffic impacts to a level of insignificance, produces less demand for infrastructure, reduces the noise impacts for Doolan Road to a level of insignificance and will have a positive fiscal impact on the City. 24. Alternative 2 was considered by the Planning Commission at its hearings, in testimony at the public hearings, in staff reports presented to the Commission at its hearings, in the EIR reviewed by the Planning Commission at its hearings and in its deliberations. 25. Alternative 2 With Modifications includes several substantial modifications to Alternative 2, as Alternative 2 is described in the Draft EIR. Although several of these modifications were considered by the Planning Commission at its hearings, the Planning Commission has considered Alternative 2 With Modifications and has reported back to the Council with its recommendation regarding Alternative 2 With Modifications. The Council has determined to follow the Planning Commission's recommendation as set forth in its Resolution No. 93-013, except with respect to the width of the Transit Spine and with the addition of the phrase "or other appropriate agreements" on page 160 of the Draft Specific Plan (S 11.3.1, first sentence). Findings/Overriding Considerations/ Mitigation Monitoring Program 26. Public Resources Code section 21081 requires the City to make certain findings if the City approves a project for which an environmental impact report has been prepared that identifies significant environmental effects. 27. Section 15093 of the State CEQA Guidelines requires adoption by the City Council of a statement of overriding considerations if the Council approves a project which will result in unavoidable significant effects on the environment. 28. Public Resource Code section 21085 and section 15092 of the State CEQA Guidelines require the City to make certain determinations if it approves a project which reduces the number of housing units considered in the environmental impact report. 29. The Final EIR for the Eastern Dublin General Plan Amendment and Specific Plan identifies certain significant adverse environmental effects. 30. Certain of the significant adverse environmental effects can be reduced to a level of insignificance by changes or alterations in the project. 31. Certain of the significant adverse environmental effects cannot be mitigated to a level of insignificance. 32. The Council has selected Alternative 2 identified in the Final EIR with modifications described in the Addendum to the Draft EIR, reducing the number of housing units for such property from the project as reviewed by the Final EIR for the Eastern Dublin General Plan Amendment and Specific Plan. 33. Public Resources Code section 21081.6 requires the City to adopt a reporting or monitoring program for changes in a project or conditions imposed to mitigate or avoid significant environmental effects in order to ensure compliance during project implementation. 34. Government Code section 65300 authorizes a city council to adopt a general plan for land outside its boundaries which in the Planning Commission's judgment bears relation to its planning. 5 35. The Planning Commission has considered whether land outside the City's boundaries bears relation to the City's planning. 36. The City has referred Alternative 2 With Modifications to the Alameda County Airport Land Use Commission ("ALUC") pursuant to Public Utilities Code section 21676 (b). The City has not received a determination from the ALUC. The 60-day time period for the ALUC to make a determination has not yet run. NOW, THEREFORE, BE IT RESOLVED THAT A. The Dublin City Council does hereby approve "Alternative 2: Reduced Planning Area" as the Eastern Dublin General Plan Amendment, with the Revisions dated December 21, 1992, and with the Modifications described in the Addendum to Draft EIR, dated May 4, 1993. B. The Dublin City Council finds the Eastern Dublin Specific Plan, as described in the Final EIR as "Alternative 2: Reduced Planning Area," with Revisions dated December 21, 1992, and with the modifications described in the Addendum to Draft EIR dated May 4, 1993, to be consistent with the Dublin General Plan, as revised by the Eastern Dublin General Plan Amendment. C. The Dublin City Council does hereby approve the Eastern Dublin Specific Plan, with the Revisions dated December 21, 1992, and with the Modifications described in the Addendum to Draft EIR, dated May 4, 1993 and with the revision to page 160 referred to in paragraph 25 above. D. The Dublin City Council does hereby direct the Staff to edit, format, and print the up-to-date Dublin General Plan with all City Council approved revisions and without any other substantive changes. E. The Dublin City Council does hereby direct the Staff to edit, format, and print the Eastern Dublin Specific Plan with all City Council approved revisions and without any other substantive changes. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby make the findings set forth in Sections 1, 2, 3, 4 and 5 of Exhibit A, attached hereto and incorporated herein by this reference, for the Eastern Dublin General Plan Amendment and Specific Plan. BE IT FURTHER RESOLVED THAT the Dublin City Council finds and declares that the rationale for each of the findings set forth in Sections 1, 2, 3, 4 and 5 of its findings (Exhibit A) is contained in the paragraph entitled "Rationale for Finding" in Exhibit A. The Council further finds that the mitigation measures for each identified impact in Exhibit A make changes to, or alterations to, the Eastern Dublin General Plan Amendment and Specific Plan, or are measures incorporated in the Eastern Dublin Specific Plan that, once implemented as described in the Mitigation Monitoring Program (Exhibit B hereto), will avoid or substantially lessen the significant effects of the Eastern Dublin General Plan Amendment and Specific Plan on the environment. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby adopt the Statement of Overriding Considerations set forth in Section 6 of Exhibit A, attached hereto, which statement shall be included in the record of the project approval. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby adopt the "Mitigation Monitoring Program: Eastern Dublin Specific Plan/General Plan Amendment" attached hereto and incorporated herein as Exhibit B, as the reporting and monitoring program required by Public Resources Code section 21081.6 for the Eastern Dublin General Plan Amendment and Specific Plan. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby direct that the Applicants for land use approvals in the Specific Plan area shall pay their pro rata share of all costs associated with the implementation of the Mitigation Monitoring Program. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby direct that all fees established pursuant to Government Code Section 65456, to recover costs of preparation of the Specific Plan, shall include the cost of preparation, adoption and administration of the Specific Plan plus interest on such costs based upon the City of Dublin's average monthly weighted investment yield calculated for each year or fraction thereof that such costs are unpaid. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby direct the City Clerk to file a Notice of Determination for the Eastern Dublin General Plan Amendment and Specific Plan project with the Alameda County Clerk and the State Office of Planning and Research. BE IT FURTHER RESOLVED THAT the Dublin City Council does hereby direct the City Clerk to make available to the public, within one working day of the date of adoption of this resolution, copies of this resolution (including all Exhibits) and the Eastern Dublin General Plan Amendment, dated May 27, 1992, with the Revisions dated December 21, 1992, and the modifications described in the Addendum to Draft EIR dated May 4, 1993, and the Eastern Dublin Specific Plan, dated May 27, 1992, with the Revisions to Draft Specific Plan, dated December 21, 1992, and the modifications 7 described in the Addendum to Draft EIR, all as modified by this resolution. BE IT FURTHER RESOLVED THAT this resolution shall become effective thirty (30) days from the date of passage. BE IT FURTHER RESOLVED THAT if, on the effective date of this resolution or within the remaining 60-day period for ALUC action, the ALUC has found that Alternative 2 With Modifications is not consistent with the ALUC's Alameda County Airport Land Use Policy Plan, the City shall submit all regulations, permits or other actions implementing the Eastern Dublin General Plan Amendment and Specific Plan to the ALUC for review until such time that the City Council revises the Eastern Dublin General Plan Amendment and Specific Plan to be consistent with the ALUC's Alameda County Airport Land Use Policy Plan or adopts specific findings by a two- thirds vote that the General Plan Amendment and Specific Plan are consistent with the purposes of Article 3.5 of Chapter 4 of Part I of Division 9 of the Public Utilities Code as stated in section 21670 of such Code. PASSED, APPROVED, AND ADOPTED this 10th day of May, the following vote: 1993, by AYES: Councilmembers Burton, Houston, Howard, Moffatt & Mayor Snyder NOES: None ABSENT: None ABSTAIN: None ATTEST: 114 \RESOL\ 29 \RESOLUTION 8 Section 1 FINDINGS CONCERNING SIGNIFICANT IMPACTS AND MITIGATION MEASURE8 Pursuant to Public Resources Code section 21081, the City Council hereby makes the following findings with respect to the Project'sI potential significant environmental impacts and means for mitigating those impacts. Findings pursuant to section 21081, subdivision (c), as they relate to "project alternatives," are made in Section 3. Section 3.1 -- Land Use IMPACT 3.1/F. Cumulative Loss of Agricultural and Open Space Lands. Agricultural grazing land and open space in Alameda and Contra Costa counties will be converted to urban uses by proposed projects such as Dougherty Valley, Tassajara Valley, North Livermore, and Eastern Dublin. Because it would result in the urbanization of a large area of open space, the proposed Project Would contribute to this cumulative loss of agricultural land and open space in the Tri-Valley area. This is considered a signifi- cant unavoidable cumulative impact. Response to Comments ("RC") # 34-9. Finding. No mitigation measures are proposed to reduce this impact to a level of insignificance. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. Rationale for Finding. The total amount of open space within the RPA that will be urbanized will be cumulatively significant, in light of numerous other open space areas within the region that is also anticipated for urbanization. IMPACT 3.1/G. Potential Conflicts with Land Uses to the West. The Parks Reserve Forces Training Area ("Camp Parks") is located due west of~the Specific Plan area. Existing and future Army training activities, such as the use of high velocity weapons and helicopters, could result in noise and safety Conflicts with adjacent open space and single-family residential areas of the Specific Plan. The extent of future army activity is unknown and 1The "Project" is Alternative 2 described in the DEIR at pages 4-9 through 4-14 with the modifications described in the May 4, 1993 Addendum to the EIR. Alternative 2 calls for development in the Reduced Planning Area (the portion of eastern Dublin within its sphere-of-influence) (hereafter "RPA"). 114 \ea stdub \ find ( 4 ) 1 the Army has not yet completed its Camp Parks Master Plan. page 3.1-13. DEIR Mitigation Measure 3.1/1.0. The City of Dublin should coordinate its planning activities with the Army to achieve compatibility with adjacent Camp Parks land uses, to solve potential future conflicts, and to reconcile land use incom- patibilities. The City should consult with the Army for any specific development proposals within the RPA. DEIR pages 3.1-13, -22. FindinG. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Coordinated planning activities will allow the City and Army to identify potential noise and safety impacts before they occur and will allow specific mitigation measures, including redesign, to be incorporated into development in the Project Area. Section 3.3 -- Traffic and Circulation When a mitigation measure referenced in this section requires development.projects within the RPA to pay for a proportionate cost of regional transportation programs and/or traffic and circulation!improvements, the proportion shall be as determined by regional!transportation studies, such as the current study by the Tri-Valley Transportation Council. IMPACT 3.3/A. 1-580 Freeway, Tassajara-Fallon. Year 2010 growth without the!Project would cause cumulative freeway volumes to exceed Level of Service E on 1-580 between Tassajara Road and Fallon Road. DEIR pages 3.3-21 (as revised), 5.0-3. Mitigation Measure 3.3/1.0. Caltrans, in cooperation with local jurisdictions, could construct auxiliary lanes on 1- 580 between Tassajara Road and Fallon Road to create a total of ten lanes, which would provide Level of Service D opera- tions, consistent with the Caltrans Route Concept Report for 1-580. DEIR pages 3.3-21 (as revised), 5.0-3. FindinG. Approval of the construction of the auxiliary lanes, and cooperation by jurisdictions other than the City of Dublin, are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by other agencies. If taken, i such actions would avoid or substantially lessen the significant effect identified in the Final EIR. 114 \ea stdub \ find ( 4 ) 2 Rationale for Finding. This mitigation measure provides acceptable Level of Service D operations during peak hours on the freeway. IMPACT 3.3/B. 1-580 Freeway, 1-680 to Hacienda. Year 2010 growth with the Project would cause 1-580 between 1-680 and Dougherty Road to exceed Level of Service E. This is also a significant cumulative impact. DEIR pages 3.3-21 (as revised), 4-11, 5.0-3. Mitigation Measure 3.3/2.0. Consistent with Specific Plan Policy 5-212, all non-residential projects with 50 or more employees in the RPA shall participate in a Transportation Systems Management (TSM) program to reduce the use of single occupant vehicles through strategies including but not limited to encouraging public transit use, carpooling, and flexible work hours. DEIR pages 3.3-21 (as revised), 5.0- 3. ff Mitigation Measure 3.3/2.1. All projects within the RPA area shall contribute a proportionate share of the costs of regional transportation mitigation programs, as determined by regional transportation studies. Such regional miti- gationf'programs may include enhanced public transit service and/or upgrading alternate road corridors to relieve demand. on 1-580 or 1-680. DEIR page 3.3-21 (as revised). Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact might not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Findinq. Approval of Alternative 2 reduces to a level of insignificance the impact on 1-580 between Doughe~ty Road and Hacienda Drive. DEIR page 4-11. The TSM program strategies will reduce single car occupancy, thereby reducing the number of cars expected to use the subject stretc~ of 1-580. Regional actions may focus not only on reducifig auto use by reducing single occupant vehicles, but also on increasing Project area road capacities through 2 This policy appears in the Eastern Dublin Specific Plan, which plan applies only to the identified Specific Plan area. The provisions of this policy provide useful mitigation outside the Specific Plan area as well. Therefore, the EIR and these findings adopt these provisions for the entire RPA. Hereinafter, those Specific Plan goals, policies, and action programs whose provisions are similarly adopted for the RPA throughout these findings will be indicated by an asterisk. 11~ \eastdub\f~nd ( ~ ) construction of routes providing convenient alternatives to 1-580 and 1-680. Given the overall expected increase in traffic, however, these measures are not sufficient to reducelthe cumulative impacts on 1-580 between 1-680 and Dougherty Road to insignificance. IMPACT 3.3/C. 1-580 Freeway, Tassajara-Fallon-Airway- Year 2010 growth with~the Project would cause freeway volumes to exceed Level of Service E on 1-580 between Tassajara Road and Airway Boulevard. ~=This is also a significant cumulative impact. DEIR page 3.3-21~(as revised), 5.0-3. Mitigation Measure 3.3/3.0. The City shall coordinate with Caltrans and the City of Pleasanton to construct auxiliary lanes on 1-580 between Tassajara Road and Airway Boulevard. All projects within the RPA shall contribute a proportionate share of the costs of these improvements. DEIR pages 3.3- 22 (as revised), 5.0-3; RC #7-6 Finding. Changes or alterations have been required in, or incorporated into the Project that avoid or substantially lessen the significant effects identified in the Final EIR. Freeway construction actions are within the ultimate res- ponsibility and jurisdiction of Caltrans,'who can and should take such actions. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The auxiliary lanes will provide sufficient additional capacity on 1-580 to provide Level of Service D between Fallon Road and Airway Boulevard, and Level of Service E between Tassajara Road and Fallon Road. Both Level of Service D and E are acceptable during peak freeway hours. DEIR pages 3.3-2, -18. Development in the RPA will be required to contribute its fair share to the auxiliary lane improvements so that when such improvements are needed, they will be provided by new development generating the need. State law authorizes the City to enter into a cooperative agreement with Caltrans to make the freeway improvements (see, e.g., Streets & Highways Code ~S 113.5, 114). IMPACT 3.3/~. 1-680 Freeway, North of 1-580. Year 2010 growth with the Pr6ject would cause freeway volumes to exceed Level of Service E on 1-680 north of the 1-580 interchange. This is also a signifi ~ cumulative impact. DEIR page 3.3-22, 5.0-4. ca t Mitigation Measure 3.3/4.0. All projects in the RPA shall contribute a proportionate share of the costs of Caltrans' planned improvements at the 1-580/I-680 interchange, in- cluding a new two-lane freeway-to-freeway flyover with ll4\eastdub\find(4) 4 related hook ramps to the City of Dublin. DEIR page 3.3-22. (as revised) (see also page 3.3-17 (as revised)). Findina. Changes or alterations have been required in, or incorporated into the Project that avoid or substantially lesseni~the significant effects identified in the Final EIR. Freeway interchange improvement actions are within the responsibility and jurisdiction of Caltrans, who can and should~take such actions. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Findinq. The expected interchanges and related improvements will provide sufficient additional capacity on 1-680 to provide Level of Service D north of the 1-580 interchange. Development in the RPA will be required to contribute its fair share to the interchange and related improvements so that when such improvements are needed, they will be provided by new development generating the need. IMPACT 3.3/E. Cumulative Freeway Impacts. Cumulative buildout with the Praject would cause additional freeway sections, in- cluding 1-580 east of Airway Boulevard, and the segment of 1-580 between Dou~herty and Hacienda to exceed level of service E. DEIR pages 3 · 3-22 (as revised) , 5.0-4. Mitigation Measure 3.3/5.0. The Project shall contribute a proportionate share to the construction of auxiliary lanes (for a total of 10) on 1-580 east of Airway Boulevard, for implementation by Caltrans. The City shall coordinate with other local jurisdictions to require that all future de- velopment projects participate in regional transportation mitigation programs as determined by the current Tri-Valley Transportation Council study. DEIR pages 3.3-22 (as re- vised) , 5.0-4. Finding. Changes or alterations have been required in, or incorporated into, the Project. Actions by other agencies and Caltrans to implement this mitigation measure are within the reaponsibility and jurisdiction of those other agencies and no~ the City of Dublin. Such actions can and should be taken ~y the other agencies. However, even with these change~ the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted. Rationale for Finding. The auxiliary lanes will provide sufficient additional capacity to provide acceptable level of service on part of 1-580 widening to ten lanes is consistent with the Route Concept Report. DEIR page 3.3-22 (as revised). Regional transportation mitigations can 114\eastdub\find(4) 5 reduce cumulative impacts through measures to decrease single occupant vehicle use and increase public transit use to further decrease traffic impacts. However, even with these improvements, part of 1-580 (between 1-680 and Hacienda Drive) will still be beyond acceptable LOS E. DEIR pages 3.3-20, 3.3-21 (as revised), 4-11. IMPACT 3.3/F. Dougherty Road and Dublin Boulevard. Year 2010 development with the Project would cause Level of Service F operations at the intersection of Dougherty Road with Dublin .~DEIR page 3.3-25. Boulevard. ~! Mitigaeion Measure 3.3/6.0. The City of Dublin shall monitor the intersection and implement construction of additi6nal lanes when required to maintain LOS D operations. All projects within the RPA shall contribute a proportionate share Of the improvement costs. DEIR page. 3.3-25 (as revised). Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The additional lanes at the Dougherty Road/Dublin Boulevard intersection will provide sufficient capacity for Level of Service D operations, which is acceptable at street intersections in Dublin (DEIR pages 3.3-2, -18 (as revised)). Development in the RPA will be required to contribute its fair share of the intersection improvements so that, when such improvements are needed, they will be provided by new development generating the need. IMPACT 3.3/G. Hacienda Drive and 1-580 Eastbound Ramps. Year 2010 development with the Project would cause Level of Service F operations at the intersection of Hacienda Drive with the 1-580 eastbound r~mps. DEIR page 3.3-25 (as revised). Mitigation Measure 3.3/7.0. The City of Dublin shall implement improvements in coordination with the City of Pleasanton and Caltrans to widen the eastbound off-ramp to provide a second left turn lane. All projects in the RPA shall contribute a proportionate share of the improvement costs. DEIR page 3.3-25 (as revised); RC # 7-9. Finding. Changes or alterations have been required in, or incorporated into the Project, that avoid or substantially lessen~'~!the significant effect identified in the Final EIR. Off-ramp widening actions are within the ultimate respon- sibility and jurisdiction of Caltrans. Such actions can and should~]!~be taken by Caltrans. If taken, such actions would 114 \ea stdub \ find avoid or substantially lessen the significant effect identi- fied i~ the Final EIR. Rationale for Finding. The additional lanes at the east- bound off-ramp will provide acceptable Level of Service C operations. Development in the Project area will be required to contribute its fair share of the intersection improvements, so that when such improvements are needed, they will be provided by new development generating the need. State law authorizes the City to enter into a cooperative agreement with Caltrans to make the off-ramp improvements (see, e.g., Streets & Highways Code SS 113.5, 114). IMPACT 3.3/H. Tassajara Road and 1-580 Westbound Ramps. Year 2010 development with the Project would cause Level of Service F operations at the intersection of Tassajara Road with the 1-580 westbound ramps. DEIR page 3.3-25 (as revised). Mitigation Measure 3.3/8.0. The City of Dublin shall implement improvements in coordination with Caltrans to widen the 1-580 westbound off-ramp and to modify the northbound approach to provide additional turn and through lanes.!~ All projects in the RPA shall contribute a pro- portionate share of the improvement costs. DEIR page 3.3- 26 (as!~revised). Finding. Changes or alterations have been required in, or incorporated into the Project, that avoid or substantially lessen the significant effect identified in the Final EIR. Coordinating and ramp widening actions are within the ulti- mate responsibility and jurisdiction of Caltrans, which can and should take such actions. If taken, such actions would avoid or substantially lessen the significant effect identi- fied in the Final EIR. Rationale for Finding. The reconfigured lanes at the east- bound off-ramp will provide acceptable Level of Service B operations. Development in the Project area will be requirad to contribute its fair share of the intersection improvements so that when such improvements are needed, they will be provided by new development generating the need. State law authorizes the City to enter into a cooperative agreement with Caltrans to make the off-ramp improvements (see, e.g., streets & Highways Code §S 113.5, 114). IMPACT 3.3/I. Santa Rita Road and 1-580 Eastbound Ramps. Year 2010 development with the Project would cause Level of Service F operations at the intersection of Santa Rita Road with the 1-580 eastbound ramps. DEIR page 3.3-26. 114 \eastdub\find ( 4 ) 7 Mitigation Measure 3.3/9.0. The City of Dublin shall implement improvements in coordination with the City of Pleasanton and Caltrans to widen the 1-580 eastbound off- ramp t0 provide two left-turn lanes, one through lane, and one right-turn lane to provide Level of Service E at this intersection. All projects in the RPA shall contribute a proportionate share of the improvement costs. The City of Dublin shall continue to work with the City of Pleasanton to monitor level of service at this intersection and partici- pate in implementing improvements which may be identified in the future to improve traffic operations. DEIR page 3.3-26 (as revised); RC # 7-11. Finding. Changes or alterations have been required in, or incorporated into the Project. Ramp widening actions are within!the ultimate responsibility and jurisdiction of Caltrans, which can and should take such actions. However, even with these changes and actions, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the ~.Project. Rationale for Finding. The off-ramp widening will provide LOS E Operations, which is still significant. Development in the Project area will be required to contribute its fair share of the intersection improvements, so that" when such improvements are needed, they will be provided by new development generating the need. IMPACT 3.3/K. Airway Boulevard and 1-580 Westbound Ramps. Year 2010 development with the Project would cause Level of Service F operations at the intersection of Airway Boulevard with the 1- 580 westbound ramps. DEIR page 3.3-27 (as revised). Mitigation Measure 3.3/11.0. The City of Dublin shall implement improvements in coordination with the City of Livermore and Caltrans to replace or widen the Airway Boulevard overcrossing of 1-580 and to widen the offramp for additional turn lanes. All projects within the RPA shall contribute a proportionate share of the improvement costs. DEIR page 3.3-27 (as revised); RC #17-2 Finding. Changes or alterations have been required in, or incorporated into the Project, that avoid or substantially lessen the significant effect identified in the Final EIR. Road and ramp widening actions are within the ultimate responsibility and jurisdiction of Caltrans, which can and should take such actions. If taken such actions would avoid or substantially lessen the significant effect identified in the Final EIR. 114 \ea stdub \ find 8 Rationale for Finding. The Airway Boulevard and 1-580 improvements will provide an acceptable Level of Service D. Development in the Project area will-be required to contri- bute its fair share of the improvements so that when such improvements are needed, they will be provided by new development generating the need. State' law authorizes the City to enter into a cooperative agreement with Caltrans to make the road and ramp improvements (see, e.g., Streets & Highways Code SS 113.5, 114). IMPACT 3.3/L. E1 Charro Road. Project traffic could introduce stops and delays for loaded trucks from the quarries on E1 Charro Road south of 1-580. DEIR page 3.3-27 (as revised). Mitigation Measure 3.3/12.0. The City of Dublin shall implement improvements in coordination with Caltrans, the City of Pleasanton, and Alameda County to ensure that modifications to the 1-580 interchange at Fallon Road/E1 Charro Road include provisions for unimpeded truck movements to and from E1 Charro Road. All projects in the RPA shall contribute a proportionate share of improvement costs. DEIR page 3.3-27 (as revised). FindinG. Changes or alterations have been required in, or incorporated into the Project, that avoid or substantially lessensthe significant effect identified in the Final EIR. Freeway interchange modification actions are within the ultimate responsibility and jurisdiction of Caltrans, which can and should take such actions. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Providing unimpeded access for the quarry trucks will prevent other traffic from backing up behind the heavily laden trucks with their slow starts and stops. Development in the Project area will be required to contribute its fair share of the improvements so that when such improvements are needed, they will be provided by new development generating the need. State law authorizes the City to enter into a cooperative agreement with Caltrans to make the off-ramp improvements (see, e.g., Streets & Highways Code SS 113.5, 114 ) . 'i IMPACT 3.3/M. cumulative Impacts on Dublin Boulevard. Cumulative buildout with the Project would cause Level of Service F opera- tions at the intersection of Hacienda Drive with Dublin Boulevard and Level of Service E operations at the intersection of Tassa- jara Road with Dublin Boulevard. DEIR page 3.3-27 (as revised), 5.0-4 . 114 \eastdub\find ( 4 ) 9 Mitigation Measure 3.3/13.0. The City shall continue to participate in regional studies of future transportation requirements, improvement alternatives, and funding pro- grams. Buildout of proposed projects outside Eastern Dublin would require the City to build grade-separated interchanges on Dublin Boulevard and/or establish alternate routes to redistribute traffic flow. All projects in the RPA shall contribute a proportionate share of improvement costs. DEIR pages 3.3-27 (as revised), 5.0-4. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact might not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. Regional transportation programs will attempt to reduce the amount of future traffic and associated impacts. Even with these efforts, however, the cumulative traffic impacts on Dublin Boulevard might not be reduced to insignificance. IMPACT 3.3/N. Cumulative Impacts on Tassajara Road. Cumulative buildout with the Project would cause Level of Service F opera- tions at the intersections of Tassajara Road with Fallon Road, Gleason Road, and the Transit Spine. These impacts would be caused primarily by traffic from the Tassajara connection to Dougherty Valley, and full buildout of the Tassajara Valley. DEIR page 3.3-28 (as revised), 5.0-4. Mitigation Measure 3.3/14.0. The City shall reserve suffi- cient right-of-way to widen Tassajara Road to six lanes between Dublin Boulevard and the Contra Costa County line and monitor traffic conditions and implement widening pro- jects as required to maintain LOS D operations on Tassajara Road. ~$All projects in the RPA shall contribute a propor- tionate share of the improvement costs. DEIR pages 3.3-28 (as revised), 5.0-4 and -5; RC #5-2, 7-13, 8-2 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Allowing for the widening of Tassajara Road to six lanes, if needed, will allow the City to maintain an acceptable LOS D. Development in the Project area will be required to contribute its fair share of the improvements so that when such improvements are needed, they will be provided by new development generating the need. 114 \eastdub\find ( 4 ) 10 IMPACT 3.3/0. Transit Service Extensions. The Project would introduce significant development in an area not currently served by public transit, creating the need for substantial expansion of existing transit systems. DEIR page 3.3-28. Mitigation Measure 3.3/15.0. Specific Plan Policy 5-10, requires the City of Dublin to coordinate with LAVTA to provide transit service within one quarter mile of 95% of the population, in accordance with LAVTA service standards. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.~3-28. MitiGation Measure 3.-3/15.1. Specific Plan Policy 5-11- requires the City of Dublin to coordinate with LAVTA to provide at least one bus every 30 minutes during peak hours, to 90%of employment centers with 100 or more employees, in accordance with LAVTA service standards. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.3-28. Mitigation Measure 3.3/15.2. All projects in the RPA shall contribute a proportionate share to the capital and operation costs of transit service extensions. DEIR page 3.3-28. MitiGation Measure 3.3/15.3. The City shall coordinate with BART and LAVTA to provide feeder service to the planned BART stations. Until the BART extension is completed(projected for 1995), the City shall coordinate with BART to ensure that BART express bus service is available to eastern Dublin residents. DEIR page 3.3-28. Findinq. Changes or alterations have been required in, or incorporated into the Project. Some of the transit service coordination actions are within the responsibility and jurisdiction of Bart and LAVTA agencies and not the City of Dublin. Such actions can and should be taken by those agencies. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for FindinG. The mitigations provide for expansion of existing transit systems to meet Project demand, not only on the local level through LAVTA but also on a local and regional level through BART. IMPACT 3.3/P. Street Crossings for Pedestrians and Bicycles. Pedestrians ~and bicycles would cross major streets with high projected traffic volumes, such as Dublin Boulevard, Tassajara Road and Fallon Road, introducing potential safety hazards for pedestrians .and bicyclists. DEIR page 3.3-29. ll4\eastdub\find(4) 11 Mitigation Measure 3.3/16.0. Specific Plan Policy 5-15- and Specific Plan Figure 5.3* require a Class I paved bicycle/pedestrian path along Tassajara Creek and trails along other stream corridors in the Project area. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.!3-29. Mitigation Measure 3.3/16.1. The City shall locate pedestrian and bicycle paths to cross major arterial streets at signalized intersections. DEIR page 3.3-29. Finding. Changes or alterations have been required in, or incorporated into the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Placing a major bicycle/pedestrian path along Tassajara Creek and using trails along other stream corridors allows bicycles and pedestrians to avoid traveling on major streets with their high traffic volumes. Where the paths must cross a major arterial street, re- quiring the crossing at a signalized intersection minimizes path and traffic conflicts by stopping traffic on a regular basis to let path travelers cross the street safely. Section 3.4.-- Community Services and Facilities IMPACT 3.4/A and B. Demand for Increased Police Services and Police Services Accessibility. The Project will increase demand for police services from the Dublin Police Department's admini- strative and sworn staff, and will require reorganization of the police operations to provide new patrol beats in the Project area. The hilly topography of most of the Project site may present some accessibility and crime-prevention problems. DEIR page 3.4-2. Mitigation Measure 3.4/1.0. Pursuant to Specific Plan Policy 8-4,* the City shall provide additional personnel and facilities and revise beats as needed in order to establish and maintain City standards for police protection service in Eastern Dublin. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-2. Mitigation Measure 3.4/2.0. Pursuant to Specific Plan Action Program 8D,* the City shall coordinate with the City Police.Department regarding the timing of annexation and proposed development, so that the Department can adequat.ely plan for the necessary expansion of services in the RPA. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-2 114 \ea stdub \ find ( 4 ) 12 Mitigation Measure 3.4/3.0. Pursuant to Specific Plan Action Program 8E,, the City shall incorporate into the requirements of project approval Police Department recommen- dations on project design that affect traffic safety and crime prevention. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-2. Mitigation Measure 3.4/4.0. Upon annexation of the RPA, the City of Dublin Police Department will be responsible for police~services. The City will prepare a budget strategy to hire the required additional personnel and implement a beat system, DEIR page 3.4-2. Mitigation Measure 3.4/5.0. As part of the development review process for residential and non-residential projects, the Police Department shall review development projects' design and circulation for visibility, security, safety, access, and emergency response times and any other police issues. DEIR pages 3.4-2 to -3. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The five mitigations identified will ensure that additional police will be hired andsthat other administrative measures will be employed to provide adequate protection for Project area residents. Police Department input into design of Project development will insure that police services are efficiently provided. IMPACT 3.4/C. Demand for Increased Fire Services. Buildout of the Project'will substantially expand the DRFA service area and increase demand for new fire stations and firefighting personnel. This will significantly increase response times and reduce service standards unless new facilities and personnel are added. DEIR page 3.4-5. Mitigation Measure 3.4/6.0. Pursuant to Specific Plan Policy 8-5,* the City shall time the construction of new facilities to coincide with new service demand in order to avoid periods of reduced service efficiency. The first station will be sited and will begin construction concurrent with initial development in the planning area. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-5. Mitigation Measure 3.4/7.0. Pursuant to Specific Plan Action~Program 8F,* the City shall'establish appropriate funding mechanisms to cover up-front costs of capital improvements. (,Specific Plan provisions adopted throughout RPA.) ~DEIR page 3.4-5. 114 \eastdub \ find ( 4 ) 13 Mitiqation Measure 3.4/8.0. Pursuant to Specific Plan Action Program 8G,* the City shall coordinate with DRFA to identify and acquire specific sites for new fire stations~ with the westernmost site in the Specific Plan area assured prior to approval of any development plans. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-5; RC # 15-26. Mitiqation Measure 3.4/9.0. Pursuant to Specific Plan Action Program 8H,* the City shall incorporate DRFA recommendations on project design relating to access, water pressure, fire safety and prevention into development approvals. Require compliance with. DRFA design standards such as non-combustible roof materials, minimum fire hydrant flow requirements, buffer zones along open space areas, fire alarm and sprinkler systems, road access, and parking requirements. (*Specific Plan provisions adopted throughout RPA.) ~DEIR pages 3.4-5 to -6. Mitigation Measure 3.4/10.0. Pursuant to Specific Plan Action!Program 8I,, the City shall ensure, as a requirement of Project approval, that an assessment district, homeowners association, or some other mechanism is in place that will provide regular long-term maintenance of the urban/open space interface. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-6. Mitigation Measure 3.4/11.0. Pursuant to Specific' Plan Action Program 8J,, the City shall ensure that fire trails and fire breaks are integrated into the open space trail system. And that fire district standards for access roads in these areas are met while environmental impacts are minimized. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-6. Mitiqation Measure 3.4/12.0. The City of Dublin, in consultation with DRFA and a qualified wildlife biologist, shall prepare a wildfire management plan for the RPA to reduce!Iopen land wildfire risks consistent with habitat protection and other open space values. The plan shall specify ownership, maintenance, use, brush control, and fire-resistant landscaping measures, as well as periodic review~of these measures, for RPA open lands. Any park distridts or other open space agencies with jurisdiction over lands within the RPA shallI be encouraged to participate in the preparation of the plan. DEIR pages 3.4-6 to -7. Mitigation Measure 3.4/13.0. The City shall consult with DRFA to determine the number, location and timing of additional fire stations for areas within the RPA outside 114 \eastdub\find ( 4 ) 14 the specific plan when such areas are proposed for annexation to the City. DEIR page 3.4-7. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to determine the number and location of fire stations are within the responsibility and jurisdiction of DRFA and not the City of Dublin. Such actions can and should be taken by DRFA. If taken, such actions can and would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. New fire facilities will be constructed to meet the needs of Project residents; DRFA input into Project design features will enable additional and efficient provision of fire services. The wildfire management plan should further limit the Project fire protection impacts by reducing the risk of wildfires. IMPACT 3.4/D. Fire Response to Outlying Areas. Based on DRFA's preliminary!locations for new fire stations, the northern-most portions of the RPA would be outside the District's standard response area. Development in these areas (especially the north end of Tassajara Road) could experience adverse fire hazard exposure and emergency response impacts. DEIR page 3.4-5. Mitigation Measures. Mitigation measures 3.4/6.0 to 13.0 as described above. DEIR pages 3.4-5 to -7. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to determine the number and location of fire stations are within the responsibility and jurisdiction of DRFA and not the City of Dublin. Such actions should be taken by DRFA. If taken, such actions can and would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. New fire facilities will be constructed to meet the needs of all Project residents, including those in the outerlying areas; DRFA input into project design features will enable additional and efficient provision of fire services. The wildfire management plan should further limit the Project fire protection impacts by reducing the risk of wildfires. IMPACT 3.4/E. Exposure to Wildfire Hazards. Settlement of population and construction of new communities in proximity to high fire hazard open space areas with difficult access poses an 114\eastdub\find(4) 15 increasing wildfire hazard to people and property if open space areas are not maintained for fire safety. This is also a significant cumulative impact in that increased development in steep grass and woodlands around the edges of the Tri-Valley's core communities may reduce response times and strain fire- fighting resources for regional firefighting services, many of whom participate in mutual aid systems. DEIR pages 3.4-5, 5.0- 5. MitiGation Measures 3.4/6.0 to 13.0. 3.4/6.0 to 13.0, as described above. -7, 5.0-5; RC #26-26. Mitigation measures DEIR pages 3.4-5 to Finding. Changes or alterations have been required in, or incorporated into the Project, that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to determine the number and location of fire stations are within the responsibility and jurisdiction of DRFA agencies and the City of Dublin. Such actions should be taken by DRFA. If taken, such actions can and would substantially lessen the significant effect identified in the Final EIR. DEIR pages 3.4-4 to -7. Rationale for Finding. New fire facilities will be constructed to meet the needs of all Project residents, including those near open space areas; DRFA input into project design features will enable additional and efficient provision of fire services. The wildfire management plan should=further limit the Project wildfire exposure impacts through fire safety planning and open space management. IMPACT 3.4/F, G. Demand for New Classroom Space; Demand for Junior High Schools. Buildout of the Project will increase the demand for new classroom space and school facilities beyond current available capacity. At the junior high school level, classroom demand may exceed both current and planned capacity levels. DEIR page 3.4-11 to -12. Mitigation Measure 3.4/13.0. Pursuant to Specific Plan Policy 8-1,* the City shall reserve school sites within the RPA designated on the Specific Plan and General Plan Amendment Land Use Maps. (,Specific Plan provisions adopted throughout RPA. ) DEIR page 3.4-12. Mitigation Measure 3.4/14.0. The City shall ensure that the two proposed junior high schools are designed to accommodate the projected number of junior high school students. DEIR page 3 ,~4-12. FindinG. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially 114 \ea stdub \ find ( 4 ) 16 lessen the significant effect identified in the Final EIR. Some actions to determine junior high school siting and design are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by such other agencies. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Providing elementary, junior high, and high school sites will accommodate classroom demand generated by Project residents. Mitigation Measures 3.4/17~i0 through 3.4/19.0 will ensure sufficient funding for such development. IMPACT 3.4/H. Overcrowding of Schools. Existing schools may be overcrowded if insufficient new classroom space is provided for new residential development. DEIR page 3.4-12. Mitigation Measures 3.4/13.0 to 14.0. 3.4/13.0 to 14.0, as described above. Mitigation Measures Mitigation Measure 3.4/15.0. Pursuant to Specific Plan Policy 8-2,* the City shall promote a consolidated develop- ment pattern that supports the logical development of planning area schools, and in consultation with the appro- priate school district(s), ensure that adequate classroom space is available prior to the development of new homes. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3~4-12. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Some actions to site and design schools are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by such other agencies. If taken, such actions would avoid or substantially lessen the significant effects identified in the Final EIR. Rationale for Finding. Providing elementary, junior high, and high school sites will accommodate classroom demand generated by Project residents, while a consolidated development pattern ensures that the classroom space will be available when it is needed. Mitigation Measures 3.4/17.0 through 3.4/19.0 will ensure sufficient funding for such development. IMPACT 3.4/I. Impact on School Financing District Jurisdiction. Development~,!of the RPA under existing jurisdictional boundaries would result in the area being served by two different school 114 \eastdub\find ( 4 ) 17 districts and would adversely affect financing of schools and provision of educational services. DEIR page 3.4-12. Mitigation Measures 3.4/16.0. Pursuant to Specific Plan Action Program 8A,* the City shall work with the school districts to resolve the jurisdictional issue to best serve student needs and minimize the fiscal burden of the service providers. (,Specific Plan provisions adopted throughout RPA.) DEIR pages 3.4-12 to -13. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Some actions to resolve the jurisdictional issue are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by such other agencies. If taken, such actions would avoid or substantially lessen the significant effects identified in the Final EIR. Rationale for Finding. Resolving the school district jurisdiction issue will limit conflicts and ensure that school services are efficiently provided. IMPACT 3.4/J. Financial Burden on School Districts. The cost of providing new school facilities could adversely impact local school districts by creating an unwieldy financial burden unless some form of financing is identified. DEIR page 3.4-13. Mitigation Measures 3.4/17.0 to 19.0. Pursuant to Specific Plan Policy 8-3, and Action Program 8B, ensure that adequate schoolfacilities are available prior to development in the RPA tothe extent permitted by law, for example, by requiring dedication of school sites and/or payment of developer fees by new development. Pursuant to Specific Plan Action Program 8C,, the City shall work with school districts to establish appropriate funding mechanisms to fund new school development and encourage school districts to use best efforts to obtain state funding for new con- struction. (*Specific Plan provisions adopted throughout RPA.) DEIR p. 3.4-13; RC #15-31. Findinq. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessenlthe significant effect identified in the Final EIR. Some actions to fund new school development are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by such other agencies. If taken, such actions would avoid or substantially lessen the significant effects identified in the Final EIR. 114\eastdub\find(4) 18 Rationale for Finding. Through these mitigations, develop- ment creating school facilities demand will have primary responsibility for accommodating that demand, with the school!Sdistricts being provided with back-up financial suppor~ from other sources. IMPACT 3.4/K. Demand for Park Facilities. Without the addition of new parks and facilities, the increased demand for new park and recreation facilities resulting from buildout of the Project would not be met, resulting in deterioration of the City's park provision standard and of the City's ability to maintain existing services and facilities. This is also a significant cumulative impact. DEIR pages 3.4-16, 5.0-5. Mitigation Measures 3.4/20.0 to 24.0. General Plan Amendment Guiding Policies A, B, and G and Implementing Policy D require the City of Dublin to provide and maintain parks and related facilities adequate to meet Project and citywide needs and in conformance with the City's Park and Recreation Master Plan 1992. Implementing Policy K specifically requires dedication and improvements for the 20 parks designated in the RPA with collection of in-lieu fees as reqdired by City standards. DEIR pages 3.4-16 to -17, 5.0-5.::: Mitigation Measures 3.4/25.0 to 27.0. Sufficient parkland shall be designated and set aside in the RPA to satisfy the City's:Park and Recreation Master Plan 1992 and its park provision and phasing standards. DEIR pages 3.4-17, 5.0-5. Mitigation Measure 3.4/28. The City shall implement Specific Plan Policies 6-1 to -6, to establish large, continuous natural open space areas with convenient access for users, and adequate access for maintenance and manage- ment; to preserve views of designated open space areas; and to establish a mechanism for open space ownership, manage- ment, and maintenance. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-18 to -19. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessensthe significant effect identified in the Final EIR. Rationale for Finding. These mitigations provide added new parks and facilities to meet increased demand from Project residents, and require compliance with phasing plans in the Park and Recreation Master Plan 1992, to ensure that new parks and facilities construction will keep pace with new residential construction. 114 \eastdub\find ( 4 ) 19 IMPACT 3.4/L. Park Facilities Fiscal Impact. Acquisition and improvement of new park and recreation facilities may place a financial strain on existing City of Dublin revenue sources unless adequate financing and implementation mechanisms are designed. DEIR page 3.4-18. Mitigation Measures 3.4/20.0 to 31.0. Pursuant to Specific Plan Policy 4-29, and Action Program 4N,, the City shall ensure that development provides its fair share of planned open space; for example, through in-lieu fees under the City's~parkland dedication ordinance. Pursuant to Specific Plan Program 4M,* the City shall develop a Parks Imple- mentation Plan identifying phasing, facilities priorities and location, and design and construction responsibilities. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3~4-18. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations ensure that needed park facilities will be provided by developers at the time of development, thereby avoiding the use of existing revenue sources to build new parks for Project area residents. IMPACT 3.4/M, N. Impact on Regional Trail System and Impact on Open Space Connections. Without adequate provisions for trail easements and without adequate design and implementation, urban development.along stream corridors and ridgelands would obstruct formation of a regional trail system and an interconnected open space system. DEIR page 3.4-18 to -19. Mitigation Measure 3.4/32.0. Pursuant to General Plan Amendment Guiding Policy H,* establish a trail system with regional and subregional connections, including a trail along the Tassajara Creek corridor. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-19. Mitigation Measures 3.4/23.0 and 33.0 to 36.0. Pursuant to General Plan Amendment Guiding Policy I, Implementation Policy D, Specific Plan Policies 6-1,, 6-3,* Action Program 40,* and consistent with the City's Parks and Recreation Master Plan 1992, use natural stream corridors and major ridgelines as the basis for a trail system with a conti- nuous, integrated open space network, emphasizing convenient user access, pedestrian and bicycle connections between developed and open space areas, and developer dedication of ridgetop and stream corridor public access easements. (*Specific Plan provisions adopted throughout RPA.) DEIR pages 3.4-17, -19. 114 \eastdub\ffnd ( 4 ) 20' Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Establishing a Project area trail system incorporating planned regional connections contri- butes to development of a regional trail system and allows the trail planning to be considered and incorporated into individual Project area developments in the RPA. By requiring that open space and trail planning be based'on continuous physical features such as stream corridors and ridgelines, and that public access be provided along these features, these mitigations avoid a disconnected open space system.! IMPACT 3.4/0, P. Increased Solid Waste Production and Impact on Solid Waste Disposal Facilities. Increased population and commercial land use will cause a proportional increase in the total projected amount of solid waste and household hazardous waste generated by the City of Dublin. This increase creates the need for additional capacity, personnel, and vehicles to dispose of the wastes. It can create public health risks from improper handling. The increased solid waste and household hazardous waste generated by the Project may accelerate the closing schedule for Altamont landfill unless additional capacity is developed or alternate disposal sites are identified. This impact on the Altamont landfill is also a potentially significant cumulative impact. DEIR pages 3.4-21 to -22, 5.0-6. Mitigation Measures 3.4/37.0 to 40.0. Pursuant to Specific Plan Action Program 8K, and other EIR mitigations, adopt a Solid Waste Management Plan for the RPA, including waste reduction programs such as composting and curbside and other collection of recyclables. Include goals, objectives, and programs necessary to integrate with the diversion targets of the City's Source Reduction and Recycling Element and Household Hazardous Waste Element. New development in the RPA shall demonstrate adequate available landfill capacity for anticipated wastes. (*Specific Plan provisions adopted throughout RPA.) DEIR pages 3-4.22 to -23, 5.0-6. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations minimize the amount/=of solid waste production and related needs and risks through compliance with AB 939 solid waste planning. Reducing the amount of Project-generated waste will also avoid an accelerated closing schedule for the Altamont landfiI1. In addition, these mitigations require that new 114 \eastdub \ find ( 4 ) 2 1 development anticipate and provide for adequate waste disposal before the development is approved. IMPACT 3.4/Q. Demand for Utility Extensions. Development of the Project site will significantly increase demand for gas, electric and telephone services. Meeting this demand will require construction of a new Project-wide distribution system. This is a significant growth-inducing impact. DEIR pages 3.4-24, 5.0-14 to -15. Mitigation Measures. None proposed. DEIR page 3.4-2.4. Finding. No changes or alterations are available to avoid or substantially lessen this impact. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the. Project. IMPACT 3.4/R. Utility Extension Visual and Biological Impacts. Expansion of electrical, gas, and telephone lines could adversely affect visual and biological resources if not appropriately sited. DEIR page 3.4-24. Mitigation Measures 3.4/41.0 to 44.0. Pursuant to Specific Plan Action Program 8L, and other identified mitigation measures, development within the RPA must document the availability of electric, gas, and telephone service and must place utilities below grade or, preferably, underground and routed away from sensitive habitat and open space lands. A development project service report shall be reviewed by the City prior to improvement plan approval. (=,Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-24 to -25. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Undergrounding utilities will avoid visualS!effects by placing the utility extensions where they cannoti!be seen. Routing the utility extensions away from sensitive habitat and open space areas will avoid impacts on biological resources by avoiding the resources themselves. IMPACT 3.4/S. Consumption of Non-Renewable Natural Resources. Natural gas and electrical service would increase consumption of non-renewable natural resources. DEIR page 3.4-25. Mitigation Measures 3.4/45.0 to 46.0. Major developers in the Project area shall provide demonstration projects on cost-effective energy conservation techniques including but not limited to solar water and space heating, landscaping ll4\eastdub\find(4) 22 for water conservation, and shading. All development projects in the RPA shall prepare an energy conservation plan as part of their proposals. The plan shall demonstrate how site planning, building design, and landscaping will conserve use of energy during construction and long term operation. DEIR page 3.4-25. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. Through the demonstration projects, developers can educate themselves and Project residents about available and feasible techniques to reduce consumption of energy resources. Requiring energy conservation plans forces both developers and the City to actively consider various techniques to reduce energy consumption and to build those techniques directly into the Project. These actions cannot, however, fully mitigate the impact. IMPACT 3.4/T. Demand for Increased Postal Service. The Project will increase the demand for postal service. DEIR page 3.4-26. Mitigation Measures 3.4/47.0 to 48.0. Pursuant to Specific Plan POlicy 8-10 and Action Program 8M, the City shall encourage the U.S.P.S. to locate a new post office in the Eastern Dublin town center. DEIR page 3.4-26; RC # 15-37. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to site a new post office within the town center are within the ultimate responsibility and jurisdiction of the USPS and not the City of Dublin. Such actions can and should be taken by the USPS. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. A post office conveniently located in the town center area will provide postal service to meet the Project generated demand. IMPACT 3.4/U. Demand for Increased Library Service. Without additional library facilities and staff, the increase in population resulting from the Project would adversely affect existing library services and facilities DEIR page 3.4-27. 114 \ ea stdub \ find ( 4 ) 23 i Mitigation Measures 3.4/49.0 to 51.0. Pursuant to Specific Plan Policy 8-11- and Action Program 8N* and other identi- fied mitigation measures, the City shall encourage and assist the Alameda County Library System to provide adequate library service in eastern Dublin, considering such factors as location, phasing, and funding of needed library services. (,Specific Plan provisions adopted throughout RPA.) DEIR pages 3.4-27 to -28; RC #15-38. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to provide library facilities are within the ultimate responsibility and jurisdiction of the Alameda CountyLLibrary system and not the City of Dublin. Such actions can and should be taken by the Alameda County Library System. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Providing library services to the RPA will meet Project generated demand. Planning how and when to provide those services will ensure that they are efficient and convenient to the maximum number of users. Section 3.5 -- Sewer, Water, and Storm Drainage IMPACT 3.5/A. Indirect Impacts Resulting from the Lack of a Wastewater Service Provider. Although Specific Plan Policy 9-4 (page 127) calls for the expansion of DSRSD's service boundaries to include the Specific Plan area, the Project does not provide for wastewater service to areas in the RPA outside the specific plan area. iThis could result in uncoordinated efforts by future developers in this area to secure wastewater services. DEIR page 3.5-5, RC #132-18. Mitigation Measure 3.5/1.0a. Pursuant to Specific Plan Policy!f9-4,* the City shall coordinate with DSRSD to expand its service boundaries to encompass the entire RPA. (*Specific Plan provisions adopted throughout RPA.) RC # 32-18. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to expand DSRSD's service boundaries are within the ultimate responsibility and jurisdiction of the DSRSD and not the City of Dublin. Such actions can and should be taken by the DSRSD. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR.' \eastdub \find ( 4 ) 24 Rational for Finding. Expanding DSRSD's service boundaries to include the entire RPA will ensure that securing wastewater services will be coordinated through one agency. IMPACT 3.5/B. Lack of a Wastewater Collection System. Estimated wastewater flow for the RPA is 4.6 MGD; however, there currently is no wastewater collection system adequate to serve the Project area. DEIR page 3.5-5. Mitigation Measures 3.5/1.0 to 5.0. Pursuant to Specific Plan Action Programs 9P,* 9I,* 90,, 9M,, and 9N,, all development in the RPA shall be connected to public sewers and shall obtain a "will-serve" letter prior to grading permits; on-site package plants and septic systems shall be discouraged. The City shall request that DSRSD update its collection system master plan to reflect Project area proposed land uses, with the cost of the plan to be borne by future development in the RPA. All wastewater systems shall be designed and built in accordance with DSRSD standards. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3~5-6; RC # 32-19, 32-20. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations will provide a wastewater collection system adequate to meet Project generated demand, and will ensure the system meets design and construction standards of DSRSD. IMPACT 3.5/C. Extension of a Sewer Trunk Line with Capacity to Serve New Developments. Construction of a wastewater collection system could result in development outside the RPA that would connect to the Project's collection system. This is also a potentially significant growth-inducing impact. DEIR pages 3.5- 6, 5.0-15. Mitigation Measure 3.5/6.0. The proposed wastewater system shall be sized only for the RPA area. DEIR pages 3.5-6, 4- 11, 5.0-15. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. By sizing the planned wastewater collection system only to serve the RPA, growth inducing impacts on lands outside that area are avoided. 114 \ea stdub \ find ( 4 ) 2 5 IMPACT 3.5/D. Allocation of DSRSD Treatment and Disposal Capacity. There is limited available capacity at the DSRSD Treatment Plant, limiting the number of sewer permits available for new developments. It is very unlikely that any of the presently remaining DUE's will be available for the Eastern Dublin Area. DEIR.page 3.5-7; RC #32-21. Mitigation Measure 3.5/7.0~ Pursuant to Specific Plan Action Program 9L,, development project applicants in the RPA shall prepare.a design level water capacity investi- gation, including means to minimize anticipated wastewater flows and reflecting development phased according to sewer permit allocation. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.5-7. Mitigation Measure 3.5/7.1. Development project applicants in the RPA shall obtain a wastewater "will,serve" letter from DSRSD before receiving a grading permit. RC #32-22. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen~the significant effect identified in the Final EIR. Rationale for Finding. The required investigation will allow development to be phased to ensure there are adequate wastewater facilities available to meet Project generated demand. The requirement of a "will-serve" letter will insure that adequate wastewater facilities willexist for all new development. If capacity is not available, DSRSD will not issue a will-serve letter. RC #32-22. IMPACT 3.5/E. Future Lack of Wastewater Treatment Plant Capacity. Development of the Project require an increase in wastewater treatment plant capacity within DSRSD to adequately treat the additional wastewater flows to meet discharge standards. This is also a potentially significant cumulative impact in that increased demand on area wastewater treatment facilities exceeds current remaining capacity. DEIR page 3.5-7 to -8, 5.0-6. Mitigation Measures 3.5/7.1, 8.0, 9.0. Pursuant to Specific Plan Policy 9-6- and mitigations identified in the EIR, ensure~.!that wastewater treatment and disposal facilities are available for future development in the RPA through compliance with'DSRSD's master plan to fund, design, and construct wastewater treatment plant expansion once export capacity is available (unleSs TWA approves export of raw wastewater, in which case DSRSD's wastewater treatment plant expansion will not be necessary). Also, development project applicants in the RPA shall obtain a wastewater "will-serve" letter from DSRSD before receiving a grading permit. ll4\eastdub\find(4) 26 (,Specific Plan provisions adopted throughout RPA.) pages 3.5-7 to -8, 5.0-6; RC #32-23. DEIR Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Compliance with DSRSD's master plan will ensure that adequate wastewater treatment plant capacity will be available in the future to serve Project generated demand once export capacity of treated wastewater is provided.(see Mitigation Measure 3.5/11..0). Alternative- ly, expanded treatment capacity will not be necessary if export of raw wastewater is approved. The requirement of a "will-serve" letter will insure that adequate wastewater facilities will exist for all new development. If capacity is not available, DSRSD will not issue a will-serve letter. RC #32,22. IMPACT 3.5/F. Increase in Energy Usage Through Increased Wastewater Treatment. Development of the Project will result in increased wastewater flows and will require increased energy use for treatment of wastewater. DEIR page 3.5-8; RC #32-24. Mitigation Measure 3.5/10.0. Include energy efficient treatment systems in any wastewater treatment plant expansion and operate the plant to take advantage of off- peak energy. DEIR page 3.5-8; RC #32-24. Finding. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublin.~ Such actions can and should be taken by other agencies. However, even if such actions are taken, this impacts.will not be avoided or substantially lessened. TherefOre, a Statement of Overriding Considerations must be adopted upon approval of the Project. Rationale for Finding. Use of energy efficient treatment systems and plant operations will reduce the amount of energy~use but these actions cannot fully mitigate the impact. IMPACT 3.5/8. Lack of Wastewater Current Disposal Capacity. The increase in wastewater flows from the Project and other sub- regional development will exceed available wastewater disposal capacity until additional export capacity is developed. This is also a significant cumulative impact. DEIR page 3.5-8, 5.0-6. Mitigation Measures 3.5/7.1, 11 to 14.0. Pursuant to Specific Plan Policy 9-5, and Action Programs 9H,, 9J,, and 9K,* the City shall support current efforts to develop 114\eastdub\find(4) 27 additional export capacity. The City shall require use of recycled water for landscape irrigation in accordance with DSRSD's Recycled Water Policy and require development within the RPA to fund a recycled water distribution system model to reflect proposed land uses. Also, development project applicants in the RPA shall obtain a wastewater "will-serve" letter from DSRSD before receiving a grading permit. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3~5-9, 5.0-6 to -7, RC #32-22, 32-25, 32-26, 32-27. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessensthe significant effect identified in the Final EIR. Actions to develop additional export capacity are within the responsibility and jurisdiction of other public agencies, and not the City of Dublin. Such actions can and should take by such agencies. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations will provide the additional wastewater disposal capacity necessary to meet Project generated demand. The requirement of a "will-serve" letter will insure that adequate wastewater facilities will exist for all new development. If capacity is not avail- able, DSRSD will not issue a will-serve letter. RC #32-22. IMPACT 3.5/H. Increase in Energy Usage Through Increased Wastewater Disposal. Development of the Project will result in increased wastewater flows and will require increased energy use for disposal of wastewater; more specifically, for (1) pumping raw wastewater to CCCSD for treatment under the TWA proposed project; and/or (2) operation of an advanced treatment and distribution system for recycled water. DEIR page 3-5.9. Mitigation Measures 3.5/15.0 to 16.0. The City shall encourage off peak pumping to the proposed TWA export system. The City shall plan, design, and construct the Project recycled water treatment system for energy efficient operation including use of energy efficient treatment systems, optimal use of storage facilities, and pumping at off peak hours. DEIR pages 3.5-10 to -11. Finding. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublin~ Such actions can and should be taken by other agencies. However, even if such actions are taken, this impactilwill not be avoided or substantially lessened. TherefOre, a Statement of Overriding Considerations must be adopted upon approval of the Project. 114 \eastdub \ find ( 4 ) 28 Rationale for Finding. The proposed mitigations will reduce the am6unt of energy used for wastewater disposal but these actions cannot fully mitigate the impact. IMPACT 3.5/I. Potential Failure of Export Disposal System. A failure in the operation of the proposed TWA wastewater pump stations would adversely affect the overall operation of the wastewater collection system for the Tri-Valley subregion, as well as the Eastern Dublin Project. DEIR page 3.5-10. Mitigation Measure 3.5/17.0. Engineering redundancy will be built into the TWA pump stations, which will also have provisions for emergency power generators. DEIR page 3.5-10. Findinq. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublin~' Such actions can and should be taken by other agencies. If taken, such actions would avoid or sub- stantially lessen the significant effect identified in the Final EIR. Rationale for Findinq. Engineering redundancy will minimize the risk of pump station system failure; providing emergency power generators will ensure that any system failure which does occur will be short lived, thereby avoiding the effects of such failure. RC #32-28. IMPACT 3.5/J. Pump Station Noise and Odors. The proposed TWA wastewater pump stations could generate noise during their operation and could potentially produce odors. DEIR page 3.5-10. Mitigation Measure 3.5/18.0. TWA's pumps and motors will be designed to comply with local noise standards and will be provided with odor control equipment. DEIR page. 3.5-10. Finding. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublini~ Such actions can and should be taken by other agencies. If taken, such actions would avoid or sub- stantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Requiring compliance with local noise standards will ensure that any noise produced not exceed acceptable levels. Odor control equipment will ensure that odor production effects are avoided. RC #32-28. IMPACT 3.5/K. Storage Basin Odors and Potential Failure. The proposed TWA Emergency Wastewater Storage Basins could poten- tially emit odors and/or the basins could have structural failure 114 \ea stdub \ find 29 due to landslides, earthquakes, or undermining of the reservoir from inadequate drainage. DEIR page 3.5-10. Mitigation Measure 3.5/19.0. TWA's basins will be covered, buried tanks with odor control equipment and will be designed to meet current seismic codes. DEIR page 3.5-11. Finding. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublin~ Such actions can and should be taken by other agencies. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations ensure that any odors related to the TWA basins are contained and controlled within the basins so as not to be detectable beyond the basins. Compliance with seismic codes will ensure that the basins are properly constructed to withstand landslides and earthquakes and are provided with adequate drainage to avoid structural failure. RC #32-28. IMPACT 3.5/L. Recycled Water System Operation. The proposed recycled water system must be constructed and operated properly in order to=!!prevent any potential contamination or cross- connection with potable water supply systems. DEIRpage 3.5-11. Mitigation Measure 3.5/20.0. Construction of the recycled water distribution system will meet all applicable standards of the Department of Health Services (DHS) and San Francisco Bay Regional Water Quality Control Board (RWQCB). DEIR page 3.5-11.' Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Applicable regulations of the DHS and RWQCB are designed to prevent cross-connection contamina- tion; compliance with these regulations will therefore avoid the contamination impact. IMPACT 3.5/M. Recycled Water Storage Failure. Loss of recycled water storage through structural damage from landslide, earth- quake, and undermining of the reservoir through inadequate drainage. DEIR page 3.5-11. Mitigation Measure 3.5/21.0. The City shall require reservoir construction to meet all applicable DSRSD and other health standards and shall require preparation of soils and geotechnical investigations to determine potential 114 \eastdub\find ( 4 ) 30 landslide and earthquake impacts. Reservoirs shall be designed to meet current seismic codes and to provide adequate site drainage. DEIR page 3.5-11. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Soils and geotechnical studies will ensure that reservoirs will be designed and constructed to comply with current seismic, DSRSD, and other applicable health standards, the purpose of which is.to avoid structural failure. IMPACT 3.5/N. Loss of Recycled Water System Pressure. Loss of pressure in'the proposed recycled water distribution systems could result in the system being unable to meet peak irrigation demand, which could result in loss of vegetation through lack of irrigation water. DEIR page 3.5-12; RC #32-30. Mitigation Measure 3.5/22.0. The recycled water pump stations shall meet all applicable DSRSD standards. DEIR page 3.5-12; RC #32-31. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Findinq. Compliance with DSRSD standards will minimize the risk of pressure being lost. IMPACT 3.5/0. Secondary Impacts from Recycled Watersystem Operation. Failure to identify and implement treatment plant improvements related to recycled water use may increase salinity in the groundwater basin. DEIR page 3.5-12. Mitigation Measures 3.5/20.0. Recycled water projects shall incorporate salt mitigation required by Zone 7. DEIR page 3.5-12~ Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Compliance with salt mitigation requirements will reduce the salinity of the recycled water, thereby avoiding the risk of increased salinity in the groundwater basin. IMPACT 3.5/P. Overdraft of Local Groundwater Resources. If the Project area is not annexed to DSRSD and development projects are 114\eastdub\find(4) 31 not required to connect to DSRSD's water distribution system, development projects may attempt to drill their own wells, causing overdraft of existing limited groundwater supplies. page 3.5-17. DEIR Mitigation Measures 3.5/24.0 to 25.0. Pursuant to Specific Plan Policy 9-2, and other EIR mitigations, the City shall coordinate with DSRSD to expand its service boundaries to include the Project area and to develop annexation conditions encouraging water conservation and recycling. The City shall encourage all developments in the RPA to connect to DSRSD's system and discourage the use of groundwater wells. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.5-17; RC #14-4. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Actions to expand DSRSD's service boundaries are within the responsibility and jurisdiction of the DSRSD and not the City of Dublin. Such actions can and should be taken by the DSRSD. If taken, such actions would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Annexation to DSRSD and connection to its water distribution system will eliminatelthe need for development projects to drill their own wells and will therefore avoid the risk of groundwater overdrafting. IMPACT 3.5/Q. Increase in Demand for Water. Estimated average daily water~demand for the RPA is 6.4 MGD, which demand could exceed available supply. This is also a potentially significant cumulative impact in that ongoing urban development in the Tri- Valley is resulting in a cumulative increase in water demand at a time when water supplies and delivery are uncertain. DEIR page 3.5-18, 5.0-7 to -8. Mitigation Measures 3.5/26.0 to 31.0. Pursuant to Specific Plan Action Programs 9A, and 9B,, the City shall require development projects in the RPA to include water conserva- tion measures within structures as well as in public and other improvements. Require developments to comply with DSRSD and Zone 7 recommendations for developing and using recycled water. Pursuant to other EIR mitigations, implement Zone 7 and DSRSD water supply and water quality improvements and interconnect Project area water systems with existing surrounding water systems for increased reliability. (*Specific Plan provisions adopted throughout RPA.) iiDEIR pages 3.5-18 to -19; 5.0-9; RC #13-9, 32-43. 114 \eastdub \find ( 4 ) 3 2 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessensthe significant effect identified in the Final EIR. Some actions to improve water supply and quality are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions should be taken by such other agencies. If taken, such actions can and would avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Through required water conservation and water recycling mitigations, the Project reduces the magnitude of the impact by reducing the demand for water using recycled water for irrigation reduces the estimated average daily water demand in the RPA to 5.5 MGD. (RC #32.52.) The remaining water quality and water supply mitigations will result in an increased water availability from Zone 7 and DSRSD to meet Project generated demand. IMPACT 3.5/R. Additional Treatment Plant Capacity. The increase in water demand through development of the Project will require an expansion of existing water treatment facilities in order to deliver safe and potable water. DEIR page 3.5-19. Mitigation Measures 3.5/32.0 to 33.0. Implement Zone 7's planned water treatment system improvements. DSRSD should construct two new chlorination/fluoridation stations at the two proposed Zone 7 turnouts to eastern Dublin, with the construction phased west to east as anticipated in the General Plan Amendment. DEIR page 3.5-19. Finding. Such actions are within the responsibility and jurisdiction of other public agencies and not the City of Dublin. Such actions can and should be taken by other agencies. If taken, such actions would avoid or sub- stantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Proposed water treatment system improvements will insure that Project water supply meets all applicable water quality requirements. IMPACT 3.5/S. Lack of a Water Distribution System. There currently iS no water distribution system to provide water service for ~ithe RPA. DEIR page 3.5-20. Mitigation Measures 3.5/34.0 to 38.0. Pursuant to Specific Plan Policy 9-1- and Action Programs 9C,, 9D,, 9E,, and 9G,, the City shall provide an adequate water supply system with related improvements and storage facilities for all develop- ment, in compliance with applicable DSRSD standards. The 114 \eastdub \ find ( 4 ) 3 3 City shall request that DSRSD update its water system masterplan to reflect the proposed land uses, and require a "will-Serve" letter from DSRSD prior to grading permits for any Project area development. The City shall encourage the proposed water system to coordinate and combine with existing neighboring water systems. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.5-20. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations will provide a water distribution system adequate to meet Project-generated demand, and will insure the system meets design and construction standards of DSRSD. IMPACT 3.5/T. Inducement of Substantial Growth and Concentration of Population. The proposed water distribution system will induce growth in the Project area and has been sized to poten- tially accommodate the Dougherty Valley Development to the north. However, if!?:.DSRSD does not provide water to the Dougherty Valley Development~i the pipes will be sized to only accommodate the RPA. The impact is also a potentially significant growth-inducing impact. DEIR page 3.5-20, 5.0-15, RC #32-41, 32-55. Finding. No feasible mitigation measures are identified to reduce this impact. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. IMPACT 3.5/U. Increase in Energy Usage Through Operation of the Water Distribution System. Development of the Project will result in increased water demand and will require increased energy use to operate a water distribution system, especially for pumping water to the system and to storage. DEIR page 3.5-21. Mitigation Measure 3.5/40. Plan, design, and construct the water distribution system for energy efficient operation. Designi;pump stations to take advantage of off-peak energy. DEIR page 3.5-21. Findinq. Changes or alterations have been required in, or incorporated into the Project. However, even with these change~, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. Use of energy efficient water distribution systems and operations will reduce the amount of energy used, but these actions cannot fully mitigate the impact. 114 \ea stdub\ find 34 IMPACT 3.5/V. Potential Water Storage Reservoir Failure. Loss of storage in proposed water distribution reservoirs from landslides, earthquakes, and/or undermining of the reservoir through inadequate drainage would adversely affect the ability of the water supply system to maintain water pressures and to meet fire flows. DEIR page 3.5-21. Mitigation Measure 3.5/41.0. Require water reservoir construction to meet all applicable DSRSD standards. Prepare soils and geotechnical investigations to determine potential landslide and earthquake impacts. Design the reservoirs to meet current seismic codes, and to provide adequate site drainage. DEIR page 3.5-21. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Soils and geotechnical studies will insure that reservoirs will be designed and constructed to comply with current seismic, DSRSD, and site drainage standards, thereby avoiding the risk of structural damage or' failure. IMPACT 3.5/W. Potential Loss of System Pressure. Loss of pressure in the proposed water distribution systems could result in contamination of the distribution system and would not allow adequate flows and pressures essential for fire flow. DEIR page 3.5-22. =~ Mitigation Measure 3.5/42.0. The proposed water pump stations shall meet all applicable standards of DSRSD and shall include emergency power generation back-up. DEIR page 3.5-22. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Compliance with DSRSD standards will minimize the risk of pressure being lost. Providing emergency power generators will insure the pumps will continue operating, thereby avoiding the risk of contamina- tion in the distribution system and insuring that adequate water flows are available for fire protection. IMPACT 3.5/X. Potential Pump Station Noise. Proposed water system pumpsstations would generate noise during their operation that could adversely affect the surrounding community. DEIR page 3.5-22. 114 \eastdub \find ( 4 ) 3 5 Mitigation Measure 3.5/43.0. Design pump stations to reduce sound levels from operating pump motors and emergency generators. DEIR page 3.5-22. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Reducing sound levels of the mechanical equipment will reduce the amount of noise perceivable by surrounding residents, thereby avoiding the impact. IMPACT 3.5/Y. Potential Flooding. Development of the Project and development of former agricultural, rural, and open space lands throughout the Tri-Valley will result in an increase in runoff to creeks and will result in an increased potential for flooding. This is also a potentially significant cumulative impact. DEIR page 3.5-25, 5.0-9. Mitigation Measure 3.5/44.0 to 48.0. Pursuant to Specific Plan Policies 9-7* and 9-8,, Action Programs 9R, and 9S,, and other EIR mitigations, require a master drainage plan for each development project in the RPA to provide drainage facilities adequate to prevent increased erosion or flood- ing, including channel improvements with natural creek bottoms, and side slopes with natural vegetation. This design level plan shall include studies of the development project area hydrology, potential impacts of the development project, and proposed design features to minimize runoff flows and their effects on erosion and riparian vegetation. Development projects shall also address potential downstream flooding, and shall include retention/detention facilities and/or~energy dissipators to minimize and control runoff, discharge, and to minimize adverse biological and visual effects. Construct storm drainage facilities in accordance with approved storm drainage master plan. (,Specific Plan provisions adopted throughout RPA.) DEIR 3.5-25 to -26, 5.0-9.: Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Findinq. Through planning and implementation of storm drainage master plans, development projects will minimize the amount of runoff to creeks and will provide drainage facilities to control the rate and location of runoff that does discharge into creeks. These measures will minimize the increase in runoff, thereby avoiding increased flooding potential. \eastdub\ find ( 4 ) 36 IMPACT 3.5/Z. Reduced Groundwater Recharge. Increasing the amount of impervious surfaces in the Project area could reduce the area's already minimal groundwater recharge capabilities. This is also a potentially significant cumulative impact, as impervious surfaces increase throughout the Tri-Valley. DEIR page 3.5-26~ 5.0-9 to -10. Mitigation Measure '3.5/49.0 to 50.0. Pursuant to Specific Plan Policy 9-9, and other EIR mitigations, plan facilities and operations that protect and enhance water quality; support Zone 7's ongoing groundwater recharge program for the nearby Central Basin, which contains the majority of the Tri-Valley's groundwater resources. (*Specific Plan provisions adopted throughout RPA.) DEIR page 2.5-26, 5.0-9. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigation measures protect and enhance what minimal groundwater recharge capability exists'!iin the Project area. IMPACT 3.5/AA. Non-Point Sources of Pollution. Development of the Project could result in a deterioration of the quality of stormwater due to an increase in non-point sources of pollution including (I) urban runoff; (2) non-stormwater discharges to storm drains; (3) subsurface drainage; and (4) construction site runoff (erosion and sedimentation). This is also apotentially significant'cumulative impact as other projects in the subregion are developed. DEIR page 3.5-26. Mitiqation Measure 3.5/52.0 to 55.0. The City shall develop a community based education program on non-point sources of pollution, coordinating such programs with current Alameda County programs. The City shall require all development to meet the requirements of the City's "Best Management Practices", the City's NPDES permit, and the County's Urban Runoff Clean Water Program to mitigate stormwater pollution. DEIR 3.5-27, 5.0-10, Addendum. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Education programs will acquaint all Project area residents with the issue of non-point pollution, and will suggest ways residents can avoid such pollution. Existing City, County, and State regulatory programs will insure that potential impacts of non-point ll4\eastdub\find(4) 37 sources of pollution or stormwater quality will be mitigated to a level of insignificance. Section 3.6 -- Soils, Geology, and Seismicity IMPACT 3.6/B. Earthquake Ground Shaking: Primary Effects. Earthquake ground shaking resulting from large earthquakes on active fault zones in the region, could be strong to violent, and could result in damage to structures and infrastructure and, in extreme cases, loss of life. DEIR page 3.6-7. Mitigation Measure 3.6/1.0. Use modern seismic design for resistance to lateral force in construction of development projects, and build in accordance with Uniform Building Code and applicable county and city code requirements. DEIR page 3.6-7. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. Modern seismic design and compliance with applicable building codes will reduce the risk of structural failure, major structural damage, and loss of life from the effects of ground-shaking. These actions will not, however, completely avoid the impact. IMPACT 3.6/C. Earthquake Ground Shaking: Secondary Effects. The secondary effects of ground shaking include seismically-induced landsliding, differential compaction and/or settlement. This is also a significant cumulative impact in that further development in the area could expose residents to significant safety hazards and could strain emergency response systems. DEIR page 3.6-8, 5.0-10. Mitigation Measure 3.6/2.0. In relatively flat areas, development should be set back from unstable and potentially unstable land or these landforms should be removed, stabilized, or reconstructed. Where improvements are located on unstable land forms, use modern design, appropriate foundation design, and comply with applicable codes and_policies. DEIR page 3.6-8, 5.0-10. Mitigation Measure 3,6/3.0. In hillside areas, where development may require substantial grading, require appropriate grading and design to completely remove unstable and potentially unstable materials. DEIR page 3.6-8, 5.0-10~ 114 \eastdub\find ( 4 ) 3 8 Mitigation Measures 3.6/4.0 to 5.0. Use engineering techniques and improvements, such as retention structures, surface and subsurface drainage improvements, properly designed keyways, and adequate compaction to improve the stability of fill areas and reduce seismically induced fill settlement. DEIR page 3.6-8, 5.0-10. Mitigation Measure 3.6/6.0. Design roads, structural foundations, and underground utilities to accommodate estimated settlement without failure, especially across transitions between fills and cuts. Remove or reconstruct potentially unstable stock pond embankments in development areas. DEIR page 3.6-8, 5.0-10. Mitigation Measure 3.6/7.0. Require all development projects in the Project area to perform design level geotechnical investigations prior to issuing any permits. The investigations should include stability analysis of natural and planned engineered slopes, and a displacement analysis to confirm the effectiveness of mitigation measures proposed in the investigation. DEIR page 3.6-9, 5.0-10. Mitigation Measure 3.6/8.0. Earthquake preparedness plans shouldibe developed by the City and all Project site residents and employees should be informed of appropriate measures to take in the event of an earthquake.. DEIR page 3.6-9, 5.0-10. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Mitigations 3.6/2.0 to 6.0 provide specific engineering techniques for reducing the effects of ground shaking throughout development in the Project area. Mitigation 3.6/7.0 requires development projects to apply these and other available engineering techniques at a design level, to identify specifically the effects that can occur on a particular site, to propose mitigations specific to those effects and the site, and to provide a means for evaluating the likely success of those measures. Through these engineering, planning, and design mitigations, development projects will be able to anticipate and avoid or reduce~ground shaking effects before the development is built. IMPACT 3.6/D. Substantial Alteration to Project Site Landforms. Development of the Project area could result in permanent change to the Project site's existing topography, particularly in hillside areas. This is also a significant cumulative impact as the hillsides and ridgelands of surrounding Tri-Valley cities are ll4\eastdub\find(4) 39 graded and excavated for development projects. 5.0-10. DEIR page 3.6-9, Mitigation Measures 3.6/9.0 to 10.0. Adapt improvements to natural landforms in order to minimize required cuts and fills through such techniques as construction of partial pads and use of retaining structures and steeper cut and fill slopes where appropriate and properly designed. Further reduce landform alteration by carefully siting individual improvements on specific lots after identifying geotechnically feasible building areas and alignments. Site improvements to avoid adverse geotechnical conditions and the need for remedial grading and use techniques such as clustering where appropriate to minimize grading and/or avoid adverse geotechnical conditions. DEIR page 3.6-9. 5.0-10. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessenS. the significant effect identified in the Final EIR. Rationale for Findinq. These mitigation measures provide designS!and engineering techniques which maintain natural landfo~ms to the greatest degree possible, and thereby minimize alteration of those landforms. The mitigations also require that geotechnical conditions be identified for development projects, allowing individual projects to identify and reduce, or in some cases completely avoid, the condition which might otherwise require alteration. IMPACT 3.6/F, G. Groundwater Impacts. Groundwater Impacts Associated with Irrigation. Shallow groundwater conditions occur in places throughout the RPA and could be caused by irrigation associated with development of the RPA. These conditions can adversely affect the performance of foundation and pavements, particularly in areas with expansive soils and bedrock. In addition, shallow groundwater can cause slope instability, including landsliding and fill settlement, and can lead to liquefaction of RPA soils. DEIR page 3.6-10. Mitigation Measures 3.6/11.0 to 13.0. Prepare detailed design?level geotechnical investigations on development projects within the RPA, to locate and characterize groundwater conditions and formulate design criteria and measures to mitigate adverse conditions. Control groundwater by construction of subdrain systems, remove stock pond embankments and drain reservoirs in development areas. (See MM 3.6/4, 6, 15, 18, 23, and 27 for additional techniques to control soil moisture and maintain slope stability. DEIR page 3.6-8, -11 through -14.) DEIR page 3.6-10 through -11; RC #15-43. ll4\eastdub\find (4) 4 0 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The geotechnical investigation will identify areas which have groundwater, and development will proceed in accordance with measures to protect structures and improvements from slope and soil instability due to shallow groundwater. IMPACT 3.6/H. Shrinking and Swelling of Expansive Soils and Bedrock. The Project site contains expansive soils and bedrock, which tend to shrink upon drying and swell upon wetting. This process canf~cause distress to overlying structures and infra- structure, causing damage to foundations, slabs, and pavements. DEIR page 3.6-11. Mitigation Measures 3.6/14.0 to 16.0. Prepare design level geotechnical investigations for development projects in the Project area to characterize site-specific soils and bedrock conditions, and to formulate appropriate design criteria and mitigation measures for those conditions. Such responsive measures include, but are not limited to, controlling moisture in the soils and bedrock, and designing foundations and pavements to be built either below the zone of seasonal moisture change, or upon structurally supportive floors and after removal of the expansive materials. DEIRpage 3.6-11 to -12~ Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessenk!the significant effect identified in the Final EIR. Rationale for Finding. The design level geotechnical evaluation will identify expansive soils and bedrock and insure that special techniques are used in these areas to reduce the risk of structure and infrastructure damage. IMPACT 3.6/I. Natural Slope Stability. The Project area contains active and dormant landslides, as well as steep slopes and colluvium-filled swales, which are subject to potential slope instability; and could cause damage to structures and infra- structure located in these areas. DEIR page 3.6-12. Mitigation Measures 3.6/17.0 to 19.0. Development projects within!'the Project area should prepare design level geotechnical investigations to characterize site-specific slope stability conditions and to formulate appropriate designScriteria and mitigation measures in response to those conditions. Such design measures and mitigations include siting!=development away from unstable landforms and from 114 \eastdub\ find ( 4 ) 41 .! slopes=greater than about 30%, and providing lower density development in steep, unstable areas. Where unstable areas canno~lbe avoided, design measures and mitigations include removing the unstable material, reconstructing or repairing the unstable area, or engineering structural responses, including subsurface drainage improvements. (See also MM 3.6/26.0, recommending maintenance and inspection plans for drainage systems. DEIR page 3.6-14.) DEIR page 3.6-12 to -13. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The design level geotechnical investigation will disclose areas which may be susceptible to slope instability. Special techniques, such as siting of structure and improvements, removing the unstable materials, and providing structural remediation, will improve slope stability. IMPACT 3.6/j. cut and fill Slope Stability. Potentially unstable cut and fill slopes may fail or settle, causing damage to structures and infrastructure. DEIR page 3.6-13. Mitigation Measures 3.6/20.0 to 21.0. Require grading plans for hillside areas, which plans minimize grading and required cuts and fills by adapting roads to natural landforms, stepping structures down steeper slopes, and demonstrating compliance with applicable building code and other applicable City and County requirements. DEIR page 3.6-13. Mitigation Measures 3.6/22.0 to 25.0. Detailed design level geotechnical investigations such as that required by mitigation measure 3.6/17.0 should describe and evaluate cut and fill slopes proposed for development projects in the RPA. Retaining structures, reinforcement and drainage measures should be provided on cut slopes as determined by code requirements and the specific conditions identified in the ge0technical investigation. Unretained cut slopes should generally not exceed 3:1. Filled slopes steeper than 5:1 should be keyed and benched into competent material and provided with subdrainage prior to placing engineered fill. DEIR pages 3.16-13 to -14. Mitigation Measure 3.6/26.0. Development projects in the Project area should prepare plans for the periodic in- spection and maintenance of subsurface drainage features, and the removal and disposal of materials deposited in surface drains and catch basins. (See also measures 114\eastdub\find(4) 42 described in MM 3.6/28.0.) The plans should include inspection and disposal procedures, schedule and reporting requirements, and a responsible party, and should emphasize overall long-term Project monitoring and maintenance. DEIR page 3.6-14. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The detailed design level geotechni- cal investigation will identify areas where cut and fill slopes are proposed. Specific grading plans affecting these conditions would be required to show how each development project will minimize cut and fill slopes, and how the remaining slopes will be stabilized through siting or engi- neering features. Long-term monitoring and maintenance plans will ensure that the design facilities and engineered features effectively protect the cut and fill slopes over the long term. IMPACT 3.6/K, L. Erosion and Sedimentation: Construction-Related and Long-Term. Construction of development projects in the RPA will modify the ground surface and its protective vegetative cover and will alter surface runoff and infiltration patterns, causing short-term erosion and sedimentation during=construction, and long-term erosion and sedimentation once permanent structures and improvements are in place. The long-term impact is also a significant cumulative impact as similar sites are developed throughout the Tri-Valley. DEIR page. 3.6-14, 5.0-11. Mitigation Measure 3.6/27.0. Time grading activities to avoid the rainy season as much as possible, and implement interim control measures, including but not limited to, providing water bars, mulch and net blankets on exposed slopes, straw bale dikes, temporary culverts and swales, sediment traps, and/or silt fences. DEIR page 3.6-14. Mitigation Measure 3.6/28.0. Reduce long-term erosion and sedimentation impacts through appropriate design, construc- tion, and continued maintenance of surface and subsurface drainage. Appropriate measures include, but are not limited to, constructing sediment catch basins, adequate storm sewer systems, stabilizing creek banks, revegetating and main' taining wooded slopes, constructing facilities to control drainage and runoff, and emphasizing periodic homeowner/ landowner maintenance. (See also MM 3.6/26.) DEIR page 3.6-15, 5.0-11. 114 \eastdub\find ( 4 ) 43 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessensthe significant effect identified in the Final EIR. Rationale for Finding. These mitigations include measures to prevent concentration of runoff, control runoff velocity, and trap silts on both a short-term and long-term basis, thereby minimizing the identified impact. Section 3.7 -- Biological Resources IMPACT 3.7/A. Direct Habitat Loss. Under Alternative 2, the Project will result in the loss, degradation, or disturbance of 1900 acres of existing vegetation. No unique or rare plant species occur in the Project area; however, urbanization will substantially reduce the habitat and range for botanical and wildlife species which are resident or migratory users of the RPA. The Project contributes to the cumulative, ongoing 'loss of natural habitat in the Tri-Valley region, and is also a potentially significant cumulative impact. DEIR page 3.7-9, 5.0- 11, Addendum. Mitiqation Measures 3.7 / 1.0 to 3.0. Pursuant to Specific Plan Policies 6-21, and 6-23,, and Action Program 60,, direct,=disturbance of trees or vegetation should be minimized and restricted to those areas actually designated for construction of improvements. Development projects should include vegetation enhancement/management plans for all open space areas identifying ways to enhance the biological potential of the area as wildlife habitat and focusing on such measures as reintroducing native species to increase vegetative cover and plant diversity. Development projects shall also be required to prepare a detailed revegetation/restoration plan, developed by a qualified revegetation specialist, for all disturbed areas that are to remain undeveloped. (,Specific Plan provisions adopted throughout RPA. ) DEIR page 3.7-9, 5.0-11. Mitigation Measure 3.7/4.0. The City shall develop and implement grazing management plans to protect riparian and wetland areas, increase plant diversity, and encourage the recovery of native plants, especially perennial grasses. DEIR page 3.7-9, 5.0-11. Findinq. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Findinq. Restricting direct disturbance to actual construction areas will reduce the amount of habitat lost. The vegetation and grazing plans will protect and restore disturbed areas to minimize the amount of habitat ll4\eastdub\find (4) 44 loss and to enhance the value of the habitat area remaining. IMPACT 3.7/B. Indirect Impacts of Vegetation Removal. Construction activities on the Project site may cause dust deposition, increased soil erosion and sedimentation, increased potential for slope failures, and alteration of surface and subsurface drainage patterns. DEIR page 3.7-9 to -10. Mitigation Measure 3.7/5.0. Pursuant to Specific Plan Policy6-22,, all disturbed areas should be revegetated as quickly as possible with native trees, shrubs, herbs, and grasses, to prevent erosion. The City shall determine specific physical characteristics of proposed revegetation areas to evaluate the long-term feasibility of the proposed mitigation and to identify potential conflicts at the site. Plants used for revegetation will be native to the Tri- Valley Area. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-10; RC # 13-18. Mitigation Measures 3.6/18.0, 22.0, 23.0. and 3.11/1.0. Development should avoid siting on steep slopes and should observe special design and engineering mitigation features where construction occurs on 3:1 or steeper slopes. The City of Dublin shall require dust deposition mitigations during construction, including but not limited to, watering the construction site, daily clean-up of mud and dust, replanting and repaying and other measures to reduce wind erosion. DEIR pages 3.6-12 to -13, 3.7-10, 3.11-3 to -4. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen=~the significant effect identified in the Final EIR. Rationale for Finding. Requiring construction to avoid siting on steep slopes will protect hillside vegetation and reduce erosion impacts. Where disturbance is necessary, engineering and other techniques to reduce erosion and sedimentation and promote slope stability will also ensure that revegetation efforts to control erosion will be more efficient and successful. IMPACT 3.7/C. Loss or Degradation of Botanically Sensitive Habitat. Direct loss and degradation from grading, road construction, and culvert crossings could adversely affect the Project area's unique and sensitive Northern Riparian Forest, Arroyo Willow Riparian Woodland, and Freshwater Marsh habitats. Indirect impacts could result from increased sedimentation or spoil deposition affecting stream flow patterns and damaging young seedlings and the roots of woody plants. This impact is also a potentially significant cumulative impact. DEIR page 3.7- 10, 5.0-11. ll4\eastdub\find(4) 45 Mitigation Measures 3.7/6.0, 7.0, and 11.0, Riparian and Wetland Areas. Pursuant to Specific Plan Policies 6-9,* 6-10,* and Action Program 6E,, natural riparian and wetland areas shall be preserved wherever possible. All development projects in the RPA shall consult with the Army Corps of Engineers (COE) and the California Department of Fish and Game (DFG) to determine these agencies' jurisdiction over the riparian or wetland area. These areas shall be incorporated into project open space areas. Any lost ripari~n habitat shall be replaced as required by DFG. Any lost wetlands shall be mitigated per COE's "no net loss" policy., (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-10, and -11, 5.0-12. Mitigation Measures 3.7/8.0 to 10.0, 12.0 to 14.0. Pursuant to Specific Plan Policies 6-11 to 6-13,, and Action Programs 6F to 6H,* the City shall require revegetation of natural stream corridors with native plant species and preservation and maintenance of natural stream corridors in the Project area, through measures including, but not limited to, avoiding underground drainage systems in favor of natural open-stream channels and retention basins. The City shall establish a stream corridor system (see Specific Plan Figure 6.1) to provide multi-purpose open space corridors for pedestrian and wildlife circulation. The City should also work with Zone 7 and DFG to develop a stream corridor restoration program, with standards for grading, stabiliza- tion, ~nd revegetation, and long-term management of RPA stream!!~channels. Development projects in the RPA are to be reviewed against, and any approval shall be consistent with, the program standards. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-10 to -12, 5.0-12; RC #14- 7, 35-25. Mitigation Measure 3.7/15.0. Pursuant to Specific Plan Action Program 6K,* the City of Dublin shall establish and maintain a liaison with state and federal resource manage- ment agencies throughout the planning and development process of individual development projects, in order to avoid violations of state and federal regulations and insure that specific issues and concerns are recognized and addressed. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-12, 5.0-12. Mitigation Measures 3.7 / 16.0 to 17.0. Existing sensitive habitats shall be avoided and protected where feasible. ConstrUction near drainages shall take place during the dry seasonE DEIR page 3.7-12, 5.0-12. Finding. Changes or alterations have been required in, or incorporated into the Project. These changes will avoid or 114 \eastdub\find ( 4 ) 4 6 substantially lessen the Pro3ect-related significant effects identified in the final EIR. However, these changes will not av6id the cumulative effects of lost or degraded biologically sensitive habitat. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. Rationale for Finding. Requiring compliance with "no net loss" policies will ensure that the amount of habitat shall remain constant. By incorporating wildlife corridors into Project plans, wildlife habitats will be enhanced and will not become isolated because wildlife will be able to migrate through these corridors as necessary. Disturbance of natural stream corridors can reduce the habitat value of these areas, but will be minimized by requirements to preserve and maintain these corridors in a natural, open condition, and by requiring construction to take place in the dry season. Any disturbed streams shall be rebuilt, reconstructed and revegetated according to the stream corridor plan, which will further enhance and protect habitat values in the RPA. Even with these protections for the RPA's biologically sensitive resource, the cumulative impact~icannot be fully mitigated. IMPACT 3.7/D. San Joaquin Kit Fox. Construction of new roads and facilities could adversely impact kit fox by destroying potential dens or burying foxes occupying dens at the time of construction. Modification of natural habitat could reduce available prey and den sites. Increased vehicle traffic, the presence of humans and domestic dogs, and resident useof poison for rodent control could kill or disturb foxes or reduce their prey populations. DEIR page 3.7-12 to -13. Mitigation Measure 3.7/18.0. The City shall require all development in the RPA to comply with the East Dublin San Joaquin Kit Fox Protection Plan outlined in Appendix E, DEIR Part Ii. Extensive mitigation measures stress siting urban development to avoid kit fox habitat where possible, and protecting and enhancing the habitat which remains primarily in the!~Open Space and Rural Residential areas. Mitigations includ~ measures for pre-construction and construction conditions, and address steps to be taken if potential or known dens are identified. DEIR page 3.7-13, DEIR Appendix E (as revised following RC #20-7.) Mitigation Measure 3.7/18.1. The City of Dublin shall work with other agencies to develop a management plan that identifies measures to protect viable habitat for the kit fox in the Tri-Valley area. RC #20-5. 114 \eastdub\find ( 4 ) 47 Mitigation Measure 3.7/19.0. Pursuant to Specific Plan Action!Program 6N,* the City shall restrict rodenticide and herbicide use. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-13. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Appendix E provides a comprehensive protection plan addressing several phases of kit fox protection, from avoidance of potential dens to maintenance of habitat. Through this plan, the Project will avoid most directS!and indirect adverse effects on any kit fox that might be present in the Project area. IMPACT8 3.7/F to I. Red-legged Frog, California Tiger Salamander, Western Pond Turtle, Tri-Colored Blackbird. The destruction and alteration of water impoundments and stream courses in the RPA threatens to eliminate habitat for these species. Increased sedimentation into the riparian areas could reduce water quality and threaten breeding and larval habitat. Disturbance of the already minimal vegetation in the stream courses could reduce habitat opportunity for adult species. Increased vehicle traffic and new road construction could increase direct mortality. Harassment and predationby feral dogs and cats already occurs, and would increase with increased residential development. DEIR page 3.7-13 to -14. Mitigation Measures 3.7/20.0 to 22.0. Pursuant to Specific Plan ACtion Program 6L, and other EIR mitigations, develop- ment projects in the RPA shall prepare open space plans to enhance and preserve existing habitat and revegetation plans for any disturbed open space or habitat areas and shall preserve and protect riparian, wetland, and stream corridor areas whenever possible. (See MMs 3.7/2.0 to 3.0.) Maintain a minimum buffer of at least 100 feet around breeding sites of the red-legged frog, California tiger salamander, and Western pond turtle. Development projects in the RPA shall conduct a pre-construction survey within sixty days prior to habitat modification to verify the presence of sensitive species. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.7-14. Findinq. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Open space protection, revegetation, and restoration planning, as well as planning to protect and enhance wetland and riparian areas will also protect and 114 \eastdub \find ( 4 ) 48 minimize impacts to the riparian habitat necessary for the species identified in this impact. IMPACTS 3.7/K. Golden Eagle: The conversion of grasslands and the consequent reduction of potential prey could reduce the amount and quality of foraging habitat for golden eagles. Noise and human activity associated with development could also disrupt foraging activities. Elimination of golden eagle foraging habi- tat is also a potentially significant cumulative impact which contributes to the overall regional loss of foraging habitat for this species. DEIR page 3.7-15, 5.0-12. Mitigation Measure 3.7/25.0. Designate substantial areas of land in the Project area as Open Space or Rural Residential (including future study areas), providing open space protection and low intensity development that will also provide a suitable foraging habitat. DEIR page 3.7-15, 5.0-12. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Providing a natural open space zone around=the existing golden eagle nest avoids destruction of the nesting site; providing an additional buffer' during the golden eagle reproductive period further protects the integrity of the existing nesting site. The natural open space zone, together with the over acres of open space and low intensity development across the Project site provides ample opportunity to maintain effective foraging habitat for golden eagles. IMPACT 3.7/L. Golden Eagle and Other Raptor Electrocutions. Golden eagles and other raptors which perch or fly into high- voltage transmission lines may be electrocuted. DEIR page 3.7-15. Mitigation Measures 3.7/26.0 and 3.4/42.0. Require all utilities to be located below grade where feasible. Pursuant to Specific Plan Action Program 6M,, require all transmission lines to be undergrounded where feasible. Where not feasible, design specifications to protect raptors from electrocution shall be implemented. These specifica- tions include, but are not limited to, spacing dangerous components; insulating conductors,, using non-conductive materials, or providing perch guards on cross arms; and avoiding grounded steel cross arm braces. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.4-24, 3.7- 15 to -16. ll4\eastdub\find(4) 49 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Undergrounding utilities, including all transmission lines, avoids the electrocution hazard. Where the hazard cannot be avoided through undergrounding, the design specifications identified in the mitigations reduce.the electrocution hazards by neutralizing and/or covering the features that provide opportunities for electrocution. IMPACT 3.7/M, N. Burrowing Owl and American Badger. Annual grasslands in the RPA provide suitable habitat for burrowing owls. Development and related construction activity could destroy both burrowing owl and American badger burrows. Harass- ment by feral dogs and cats, as well as use of poisons for rodent control, could harm these species and/or reduce their prey populations. DEIR page 3.7-16 to -17. Mitigation Measures 3.7/20.0 and 27.0. Pursuant to Specific Plan Action Program 6L, and other EIR mitigations, develop- ment projects in the RPA shall conduct a pre-construction survey within sixty days prior to habitat modification to verify the presence of sensitive species. The projects shall maintain a minimum buffer of at least 30O~=feet around the breeding sites of the American badger during the breeding season (March to September) to avoid direct loss of individuals. Also, projects shall maintain a minimum buffer of at least 300 feet around known or identified nesting sites of the burrowing owl, or implement other mitigation actions pursuant to standardized protocol now under development, including relocation of nesting sites in coordination with the USFWS and the CDFG. (*Specific Plan provisions adopted throughout RPA.) DEIR pages 3.7-14, and -17; RC #15-60. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The pre-construction survey and required buffer zone around known nesting and breeding sites preserves these species' burrows by allowing them to be avoided during the construction and development process. IMPACT 3.7 / O. Shouldered Kite. foraging habitat. 114\eastdub\find(4) Prairie Falcon, Northern Harrier, and Black- Development in the RPA could cause loss of DEIR page 3.7-17. 50 Mitigation Measure 3.7/25.0. Substantial areas of land in the Project area are designated for Open Space and low intensity Rural Residential land uses (including future study areas). DEIR pages 3.7-15 and -17. FindinG. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The designated open space and low intensity rural residential uses provide adequate foraging habitat for these species. IMPACT 3.7/P. Sharp-Shinned Hawk and Cooper's Hawk. Development in the RPA could cause loss of foraging habitat. DEIR page 3.7- 17. Mitigation Measures 3.7/6.0 through 17.0 and 21.0. Establish protective buffer zones for riparian and fresh- water marsh habitats to protect and enhance sensitive habitats. Preserve riparian, wetland, and stream corridor areas;~where avoidance of these areas is not feasible, prepare and implement habitat restoration, enhancement and maintenance plans. DEIR pages 3.7-10 to -12, -14, -17. Findinq. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the~Final EIR. Rationale for Finding. The mitigations provide preservation, enhancement and maintenance features for riparian and freshwater marsh habitats upon which these species rely for forage. Protecting and enhancing this habitat avoids the impact of lost habitat. IMPACT 3.7/8. Special Status Invertebrates. Impacts to special status invertebrates cannot be estimated at this time. DEIR page 3 . 7-18 . Mitigation Measure 3.7/28.0. Species-specific surveys shall be conducted in appropriate riparian/wetland habitats prior to approval of specific projects in the RPA. DEIR page 3.7- 18, Addendum. Findinc. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Any potential impacts to Special Status Invertebrates will be addressed during CEQA review of specific development projects in the RPA. 114\eastdub\find ( 4 ) 51 Section 3.8 -- Visual Resources IMPACT 3.8/A. Standardized "Tract" Development. Generic "cookie-cutter" development could obscure the specific natural features of the RPA, such as its landforms, vegetation, and watercourses, that make it a unique place with its own identity. DEIR page 3~8-4. Mitigation Measure 3.8/1.0. Pursuant to the goal statement in SpeCific Plan Section 6.3.4,* establish a visually distinctive community which preserves the character of the natural landscape by protecting key visual elements and maintaining views from major travel corridors and public spaces. Implement the extensive design guidelines for development as described in Chapter 7, of the Specific Plan. These guidelines provide a flexible design framework, but do not compromise the community character as a whole. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-5. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. By protecting key natural and visual elements, the Project maintains the natural features of the RPA, which make it unique. The general design guidelines for the Project, including a village center, town center, mixed use orientation, and varying lot sizes, provide a varied development pattern, which avoids the look of standard cookie-cutter tract developments. IMPACT 3.8/B. Alteration of Rural/Open Space Visual Character. Urban development of the RPA will substantially alter the existing rural and open space qualities that characterize eastern Dublin. This is also a significant cumulative impact as the natural rural character of the Tri-Valley subregion is replaced by urban development. DEIR page 3.8-5, 5.10-12. Mitigation Measure 3.8/2.0. Implement the land use plan for the RPA, which plan emphasizes retaining the predominant natural features, such as ridgelines and watercourses, and preserves the sense of openness that characterizes Eastern Dublin. DEIR page 3.8-5, 5.0-12. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. ll4\eastdub\find(4) 52 Rationale for Finding. Maintaining predominant natural features minimizes the alteration of the RPA's current rural open space character; however, it does not fully mitigate this impact. IMPACT 3.8/C. Obscuring Distinctive Natural Features. The characteristic unvegetated landscape of the RPA heightens the visual importance of existing trees, watercourses, and other salient natural and cultural features. The Project has the potential to obscure or alter these existing features and thereby reduce the visual uniqueness of the site. DEIR page 3.8-5. Mitigation Measure 3.8/3.0. Pursuant to Specific Plan Policy 6-28,* preserve the natural open beauty of the hills and other important visual resources, such as creeks and major stands of vegetation. (,Specific Plan provisions adopted throughout RPA. ) DEIR page 3.8-5. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen?!~the significant effect identified in the Final EIR. Rationale for Findinq. This mitigation measure calls for preservation of the RPA's important visual resources, thereby avoiding the impact of obscured or altered visually important features. IMPACT 3.S/D. Alteration of Visual Quality of Hillsides. Grading and excavation of building sites in hillside areas will severely compromise the visual quality of the RPA. DEIR page 3.8-6. Mitigation Measures 3.8/4.0 to 4.5. Pursuant to Specific Plan Policies 6-32,* and 6-34 to -38,* grading and excavation throughout the RPA should be minimized, by using such grading features as gradual transitions from graded ares to natural slopes, by revegetation of graded areas, by maintaining natural contours as much as possible and grading only the actual development areas. Building pads in hillside areas should be graded individually or stepped, wherever possible. Structures and roadways should be designed in response to the topographical and geotechnical conditions. Structures should be designed to blend in with surrounding slopes and topography and the height and grade of cut and fill slopes should be minimized wherever feasible. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-6. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. ll4\eastdub\£ind(4) 53 Rationale for Finding. The various grading techniques identified, together with revegetation and sensitive building design will avoid the impact by minimizing physical alteration throughout the RPA. IMPACT 3.8/E. Alteration of Visual Quality of Ridges. Structures built in proximity to ridges may obscure or fragment the profile'of visually-sensitive ridgelines. DEIR page 3.8-6. Mitiqation Measures 3.8/5.0 to 5.2. Pursuant to Specific Plan Policy 6-29,, development is not permitted on the main ridgeline that borders the Specific Plan area to the north' and east, but may be permitted on the foreground hills and ridgelands. Minor interruptions of views of the main ridgeline by individual building masses may be permitted only where all other remedies have been exhausted. Pursuant to Specific Plan Policy 6-30, and General Plan Amendment Guiding Policy E, structures shall not obstruct scenic views and shall not appear to extend above an identified scenic ridgetop when viewed from scenic routes. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-7. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Prohibiting development along the main ridgeline in the RPA preserves the visualquality of this resource. Limiting development so that structures are not silhouetted against other scenic ridgetops, as well as requiring that a backdrop of natural ridgeline remain visible, minimizes the obstruction or fragmentation of visually sensitive ridgelines. IMPACT 3.8/F. Alteration of Visual Character of Flatlands. Commercial and residential development of the RPA's flatlands will completely alter the existing visual character resulting from valley grasses and agricultural fields. DEIR page 3.8-7. Mitigation Measures. None identified. DEIR page 3.8-7. Finding. No changes or alterations are available to substantially lessen this impact. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. Rationale for Finding. Development of the Project site's flatter areas is regarded as a "trade-off" measure designed to preserve slopes, hillsides, and ridgelines. 114\eastdub\find(4) 54 IMPACT 3.8/G. Alteration of the Visual Character of Water- courses. Urban development of the Project site in proximity to watercourses may diminish or eliminate their visibility and function as~distinct landscape elements. DEIR page 3.8-7. Mitigation Measure 3.8/6.0. Pursuant to Specific Plan Policy 6-39,* protect the visual character of Tassajara Creek and other stream corridors from unnecessary alteration or disturbance. Adjoining development should be sited to maintain visual access to the stream corridors. Implement earlier identified mitigation measures 3.7/8.0, 12.0, and 13.0, to revegetate stream corridors to enhance their natural appearance, to prepare a comprehensive stream corridor restoration program, and to establish dedication of land along both sides of stream corridors. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-7 to -8, 3.7-10 to -11. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Preserving the RPA watercourses will retain both their visibility and function as distinct landscape elements. Special attention to stream corridors through revegetation, restoration, and dedication of land along both sides, will further enhance this distinct landscape element. IMPACT 3.8/I. Scenic Vistas. Development on the RPA will alter the character of existing scenic vistas and may obscure important sightlines. DEIR page 3.8-8. Mitigation Measure 3.8/7.0 to 7.1. Pursuant to Specific Plan policy 6-5* and other EIR mitigations, preserve views of designated open space areas. The City will conduct a visual survey of the RPA to identify and map viewsheds of scenic vistas. (,Specific Plan provisions adopted throughout RPA.) Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Identifying and mapping critical viewsheds allows the City to consider specific ways of preserving those views when reviewing development projects within the RPA. IMAGE 3.8/J. Scenic Routes. Urban development of the RPA will significantly alter the visual experience of travelers on scenic 114 \ea stdub \ find ( 4 ) 5 5 routes in eastern Dublin. As quiet rural roads become major suburban thoroughfares, foreground and distant views may be obstructed. DEIR page 3.8-8 to -9. Mitigation Measure 3.8/8.0. Pursuant to Specific Plan Action Program 6Q,* the City should officially adopt Tassajara Road, 1-580, and Fallon Road as designated scenic corridors, should adopt scenic corridor policies, and should establish development review procedures and standards to preserve scenic vistas. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-9. Mitigation Measure 3.8/8.1. Pursuant to Specific Plan Action Program 6R,, the City should require that projects with potential impacts on scenic corridors submit detailed visual analysis with development project applications. The analysis shall include graphic simulations and/or sections drawn from affected travel corridors and representing typical views from scenic routes. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.8-9. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Establishing scenic corridor policies will insure that the visual experienceof travelers along scenic routes be maintained as much as possible. Requiring visual analyses will allow the City to specifi- cally review development projects for their visual impacts and to review how locations of structures and associated landscaping can be used to adjust the project design to minimize its visual impacts from scenic routes. Section 3.9 -- Cultural Resources IMPACT 3.9/A. Disruption or Destruction of Identified PrehistoriciResources. Due to the level of development proposed in the RPA, iit is assumed that all prehistoric sites identified in the 1988!:inventory will be disturbed or altered in some manner. DEIR page 3.9-6. Mitigation Measures 3.9/1.0 to 4.0. Develop a testing program to determine the presence or absence of hidden deposits in all locations of prehistoric resources. All locations containing these components shall be recorded with the State of California and their borders will be staked so that professional survey teams may develop accurate location maps. If any of these recorded and mapped locations are affected by future construction or increased access to the areas, evaluative testing, consisting of collecting and 114 \eastdub\find ( 4 ) 56 analyzing any surface concentration of materials, shall be undertaken in order to prepare responsive mitigation measures. The City shall hire a qualified archaeologist to develop a protection program for prehistoric sites con- taining significant surface or subsurface deposits of cultural materials in areas where development will alter the current condition of the resource. DEIR page 3.9-6 to -7. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Through these mitigations, prehistoric resources can be identified and mapped, and specific mitigation plans prepared as part of review of development projects that will affect the resources. IMPACT 3.9/B. Disruption or Destruction of Unidentified Pre- Historic Resources. Previously unidentified pre-historic resources may exist in the RPA and would be subject to potential disruption or destruction by construction and development activities associated with the Project. DEIR page 3.9-7. Mitigation Measures 3.9/5.0 to 6.0. Pursuant to Specific Plan Policy 6-25, and Action Program 6P,, cease any grading or construction activity if historic or prehistoric remains are discovered until the significance and extent of those remains can be ascertained by a certified archaeologist. Development projects in the RPA shall prepare an archaeolo- gical site sensitivity determination and detailed research and field reconnaissance by a certified archaeologist, and develop a mitigation plan. (*Specific Plan provisions adopted throughout RPA.) DEIR page 3.9-7. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. These mitigations will insure that any significant prehistoric resources which are discovered during~.~development activities are not disrupted or destroyed. IMPACT 3.9/C. Disruption or Destruction of Identified Historic Resources. .=~Due to the level of development proposed in the RPA, it is assumed that all historic sites identified in the 1988 inventory will be disturbed or altered in some manner. Even cultural resources in the proposed Open Space and Rural Residen- tial areas will potentially be disturbed or altered due to the presence of new residential population in the area. DEIR page 3.9-8. 114 \eastdub\ find ( 4 ) 57 Mitigation Measures 3.9/7.0 to 12.0. Pursuant to Specific Plan Policies 6-26, and 6-27* and other mitigations identified in the EIR, all properties with historic resources and all standing structural remains shall be evaluated by an architectural historian as part of in-depth archival research to determine the significance of the resource prior to any alteration. All historic locations in the 1988 inventory shall be recorded on official State of California historical site inventory forms. These records should~'~be used to make sure that historical locations are recorded onto development maps by professional surveyors. Where the disruption of historical resources is unavoidable, encourage the adaptive reuse or restoration of the struc- tures whenever feasible. A qualified architectural historian shall be hired to develop a preservation program for historic sites found to be significant under Appendix K of the CEQA guidelines. (,Specific Plan provisions adopted throughout RPA.) DEIR page 3.9-8. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Archival research and recordation of historical sites on state inventory forms will insure that historical resources are identified throughout the Project area. ~Encouraging adaptive reuse or restoration of historic structures and development of a preservation program for historic sites will insure that identified resources are not disturbed or destroyed. IMPACT 3.9/D. Disruption or Destruction of Unidentified Historic Resources. Previously unidentified historic resources may exist in the RPA and would be subject to potential disruption or destruction by construction and development activities associated with the Project. DEIR page 3.9-8. Mitigation Measures 3.9/5.0 to 7.0, 9.0, 10.0, and 12.0. These previously identified mitigation measures will be used to ascertain the presence of unidentified historic resources on a development project site in the RPA. If a historic resource is identified, archival research shall be performed to determine the significance of the resource or structure. The City shall hire a qualified architectural historian to develop a preservation program for significant historic sites. z! DEIR page 3.9-7 to -9. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen' the significant effect identified in the Final EIR. 114 \ea stdub\find ( 4 ) 5 8 Rationale for Finding. Mitigations will ensure that any significant historic resources which are discovered during development activities are not disrupted or destroyed. Section 3.10 -- Noise IMPACT 3.10/A. Exposure of Proposed Housing to Future Roadway Noise. Proposed residential housing along Dublin Boulevard, Tassajara Road, Fallon Road, and Hacienda Drive will be exposed to future noise levels in excess of 60 dB CNEL. DEIR page 3.10- 2. Mitigation Measure 3.10/1.0. Require acoustical studies for all residential development projects within the future CNEL 60 contour to show how interior noise levels will be reduced to 45 dB. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lesseni. the significant effect identified in the Final EIR. Rationale for Finding. The required acoustical studies must show how interior noise exposures are reduced to 45 dB CNEL, the minimum acceptable noise level. IMPACT 3.10/B. Exposure of Existing Residences to Future Roadway Noise. Increased traffic noise on local roads would. result in significant cumulative noise level increases along Tassajara .(4 dB), Fallon (6dB), and Hacienda Roads of 6 dB. This is a potentially significant cumulative impact in that small indivi- dual Project noise increases considered together and over the long term, will substantially increase overall noise levels. DEIR page 3~i10-3, 5.0-13. Mitigation Measures 3.10/2.0. All development projects in the RPA shall provide noise barriers or berms near existing residences to control noise in outdoor use spaces. DEIR page 3:10-3. Mitigation Measure 3.10/7.0. To mitigate cumulative noise impacts, the City shall develop a noise mitigation fee to pay for on- and off-site noise mitigations, including but not limited to, noise barriers, earthen berms, or retrofitting structures with sound-rated windows. DEIR page 5.0-13. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. 114 \ea stdub\fj~:nd ( 4 ) 59 Rationale for Finding. Providing noise barriers or berms will reduce noise exposure for existing residences; however, mitigation may not be feasible at all locations because of site constraints such as driveways and proximity to road- ways. Furthermore, while developers will provide funding for noise mitigations to reduce overall noise levels, funds derived from the experimental program may not adequately mitigate the cumulative impact. Therefore, this noise impact cannot be fully mitigated. IMPACT 3.10/D. Exposure of Proposed Residential Development to Noise from Future Military Training Activities at Parks Reserve Forces Training Area (Camp Parks RFTA) and the County Jail. Residential development on the Project site within 6000 feet of Camp Parks RFTA and the County Jail could be exposed to noise impacts from gunshots and helicopter overflights. DEIR page 3.10-4. Mitigation Measure 3.10/3.0. The City shall require an acoustical study prior to future development in the Foothill Residential, Tassajara Village Center, County Center, and Hacienda Gateway subareas (as defined in Figure 4.2 of the Specific Plan) to determine whether future noise impacts from Camp Parks and the county jail will be within accept- able limits. This study should identify and evaluate all potential noise generating operations. DEIR page 3.10-4. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. The required acoustical study will identify noise sensitive areas in the Project site and noise generating operations at Camp Parks and the jail and will propose mitigation to reduce noise impacts to acceptable limits. However, mitigation may not be possible at all critical locations, so the impact may not be fully mitigated. IMPACT 3.10jE. Exposure of Existing and Proposed Residences to Construction Noise. Construction would occur over years on the Project site and will be accompanied by noise from truck activity on local roads, heavy equipment used in grading and paving, impact noises during structural framing, and pile driving. Construction impacts will be most severe near existing residen- tial uses along Tassajara Road and near existing uses in the southern portion of the Project area. DEIR page 3.10-4. 114 \ea stdub \ find ( 4 ) 60 Mitigation Measures 3.10/4.0 to 5.0. Development projects in the RPA shall submit a Construction Noise Management Program that identifies measures proposed to minimize construction noise impacts on existing residents. The Program shall include a schedule for grading and other major noise-generating activities, limiting these activities to the shortest possible number of days. Other noise mitigation measures include, but are not limited to, restricting hours of construction activity, developing construction vehicle access routes which minimize truck traffic through residential areas, and developing a mitigation plan for construction traffic that cannot be avoided in residential areas. In addition, all development- related operations should comply with local noise standards, including limiting activity to daytime hours, muffling stationary equipment, and locating that equipment as far away from sensitive receptors as possible. DEIR page 3.10- 4 to -5. Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. Through these mitigation measures, developers will limit the intensity and duration of noise exposure experienced by existing residences in~construction areas. Other mitigations will limit noise exposure by moving the noise-generating equipment as far away from residential uses as possible. IMPACT 3.10/F. Noise Conflicts due to the Adjacency of Diverse Land Uses Permitted by Plan Policies Supporting Mixed-Use Development.i The presence of different land use types within the same development creates the possibility of noise impacts between adjoining uses, particularly when commercial and residential land uses abut. =DEIR page 3.10-5. Mitigation Measure 3.10/6.0. Development projects in the RPA shall prepare noise management plans to be reviewed as part of the development application for all mixed use projects involving residential uses and non-residential uses. To be prepared by a qualified acoustical consultant, the plan should aim to provide a high quality acoustic environment for residential and non-residential users and should propose steps to minimize or avoid potential noise problems. The plan should address the concerns of resi- dents, non-residential users, and maintenance personnel, and should make maximum use.of site planning to avoid noise conflicts. DEIR page 3.10-5 to -6. i 114 \ea stdub \ find ( 4 ) 61 Finding. Changes or alterations have been required in, or incorporated into, the Project that avoid or substantially lessen the significant effect identified in the Final EIR. Rationale for Finding. The required noise management plans allow both the developer and the City to anticipate possible noise conflicts in mixed-use developments and to propose specific measures to address the specific conflicts identi- fied. ~Occurring at an early stage in the process and reviewed with the development application, projects can make use ofthe greatest array of conflict reducing techniques, including building design and site planning. Compliance with these mitigations will lessen or avoid potential noise conflicts from adjacent mixed uses. IMPACT 3.11/A. Dust Deposition Soiling Nuisance from Construction Activity. Clearing, grading, excavation, and unpaved roadway travel related to project construction will generate particulate matter which may settle out near the construction sites, creating a soiling nuisance. Any additional dust pollution will worsen the air basin's non-attainment status for particulates. Dust emissions is therefore also a potentially significant cumulative impact. DEIR page 3.11-3, 5.0-13. Mitigation Measure 3.11/1.0. Require development projects in the Project area to implement dust control.measures, including but not limited to, watering construction sites, cleaning up mud and dust carried by construction vehicles, effective covers on haul trucks, planting, repaying, and other revegetation measures on exposed soil surfaces, avoiding unnecessary idling of construction equipment, limiting on-site vehicle speeds, and monitoring particulate matter=~levels. These measures will reduce project dust deposition to acceptable levels, but will not avoid cumulative impacts of dust generation. DEIR page 3.11-3 to -4, 5.0-13. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, cumulative dust generation impacts will not be substantially avoided. Therefore, a Statement of Overriding Considerations must be adopted upon approval of the Project. Rationale for Finding. The mitigation measures identify various feasible and reasonable dust control measures that .developers can take during construction activity. These measures eliminate and/or minimize the amount and effect of dust deposition in construction areas. Even with these measures, however, some small amount of additional pollution will occur. Therefore, the cumulative impacts of dust emissions cannot be fully mitigated. 114 \eastdub\ find ( 4 ) 6 2 IMPACT 3.11/B. Construction Equipment/Vehicle Emissions. Construction equipment operation generates daily exhaust emissions. Normally considered a temporary impact, buildout of the Project area over the long term will be a chronic source of equipment/vehicle emissions. This is also a potentially signifi- cant cumulative impact due to the non-attainment status of the air basin. DEIR page 3.11-4, 5.0-13. Mitigation Measures 3.11/2.0 to 4.0. Minimize construction interference with regional non-Project traffic movement by scheduling and routing construction traffic to non-peak times and locations. Provide ride-sharing incentives for construction personnel. Require routine low-emission tune- ups for on-site equipment. Require development projects in the Project area to prepare a Construction Impact Reduction Plan incorporating all proposed air quality mitigation strategies with clearly defined responsibilities for plan implementation and supervision. DEIR page 3.11-4, 5.0-13. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. The mitigations include construction timing and siting measures that will reduce equipment and vehicle emissions over the long-term buildout of the Project. Even with these mitigations, however, neither Project nor cumulative air quality impacts canbe fully mitigated. IMPACT 3.11/C. Mobile Source Emissions: ROG or NOx. Project implementation at full buildout will generate 500,000 daily automobile trips within the air basin. Mobile source emissions for ROG and.NOx associated with these vehicle trips are precursors to ozone formation. The emissions associated with this level Of vehicle use will far exceed BAAQMD thresholds for significant4ieffect. This is also a potentially significant cumulative impact. DEIR page 3.11-5, 5.0-14. Mitigation Measures 3.11/5.0 to 11.0. Exercise interagency cooperation on a subregional and regional basis to integrate local air quality planning efforts with transportation, transit and other infrastructure plans. Implement techni- ques, such as transportation demand management (TDM), shifting travel to non-peak periods, and encouraging mixed- use development which provides housing, jobs, goods and services in close proximity as a means of reducing vehicle trips and related emissions and congestion. At the development Project level, maintain consistency between 114 \eastdub\find ( 4 ) 63 specific development plans and regional transportation and growth management plans, coordinate levels of growth with roadway transportation facilities and improvements, and require linkage between housing growth and job opportunities to achieve a positive subregional jobs/housing balance. DEIR page 3.11-5, 5.0-14. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. The various techniques described in the mitigation measures provide opportunities to reduce vehicle trips, and therefore reduce vehicle emissions. However, because of the size of this Project, neither Project nor cumulative impacts can be fully mitigated. IMPACT 3.11/E. Stationary Source Emissions. Specific Plan buildout will create emissions from a variety of sources, including but not limited to, fuel combustion in power plants, evaporative emissions from paints, and subsurface decay of organic materials associated with solid waste disposal. This is also a potentially significant cumulative impact. DEIR page 3.11-6, 5.0.14. Mitigation Measures 3.11/12.0 to 13.0. Minimize stationary sourceSemissions associated with Project development where feasible, with the goal of achieving 10 percent above the minimum conservation target levels established in Title 24 of the California Code of Regulations. Include solid waste recycling in all development planning. DEIR page 3.11-6, 5.0-14. Finding. Changes or alterations have been required in, or incorporated into the Project. However, even with these changes, the impact will not be avoided or substantially lessened. Therefore, a Statement of Overriding Considera- tions must be adopted upon approval of the Project. Rationale for Finding. Focusing on reducing emissions from various sources will allow an incremental reduction in stationary source emissions. These reductions will not, however, be sufficient to avoid either Project-related or cumulative impacts. 114\eastdub\find(4) 64 Section 2 ENVIRONMENTALLY INSIGNIFICANT IMPACTS The City Council finds that all other impacts of the proposed Project are not environmentally significant as documented in the FEIR and supported by evidence elsewhere in the record. No mitigation is required for these insignificant impacts. 114 \eastdub\find ( 4 ) 6 5 Section 3 FINDINGS CONCERNING ALTERNATIVES The City Council is adopting Alternative 2 (with minor changes) described in the Final EIR in place of the originally proposed Project. The City hereby finds the remaining three alternatives identified and described in the Final EIR were considered and are found to be infeasible for the specific economic, social, or other considerations set forth below pursuant to CEQA Section 21081, subdivision (c). The City also declines to adopt the Project as originally proposed for the reasons set forth below. THE ORIGINALLY PROPOSED PROJECT. Section 21081, subdivision (c) does not require the City Council to make findings as to why the originally proposed Project was not adopted. Such findings need only be made as to project alternatives which would mitigate significant environmental effects. Alternative 2 has no significant environmental effects which could be avoided by adopting the originally proposed project in its stead. Rather, the City Council finds that Alternative 2 will pose no significant environmental effects that would not be posed at least to the same extent (and often to a greater extent) by the Project as originally proposed. Public=Resources Code section 21085 prohibits public agencies from reducing the proposed number of housing units as a project alternative pursuant to CEQA for a particular significant affect on the environment if it determines that there is another feasible specific mitigation measure or project alternative that would provide a comparable level of mitigation. The Project as adopted does indeed involve a reduction of the number of housing units than were originally proposed, both because the Project as adopted does not provide for residential development in the Livermore Municipal Airport Protection Zone and because the Project as adopted only involves residential development approximately two-thirds of the area originally proposed for development. Moreover, these reductions dQ result in mitigation of some significant environmental impacts, especially impacts on Doolan Canyon. The prohibition of residential development within the Livermore Municipal Airport Protection Zone is adopted in order to comply with Public Utilities Code section 21676 and the decision of'the Alameda County Airport Land Use Commission pursuant to that action to prohibit residential development in 114 \ea stdub \ find ( 4 ) 6 6 the Zone. This prohibition is, thus, not adopted merely as a mitigation measure pursuant to CEQA. The City also finds that no feasible alternatives or mitigation measures will provide the level of mitigation of significant environmental effects as are provided by the adoption of Alternative 2 rather than the project as originally proposed. Alternative 2 will leave Doolan Canyon in its current largely undeveloped state, thereby mitigating significant impacts involving loss of open space, and biologically sensitive habitat in a way that could not be accomplished by any mitigation measure or alternative were Doolan Canyon in fact developed as originally proposed. ALTERNATIVE 1: NO PROJECT. DEIR pages 4-1 to 4-8, 4-20 Finding: Infeasible. This option assumes the Project as proposed would not be built on the site; instead any development would be pursuant to!the existing general plan. Under that plan, a limited amount of business park/industrial development could occur on the 600 acre County property and on the 200 acre portion of the Project area south of the proposed Dublin Boulevard extension. The No Project Alternative is found to be infeasible because the City's General Plan has designated the Eastern Dublin area for planned development, subject to the preparation of a Specifi6 Plan. In addition, the No Project Alternative fails to provide needed housing. The need for housing is documented in the Housing Element of the City's General Plan, and in other plan documents of the City and other jurisdictions in the area. ALTERNATIVE 3: REDUCED LAND USE INTENSITIES. DEIR pages 4-14 to 4-19 Finding: Infeasible. This option assumes development of both the Specific Plan and the General Plan Amendment except that 285 acres of higher traffic generating commercial uses will be replaced with lower traffic generating residential uses. The Reduced Land Use Intensities alternative is found to be infeasible for the following reasons: (1) Airport Safety. This alternative will increase the number of housing units within the Livermore Municipal Airport Protection Zone. (p. 4-15). (2) Unavoidable impacts. Even with the reduced intensities of this alternative, all the unavoidable impacts identified for the Project would remain except traffic impacts at 1-580, I- 680/Hacienda, at 1-580, Tassajara/Airway, at Airway 114\eastdub\find(4) 67 Boulevard/Dublin Boulevard and cumulative traffic impacts on Dublin Boulevard (Impacts 3.3/B, C, J, and M). DEIR Page 4- 15. (3) Fiscal impacts. This alternative may have potentially significant fiscal impacts on the City budget's cost/revenue balance by reducing commercial development which generally generates less service costs and more property tax revenues than housing. These potential impacts can be mitigated. However, any mitigating revenues raised would have to be shared mitigation for capital facilities, possibly reducing the amount of revenue available for both the budget and capital facility programs. (page 4-19, 3.12-2 to -4). ALTERNATIVE 4: NO DEVELOPMENT. DEIR page 4-19 Finding: Infeasible. This alternative assumes no development of the Project site beyond existing conditions, assumes no annexa- tion and therefore no application of even the current General Plan. The No Development alternative is found to be infeasible because the City's General Plan has designated the Eastern Dublin area for planned development, subject to the preparation of a Specific Plan. In addition, the No Development Alternative fails to provide needed housing. The need for housing is documented in the Housing Element of the City's General Plan, and in other plan documents of the City and other jurisdictions in the area. (page 4-19 to -20). ll4\eastdub~find(4) 68 Section 4 STATEMENT OF OVERRIDING CONSIDERATIONS 1, General. Pursuant to CEQA Guidelines section 15093, the City Council of the City of Dublin makes the following Statement of Overriding Considerations. The City Council has balanced the benefits of the eastern Dublin Project to the City of Dublin against the adverse impacts identified in the EIR as significant and potentially significant which have not been eliminated or mitigated to a level of insignificance. The City Council, acting pursuant to CEQA Guidelines Section 15093, hereby determines that the benefits of the Project outweigh the unmitigated adverse impacts and the Project should be approved. The City Council has carefully considered each impact in reaching its decision to adopt the Project and to allow urbanization of the easterniDublin Project area. Although the City Council believes that many of the unavoidable environmental effects identified in the EIR will be substantially lessened by mitiga- tion measures incorporated into the General Plan Amendment, Specific Plan, and future development plans as well as future mitigation measures implemented with future approvals, it recognizes that the implementation of the Project carries with it unavoidable adverse environmental effects. The City Council specifically finds that to the extent that the identified adverse or potentially adverse impacts have not been mitigated to acceptable levels, there are specific economic, social, environmental, land use, and other considerations which support approval of the Project. The City Council further finds that any one of the overriding considerations identified herein- after in subsection 3 is sufficient basis to approve the Project as mitigated. 2. Unavoidable Significant Adverse Impacts The following unavoidable significant environmental impacts are associated with the proposed Project as identified in the Final Environmental Impact Report for the Project, which consists of a Draft Environmental Impact Report, Parts I and II (Appendix), dated August 28, 1992; Comments and Response to Comments, dated 114 \eastdub \ find ( 4 ) 69 December 7 and December 21, 1992; letter of December 15, 1992 from DKS Associates to Laurence Tong; and the Addendum to draft EIR dated May 4, 1993. These impacts cannot be fully mitigated by changes or alterations to the Project. Land Use Impact 3.1/F. Cumulative Loss of Agricultural and Open Space Lands. Even with mitigation, the Project would still result in the loss of a large area of open space. This loss is cumulatively significant, given the loss of numerous other. areas of open space in the area. No feasible mitigation measures are available to reduce this impact to a level of insignificance. The only PrOject alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative, both of which have been found to be infeasible (see Section 3 above). RC #34-9. Traffic and Circulation Impact 3.3/B: 1-580 Freeway, 1-680- Hacienda. Even with mitigation, the Level of Service on 1-580 between 1-680 and Dougherty Road could exceed Level of Service E, the minimum acceptable level of service. No feasible mitigation measures are available to reduce this impact to a level of insignificance, since the freeway has already been widened to its maximum practical capacity. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see ~Section 3 above). (DEIR pages 3.3-21, 5.0-16). Traffic and!Circulation Impact 3.3/E: Cumulative Freeway Impacts. Even with mitigation, portions of 1-580 will operate at Level of Service F under the Cumulative Buildout with Project scenario. No feasible mitigation measures are available to reduce this impact to a level of insignificance. The only Project alternative which could reduce this impact to a level of insignificance is the No Development Alternative. This alternative has been found to be infeasible (see Section 3 above). (DEIR pages 3.3-22, 5.0-16) Traffic and Circulation Impact 3.3/I: Santa Rita Road and 1-580 Eastbound Ramps. Year 2010 development with the Project will cause Level of Service F operations at this intersection. No feasible mitigation measures are available to reduce this impact to a level of insignificance. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). (DEIR pages 3.3-26, 5.0-16) Traffic andS!Circulation Impact 3.3/M: Cumulative Impacts on Dublin Boulevard. Cumulative Buildout with the Project will cause Level=!of Service F operations at the Hacienda Drive intersection and Level of Service E operations at the Tassajara 114 \eastdub \ find ( 4 ) 7 0 Road intersection. No feasible mitigation measures are available to reduce this impact to a level of insignificance. Project alternatives which could reduce this impact to a level of insignificance are the Reduced Land Use Intensities Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). (DEIR pages 3.3- 27, 5.0-16). Community Services and Facilities Impact 3.4/0: Demand for Utility Extensions. The extension of gas, electric and telephone service lines onto the Project site is necessary for development and will require new distribution systems or substantial exten- sions of existing systems onto undeveloped lands currently in agricultural and open space uses. No feasible mitigation measures are available to reduce this growth inducing impact to a level of insignificance. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). (DEIR pages 3.4-24, 5.0-16). Community Services and Facilities Impact 3.4/S: Consumption of Non-Renewable Natural Resources. Natural Gas and electrical service would increase consumption of non-renewable natural resources. Requiring energy conservation plans provides partial mitigation. However, because energy use will still increase, the impact cannot be reduced to a level of insignificance. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). DEIR page 3.4-25. Sewer, Water, and Storm Drainage Impact 3.5/F,H,U: Increases in EnerGy Usage Through Increased Water Treatment and Disposal and Thorough Operation of the Water Distribution System. Increased Wastewater Flows to and from the Project will require increased energy. Using energy efficient water distribution treatment, and disposal systems provides partial mitigation. However, because energy use will still increase, the impact cannot be reduced to a level of insignificance. Project alternatives which could reduce this impacti~to a level of insignificance are the No Project Alternativei~and the No Development Alternative. These alterna- tives have keen found to be infeasible (see Section 3 above). DEIR pages 3.5-8 to -10. Sewer, Water and Storm Drainage Impact 3.5/T: Inducement of Substantial=i~Growth and Concentration of Population. The proposed water distribution system will induce significant growth in the Project area. No feasible mitigations are available to reduce this impact to a level of insignificance. The only Project alternatives which could reduce this impact to a level of ll4\eastdub\find(4) 71 insignificance are the No Project alternative and the No Development~i~alternative. These alternatives have been found to be infeasible (see Section 3 above). (DEIR, pages 3.5-20, 5.0- 15). !. Soils, Geology, and Seismicity Impact 3.6/B: Earthquake Ground Shaking, Primary Effects. Development of the RPA will expose more residents to the risk of potentially large earthquakes on active fault zones in the region, which could result in damage to structures and infrastructure and, in extreme cases, loss of life. Using modern seismic design for resistance to lateral force in construction of development projects, and building in accordance with the Uniform Building Code and applicable local code requirements will partially mitigate this impact. However, the impact cannot be reduced to a level of insignificance. The only Project alternative which could reduce this impact to a level of insignificance is the No Development alternative. This alternative has been found to be infeasible (see Section 3 above). (DEIR page 3.6-7.) Biological Resources Impact 3.7/C: Loss or Degradation of Botanically~Sensitive Habitat. Development of the RPA will result in a=significant loss and degradation of biologically sensitive habitat. As described in section 1, mitigation measures will partially reduce this impact. However, because biologically sensitive habitat will still be lost, the impact cannot be reduced to a level of insignificance. The only Project alternative which could reduce this impact to a level of insignificance is the No Development alternative. This alternative has been found to be infeasible (see Section 3 above). (DEIR pages 3.7-10, 5.0-11). Visual Impacts 3.8/B: Alteration of Rural/Open Space Visual Character and 3.8/F: Alteration of Visual Character of Flatlands. Project development will permanently alter the existing rural, agricultural character of the Project area. Although the highest ridgelines will be preserved as open space, the visual character of the rounded lower foothills along 1-580 will be altered by construction of homes and roads. No feasible mitigations are available tO reduce these visual impacts to a level of insignifi- cance. The~only Project alternative which could reduce these impacts to a level of insignificance is the No Development alternative.. This alternative has been found to be infeasible (see Section 3 above). (pages 3.8-5, -7, 5.0-17). Noise Impact 3.10/B: Exposure of Existing Residences to Future Roadway Noise. Increased traffic on area roadways will significantly increase noise levels, thus adversely affecting existing residences and population. Mitigation can be achieved to buffer residents from levels that exceed acceptable standards, by providing berms or walls adjacent to outdoor use spaces of ll4\eastdub\find(4) 72 existing residences. However, the magnitude of change in the noise environment, from quiet rural roads with little traffic to busy suburban thoroughfares, cannot be avoided. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). (DEIR pages 3.10-3 to 4, 5.0-16). Noise Impact 3.10/D: Exposure of Proposed Residential Development to Noise from Future Military Training Activities at Camp Parks and from the County Jail. Residential development in the Specific Plan area would be within 6000 feet of Camp Parks and the County Jail and could be exposed to noise from gunshots and helicopter overflight. Mitigations calling for noise studies may not be feasible at all locations; therefore this impact might not be reduced to a level of insignificance. Project alternatives which could reduce this impact to a level of insignificance are the No Project Alternative and the No Development Alternative. These alternatives have been found to be infeasible (see Section 3 above). (page 3.10-4, 5.0-16). Air Oualityii=Impacts 3.11/A,B,C,E. Project development will have a potentially significant cumulative impact on air quality as a result of dust deposition, construction equipment emissions, mobile source emissions of ROf and NOx, and stationary source emissions. While some measures have been adopted to partially mitigate these impacts, the impacts remain potentially signifi- cant, especially given the region's existing non-compliance with air quality standards. The only Project alternative which could reduce these impacts to a level of insignificance is the No Development alternative. This alternative has been found to be infeasible (see Section 3 above). (DEIR pages 3.11-3 through - 6, 5.0-13 through -16.) 3. overriding Considerations The City Council has considered the public record of proceedings on the proposed Project and does determine that approval and implementation of the Project would result in the following substantialpublic benefits. Economic Considerations. Substantial evidence is included in the record demonstrating the economic benefits which the City would derive from implementation of the Project. Specifically, the Project will result in: The creation of about 28,200 new jobs in the Specific Plan area alone, and a substantial number of construction jobs. b. Increases in sales revenues for the City. l14\eastdub\find ( 4 ) 73 c. Substantial increases in property tax revenues. Social Considerations. Substantial evidence exists in the record demonstrating the social benefits which the City would derive from the implementation of the Project. Specifically, the Project will result in: Increases in housing opportunities in the City and in a region where housing is costly and in short supply. Increases in the amount of affordable housing in the community. An arrangement for the City to contribute its fair share of regional housing opportunities. d. Provision of upper-end executive housing in the City. Other Considerations. Substantial evidence exists in the record demonstrating other public benefits which the City would derive from implementation of the Project. They include: Comprehensive planning incorporating innovative and extensive environmental premitigation measures not usually found in projects of this type. Designating substantial areas of land for Open. Space and low intensity Rural Residential uses. This includes a potential regional trail system link through the open space of the Project site. This open space will conserve the ecological values~of the site and surrounding areas and provide recreational and open space amenity opportunities for residents of the Project, the City, and the region. 3.4- 15, 3.7-15. 114 \eastdub\find ( 4 ) 7 4 MITIGATION MONITORING PLAN: EASTERN DUBLIN SPECIFIC PLAN/GENERAL PLAN AMENDMENT prepared by WALLACE ROBERTS & TODD May 7, 1993 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan MITIGATION MONITORING PLAN EASTERN DUBLIN SPECIFIC PLAN/GENERAL PLAN AMENDMENT The State of California now requires public agencies to adopt a mitigation monitoring program for changes to the project or conditions of approval which have been identified and adopted as methods to reduce environmental impacts. Thus with the certification of the Eastern Dublin EIR and adoption of the Specific Plan and General Plan Amendment, the City of Dublin is required to establish a mitigation monitoring program for all approved mitigation measures. In order to ensure that all adopted mitigation measures are implemented in a timely fashion, the Mitigation Monitoring Program provides the following information for each measure: Why has the mitigation measure been recommended? Who is responsible for implementing the mitigation? What is the mitigation measure being monitored and how? When should mitigation monitoring be undertaken? What schedule is required? Comoletion: when should the mitigation measure be in place and monitoring be completed? Verification: what agency is required to ensure that the mitigation measure was implemented? 2 City of Dublin May 7, 1993 ,Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan SECTION 3:1 LAND USE 1. Imoacts Reauirin~ Mitieation This section identifies the following impacts requiring mitigation: IM 3.1/G Potential Conflicts with Land Uses to the West 2. MitiRation Imolementation and Monitoring Pronram Impact 3.1/G Potential Conflicts with Land Uses to the West Miti~,ation Measure 3.1/1.0: Coordination of Planning, Activities with U.S. Army Why: Who: What: When: Completion: Verification: To resolve potential land use conflicts between activities at Camp Parks and proposed uses in the Project area Planning Department/U.S. Army; Directorate of Engineering and Housing. Establish a liaison committee between the City and the Army. Establish a schedule for periodic meetings to discuss and provide updates on planning and development efforts within the Project site and in Camp Parks. The City of Dublin Planning Department will send to the base commander a copy of new applications for development adjacent to Camp Parks for review and comment. Projects will be considered by liaison committee at request of Camp Parks. Periodically, pursuant to agreed-upon calendar, and as required for review of specific project proposals. On-going. Specific project review will be considered complete when City has received written comments from Camp Parks. City of Dublin Planning Director. SECTION 3.2: POPULATION. HOUSING AND EMPLOYMENT This section provides baseline data related to population, housing and employment and does not identify environmental impacts or related mitigation measures. No mitigation monitoring program is required. SECTION 3.3: TRAFFIC AND CIRCULATION 1. Imnacts Requirin~ Mitigation This section identifies the following impacts requiring mitigation: IM 3.1/G IM 3.3/B IM 3.3/C IM 3.3/D IM 3.3/E IM 3.3/F IM 3.3/G IM 3.3/H Potential Conflicts with Land Uses to the West 1-580 Freeway; between 1-680 and Hacienda 1-580 Freeway; between Tassajara-Fallon-Airway 1-680 Freeway; North of the 1-580 Interchange Cumulative Freeway Impacts (I-580 west of 1-680; 1-580 east of Airway) Dougherty Road and Dublin Boulevard Hacienda Drive and 1-580 Eastbound Ramps Tassajara Road and 1-580 Westbound Ramps Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan City of Dublin May 7, 1993 IM 3.3/I Santa Rita Road & 1-580 Eastbound Ramps IM 3.3/J Airway Boulevard and Dublin Boulevard IM 3.3/K Airway Boulevard & 1-580 Westbound Ramps IM 3.3/L Impediments to Truck Traffic on E1 Charro Road IM 3.3/M Cumulative Impacts on Dublin Boulevard (Dublin/Hacienda; Dublin/Tassajara) IM 3.3/N Cumulative Impacts on Tassajara Road (Tassajara/Fallon; Tassajara/Fallon; Tassajara/Transit Spine) IM 3.3/0 Transit Service Extensions IM 3.3/P Street Crossings 2. Mitigation Imnlementation and Monitorin~ Program Daily Traffic Volumes (Year 2010 With Project) Impact 3.3/B 1-580 Freeway; between 1-680 and Hacienda Mitigation Measure 3.3/2.0: Transvortation Systems Management ( TSM ) Why: Who: What: When: Completion: Verification: To reduce project-generated vehicle trips All non-residential projects with 50+ employees. Require compliance with BAAQMD Regulation 13 Transportation Control Measures Rule I to satisfaction of BAAQMD or City of Dublin (Public Works Department) Prior to occupancy Upon issuance of Planning Department sign-off on compliance City of Dublin Planning Director Mitigation Measure 3.3/2.1: Re~,ional Transvortation Miti~,ation Prod, rams Why: Who: What: When: Completion: Verification: To assist in the funding of improvements to regional transportation system All approved projects Proportionate monetary contribution to regional transportation mitigation programs as approved by the City of Dublin. As a condition of project approval. When applying for a permit, the applicant developer will be notified of this fee assessment. Payments shall be made prior to issuance of building permits City of Dublin Department of Public Works Impact 3.3/C 1-580 Freeway; between Tassajara-Fallon-Airway Miti~,ation Measure 3.3/3.0: Construction of Auxiliary Lanes Why: Who: What: When: To assist in the funding of the construction of auxiliary lanes on 1-580 between Tassajara and Airway boulevards Caltrans/City of Dublin Public Works Department. Payment of a regionally-assessed fee for all new development within the Project area as approved by the City of Dublin. As a condition of project approval. When applying for a permit, the applicant developer will be notified of this fee assessment. Dublin Specific Plan & GPA Mitigation Monitoring Plan City of Dublin May 7, 1993 Completion: Verification: Payments shall be made prior to issuance of building permits City of Dublin Department of Public Works Impact 3.3/D 1-680 Freeway; North of the 1-580 Interchange Mitigation Measure 3.3/4.0.' 1-580/1-680 Interchange Imvrovements Why: Who: What: When: Completion: Verification: To establish funding for construction of future 1-580/I-680 Interchange improvements. Caltrans/City of Dublin Public Works Department. Payment of a regionally-assessed fee for all new development within the Project area as approved by the City of Dublin. As a condition of project approval, the applicant developer will be notified of this fee assessment. Payments shall be'made prior to issuance of building permits City of Dublin Department of Public Works Daily Traffic Volumes (Cumulative Buildout with Project) Impact 3.3/E Cumulative Freeway Impacts Mitigation Measure 3.3/5.0.' Transvortation Systems Management r'TSM ) Why: Who: What: When: Completion: Verification: To establish funding for construction of auxiliary lanes on 1-580 east of Airway Boulevard All approved development projects in the Project area/City of Dublin. 1 ) Proportionate monetary contribution to regional transportation mitigation programs as approved by the City of Dublin. 2) City coordination with other local jurisdictions to require that all future development projects participate in regional transportation mitigation programs. 1) The contribution to regional improvements will be implemented as a condition of project approval. Applicants will be notified of this fee assessment. i ) Payments shall be made prior to issuance of building permits. 2) Coordination will be ongoing. 1) Fee payments will be verified by the City of Dublin Planning Department. 2) Coordination will be the responsibility of the Department of Public Works Peak Hour Intersection Operation (Year 2010 with Project) Impact 3.3/F Dougherty Road and Dublin Boulevard Mitigation Measure 3.3/6.0: Construction o( Additional Lanes Why: To ensure the funding and construction of improvements to the Dougherty Road/Dublin Blvd. intersection as needed Who: City of Dublin Department of Public Works/All approved projects. City of Dublin May 7, 1993 . Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan What: When: Completion: Verification: 1) Payment of fees towards the construction of additional lanes at the intersection of Dougherty Road and Dublin Boulevard. 2) Monitoring of the need for intersection improvements and coordination of their construction. 1) Fees will be collected as a condition of project approval. Applicants will be notified of fees. 2) Monitoring will be ongoing annually. 3) Construction will occur prior to intersection declining to LOS F. 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Monitoring of intersection level of service will be ongoing. 3) Construction will be complete with implementation of specific improvements or equivalent as identified in mitigation measure. 1 ) City of Dublin Planning Department will verify payment of fees. 2) Department of Public Works will be responsible for monitoring calculating fees and construction. Impact 3.3/G Hacienda Drive and 1-580 Eastbound Ramps Mitigation Measure 3.3/7.0: Widening of Eastbound O ff-Ramt~ Why: Who: What: When: Completion: Verification: To provide improvements that will prevent congestion on the eastbound off- ramps from 1-580 at Hacienda Drive. Caltrans/City of Pleasanton/City of Dublin Public Works/Project Applicants 1 ) Payment of fee towards widening. 2) Coordination of improvement with Caltrans and the City of Pleasanton. 1) Fees will be assessed as a condition of project approval. 2) Coordination will occur as needed prior to implementation of mitigation. 3) Construction will be underway prior to decline of level of service to unacceptable LOS E. 4) Monitoring and coordination will begin with development review processing. 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of widening described in mitigation measure. 1 ) City of Dublin Planning Department will verify payment of fees. 2) Department of Public Works will be responsible for calculating fees and coordination with other agencies. Impact 3.3/H Tassajara Road and 1-580 Westbound Ramps Mitigation Measure 3.3/8.0: Wideninz of 1-580 Westbound Ramt~s Why: Who: What: To fund and implement improvements necessary to ensure the efficient operation of the intersection of Tassajara Road with the 1-580 westbound ramps. Caltrans/Pleasanton and Dublin Departments of Public Works/Developers 1) Payment of fee to fund design and construction of improvements, including widening of the 1-580 westbound off-ramp and modification of northbound approach to provide additional turn and through lanes. 2) Monitoring of service levels and coordination of construction. City of Dublin May 7, 1993 Eas', .)ublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: 1) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will be begin with development review processing. 3) Construction will be underway prior to decline of level of service to unacceptable level (LOS E). 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of widening described in mitigation measure. 1) City of Dublin Planning Department will verify payment of fees. 2) Department of Public Works will be responsible for coordinating construction. Impact 3.3/1 Santa Rita Road & 1-580 Eastbound Ramps Mitigation Measure 3.3/9.0: Improvements to 1-580 Eastbound Rarnt;s Why: Who: What: When: Completion: Verification: To fund and implement improvements necessary to ensure adequate service levels on Santa Rita Road and 1-580 eastbound ramps. Caltrans/Pleasanton and Dublin Departments of Public Works/Developers 1) Payment of fee to fund design and construction of improvements; including widening of 1-580 eastbound off-ramps. 2) Monitoring of service levels and coordination of construction. 1 ) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will be begin with development review processing. 3) Widening of eastbound ramps will occur prior to decline of level of service to unacceptable level (LOS E). 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of widening described in mitigation measure. 1 ) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Pleasanton Department of Public Works and Caltrans. Impact 3.3/K Airway Boulevard & 1-580 Westbound Ramps Mitigation Measure 3.3/11.0: Widenin~ o[ Airway Boulevard Overcrossing, Why: Who: What: When: To fund and implement improvements necessary to ensure adequate service levels at the intersection of Airway Boulevard and the westbound ramps. City of Dublin/Caltrans/City of Livermore/Developers 1) Payment of fee to fund design and construction of improvements; including the widening or replacement of the Airway Blvd. overcrossing and the widening of the 1-580 westbound off-ramp. 2) Monitoring of service levels and coordination of construction. 1 ) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will be begin with development review process. 3) Improvements to ramps and overcrossing will occur prior to decline of City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: level of service to unacceptable level (LOS E). 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of improvements described in mitigation measure. 1 ) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Livermore Department of Public Works and Caltrans. Impact 3.3/L Impediments to Truck Traffic on El Charro Road Miti~,ation Measure 3.3/12.0: Provisions to Ensure Unimveded Truck Tra[fic Why: Who: What: When: Completion: Verification: To fund and implement improvements necessary to ensure unimpeded movement of trucks to and from the quarries on E1 Charro Road south of 1-580. City of Dublin/Caltrans/City of Pleasanton/Developers/City of Livermore 1) Payment of fees to fund design and construction of necessary improvements. 2) Monitoring of service levels and coordination of improvements with Caltrans and the City of Pleasanton Department of Public Works. 1 ) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will begin with development review processing. 3) Improvements will occur prior to decline of level of service to unacceptable level (LOS E). 1 ) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of improvements. 1) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Pleasanton Department of Public Works and Caltrans and City of Livermore. Impact 3.3/M Cumulative Impacts on Dublin Boulevard Mitization Measures 3.3/13.0: Maintain Adeauate Levels o{ Service at Intersections. Why: Who: What: When: To identify, fund and implement improvements that will maintain adequate service levels at the intersections Dublin Blvd with Hacienda Drive and Tassajara Road with buildout of cumulative projects. City of Dublin 1 ) The City of Dublin will participate in the regularly-scheduled meetings of the Congestion Management Agency and Tri-Valley Transportation Council to determine long-term mitigation measures for cumulative impacts on Dublin Boulevard. 2) Payment of fees to fund design and construction of necessary improvements. 3) Monitoring of service levels and coordination of improvements with Caltrans and the City of Pleasanton Department of Public Works. 1 ) Participation in the Tri-Valley Transportation Council is current and on- City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: going. 2) Fees will be assessed as a condition of project approval. 3) Monitoring and coordination will be begin with development review process and continue through to identification and construction of necessary improvements. 4) Construction will be underway prior to decline of level of service to unacceptable level (LOS E). 1 ) Participation in the Tri-Valley Transportation Council is on-going. 2) Payment of fees shall be made prior to issuance of building permits. 3) Mitigation will be complete with implementation of improvements. 1 ) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating Project area improvements resulting from regional growth. Impact 3.3/N Cumulative Impacts on Tassajara Road Miti~,ation Measure 3.3/14.0: Widening' of Tassa/ara Road to Six Lanes Why: Who: What: When: Completion: Verification: To reserve sufficient right-of-way along Tassajara Road to accommodate cumulative development of projects north of the Project area. City of Dublin Planning Department/City of Dublin Department Public Works. Reservation of sufficient right-of-way to accommodate six travel lanes on Tassajara Road. Reservation of right-of-way to be adopted prior to approval of tentative map. Dedication of right-of-way required prior to filing of Final maps for development projects adjacent to the Tassajara Road corridor. City of Dublin Planning Department. Impact 3.3/0 Transit Service Extensions Mitigation Measure 3.3/15.0: Provision of Transit Service to Meet LAVTA standards Why: Who: What: When: Completion: Verification: To extend transit service within 1/4 mile of 95% of the Project area population. City of Dublin Planning Department/Department of Public Works/LAVTA 1) Meetings between the City of Dublin and LAVTA to coordinate extension of bus service to the Project area. 2) Notification to LAVTA of development approvals involving potential for 100 or more employees or residents. 1) Initial meeting to review the plan and ultimate service needs should be held within one year of plan adoption to allow LAVTA to plan for future expansion. Thereafter, meetings should be held periodically at the request of either the City or LAVTA. On-going. City of Dublin Planning Department. City of Dublin May 7, 1993 Ea8 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.3/15.1.' Bus Service to Emtdovment Centers with 1004-Employees Why: Who: What: When: Completion: Verification: To provide transit service at a minimum frequency of one bus every 30 minutes during peak hours, to employment centers with 100 or more employees. City of Dublin Planning Department/Department of Public Works/LAVTA 1) Meetings between the City of Dublin and LAVTA to coordinate extension of bus service to employment centers. 2) Notification to LAVTA of development approvals involving potential for 100 or more employees. 1 ) Meetings should be held periodically at the request of either the City or LAVTA. On-going. City of Dublin Planning Department. Mitigation Measure 3.3/15.2: Monetary Contribution to Suvvort Transit Service Extensions Why: To provide funding in support of expansion of transit service to the Project area. Who: City of Dublin Planning Department/Department of Public Works/LAVTA/Developers What: Payment of fees or construction of capital improvements to support extension of transit service. When: Fees/improvements will be identified as a condition of project approval. Completion: Prior to approval of Final Map. Verification: City of Dublin Planning Department. Miti~,ation Measure 3.3/15.3.' Feeder Transit Service to the East Dublin/Pleasanton BART station Why: Who: What: When: Completion: Verification: To coordinate provision of feeder bus service to the planned BART stations from the Project area. City of Dublin Planning Departmeht/Department of Public Works/LAVTA/BART Meetings with BART and LAVTA to coordinate feeder transit service to BART. Initial meeting to review the plan and ultimate service needs should be held within one year of plan adoption to allow BART and LAVTA to plan for future expansion. Thereafter, meetings should be held periodically at the request of the City, BART, or LAVTA. On-going. City of Dublin Planning Department. Impact 3.3/P Street Crossings Mitigation Measure 3.3/16.0: Provision of a Class I bicvcle/vedestrian path Why: To provide a paved bicycle/pedestrian path along Tassajara Creek. Who: Developers in consultation with the City of Dublin Planning Department, 10 City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan What: When: Completion: Verification: Department of Public Works, and East Bay Regional Park District. Design and construction of a Class I bicycle/pedestrian path along Tassajara Creek. As a condition of approval for development projects adjacent to the Tassajara Creek corridor. Construction to occur prior to occupation of first phase of homes responsible for providing the path. City of Dublin Department of Public Works. Mitigation Measure 3.3/16.1: Signalized Bicycle/Pedestrian Intersections Why: Who: What: When: Completion: Verification: To provide for safe pedestrian/bicycle crossings of major arterial streets. Developers/Department of Public Works Locate pedestrian and bicycle crossings at signalized intersections. As a condition of project approval. Final approval of detailed improvement plans. Department of Public Works. SECTION 3.4: COMMUNITY SERVICES AND FACILITIES Prior to annroyal of nrezonin~.l. ImPacts RequirinR Mitigation This section identifies the following impacts requiring mitigation: IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM 3.4 IM IM IM IM IM IM /A Demand for Increased Police Services. /B Police Services Accessibility /C Demand for Increased Fire Services /D Fire Response to Outlying Areas /E Exposure to Wildlands Hazards /F Demand for New Classroom Space /G Demand for Junior High School Space /H Overcrowding of Schools /I Impact on School District Jurisdiction /J Financial Burden on School Districts /K Demand for Park Facilities /L Park Facilities Fiscal Impact /M Impact on Regional Trail System /N Impact on Open Space Connections /O Increased Solid Waste Production 3.4/P Impact on Solid Waste Disposal Facilities 3.4/Q Demand for Utility Extensions 3.4/R Utility Extension: Visual and Biological Impacts 3.4/S Consumption of Non-Renewable Natural Resources 3.4/T Demand for Increased Postal Service 3.4/U Demand for Increased Library Service 11 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan 2. Mitigation Imnlementation and Monitoring Program Police Services Impact 3.4/A Demand for Increased Police Services Impact 3.4/B Police Services Accessibility Mitigation Measure 3.4/1.0: Additional Personnel, Facilities and "Beats" Why: Who: What: When: Completion: Verification: To provide additional personnel, facilities, and procedures to police service standards. City of Dublin Police Department/Planning Department. 1 ) Police Department will hire and train new sworn and civilian staff, revise "beat" system to serve eastern Dublin, and estimate and schedule projected facility needs in eastern Dublin. 2) Planning Department to notify Police Department of development approvals to assist the Police Department in its annual budget formulation. On-going. Annually as part of the Police Department's planning and budgetary process. Chief of Police. Mitigation Measure 3.4/2.0: Coordination of exvansion of Police services Why: Who: What: When: Completion: Verification: To provide the Police Department information needed to adequately plan for expansion of services. Planning Department/City of Dublin Police Department. Notification to the Police Department of the timing of annexation and approved development. During processing of prezoning and annexation applications. Ongoing. Planning Department Mitigation Measure 3.4/3.0: Police Det~artment Review Why: Who: What: When: Completion: Verification: To provide for Police Department input into the design of proposed development. City of Dublin Police Department/Planning Department. Police Department review of proposed development plans for safety issues, and provide the Planning Department with recommendations for inclusion in the final plans. During development review process. Prior to final site plan approval. Chief of Police or representative. Mitigation Measure 3.4/4.0: Budgeting for Police Services Why: Who: To prepare a budget strategy to hire the required additional personnel and implement necessary changes in the "beat" system. City of Dublin/City of Dublin Police Department 12 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan What: When: Completion: Verification: 1) Police Department will estimate projected personnel and facility needs for eastern Dublin and develop a budget strategy to meet these needs. 2) Planning Department will notify Police Department of development approvals in order to assist the Police Department in its annual budget formulation. On-going. Annually as part of the Police Department's planning and budgetary process. Chief of Police. Mitigation Measure 3.4/5.0: Police Department Review Why: Who: What: When: Completion: Verification: To ensure Police Department review of proposed development for safety issues. City of Dublin Police Department/Planning Department. Police Department review of proposed development plans for safety issues. During development review process. Prior to final site plan approval. Chief of Police or representative. Fire Protection Impact 3.4/C Demand for Increased Fire Services Impact 3.4/D Fire Response to Outlying Areas Impact 3.4/E Exposure to Wildlands Hazards Mitigation Measure 3.4/6.0: Construction of New Fire Facilities Why: Who: What: When: Completion: Verification: To provide for the construction of new facilities coincident with new service demand in eastern Dublin. Developers/Dougherty Regional Fire Authority Design and Construction of New Facilities Condition of tentative map and/or development review approval Construction of fire station(s) will occur concurrently with new service demand not addressed by other agreements. DRFA/City Planning Department. Mitigation Measure 3.4/7.0: Funding of New Fire Facilities Why: Who: What: When: Completion: Verification: To establish appropriate funding mechanisms to cover up-front costs of capital improvements. City of Dublin City Manager's Office/DRFA. Establish funding mechanism for capital improvements. Condition of tentative map and/or development review approval Construction of fire station(s) will occur concurrently with new service demand not addressed by other agreements. City of Dublin City Manager responsible for establishing funding mechanisms; Planning Department responsible for verifying completion prior to project approval. 13 City of Dublin May 7, 199S Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.4/8.0: Sites for New Fire Facilities Why: Who: What: When: Completion: Verification: To ensure acquisition of sites for construction of new fire stations. City of Dublin Planning Department in consultation with DRFA. Identification and acquisition of sites for new fire stations. Condition of tentative map and/or development review approval Construction of fire station(s) will occur concurrently with new service demand not addressed by other agreements. City of Dublin Planning Department. Mitigation Measure 3.4/9.0: Fire Devartment Review Why: Who: What: When: Completion: Verification: To ensure DRFA input on project design relating to access, water pressure, fire safety and prevention. DRFA/City of Dublin Planning Department. Review of proposed developments by DRFA for fire safety. Incorporation of DRFA recommendations into project conditions by Planning Department. During development review process. Prior to development review and/or Final Map approval. Fire Chief or representative to provide recommendations; Planning Department to verify incorporation of DRFA recommendations as conditions of project approval. Mitigation Measure 3.4/10.0: Urban/Oven Space Interface Management Why: Who: What: When: Completion: Verification: To ensure that a mechanism is in place to provide long-term maintenance for the urban/open space interface. Developers/DRFA/City of Dublin Planning Department. Establishment of an assessment district or other suitable mechanism to maintain safe fire conditions along the urban/open space interface. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Mitigation Measure 3.4/11.0: Fire Trails/Olden Svace System Why: Who: What: When: Completion: Verification: To integrate fire trails and fire breaks into the open space trail system. City of Dublin Planning Department/City of Dublin Recreation Department/DFRA/Developers. Design and dedication of fire trails and fire breaks. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Mitigation Measure 3.4/12.0: Wildfire Management Plan Why: To prepare a wildfire management plan for the Project area in order to 14 City of Dublin May 7, 1993 Eas~ Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Who: What: When: Completion: Verification: reduce the risk of impact related to wildland fire. City of Dublin/DRFA. Prepare a wildfire management plan. During prezoning and annexation application processing. Prior to approval of any development in lands adjacent to land designated for permanent open space or rural residential/agriculture. City of Dublin Planning Department. Mitigation Measure 3.4/13.0 Sites for Fire Facilities for the GPA Increment Why: Who: What: When: Completion: Verification: To determine the number, location and timing of additional fire stations for areas within the Project area yet outside the Specific Plan area. DRFA/City of Dublin Planning Department. Identification of future fire station sites. During prezoning and annexation application processing. Prior to development approvals in the areas outside the Specific Plan area. City of Dublin Planning Department. Schools Impact 3.4/F Impact 3.4/G Demand for New Classroom Space Demand for Junior High School Space Miti~,ation Measure 3.4/13.0: Dedication of New School Sites Why: Who: What: When: Completion: Verification: To reserve school sites within the Project area as designated in the Specific Plan and GPA. Developers/City of Dublin Planning Department/DUSD/LVJUSD Identification of new school sites. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Mitigation Measure 3.4/14.0: Plannin~ for Additional Junior Hieh School Cavacitv Why: Who: What: When: Completion: Verification: To ensure that adequate capacity is provided for junior high school age students. DUSD. Planning for projected junior high school demand within two proposed sites and/or provide for a third site in the Future Study Area to the east of the Project area. During planning and design of the first Junior High School site. Prior to final map approval for the first junior high school. City of Dublin/DUSD. 15 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan IM 3.4/H Overcrowding of Schools Mitigation Measure 3.4/15.0: Provision of Adeauate Schools to Serve the Pro iect site Why: Who: What: When: Completion: Verification: To ensure that adequate classroom space is provided prior to the development of new homes. DUSD/City of Dublin Planning Department. l) Coordination between City of Dublin and DUSD to monitor available school capacity and proposed development. 2) DUSD sign-off on available capacity to accommodate new development. Coordination to occur during development review process, with written sign-off from DUSD submitted prior to tentative map approval. Prior to occupancy approval. City of Dublin Planning Department. Impact 3.4/I Impact on School District Jurisdiction Mitigation Measure 3.4/16.0: Resolution of School District Jurisdiction Issue Why: Who: What: When: Completion: Verification: To resolve the jurisdictional issue of which school district(s) will provide service to the Project area. City of Dublin/DUSD/LVJUSD. City will assist with resolution of District boundary dispute. Within two years of plan adoption. Prior to occupancy of residential units within the Project area. City of Dublin Planning Department. Impact 3.4/J Financial Burden on School Districts Mitization Measure 3.4/17.0: Full miti~,ation of Pro iect imt~act on school facilities Why: Who: What: When: Completion: Verification: To ensure that adequate school facilities are available prior to development in the Project area to the extent permitted by law. City of Dublin/DUSD/LVJUSD. Establish liaison between City of Dublin and school districts. Ongoing as part of development review process. On-going. City of Dublin Planning Department with input from school districts. Mitigation Measure 3.4/18.0: Provision of School Sites Why: Who: What: When: Completion: Verification: To ensure that the development of new facilities is provided for through the dedication of school sites and/or payment of development fees by developers. Developers/City of Dublin/DUSD/LVJUSD. Dedication of School Sites/Payment of Development Fees. Condition of Tentative Map Approval. Prior to occupancy approval. City of Dublin Planning Department. 16 City of Dublin May 7, 1993 Eas, , Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.4/19.0: Funding of New Schools Why: Who: What: When: Completion: Verification: To establish appropriate funding mechanisms, such as Mello Roos Community Facilities District, development impact fees, or a general obligation bond measure, to fund new school development in eastern Dublin. City of Dublin/DUSD/LVJUSD. Creation of funding mechanism(s). During processing of prezoning and annexation applications. Prior to occupancy of residential units within the Project area. City of Dublin Planning Department. Parks and Recreation Park Facilities Impact 3.4/K Demand for Park Facilities Mitigation Measure 3.4/20.0: Exvansion of park area (Guiding Policy. No monitoring aoplicable or required. ) Mitigation Measure 3.4/21.0: Maintenance and improvement of outdoor facilities in conformance with Park and Recreation Master Plan (Guiding Policy. No monitoring aoplicable or reauired. ) Mitigation Measure 3.4/22.0: Provide adeauate active oarks and facilities (Guiding Policy. No monitoring applicable or reauired. ) Mitigation Measure 3.4/23.0: Acauire and imorove oarHands Why: Who: What: When: Completion: Verification: To acquire and improve parklands in conformance with the priorities and phasing recommended in the City's Park and Recreation Master Plan. City of Dublin Planning Department/Dublin Recreation Department. Coordination between the Planning Department and Recreation Department to ensure adherence with standards of Park and Recreation Master Plan. Ongoing as part of the development review process. Ongoing. City of Dublin Planning Department. Mitigation Measure 3.4/24.0: Land dedication and oarks imvrovements/Collection of in-lieu park fees Why: Who: What: When: Completion: Verification: To require land dedication and improvements as designated in the GPA and collect in-lieu fees per City standards. City of Dublin Planning Department/Recreation Department. Require land dedication or payment of in-lieu fees as condition of approval for individual projects. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. 17 City of Dublin Eas. , Dublin Specific Plan & GPA EIR May 7, 1993 Mitigation Monitoring Plan Mitigation Measure 3.4/25.0: Park Acreage Dedication Why: Who: What: When: Completion: Verification: To provide an adequate ratio of developed parklands to population. Developers/City of Dublin Planning Department. Park dedication. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Mitigation Measure 3.4/26.0: Specific Park Acrea~,e Dedication Why: Who: What: When: Completion: Verification: To provide an adequate ratio of developed parklands to population. Developers/City of Dublin Planning Department. Park dedication. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Mitigation Measure 3.4/27.0: Park standards Why: Who: What: When: Completion: Verification: To ensure that park development is consistent with the standards and phasing recommended in the City's Park and Recreation Master Plan. Developers/City of Dublin Recreation Department. Monitor individual project conformance with standards in Master Plan. Condition of tentative map approval. Prior to final map approval. City of Dublin Recreation Department. Mitigation Measure 3.4/28.0: Implementation of Specific Plan t~olicies related to the provision of open space. Why: To ensure the provision of open space, access and areas for public recreation. Developers/City of Dublin Planning Department. Monitor individual project conformance with open space policies. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Who: What: When: Completion: Verification: Park Financing Impact 3.4/L Park Facilities Fiscal Impact Mitigation Measure 3.4/29.0: Provision of Fair Share o{ Park Space Why: To ensure that each new development reserves the open space and parkland designated in the Plan. 18 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIE Mitigation Monitoring Plan Who: What: When: Completion: Verification: Developers/City of Dublin Planning Department Review each development proposal against the Specific Plan/GPA to ensure that designated park and open space is set aside. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Mitigation Measure 3.4/30.0: Parks Imvlementation Plan Why: Who: What: When: Completion: Verification: To develop a Parks Implementation Plan for eastern Dublin. Dublin Recreation Department Preparation of a Parks Implementation Plan. Within two years of Plan adoption or prior to any significant residential development, whichever occurs first. Prior to final map approval on the first residential projects. Dublin Recreation Department. Mitigation Measure 3.4/31.0: Calculation and Assessment of In-Lieu Park Fees Why: Who: What: When: Completion: Verification: To calculate and assess in-lieu park fees. City of Dublin Planning Department Assessment of In-Lieu Park Fees. Notification at time of permit application. Condition of tentative map approval. Payment at time of final map approval. City of Dublin Planning Department. Impact 3.4/M Impact on Regional Trail System Mitigation Measure 3.4/32.0: Trail Linkaze and Access Why: Who: What: When: Completion: Verification: To establish a trail system with connections subregional system. Developers/City of Dublin Planning Department Dedication of trail rights-of-way. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. to planned regional and Impact 3.4/N Impact on Open Space Connections Mitigation Measure 3.4/33.0: Establish a comvrehensive trail network Why: Who: What: To establish a comprehensive, integrated trail network that permits safe and convenient pedestrian and bicycle access. Developers/City of Dublin Planning Department/City of Dublin Recreation Department. Provide guidelines to developers on right-of-way alignment and design 19 Eas City of Dublin May 7~ 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: standards, and ensure implementation. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Miti,~ation Measure 3.4/34.0: Establish a continuous oven svace network Why: Who: What: When: Completion: Verification: To establish a continuous open space network that integrates large natural open space areas, stream corridors, and developed parks and recreation areas. Developers/City of Dublin Planning Department/City of Dublin Recreation Department. Ensure dedication/preservation of designated open space areas. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Mitigation Measure 3.4/35.0: Provision of access to oven svace areas Why: Who: What: When: Completion: Verification: To provide convenient pedestrian connections between developed areas and designated open space areas and trails. Developers/City of Dublin Planning Department/City of Dublin Recreation Department. Ensure designation of appropriately located trails and access points as part of development review. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Miti~,ation Measure 3.4/36.0: Reauire vublic access easements Why: Who: What: When: Completion: Verification: To require developers to dedicate public access easements along ridgetops and stream corridors to accommodate the development of trails and staging areas. Developers/City of Dublin Planning Department. Ensure dedication of public access easements. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Solid Waste Impact 3.4/0 Increased Solid Waste Production Impact 3.4/P Impact on Solid Waste Disposal Facilities 2O City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Miti~,ation Measure 3.4/37.0: Prevaration of Solid Waste Mana~,ement Plan Why: Who: What: When: Completion: Verification: To prepare/update a Solid Waste Management Plan as needed to address eastern Dublin. Dublin City Manager's Office. Prepare plan. Within two years of the adoption of the Eastern Dublin Specific Plan/GPA. Prior to issuance of building permits. Dublin City Manager's Office. Miti~,ation Measure 3.4/38.0: Revise Waste Generation Pro iections Why: Who: What: When: Completion: Verification: To revise waste generation projections of the City's SRRE/HHWE as needed to reflect the population and commercial land use projections of the adopted Project. Dublin City Manager's Office. Revise projections and update solid waste generation and disposal capacity characteristics. Within two years of the adoption of the Eastern Dublin Specific Plan/GPA. Prior to issuance of building permits. Dublin City Manager's Office. Mitigation Measure 3.4/39.0: Inter, ration of Eastern Dublin Solid Waste Plan into Citv's SRRE/HHWE Why: Who: What: When: Completion: Verification: To ensure that the Solid Waste Management Plan for Eastern Dublin addresses and incorporates the goals, objectives, and programs of Dublin's SRRE and HHWE. Dublin City Manager's Office/Public Works Department. Updating of SRRE/HHWE to reflect Project. Within two years of the adoption of the Eastern Dublin Specific Plan/GPA. Prior to issuance of building permits. Dublin City Manager's Office. Mitigation Measure 3.4.40: Assessment of Land fill Cat~acitv Why: Who: What: When: Completion: Verification: To ensure that adequate landfill capacity is available to accommodate project waste. City Manager's Office/City Planning Department/Alameda County Solid Waste Management Authority. Determine the adequacy of available disposal capacity. As a condition of Tentative Map approval. Prior to Final Map approval. City of Dublin Planning Department. 21 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Electricity, Natural Gas and Telephone Service Impact 3.4/Q Demand for Utility Extensions Impact 3.4/R Utility Extension: Visual and Biological Impacts Mitigation Measure 3.4/41.0: Provision of documentation that electric. gas and televhone service can be vrovided. Why: Who: What: When: Completion: Verification: To require project applicants to provide documentation that electric, gas, and telephone service can be provided to all new development. Developers/City of Dublin Planning Department. Submit documentation from utilities providers. As a condition of Tentative Map approval. Prior to final map approval. City of Dublin Planning Department. Mitigation Measure 3.4/42.0: Under~rounding of Utilities Why: Who: What: When: Completion: Verification: To require all utilities to be located below grade where feasible and designed to City standards. City of Dublin Public Works Department. Require developers to provide for installation of utilities below grade. Prior to issuance of building permits. Construction of infrastructure improvements. City of Dublin Public Works Department. Mitization Measure 3.4/43.0: Avoidance of In frastructure Imvacts on Sensitive Habitat Why: Who: What: When: Completion: Verification: To mitigate the effects of utilities expansion, the city will work with PG&E to plan the undergrounding of all new electric lines and to route infrastructure away from sensitive habitat and open space lands. Developers/City of Dublin Public Works Department/PG&E. Coordinate routing of electric lines. During site design phase. Prior to final map approval. City of Dublin Public Works Department. Mitigation Measure 3.4/44.0: Submittal of Service Report Why: Who: What: When: Completion: Verification: To require project applicants to submit a utilities service report to the City prior to Public Improvement Plan approval. Project Applicants/City of Dublin Planning Department. Submittal of utilities service report. Prior to approval of Public Improvement Plan. Prior to issuance of building permits. City of Dublin Planning Department. 22 Eas City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Impact 3.4/S Consumption of Non-Renewable Natural Resources Mitigation Measure 3.4/45.0: Demonstration Pro iects Why: Who: What: When: Completion: Verification: To require the installation of a demonstration project(s) of cost-effective energy conservation techniques. Developers/PG&E/City of Dublin Planning Department. Meet with major land owners and PG&E to determine how to set up an Energy Conservation Demonstration Project within the Project area. During development review process. Prior to occupancy approval. City of Dublin Planning Department. Mitigation Measure 3.4/46.0: Site Planning, Building Design and Landscat~ing Why: To require developers to demonstrate the incorporation of energy conservation measures into the design, construction, and operation of proposed development. Developers/City of Dublin Planning Department. Preparation of an Energy Conservation Plan. Upon filing of tentative map. Prior to building permit approval. City of Dublin Planning Department, Who: What: When: Completion: Verification: Postal Service Impact 3.4/T Demand for Increased Postal Service Mitigation Measure 3.4/47.0: Provision of a Post Office in Eastern Dublin Why: Who: What: When: Completion: Verification: To provide for the creation of a post office with the eastern Dublin Town Center. Developer/City of Dublin Planning Department. The City will work with developers of Town Center and the U.S. Postal Service to determine need and procedures for implementation. Prior to tentative map approval for the Public/Semi-Public designated area in the Town Center subarea. Prior to approval of Final Map. City of Dublin Planning Department. Mitigation Measure 3.4/48.0: Coordination with U.S. Postal Service Why: Who: What: When: To provide for the creation of a post office with the eastern Dublin Town Center. Developer/City of Dublin Planning Department. The City will work with developers of Town Center and the U.S. Postal Service to determine need and procedures for implementation. Prior to tentative map approval for the Public/Semi-Public designated area in the Town Center subarea. 23 City of Dublin May 7, 1998 / Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to approval of Final Map. City of Dublin Planning Department. Library Service Impact 3.4/U Demand for Increased Library Service Mitigation Measure 3.4/49.0: Provision of Adeauate Library Services Why: Who: What: When: Completion: Verification: To provide a library(ies) and associated services for eastern Dublin. Alameda County Library System/City of Dublin Planning Department. Assessment of eastern Dublin library needs and formulation of strategy to meet these needs. During processing of prezoning and annexation applications. Prior to Final Map approval. City of Dublin Planning Department. Mitigation Measure 3.4/50.0: Coordination with Alameda County Library System Why: Who: What: When: Completion: Verification: To provide a library(ies) and associated services for eastern Dublin. Alameda County Library System/City of Dublin Planning Department. Assessment of eastern Dublin library needs and formulation of strategy to meet these needs. During processing of prezoning and annexation applications. Prior to Final Map approval. City of Dublin Planning Department. Mitigation Measure 3.4/51.0: Specific Site Selection for New Library Why: Who: What: When: Completion: Verification: To have the City Library Task Force identify appropriate location and timing for development of new library(ies). City Library Task Force. Assessment of site requirements and timing of projected need. During processing of prezoning and annexation applications. Prior to Final Map approval. City of Dublin Planning Department. SECTION 3.5: SEWER, WATER AND STORM DRAINAGE 1. Imnacts Re~luirinu Mitigation This section identifies the following impacts requiring mitigation: IM 3.5/B Lack of a Wastewater Collection System IM 3.5/C Extension of Sewer Trunk Line IM 3.5/D Current Limited Treatment Plant Capacity IM 3.5/E Future Lack of Wastewater Treatment Plant Capacity IM 3.5/F Increase in Energy Usage Through Increased Wastewater Treatment 24 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan IM 3.5/G Lack of Current Wastewater Disposal Capacity IM 3.5/H Increase in Energy Usage Through Increased Wastewater Disposal IM 3.5/I Potential Failure of Export Disposal System IM 3.5/J Pump Station Noise and Odors IM 3.5/K Storage Basin Odors and Potential Failure IM 3.5/L Recycled Water System Operation IM 3.5/M Recycled Water Storage Failure IM 3.5/N Loss of Recycled Water System Pressure IM 3.5/0 Secondary Impacts from Recycled Water System Operation IM' 3.5/P Overdraft of Local Groundwater Resources IM 3.5/Q Increase in Demand for Water IM 3.5/R Additional Water Treatment Plant Capacity IM 3.5/S Lack of Water Distribution System IM 3.5/T Inducement of Substantial Growth and Concentration of Population IM 3.5/U Increase in Energy Usage Through Operation of the Water Distribution System IM 3.5/V Potential Water Storage Reservoir Failure IM 3.5/W Potential Loss of System Pressure IM 3.5/X Potential Pump Station Noise IM 3.5/Y Potential Flooding IM 3.5/Z Reduced Groundwater Recharge IM 3.5/AA Non-Point Sources of Pollution 2. Mitigation Implementation and Monitoring Prouram Impact 3.5/B Lack of a Wastewater Collection System Mitigation Measure 3,5/1.0a: Expansion of DSRSD Service Boundaries Why: Who: What: When: Completion: Verification: To provide for the expansion of DSRSD's service boundaries to include the Project area. DSRSD. DSRSD will revise its service area boundaries. Prior to approval of any development outside the current service boundaries. Prior to tentative map approval. City of Dublin Department of Public Works. Mitigation Measure 3.5/1.0: Connection to Public Sewers Why: Who: What: When: Completion: Verification: To require that all development within the Project area be connected to public sewers. City of Dublin Department of Public Works/DSRSD. Require connection to public sewers. Condition of approval for tentative map. Prior to final map approval, Department of Public Works. 25 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitieation Measure 3.5/2.0: Wastewater Collection System Master Plan Why: Who: What: When: Completion: Verification: To have DSRSD update its wastewater collection system master plan computer model to reflect the adopted Specific Plan/GPA. Department of Public Works/DSRSD. Public Works will request DSRSD to update Master Plan. DSRSD will be responsible to update the Master Plan. As soon as possible after the adoption of the Specific Plan/GPA. Before approval of any detailed wastewater improvement plans. Department of Public Works/DSRSD. Mitigation Measure 3.5/3.0: On-site Wastewater Treatment Why: Who: What: When: Completion: Verification: To discourage the use of on-site package plants and septic systems within the Project area. Department of Public Works/DSRSD. Communicate to project applicants the City's desire that all projects be connected to the DSRSD sewer system. Ongoing, as part of the development application process. Prior to tentative map filing. Department of Public Works. Mitigation Measure 3.5/4.0: DSRSD Service Why: Who: What: When: Completion: Verification: To require a "will serve" letter from DSRSD prior to permit approval for grading. Department of Public Works/DSRSD. Confirm receipt of a "will-serve" letter for all proposed projects. Prior to tentative map approval. Prior to issuance of grading permit. Department of Public Works. Mitization Measure 3.5/5.0: DSRSD Standards Why: Who: What: When: Completion: Verification: To require that design and construction of all wastewater systems is in conformance with DSRSD standards. Department of Public Works/DSRSD. Confirm that wastewater system meet DSRSD standards. Prior to issuance of building permits. Approval of improvement plans. Department of Public Works/DSRSD. Impact 3.5/C Extension of Sewer Trunk Line Miti~,ation Measure 3.5/6.0: Sizing o f Wastewater System Why: To ensure that the planned wastewater collection system has been sized to accommodate only the development within the Project area. 26 City of Dublin May 7, 1993 Eas~ Dublin Specific Plan & GPA Mitigation Monitoring Plan Who: What: When: Completion: Verification: DSRSD. Engineer wastewater capacity for Project site capacity only. Wastewater system design phase. Prior to installation of Project area sewer system. DSRSD. Impact 3.5/D Current Limited Treatment Plant Capacity Mitigation Measure 3.5/7.0: Design Level Wastewater Investigation Why: Who: What: When: Completion: Verification: To require project applicants to prepare detailed wastewater capacity investigations, including means to minimize wastewater flows. Applicants in coordination with DSRSD. Prepare a detailed wastewater capacity investigation. Preparation of preliminary Public Improvement Plan. Final Public Improvement Plan Approval. DSRSD/Department of Public Works. Mitigation Measure 3.5/7.1: DSRSD Service Why: Who: What: When: Completion: Verification: To require a "will serve" letter from DSRSD prior to permit approval for grading. Department of Public Works/DSRSD. Confirm receipt of a "will-serve" letter for all proposed projects. Prior to tentative map approval. Prior to issuance of grading permit. Department of Public Works. Impact 3.5/E Future Lack of Wastewater Treatment Plant Capacity Mitigation Measure 3.5/8.0: Ensure Adequate Wastewater Treatment Capacity Why: Who: What: When: Completion: Verification: To ensure that wastewater treatment and disposal facilities are available to meet the needs of future development in eastern Dublin. Department of Public Works/DSRSD. DSRSD will prepare a Master Plan including growth projections and facility expansion needs and timing to meet the needs of projected development. As soon as possible after adoption of the Specific Plan/GPA. Prior to approval of any development. Department of Public Works. Miti~,ation Measure 3.5/9.0: Wastewater Treatment Plant Expansion Schedule Why: Who: What: To ensure that proposed development is consistent with wastewater treatment plant expansion as set forth in DSRSD's master plan. DSRSD/Department of Public Works. The City must confirm that proposed development is consistent with the capacity and timing identified in DSRSD's Master Plan 27 City of Dublin May 7, 1993 Ea8 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: During review of tentative map. Prior to approval of Final Map. Department of Public Works. Impact 3.5/F Increase in Energy Usage Through Increased Wastewater Treatment Mitiltation Measure 3.5/10.0: Use of Energy-Efficient Treatment System Why: Who: What: When: Completion: Verification: To include energy efficient treatment systems in any wastewater treatment plant expansion and operate the plant to take advantage of off-peak energy. DSRSD Design and construct energy-efficient treatment systems. Design phase for WWTP expansion. On-going. DSRSD. Impact 3.5/G Lack of Current Wastewater Disposal Capacity Mitigation Measure 3.5/11.0: (Program 9H) Export Pit~eline Why: Who: What: When: Completion: Verification: To support TWA in its current efforts to implement a new wastewater export pipeline system. Tri-Valley Wastewater Authority/Dublin City Manager's Office. Support implementation of new export pipeline. Ongoing. Approval of TWA improvement plans. Dublin City Manager's Office. Mitigation Measure 3.5/12.0: (Policy 9-5) Construction of Recycled Water System Why: Who: What: When: Completion: Verification: To promote recycled water use for landscape irrigation in eastern Dublin through upgrading of treatment and construction of a recycled water distribution and storage system in eastern Dublin. DSRSD. Promote recycled water use. During development review process. Ongoing. DSRSD. Mitization Measure 3.5/13.0: (Program 9J) Recycled Water Distribution System Why: Who: What: When: Completion: To have DSRSD update its proposed recycled water distribution system computer model to reflect the adopted Specific Plan/GPA. Department of Public Works/DSRSD. Public Works will request DSRSD to update its computer model. DSRSD will be responsible to update the model. As soon as possible after the adoption of the Specific Plan/GPA. Before approval of any detailed wastewater improvement plans. 28 City of Dublin May 7, 1993 Eas, , Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: Department of Public Works/DSRSD. Mitigation Measure 3.5/14.0: (Program 9K) Wastewater Recycling and Reuse Why: Who: What: When: Completion: Verification: To support the efforts of the Tri-Valley Water Recycling Task Force Study through Zone 7, encouraging wastewater recycling and reuse for landscape irrigation. City of Dublin Department of Public Works/Zone 7. Encourage wastewater recycling as detailed in the Tri-Valley Water Recycling Task Force Study. As soon as possible after the adoption of the Specific Plan/GPA. Ongoing. Department of Public Works. Impact 3.5/H Increase in Energy Usage Through Increased Wastewater Disposal Mitigation Measure 3.5/15.0: Energy for Ex~ort Dist~osal Why: Who: What: When: Completion: Verification: To encourage LAVWMA to continue its program of off-peak pumping of wastewater to balance electric demands in the PG&E system. City of Dublin/LAVWMA. Encourage off-peak pumping. Upon adoption of the Specific Plan/GPA. On-going. Department of Public Works. Mitigation Measure 3.5/16.0: Energy for Distgosal through Recycled Water System Why: Who: What: When: Completion: Verification: To ensure that the recycled water treatment system is planned, designed and constructed for energy efficiency in operation. City of Dublin Department of Public Works/DSRSD Design, construction, and operation of energy-efficient system. Upon agreement to use a recycled water treatment system. On-going. DSRSD. Impact 3.5/I Potential Failure of Export Disposal System Mitigation Measure 3.5/17.0: Redundancy in Engineering Why: Who: What: When: Completion: Verification: To avoid potential failure in the operation of the pumps in the TWA wastewater collection system. TWA Incorporate engineering redundancy into the design of the pump stations and provide emergency power generators. Design and construction phase of export system. Approval of export system improvement plans. Department of Public Works. 29 City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Impact 3.5/J Pump Station Noise and Odors Miti~,ation Measure 3.5/18.0: Design of Pumv and Motors Why: Who: What: When: Completion: Verification: To ensure that pump station design minimizes potential for impacts related to noise and odors. TWA Design pump and motors to meet local noise standards. Install odor control equipment. Design phase of export system. Approval of export system improvement plans. Department of Public Works. Impact 3.5/K Storage Basin Odors and Potential Failure Mitigation Measure 3.5/19.0: Desi~n/En~cineering of Storage Basins Why: Who: What: When: Completion: Verification: To ensure that wastewater storage basins are designed to control odors and minimize the risk of failure in the event of an earthquake. TWA Design storage basins to meet seismic codes, and limit odors by burying tanks and incorporating odor control equipment. Design phase of export system. Approval of export system improvement plans. Department of Public Works. Impact Impact 3.5/L Recycled Water System Operation Mitigation Measure 3.5/20.0: Construction of Recycled Water Distribution System Why: Who: What: When: Completion: Verification: To require that construction of the recycled water distribution system be in accordance with all applicable State and local regulations. DSRSD Require compliance of recycled water distribution system with applicable regulations of the DHS and the SFBRWQCB. Condition of approval for recycled water distribution system. Approval of improvement plans. DSRSD. 3.5/M Recycled Water Storage Failure Mitigation Measure 3.5/21.0: Desi~,n/En~ineerin~, of Water Stora~,e Basins Why: Who: What: When: To ensure that reservoir construction meets all applicable standards of DSRSD and appropriate health agencies. DSRSD/Department of Public Works. Confirm the reservoir design and construction meets all applicable standards. Design phase. 3O City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Approval of improvement plans. Department of Public Works/DSRSD. Impact 3.5/N Loss of Recycled Water System Pressure Mitigation Measure 3.5/22.0: Comt~liance with DSRSD standards Why: Who: What: When: Completion: Verification: To ensure that proposed recycled water pump stations meet all applicable standards of DSRSD and include emergency power generation. DSRSD/Department of Public Works. Confirm compliance of pump station design with DSRSD standards, and include emergency power generators. Design phase. Approval of improvement plans. Department of Public Works. Impact 3.5/0 Secondary Impacts from Recycled Water System Operation Mitigation Measure 3.5/23.0: Salt Reduction Why: Who: What: When: Completion: Verification: To ensure that recycled water projects meet any applicable salt mitigation requirements of Zone 7. DSRSD. Coordinate with Zone 7 to confirm whether or not a recycled water system in the Project area would require demineralization. Design Phase. Approval of improvement plans. DSRSD. Impact 3.5/P Overdraft of Local Groundwater Resources Mitigation Measure 3.5/24.0: (Policy 9-2) Annexation of Svecific Plan area to DSRSD Why: Who: What: When: Completion: Verification: To expand DSRSD service boundaries to encompass the entire eastern Dublin Specific Plan/GPA area. DSRSD. Development of annexation application. Condition of approval for planned development prezoning. Prior to approval of detailed improvement plans. DSRSD. Mitigation Measure 3.5/25.0: Connection to DSRSD Water System Why: Who: What: When: To encourage all development in the Project area to connect to the DSRSD water system. City of Dublin Public Works Department/DSRSD. Inform all project applicants of preference for connection of new development to the DSRSD system. During preparation of tentative map. 31 City of Dublin May 7, 1993 Dublin Specific Plan ,~ GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to approval of final map. City of Dublin Department of Public Works. Impact 3.5/Q Increase in Demand for Water Mitigation Measure 3.5/26.0: (Program 9 A ) Water Conservation Why: Who: What: When: Completion: Verification: To require water conservation measures to be designed into individual projects. Developers/City of Dublin Public Works Department/DSRSD. Review project applications for incorporation of water conservation measures. Condition of approval for tentative map. Prior to approval of final map. Department of Public Works. Mitigation Measure 3.5/27.0: (Program 9B ) Water Recycling Why: Who: What: When: Completion: Verification: To require water recycling measures be incorporated into individual projects. Developers/City of Dublin Public Works Department/DSRSD. Review projects for incorporation of DSRSD and Zone 7 recommendations relating to the use of recycled water. Condition of approval for tentative map. Approval of detailed improvement plans. Dublin Department of Public Works. Mitigation Measure 3.5/28.0: Zone 7 Imvrovements Why: Who: What: When: Completion: Verification: To ensure that Zone 7 has water supply needed to meet requirements of the Project. Public Works Department/DSRSD/Zone 7. Confirm status of Zone 7 water supply improvements. Condition of approval for "will serve" letter. Prior to approval of final map. DSRSD/Public Works Department. Mitigation Measure 3.5/29.0.' New Zone 7 Turnouts Why: Who: What: When: Completion: Verification: To provide for the construction of two additional turnouts from the Zone 7 Cross Valley Pipeline to serve the Eastern Dublin area. Zone 7/DSRSD. Construction of two additional turnouts. As needed to provide adequate service to new development. Ongoing. DSRSD. 32 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Miti~,ation Measw:e 3.5/30: Interconnections with Existing, Systems Why: Who: What: When: Completion: Verification: To provide for increased water source reliability, the Project water system should be interconnected with existing adjoining systems. DSRSD/Public Works Department. Plan water system to interconnect with existing systems. Ongoing as system within the Project area is built out. Ongoing. Public Works Department. Mitigation Measure 3.5/31.0: Reimbursement for New DSRSD Groundwater Wells Why: Who: What: When: Completion: Verification: To provide a backup source of water supply to its Zone 7 source, DSRSD will reimburse City of Pleasanton for construction and operation of new groundwater wells south of the Project area. DSRSD/City of Pleasanton. DSRSD will reimburse City of Pleasanton for groundwater wells. On schedule to be determined by DSRSD and the City of Pleasanton. Ongoing. DSRSD. Impact 3.5/R Additional Water Treatment Plant Capacity Mitigation Measure 3.5/32.0: Zone 7 Phasing, for Water Treatment System Improvements Why: Who: What: When: Completion: Verification: To meet increasing demands on its water system, Zone 7 has established a phasing for water treatment system improvements. Zone 7. Implementation of phased improvements. Pursuant to established schedule. Pursuant to established schedule. Zone 7. Mitigation Measure 3.5/33.0: Construction of New Chlorination/Fluoridation Stations Why: Who: What: When: Completion: Verification: To meet increased demand resulting from the project, DSRSD should construct two new chlorination/fluoridation stations at the two proposed Zone 7 turnouts to eastern Dublin. DSRSD/Zone 7. Construction of two new stations. As needed to provide adequate service, with the western turnout being developed first. The eastern turnout would not be developed until development of the eastern portion of the Project area. On schedule to be determined by DSRSD and Zone 7. DSRSD. 33 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Impact 3.5/S Lack of a Water Distribution System Miti~,ation Measure 3.5/34.0: (Policy 9-1 ) Provision of an Adequate Water Suvvlv System Why: Who: What: When: Completion: Verification: To provide an adequate water supply system and related improvements and storage facilities for all new development in the Project area. DSRSD/Developers. Require new development to build the water supply system needed per DSRSD Master Plan and service standards. Condition of approval for tentative map. Prior to approval of Final Public Improvements Plan. DSRSD/Department of Public Works. Miti~,ation Measure 3.5/35.0: (Program 9C) Water System Master Plan Why: Who: What: When: Completion: Verification: To ensure that DSRSD updates its water system master plan computer model to reflect the adopted Specific Plan/GPA land uses. City of Dublin/DSRSD Request that DSRSD update its water system master plan computer model. As soon as possible after adoption of the Specific Plan/GPA. Prior to the approval of a Public Improvement Plan for any new development. Public Works Department. Mitigation Measure 3.5/36.0: (Proi~ram 9D ) Combining of Water Systems Why: Who: What: When: Completion: Verification: To consolidate the Camp Parks and Alameda County water systems and turnouts with the DSRSD system. City of Dublin Public Works Department/Camp Parks/Alameda County/DSRSD. Encourage agencies to combine water systems with DSRSD. Ongoing from date of Project adoption. Ongoing. DSRSD. Mitigation Measure 3.5/37.0: DSRSD Standards Why: Who: What: When: Completion: Verification: To require that design and construction of all water system facility improvements be in accordance with DSRSD standards. City of Dublin Public Works Department/DSRSD/Developers Review each development proposal to verify that all water system facility improvements conform to DSRSD standards. Condition of approval for Public Improvements Plan. Prior to approval of Final Public Improvements Plan. Public Works Department. 34 City of Dublin May 7, 1993 Eas~, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.5/38.0: DSRSD Service Why: Who: What: When: Completion: Verification: To require a "will serve" letter from DSRSD prior to issuance of a grading permit. City of Dublin/DSRSD/Developer. Confirm receipt of a "will-serve" letter from DSRSD. Condition of approval for tentative map. Prior to approval of final map. Planning Department. Impact 3.5/T Inducement of Substantial Growth and Concentration of Population Mitigation Measure 3.5/39.0: Sizing of Water Distribution System Why: Who: What: When: Completion: Verification: To reduce the growth-inducing potential of water system expansion, the water distribution system will be sized to accommodate only the estimated water demands from approved land uses within the Project. DSRSD. Limit capacity of water distribution system to serve only the Project site. Update of DSRSD water system master plan computer model. Prior to the approval of a Public Improvement Plan for any new development in the Project area. Department of Public Works. Impact 3.5/U Increase in Energy Usage through Operation of the Water Distribution System Mitigation Measure 3.5/40.0: Energy-Efficient Ot~eration of Water Distribution System Why: Who: What: When: Completion: Verification: To ensure that the water distribution system is planned, designed and constructed for energy-efficient operation. City of Dublin/DSRSD. Design and operation of energy efficient water distribution system. Ongoing. On-going. Public Works Department. Impact 3.5/V Potential Water Storage Reservoir Failure Mitigation Measure 3.5/41.0: Design/Engineering of Water Storage Basins Why:' Who: What: When: Completion: Verification: To require all reservoir construction to meet all the applicable standards of DSRSD, to meet current seismic building standards, and to provide adequate site drainage. DSRSD. Design basins to reduce failure potential. Design phase. Approval of improvement plans. DSRSD. 35 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan City of Dublin May 7, 1993 Impact 3.5/W Potential Loss of System Pressure Mitigation Measure 3.5/42.0: Compliance With All DSRSD Standards Why: Who: What: When: Completion: Verification: To require the proposed new water pump stations to meet all the applicable standards of DSRSD and include emergency power generators at each pump station. City of Dublin/DSRSD. Engineering provisions for emergency conditions. Design phase. Approval of final improvement plans. Public Works Department. Impact 3.54/X Potential Pump Station Noise Mitigation Measure 3.5/43.0: Reduction of Potential Noise Why: Who: What: When: Completion: Verification: To include design provisions to pump stations that will reduce sound levels from operating pump motors and emergency generators. DSRSD. Incorporate necessary engineering provisions in design of pump stations to minimize operational noise. Design phase. Approval of final improvement plans. Public Works Department. Impact 3.5/Y Potential Flooding Mitigation Measure 3.5/44.0: (Policy 9-7 ) Provision of Drainage Facilities Why: Who: What: When: Completion: Verification: To provide drainage facilities that will minimize any increased potential for erosion or flooding. Developers/DSRSD. Review drainage facilities design to verify that erosion/flOoding potential will be minimized. Condition of tentative map approval. Approval of final grading and improvement plans. Public Works Department. Mitigation Measure 3.5/45.0: (Poticy 9-8 ) Natural Channel Imvrovements Why: Who: What: When: Completion: Verification: To require channel improvements consisting of natural creek bottoms and side slopes with natural vegetation where possible. Developers/Zone 7. Review required channel improvements for their attempt to maintain natural-appearing conditions while addressing the drainage requirements. Condition of tentative map approval. Prior to final grading plan approval. Department of Public Works with input from Zone 7. 36 City of Dublin May 7, 1998 E~s, . Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Miti~,ation Measure 3.5/46.0: (Program 9R ) Storm Draina~,e Master Plan Why: Who: What: When: Completion: Verification: To require the preparation of a Master Drainage Plan for each development. Developers. Preparation of Storm Drainage Master Plan. Condition of tentative map approval. Prior to final map approval. Public Works Department. Mitigation Measure 3.5/47.0: (Pro~,ram 95) Flood Control Why: Who: What: When: Completion: Verification: To require Project area development to provide facilities to alleviate potential downstream flooding due to Project area development. Developers. Provision of flood control improvements. Condition of tentative map approval. Prior to final map approval. Public Works Department. Miti~,ation Measure 3.5/48.0: Construction of Storm Drainage Facilities Why: Who: What: When: Completion: Verification: To require the construction of the backbone drainage facilities consistent with the Storm Drainage Master Plan. Developers. Construction of storm drainage facilities. Condition of tentative map approval. Prior to final map approval. Public Works Department. Impact 3.5/Z Reduced Groundwater Recharge Mitization Measure 3.5/49.0: (Policy 9-9) Protection and Enhancement of Water Resources Why: Who: What: When: Completion: Verification: To plan facilities and management practices that protect and enhance water quality. City of Dublin Public Works Department/Zone 7. Oversight of facilities to protect and enhance water quality. Condition of tentative map approval. Prior to final map approval. Public Works Department. Mitigation Measure 3.5/50.0: Zone 7 Groundwater Recharge Prod, ram Why: Who: What: To protect groundwater resources, Zone 7 supports an ongoing groundwater recharge program for the Central Basin. City of Dublin Public Works Department. Support Zone 7 groundwater recharge program, by encouraging recharge areas within the Project area where feasible. 37 City of DUblin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: COndition of tentative map approval. Prior to final map approval. Public Works Department. Impact 3.5/AA Non-Point Sources of Pollution Mitigation Measure 3.5/52.0: Community Education Programs Why: Who: What: When: Completion: Verification: To develop community-based programs to educate local residents and businesses on methods to reduce non-point sources of pollution, and coordinate such programs with current Alameda County p.rograms. City of Dublin Public Works Department. Development/dissemination of information to reduce non-point sources of pollution. Condition of tentative map approval On-going Public Works Department. Mitigation Measure 3.5/53.0: "Best Management Practices" Why: Who: What: When: Completion: Verification: To require all development to meet the requirements of the City of Dublin's "Best Management Practices" to mitigate storm water pollution. City of Dublin Public Works Department. Review proposed development plans to ensure that "Best Management Practices" have been incorporated to reduce pollution. During development review processing. Prior to building permit approval. Public Works Department. Mitigation Measure 3.5/54.0: National Pollution Dischar~,e Elimination System Reauirements Why: Who: What: When: Completion: Verification: To require all development to meet the water quality requirements of the City of Dublin's NPDES permit. City of Dublin Public Works Department. Review proposed development plans to ensure that NPDES requirements have been incorporated to reduce pollution. During development review processing. Prior to building permit approval. Public Works Department. Mitigation Measure 3.5/55.0: Urban Runoff Clean Water Pro~,ram Reauirements Why: Who: What: When: To require all development to meet the water quality requirements of the Alameda County Urban Runoff Clean Water Program. City of Dublin Public Works Department. Review proposed development plans to ensure that the requirements of the County's Urban Runoff Clean Water Program have been incorporated to reduce pollution. During development review processing. 38 City of Dublin May 7, 1998 Ea, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to building permit approval. Public Works Department. SECTION 3.6: SOILS. GEOLOGY AND SEISMICITY 1. Impacts Reauirin!~ Mitigation This section identifies the following impacts requiring mitigation: IM 3.6/B Earthquake Ground Shaking: Primary Effects IM 3.6/C' Earthquake Ground Shaking: Secondary Effects IM 3.6/D Substantial Alteration to Project Site Landforms IM 3.6/F Groundwater Impacts IM 3.6/G Groundwater Impacts Associated with Irrigation IM 3.6/H Shrinking and Swelling of Expansive Soils and Bedrock IM 3.6/I Natural Slope Stability IM 3.6/J Cut-and-Fill Slope Stability IM 3.6/K Erosion and Sedimentation: Construction-Related IM 3.6/L Erosion and Sedimentation: Long-Term 2. Mitigation Imnlementation and Monitorin~ Program Impact 3.6/B Earthquake Ground Shaking: Primary Effects Mitigation Measure 3.6/1.0: ImMementation of Current Seismic Design Standards Why: Who: What: When: Completion: Verification: To require the use of modern seismic design in construction of development projects, and build in accordance with Uniform Building code and applicable county and city code requirements. Developers/Public Works Department. Review plans to ensure conformance to UBC and all other applicable codes. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Impact 3.6/C Earthquake Ground Shaking: Secondary Effects Mitigation Measure 3.6/2.0: Design Reauirements for Flat Areas Why: Who: What: When: Completion: Verification: To provide setbacks from or modification of unstable and potentially unstable landforms, and use of appropriate design to ensure seismic safety. Developers/Public Works Department. Verify that improvements have been located away from unstable landforms; that potentially unstable landforms have been stabilized; and that development plans conform to UBC and all other applicable codes. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. 39 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.6/3.0: Design Reauirements Dr Hillside Areas Why: Who: What: When: Completion: Verification: To require appropriate grading and design to completely remove unstable and potentially unstable materials in hillside areas where development may require substantial grading. Developers/Public Works Department. Verify that grading and design will remove unstable materials. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/4.0: Design Reauirements for Hillside Fills Why: Who: What: When: Completion: Verification: To use engineering techniques and improvements, such as retention structures, drainage improvements, properly designed keyways, and adequate compaction to improve the stability of fill areas and reduce seismically induce fill settlement. Developers/Public Works Department. Require engineered retention structures, surface and subsurface drainage improvements. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/5.0: Desizn Reauirements for Fill Settlement Why: Who: What: When: Completion: Verification: To use engineering techniques and improvements, such as retention structures, drainage improvements, properly designed keyways, and adequate compaction to improve the stability of fill areas and reduce seismically induce fill settlement. Developers/Public Works Department. Require engineered retention structures, surface and subsurface drainage improvements. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/6.0: Design Reauirements (roads, structural foundations and underground utilities ) for Fill Settlement Why: Who: What: When: Completion: To design roads, structural foundations, and underground utilities to accommodate estimated settlement without failure, especially across transitions between fills and cuts, and to remove or reconstruct potentially unstable stock pond embankments in development areas. Developers/Public Works Department. Verify the effectiveness of improvements to ensure the stability of proposed roads, structural foundations and underground utilities. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. 4O City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: Public Works Department. Mitigation Measure 3.6/7.0: Design-Level Geotechnical Investigations Why: Who: What: When: Completion: Verification: To require all development projects in the Project area to perform design level geotechnical investigations prior to issuing any permits. Developers/Public Works Department. Confirm receipt of geotechnical investigations (ie. stability analysis of significant slopes and displacement analysis of critical slopes) in conjunction with final design of improvements. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/8.0: Earthauake Prevaredness Plans Why: Who: What: When: Completion: Verification: To provide for the development of earthquake preparedness plans and the dissemination of appropriate emergency measures to all Project residents and employees. City of Dublin Planning Department. Develop earthquake preparedness plan, and prepare public information strategy. Within two years of adoption of the Specific Plan/GPA. Prior to substantial development in the Project Area. Planning Department Impact 3.6/D Substantial Alteration to Project Site Landforms Mitigation Measure 3.6/9.0: Grading Plans to Reduce Land form Alteration Why: Who: What: When: Completion: Verification: To reduce alteration to existing landforms through the preparation of grading plans that adapt improvements to natural land forms and implementation of such techniques as partial pads and retaining structures. Developers/Public Works Department. Review grading plans to ensure that they do not result in unnecessary or avoidable alterations to existing landforms. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/10.0: Siting of Improvements Why: Who: What: When: To reduce landform alteration by carefully siting individual improvements to avoid adverse conditions and thus the need for remedial grading. Developers/Public Works Department. Review proponents geotechnical investigation to determine if improvements have been sited to reduce the need for grading. Prior to submittal of tentative map. 41 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to issuance of grading permit. Public Works Department. Impact 3.6/F Groundwater Impacts Impact 3.6/G Groundwater Impacts Associated with Irrigation Mitigation Measure 3.6/11.0: Geotechnical Investigations to Locate and Characterize Groundwater Conditions Why: Who: What: When: Completion: Verification: To prepare detailed design level geotechnical investigations on development sites within the Project area, to locate and characterize groundwater conditions and formulate design criteria and measures to mitigate adverse conditions. Developers/Public Works Department. Verify the preparation of geotechnical investigations to locate and characterize groundwater conditions. One year prior to construction. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/12.0: Construction of Subdrain Systems Why: Who: What: When: Completion: Verification: To reduce groundwater impacts, subdrain systems including drainage pipe and permeable materials can be constructed. Developers/Public Works Department. Construct subdrain systems to control groundwater impacts. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/13.0: Stock Ponds and Reservoirs Why: WhO: What: When: Completion: Verification: To reduce groundwater impacts, stock pond embankments should be removed and reservoirs drained in development areas. Developers/Public Works Department. Remove stock pond embankments and drain reservoirs within development areas. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Impact 3.6/H Shrinking and Swelling of Expansive Soils and Bedrock Mitigation Measure 3.6/14.0: Geotechnical Investi~,ation Why: To prepare design level geotechnical investigations for development projects in the Project area to characterize site-specific soils and bedrock conditions, and to formulate appropriate design criteria. 42 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Who: What: When: Completion: Verification: Developers/Public Works Department. Confirm the preparation of geotechnical investigations to characterize site- specific soils and rock conditions, and the development of appropriate design solutions. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/15.0: Moisture Control Measures Why: Who: What: When: Completion: Verification: To reduce the potential for impact resulting from expansive soils and rock, by implementing measures to control moisture in the ground. Developers/Public Works Department. Verify the appropriate application of moisture conditioning; construction of surface and subsurface drainage to control infiltration; lime treatment. Condition of tentative map approval. Prior to issuance of building permits. Public Works Department. Mitigation Measure 3.6/16.0: Foundation and Pavement Design Why: Who: What: When: Completion: Verification: To reduce the potential effects of expansive soil and rock through appropriate foundation and pavement design. Developers/Public Works Department. Verify that structural foundations have been located below the zone of seasonal moisture change; the use structurally supported floors; the use of non-expansive fill beneath structure slabs and asphaltic concrete. Prior to submittal of tentative map. Prior to final improvement plan/grading plan approval. Public Works Department. Impact 3.6/I Natural Slope Stability Mitigation Measure 3.6/17.0: Geotechnical Investigations Why: Who: What: When: Completion: Verification: To characterize site-specific slope stability conditions and to formulate appropriate design criteria, development within the Project area should prepare design level geotechnical investigations. Developers/Public Works Department. Confirm the preparation of geotechnical investigations to characterize slope stability conditions and identify appropriate design solutions. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Mitigation Measure 3.6/18.0: Siting of Improvements Why: To avoid impacts from unstable slopes by siting development away from 43 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Who: What: When: Completion: Verification: unstable landforms and from slopes greater than 30%, and providing lower density development in steep, unstable areas. Developers/Public Works Department. Confirm that plans avoid siting improvements downslope or on unstable and potentially unstable landforms or on 30%+ slopes. Condition of submittal of tentative map. Prior to final map approval. Public Works Department. Mitigation Measure 3.6/19.0: Desi~,n Measures for lmvrovements on, below, or adiacent to Unstable Sloves Why: Who: What: When: Completion: Verification: To implement measures such as removing, reconstructing, or repairing unstable areas, or structural engineering, when unstable areas cannot be avoided. Developers/Public Works Department. Review for appropriateness and safety the measures suggested to resolve areas with steep and/or unstable slopes. Prior to approval of tentative map. Prior to final improvement plan/grading plan approval. Public Works Department. Impact 3.6/J Cut-and-Fill Slope Stability Miti~,ation Measure 3.6/20.0: Minirnizin~ Gradin~ Why: Who: What: When: Completion: Verification: To require grading plans for hillside areas, which plans minimize grading and required cuts and fills by adapting roads to natural landforms and stepping structures down steeper slopes. Developers/Public Works Department. Review plans to determine if proposed development has attempted to minimize grading. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitization Measure 3.6/21.0: Conformance of Gradin~ Plans to UBC Why: Who: What: When: Completion: Verification: To require compliance with the minimum requirements of the Uniform Building Code and applicable County and City code requirements. Developers/Public Works Department. Verify that grading plans conform to chapters 70 and 22 of the Uniform Building Code and to other applicable codes. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. 44 City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.6/22.0: Avoidance of Unretained Cut Slot~es Greater Than 33% Why: Who: What: When: Completion: Verification: To require that unretained cut slopes should not exceed 3:1 unless detailed, site-specific'geotechnical investigations indicate that steeper inclinations are appropriate and safe. Developers/Public Works Department. Confirm that project avoids unretained cut slopes greater than 3:1; uses retaining structures to reduce grading on slopes greater than 3:1; and provides benches and subsurface drainage on cut slopes where applicable. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/23.0: .Measures [or Slopes Greater Than 20% Why: Who: What: When: Completion: Verification: To require that slopes steeper than 5:1 should be keyed and benched into competent material and provided with subdrainage, prior to placement of engineered fill. Developers/Public Works Department. Confirm that appropriate measures have been taken in areas where slopes are greater than 20% are to be disturbed. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/24.0: Measures for Stoves Greater Than 50% Why: Who: What: When: Completion: Verification: To require that unreinforced fill slopes should be no steeper than 2:1 and provided with benches and surface drainage, as appropriate. Developers/Public Works Department. confirm that appropriate measures have been incorporated where unreinforced fill slopes greater than 2:1 are involved. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Mitigation Measure 3.6/25.0: Comvaction of Fill Why: Who: What: When: Completion: Verification: To require that fill be engineered (compacted) to at least 90 percent relative compaction. Developers/Public Works Department. Ensure that fill will be compacted to at least 90 percent relative compaction Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. 45 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.6/26.0: Preparation and Submittal of Subsurface Drainage Inspection Plans Why: Who: What: When: Completion: Verification: To require that development projects prepare plans for the periodic inspection and maintenance of subsurface drainage features, and the removal and disposal of materials deposited in surface drains and catch basins. Developers/Public Works Department. Confirm that plans have been prepared and submitted for the periodic inspection and maintenance of subsurface and surface drainage facilities. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. Impact 3.6/K Erosion and Sedimentation: Construction-Related Miti~,ation Measure 3.6/27.0: Timin~ of Gradin~ Activities Why: Who: What: When: Completion: Verification: To require that grading activities be timed to avoid the rainy season as much as possible, and that interim control measures be implemented to control runoff and reduce erosion potential. Developers/Public Works Department. Review interim control measures to prevent runoff, control runoff velocity and trap silt for effectiveness. Prior to issuance of grading permit. Prior to issuance of grading permit. Public Works Department. Impact 3.6/L Erosion and Sedimentation: Long-Term Mitigation Measure 3.6/28.0: Long-Term Control Measures Why: Who: What: When: Completion: Verification: To reduce long-term erosion and sedimentation impacts through appropriate design, construction, and continued maintenance of surface and subsurface drainage. Developers/Public Works Department. Review adequacy of long-term control measures based upon recommendations of geotechnical consultants. Condition of tentative map approval. Prior to issuance of grading permit. Public Works Department. 46 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan SECTION 3.7: BIOLOGICAL RESOURCES 1. Imnacts Ret~uiring Mitigation This section identifies the following impacts requiring mitigation: IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM 3.7 IM IM /A Direct Habitat Loss /B Indirect Impacts of Vegetation Removal /C Loss or Degradation of Botanically Sensitive Habitat /D San Joaquin Kit Fox /F Red-Legged Frog /G California Tiger Salamander /H Western Pond Turtle /I Tri-Colored Blackbird /J Golden Eagle: Destruction of Nesting Site /K Golden Eagle: Elimination of Foraging Habitat /L Golden Eagle and Other Raptor Electrocutions /M Burrowing Owl /N American Badger /O Prairie Falcon, Northern Harrier, and Black-Shouldered Kite 3.7/P Sharp-Shinned Hawk and Cooper's Hawk 3.7/S Special Status Invertebrates 2. Mitigation Imnlementation and Monitoring Program Impact 3.7/A Direct Habitat Loss Mitigation Measure 3.7/1.0: (Policy 6-21 ) AvoidinE Disturbance/Removal of Vegetation Why: Who: What: When: Completion: Verification: To ensure that direct disturbance or removal of trees or native vegetation cover should be minimized and be restricted to those areas actually designated for the construction of improvements. Developers/Planning Department. Review plans to verify that disturbance/removal of vegetation has been kept to a minimum. Prior to approval of tentative map. Prior to approval of final map. Planning Department. Miti~,ation Measure 3.7/2.0: (Policy 6-23) Vegetation Management Plans Why: Who: What: When: Completion: Verification: To provide for the preparation of vegetation enhancement/management plans for all open space areas (whether held publicly or privately) with the intent to enhance the biologic potential of the area as wildlife habitat. Developers/Planning Department. Ensure that vegetation management plans have been prepared for designated open space areas. Prior to approval of tentative map. Prior to approval of final map. Planning Department. 47 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.7/3.0: (Action Program 60 ) Revegetation Plan Why: Who: What: When: Completion: Verification: To require a detailed revegetation/restoration plan to be developed for all disturbed areas that are to remain undeveloped. Developers/Planning Department. Ensure that revegetation/restoration plans have been prepared for disturbed areas. Prior to approval of final map. Prior to approval of grading plans. Planning Department. Miti~cation Measure 3.7/4.0: Grazing Mana~,ement Plan Why: Who: What: When: Completion: Verification: To require the City to develop and implement grazing management plans to protect riparian and wetland areas, increase plant diversity, and encourage the recovery of native plants. Planning Department. Prepare a Grazing Management Plan and develop a strategy for implementation. Upon annexation. As soon as possible after annexations. Planning Department. Impact 3.7/B Indirect Impacts of Vegetation Removal Mitigation Measure 3.7/5.0: (Policy 6-22) Reve~,etation Why: Who: What: When: Completion: Verification: To ensure that all areas of disturbance are revegetated as quickly as possible to prevent erosion. Developers/Planning Department. 1 ) Planning Department will ensure that revegetation plans include schedule for replanting. 2) Building Inspectors will ensure that revegetation occurs on schedule. 1 ) Prior to approval of revegetation plans. 2) After site grading. 1 ) Prior to approval of final grading plans. 2) Completion of revegetation. Planning Department/Public Works. Impact 3.7/C Loss or Degradation of Botanically Sensitive Habitat Mitization Measure 3.7/6.0: (Policy 6-9) Preservation of Hvdrolo~,ic Features Why: Who: What: When: To require the preservation of natural stream corridors, ponds, springs, seeps, and wetland areas wherever possible. Applicants/Planning Department. Ensure that California Department of Fish and Game and Army Corps of Engineers (COE) have been consulted to determine jurisdiction and provide recommendations. During processing of prezoning and annexation applications. 48 City of Dublin May 7, 1993 E~s, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to approval of final map. Planning Department. Mitigation Measure 3.7/7.0: fPolicv 6-10 ) Preservation of Ri~arian and Wetlands Areas Why: Who: What: When: Completion: Verification: To require the incorporation of riparian and wetland areas into project open space areas, and ensure that loss of riparian or wetland habitat will be mitigated per Department of Fish and Game/Corps of Engineers. Developers/Planning Department. 1) Planning Department will ensure that riparian and wetland areas are incorporated into open space areas wherever feasible, and that revegetation plans provide appropriate mitigation for loss of riparian/wetlands habitat. 2) Planning Department in conjunction with appropriate agency will ensure that mitigation occurs as planned. 1 ) Prior to approval of revegetation plans. 2) After site grading. 1 ) Prior to approval of final grading plans. 2) Completion of revegetation. Planning Department. Mitigation Measure 3.7/8.0: f Policv 6-11 ) Vegetation o f Stream Corridors Why: Who: What: When: Completion: Verification: To require that all stream corridors be revegetated with native plant species to enhance their natural appearance and improve habitat values. Developers/Planning Department. 1 ) Planning Department will ensure that revegetation plans provide for the revegetation of stream corridors. 2) Planning Department in conjunction with appropriate agency will ensure that revegetation occurs as planned. 1) Prior to approval of revegetation plans. 2) After site grading. 1 ) Prior to approval of final grading plans. 2) Completion of revegetation. Planning Department. Mitigation Measure 3.7/9.0: (Policy 6-12) Engineering for Storm Runoff Why: Who: What: When: Completion: Verification: To ensure that storm runoff is carried in natural stream channels wherever possible, rather than replacing with underground drainage systems. Applicants/Public Works Department. Ensure that storm runoff plans preserve/utilize natural stream channels as effectively as possible. Prior to tentative map approval. Final map approval. Public Works Department. 49 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.7/10.0: (Policy 6-13) Open Soace Corridor System Why: Who: What: When: Completion: Verification: To establish a stream corridor system that provides multi-purpose open space corridors capable of accommodating wildlife and pedestrian circulation. Developers/Planning Department. Planning Department, with consultation from CDFG, will ensure that plans provide for the effective preservation/enhancement of stream corridors as multi-purpose corridors. Prior to approval of tentative map. Prior to approval of final grading plans. Planning Department. Mitigation Measure 3.7/11.0: (Program 6E ) Submittal of Wetlands Delineation Why: Who: What: When: Completion: Verification: To require all project applicants to submit a multi-parameter wetlands delineation to the COE for verification and jurisdictional establishment, and submit plans for proposed alteration to any watercourse to the DFG for their review and approval. Applicants/Planning Department. Verify submittal of multi-parameter wetlands delineation to the Corps of Engineers, and submittal of plans streamcourse alteration plans to the Department of Fish and Game. Condition of approval for tentative map. Final map approval. Planning Department. Mitigation Measure 3.7/12.0 (Program 6F) Comvrehensive Stream Corridor Restoration Program Why: Who: What: When: Completion: Verification: To provide for the development of a comprehensive stream corridor. restoration program that identifies a detailed set of criteria for grading, stabilization and revegetation of planning area stream channels. Planning Department/Public Works/Zone 7/Department of Fish and Game Develop a comprehensive stream corridor restoration program. During processing of prezoning and annexation applications. Prior to tentative map approval. Planning Department. Mitigation Measure 3.7/13.0: (Program 6G ) Dedication of Land and Imvrovements Why: Who: What: When: Completion: To provide for the dedication of land and improvements (i.e., trails, revegetation, etc.) along both sides of stream corridors as a condition of project approval. Developers/Planning Department. Require dedication of land and improvements along both sides of stream corridors. Condition of tentative map approval. Prior to Final map approval. 5O City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: Planning Department. Mitigation Measure 3.7/14.0: (Program 6H ) Sedimentation Control Ordinance Why: Who: What: When: Completion: Verification: To provide for the enactment of an erosion and sedimentation control ordinance establishing performance standards to ensure maintenance of water quality and protection of stream channels. Public Works Department. Enactment and enforcement of a sedimentation control ordinance. During processing of prezoning and annexation applications. Prior to tentative map approval of the Project site. Public Works Department. Mitigation Measure 3.7/15.0: (Program 6K) Liaison with Resource Management Agencies Why: Who: What: When: Completion: Verification: To establish a liaison between the City and resource management agencies for the purpose of monitoring compliance with Specific Plan policies. Planning Department. Establish and maintain a liaison with resource management agencies. Set up a meeting with agency representatives to review with them the adopted plan and points at which their input will be important. As soon as possible after adoption of the Specific Plan/GPA. On-going. Planning Department. Mitigation Measure 3.7/16.0: Protection of Existing, Sensitive Habitats Why: Who: What: When: Completion: Verification: To require that sensitive habitat areas will be avoided and protected wherever feasible. Developers/Planning Department. Verify that land use proposals avoid and protect existing sensitive habitat areas. Upon submittal of tentative map. Condition of final project approval. Planning Department. Mitigation Measure 3.7/17.0: Construction Near Drainages During the Dry Season Why: Who: What: When: Completion: Verification: To require construction near drainages to take place during the dry season. Developers/Public Works Department. Require that construction near drainages take place only during the dry season. Upon submittal of tentative map. Condition of approval of building permit or grading permit. Public Works Department. 51 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Impact 3.7/D San Joaquin Kit Fox Mitigation Measure 3.7/18.0: USFWS Section 7 Consultation/CDFG Section 2053 Consultation Why: Who: What: When: Completion: Verification: To require all development in the Project area to comply with the Eastern Dublin San Joaquin Kit Fox Protection Plan. Developers/Planning Department. Verify that development plans are consistent with the provisions and procedures set forth in the Eastern Dublin San Joaquin Kit Fox Protection Plan. Condition of tentative map approval. Final map approval. Planning Department. Mitigation Measure 3.7/18.1: Kit Fox Habitat Management Plan Why: Who: What: When: Completion: Verification: To provide for cooperation between the City and other appropriate agencies in the preparation of a Kit Fox Habitat Management Plan. Planning Department. Contact Department of Fish and Game about the City's interest in participating in the establishment of a habitat management plan with other jurisdictions in the region. Upon adoption of the Specific Plan/GPA. Ongoing. Planning Department. Mitigation Measure 3.7/19.0: (Program 6N) Restriction on use of Rodenticides/Herbicides Why: Who: What: When: Completion: Verification: To restrict the use of rodenticicles and herbicicles within the Project area in order to reduce potential impacts to wildlife. Public Works/Alameda County Department of Agriculture. Monitor use of rodenticides/herbicides on Project site. Require any poisoning programs to be done in cooperation with and under supervision of the County Department of Agriculture. Ongoing as a condition of project approval. On-going. Public Works Department. Impact Impact Impact Impact 3.7/F Red-Legged Frog 3.7/G California Tiger Salamander 3.7/H Western Pond Turtle 3.7/I Tri-Colored Blackbird Mitigation Measure 3.7/20.0: (Program 6L ) Pre-Construction Survey Why: Who: What: To require developers to conduct a pre-construction survey within 60 days prior to habitat modification to verify the presence of sensitive species. Developers/Planning Department Review results of pre-construction surveys. 52 City of Dublin May 7, 1993 Eas~ . Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: 60 days prior to habitat modification. Prior to grading plan approval. Planning Department. Mitigation Measure 3.7/21.0: Habitat Protection Why: Who: What: When: Completion: Verification: To ensure the protection and enhancement of sensitive species habitat areas. Developers/Planning Department. Review plans to ensure compliance with Mitigation Measures 3.7/2.0, 3.7/3.0, and 3.7/6.0-3.7/18/0 inclusive. Prior to tentative map approval. Prior to grading plan approval. Planning Department. Mitigation Measure 3.7/22.0: Buffer Zones Why: Who: What: When: Completion: Verification: To require the maintenance of a buffer around breeding sites of the red- legged frog, California tiger salamander, and the Western pond turtle. Developers/Public Works. Maintenance of minimum buffer around breeding sites identified during the pre-construction surveys. Condition of grading plan approval. End of construction. Public Works Department. Impact 3.7/J Golden Eagle: Destruction of Nesting Site Mitigation Measure 3.7/23.0: (Policy 6-20) Golden Eagle Protection Zone Why: Who: What: When: Completion: Verification: To ensure that a natural open space zone (Golden Eagle Protection Zone) is maintained around the golden eagle nest located in the northeast corner of the planning area. Developers/Planning Department. Review development plans to ensure that a protection zone is maintained around the golden eagle nest. Condition of tentative map approval. Final map approval. Planning Department. Mitigation Measure 3.7/24.0: Golden Eagle Protection Zone: Additional Temporal Buffer Why: Who: What: To require that during the golden eagle reproductive period, an additional temporal buffer will be established within 250 feet of the Golden Eagle Protection Zone. Developers/Public Works Department. Monitor construction activities to ensure that the temporal buffer around golden eagle protection zone is maintained during the period between July and January. 53 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: During construction near the golden eagle protection zone. Following reproductive period or end of construction, whichever occurs first. Public Works Department. Impact 3.7/K Golden Eagle: Elimination of Foraging Habitat Mitigation Measure 3.7/25.0: Preservation of Foragin~ Habitat Why: Who: What: When: Completion: Verification: To provide suitable forage for the golden eagles, the Project maintains substantial rural residential/agricultural acreage. Planning Department. Ensure that future plans do not reduce habitat area. Condition of tentative map approval. Final map approval. Planning Department. Impact 3.7/L Golden Eagle and Other Raptor Electrocutions Mitigation Measure 3.7/26.0: (Program 6M) Under~rounding of Transmission Lines Why: Who: What: When: Completion: Verification: To require the placement of all transmission lines underground whenever feasible, to avoid the potential for raptor electrocutions. Public Works Department. Undergrounding of transmission lines. Condition of approval for Public Improvements Plan. Final Improvements Plan approval. Public Works Department. Impact 3.7/M Burrowing Owl Impact 3.7/N American Badger Mitigation Measure 3.7/27.0: Buffer Zones Why: Who: What: When: Completion: Verification: To require a minimum buffer be maintained around nesting sites of the burrowing owl and breeding sites of the American badger during the breeding season to avoid direct loss of individuals. Developers/Public Works Department. Maintenance of a minimum buffer (at least 300 feet) around nesting sites (either known or those identified in the pre-construction surveys) During construction. Following reproductive period or end of construction, whichever occurs first. Public Works Department. Impact 3.7/0 Prairie Falcon, Northern Harrier, and Black-Shouldered Kite Mitigation Measure 3.7/25.0 mitigates impacts to these species. Refer to monitoring of that 54 City of Dublin Eas May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan mitigation measure. Impact 3.7/P Sharp-Shinned Hawk and Cooper's Hawk Mitigation Measures 3.7/6.0-3.7/17.0 and 3.7/21.0 are applicable. Refer to monitoring of those mitigation measures. Impact 3.7/S Special Status Invertebrates Mitigation Measure 3.7/28.0: Pre-construction Surveys Why: Who: What: When: Completion: Verification: To require developers to conduct a pre-construction survey within 60 days prior to habitat modification to verify the presence of sensitive species. Developers/Planning Department Review results of pre-construction surveys. 60 days prior to habitat modification. Prior to grading plan approval. Planning Department. SECTION 3.8: VISUAL RESOURCES 1. Imnacts Reauirin~ Mitigation This section identifies the following impacts requiring mitigation: IM 3.8/A Standardized "Tract" Development IM 3.8/B Alteration of Rural/Open Space Visual Character IM 3.8/C Obscuring Distinctive Natural Features IM 3.8/D Alteration of Visual Quality of Hillsides IM 3.8/E Alteration of Visual Quality of Ridges IM 3.8/F Alteration of Visual Quality of Flatlands IM 3.8/G Alteration of Visual Quality of Watercourses IM 3.8/H Alteration of Dublin's Visual Identity as a Freestanding City IM 3.8/I Scenic Vistas IM 3.8/J Scenic Routes 2. Mitigation Imnlementation and Monitoring Program Impact 3.8/A Standardized "Tract" Development Mitigation Measure 3.8/1.0: Visually Distinctive Community Why: Who: What: To establish a visually distinctive community which preserves the character of the natural landscape by protecting key visual elements and maintaining views from major travel corridors and public spaces. Planning Department/Developers. Ensure development proposals comply with design guidelines set forth in 55 City of Dublin May 7, 1993 Easl Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion:. Verification: Chapter 7: Community Design of the specific Plan. Prior to approval of prezoning. Final map approval. Planning Department. Impact 3.8/B Alteration of Rural/Open Space Visual Character Mitigation Measure 3.8/2.0: Imt~lementation of Land Use Plan Why: Who: What: When: Completion: Verification: To ensure implementation of the Specific Plan/GPA land use plan, which was developed to retain predominant natural features and a sense of openness. Applicants/Planning Department. Ensure that development proposals emphasize retention of predominant natural features and preservation of a sense of openness. Prior to approval of prezoning. Final map approval. Planning Department. Impact 3.8/C Obscuring Distinctive Natural Features Mitigation Measure 3.8/3.0: (Policy 6-28) Preservation of natural features Why: Who: What: When: Completion: Verification: To require the preservation of the natural open beauty of the hills and other important visual resources. Applicants/Planning Department. Ensure that development proposals preserve the natural open beauty of the hills and other important visual resources on the site. Prior to approval of prezoning. Final map approval. Planning Department. Impact 3.8/D Alteration of Visual Quality of Hillsides Mitieation Measure 3.8/4.0: (Policy 6-32) Reduction of visual imvacts due to extensive ~radin~ Why: Who: What: When: Completion: Verification: To reduce the visual impact of extensive grading through sensitive engineering design that uses gradual transitions from graded areas to natural slopes and revegetation. Developers/Planning Department. Review plans to ensure implementation of sensitive engineering design and revegetation. Prior to approval of prezoning. Prior to final grading plan approval. Planning Department. 56 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.8/4.1: (Policy 6-34) Minirnization of Contours Alteration Why: Who: What: When: Completion: Verification: To minimize alterations to existing natural contours. Developers/Planning Department. Review plans to see that they minimize alteration of natural contours. Prior to approval of prezoning. Before final grading plan approval. Planning Department. Mitigation Measure 3.8/4.2: (Policy 6-35 ) Avoidance of Flat Grading, Why: Who: What: When: Completion: Verification: To avoid extensive areas of flat development. Developers/Planning Department. Review plans for success at employing alternatives to flat grading including individual grading, stepped grading, and design in response to topographical and geotechnical conditions. Prior to approval of prezoning. Before final grading plan approval. Planning Department. Miti~,ation Measure 3.8/4.3: (Policy 6-36) Building, DesiVn Why: Who: What: When: Completion: Verification: To encourage building design to conform to natural land form as much as possible. Developers/Planning Department. Review plans for success at using building design that conforms to the natural landforms of the Project site. Prior to approval of prezoning. Before building permit is approved. Planning Department. Mitization Measure 3.8/4.4: (Policy 6-37 ) Recontourinz of Graded Sloves Why: Who: What: When: Completion: Verification: To require graded slopes to be re-contoured to resemble existing landforms in the immediate area. Developers/Planning Department. Review plans to ensure that graded slopes will be recontoured to blend into existing landforms in the immediate area. Prior to approval of prezoning. Final grading plan approval. Public Works Department. Miti~,ation Measure 3.8/4.5: (Policy 6-38 ) Minimization of the Height of Cut and Fill Slopes Why: Who: What: When: To minimize the height of cut and fill slopes as much as possible. Developers/Public Works Department. Require that the height of cut and fill slopes be minimized. Prior to approval of prezoning. 57 City of DuBlin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Prior to issuance of grading permit. Public Works Department. Impact 3.8/E Alteration of Visual Quality of Ridges Mitigation Measure 3.8/5.0: (Policy 6-29 ) Prohibition Against Develovment on Main Ridgeline Why: Who: What: When: Completion: Verification: To minimize visual impacts by prohibiting development on the main ridgeline, and ensuring that development on foreground hills meets certain standards. Planning Department/Applicants. Review plans to ensure that no development is located on main ridgeline of Specific Plan area, and that development on foreground hills maintains a backdrop of natural ridgelines. Prior to approval of prezoning. Prior to final map approval. Planning Department. Mitigation Measure 3.8/5.1: (Policy 6-30) General Maintenance of Scenic Views Why: Who: What: When: COmpletion: Verification: To control the location and design of structures so they generally maintain scenic views or appear to extend above an identified scenic backdrop when viewed from a designated scenic route. Planning Department/Applicants. Ensure that proposed development minimizes obstruction of scenic views. Prior to approval of prezoning. Prior to final map approval. Planning Department. Mitigation Measure 3.8/5.2: (General Plan Amendment Guiding Policy E) Structures on Ridgelines Why: Who: What: When: Completion: Verification: To restrict structures on the hillsides that appear to project above major ridgelines. Planning Department/Applicants. Ensure that proposed development minimizes obstruction of scenic views. Prior to approval of prezoning. Prior to final map approval. Planning Department. Impact 3.8/G Alteration of the Visual Character of Watercourses Mitigation Measure 3.3/6.0: (Policy 6-39 ) Protection of the Visual Character of Watercourses Why: Who: What: To protect the visual character of the stream corridors, unnecessary alteration or disturbance should be avoided and visual access to the stream corridors should be maintained from adjoining development. Planning Department/Applicants Review plans to ensure that watercourses are protected from unnecessary 58 City of Dublin May 7, 1993 ,, Eas, , Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: alteration or disturbance, and that visual access to the stream corridors is maintained. Prior to approval of prezoning. Prior to final map approval. Planning Department. Impact 3.8/I Scenic Vistas Miti~,ation Measure 3.8/7.0: (Policy 6-5 ) Preserve Views of Desiznated Oven Svace Areas Why: Who: What: When: Completion: Verification: To preserve views of designated open space areas. Planning Department/Applicants. Review plans to ensure that view corridors are developed and open space areas. Prior to approval of prezoning. Prior to final map approval. Planning Department. maintained between Mitigation Measure 3.8/7.1: Visual Survey of the Pro iect Site Why: Who: What: When: Completion: Verification: To provide for the preparation of a visual survey of the Project area to identify and map viewsheds of scenic vistas. Planning Department. Identify and map viewsheds of scenic vistas. During processing of prezoning Prior to any development east of Tassajara Road. Planning Department. IM 3.8/J Scenic Routes Mitigation Measure 3.8/8.0: (Action Pro~,ram 60 ) Desiznation of Scenic Routes Why: Who: What: When: Completion: Verification: To provide for the designation of scenic corridors, and the adoption of scenic corridor policies and review procedures for projects within a scenic corridor viewshed. Planning Department. Designate Tassajara Road, 1-580 and Fallon Road as scenic corridors; draft and adopt scenic corridor policies and review procedures and standards for projects within the scenic corridor viewshed. During processing of prezoning. Prior to annexation of new areas into the City. Planning Department. Miti~,ation Measure 3.8/8.1: (Action Pro~,ram 6R ) Visual Analysis of Projects Why: Who: What: To require projects with potential impacts on scenic corridors to submit detailed visual analysis with development project application. Developers/Planning Department. Review visual analysis of projects with potential impacts on scenic corridors 59 City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: to ensure project conformance with visual quality objectives. During processing of prezoning. Prior to final map approval. Planning Department. SECTION 3.9: CULTURAL RESOURCES 1. Imnacts Reouirin~ Mitigation This section identifies the following impacts requiring mitigation: IM 3.9/A Disruption or Destruction of Identified Prehistoric Resources IM 3.9/B Disruption or Destruction of Unidentified Prehistoric Resources IM 3.9/C Disruption or Destruction of Identified Historic Resources IM 3.9/D Disruption or Destruction of Unidentified Historic Resources 2. Mitigation Imnlementation and Monitorin~ Program Impact 3.9/A Disruption of Identified Prehistoric Resources Miti~,ation Measure 3.9/1.0: Subsurface Testin~ Why: Who: What: When: Completion: Verification: To require mechanical and/or hand subsurface testing on all location of prehistoric resources to determine the presence or absence of midden deposits. Applicants/Planning Department. Require submittal of findings of subsurface testing (mechanical or hand) to determine the presence or absence of midden deposits. Condition of tentative map approval. Prior to final map approval. Planning Department. Miti,~ation Measure 3.9/2.0: Recordin~ of Archaeolo,~ical Materials Why: Who: What: When: Completion: Verification: To require all locations containing either midden components or concentrations of cultural materials located on the surface to be recorded on State of California site survey forms. Applicants/Planning Department. Record midden components or concentrations of cultural materials on State of California site survey forms. Condition of tentative map approval. Prior to grading plan approval. Planning Department. 6O City of Dublin May 7, 1993 Eas , Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Miti~,ation Measure 3.9/3.0: Evaluative Testing Why: Who: What: When: Completion: Verification: To require evaluative testing if proposed development would directly or indirectly impact recorded and mapped locations of resources. Applicants/Planning Department. Review the findings of evaluative testing required for recorded and mapped locations that may be impacted by future construction or access. Condition of tentative map approval. Prior to grading plan approval. Planning Department. Mitigation Measure 3.9/4.0: Protection Program for Prehistoric Sites Why: Who: What: When: Completion: Verification: To require a qualified archaeologist to develop a protection program for "significant" resources whose condition will be altered by proposed development. Applicants/Planning Department. Review protection program prepared for prehistoric sites which contain either a surface or subsurface deposit of cultural materials, and incorporate recommended mitigation into the conditions of approval for the project. Condition of tentative map approval. Prior to grading plan approval. Planning Department. Impact 3.9/B Disruption or Destruction of Unidentified Prehistoric Resources Mitigation Measure 3.9/5.0: (Policy 6-25 ) Discovery of Historic/Prehistoric Remains Why: Who: What: When: Completion: Verification: To require grading and construction to cease in the event that historic or prehistoric remains are discovered during such activities. Developers/Planning Department. Cease grading/construction activities when historic or prehistoric resources are discovered. Retain a certified archaeologist to ascertain the significance of the remains. During grading/construction. Before grading/construction resume. Planning Department. Mitigation Measure 3.9/6.0: (Action Program 6P ) Additional Actions Related to Prehistoric Resources Why: Who: What: When: Completion: To require as part of the development application process that steps be taken to ensure that cultural resources are not impacted. Applicants/Planning Department. Prepare site sensitivity determination. If determined tO be sensitive, require detailed research and field reconnaissance, and development of a mitigation plan as necessary. Condition of tentative map approval. Prior to issuance of grading permit. 61 City of Dublin May 7, 1993 Eas Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: Planning Department. Impact 3.9/C Disruption or Destruction of Identified Historic Resources Miti~,ation Measure 3.9/7.0: (Policy 6-26 ) Archival Research Why: Who: What: When: Completion: Verification: To require all properties with historic resources which may be impacted by development to be subjected to in-depth archival research. Applicants/Planning Department. Review findings of in-depth archival research on any historic resources potentially impacted by future development. Prior to tentative map approval. Prior to issuance of grading permit. Planning Department. Mitigation Resources Why: Who: What: When: Completion: Verification: Measure 3.9/8.0: (Policy 6-27) Adaptive Reuse or Restoration o[ Historic To encourage the adaptive re-use or restoration of historic structures whenever feasible. Developers/Planning Department. Review development proposals to determine if reasonable consideration has been given to the potential to reuse or restore historic structures. Prior to tentative map approval. Prior to final map approval. Planning Department. Mitigation Measure 3.9/9.0: Evaluation of Structural Remains Why: Who: What: When: Completion: Verification: To require an architectural historian to assess the significance of all standing structures and other indicators of historic occupation and/or use of the area. Applicants/Planning Department. Review professional evaluation of structural remains to determine significance pursuant to CEQA, and incorporate mitigation recommendations, as needed, as conditions of project approval. Prior to tentative map approval. Prior to final map approval. Planning Department. Miti~,ation Measure 3.9/10.0: Research o [ Standing Structure Locations and Other Indicators of Historic Occupation Why: Who: What: To require archival research and oral interviews to determine the local or regional significance of structures or locations (identified in the 1988 report) by their association with important persons or events. Applicants/Planning Department. Review professional evaluation of structural remains to determine significance pursuant to CEQA, and incorporate mitigation 62 City of Dublin May 7, 1993 Eas , Dublin Specific Plan & GPA EIR Mi~igafsion Monitoring Plan When: Completion: Verification: recommendations, as needed, as conditions of project approval. Prior to tentative map approval. Prior to final map approval. Planning Department. Miti~,ation Measure 3.9/11.0: Record of All Historic Locations in 1988 Revort Why: Who: What: When: Completion: Verification: To require that all previously noted locations (in 1988 report) be recorded on official State of California Historical Site Inventory forms. Applicants/Planning Department. Verify that all locations noted in 1988 report have been recorded on State of California Historical Site Inventory forms. Prior to tentative map approval. Prior to final map approval. Planning Department. Miti~,ation Measure 3.9/12.0: Preservation Program for Historic Sites Why: Who: What: When: Completion: Verification: To require the preparation of a preservation program for historic sites which qualify under CEQA Guidelines as historically significant. Applicants/Planning Department. Review the preservation program prepared for any historic sites, and incorporate any recommended mitigations as a condition of project approval. Prior to tentative map approval. Prior to final map approval. Planning Department. SECTION 3.10 NOISE 1. Impacts Reauirinu Mitigation This section identifies the following impacts requiring mitigation: IM 3.10/A Exposure of Proposed Housing to Future Roadway Noise IM 3.10/B' Exposure of Existing Residences to Future Roadway Noise IM 3.10/D Exposure of Proposed Residential Development to Noise from Future Military Training Activities at Parks Reserve Forces Training Area (Camp Parks RFTA) and the County Jail IM 3. 10/E Exposure of Existing and Proposed Residences to Construction Noise IM 3.10/F Noise Conflicts due to the Adjacency of Diverse Land Uses Permitted by Plan Policies Supporting Mixed-Use Development 63 City of Dublin May 7, 1993 ~Dublin Specific Phn & GPA EIR Mitigation Monitoring Plan 2. Mitil~ation Imnlementation and Monitorin!~ Program Impact 3.10/A Exposure of Proposed Housing to Future Roadway Noise Mitigation Measure 3.10/1.0: Acoustical Study Within Future CNEL 60 Contour Why: Who: What: When: Completion: Verification: To require acoustical studies for all residential development projects within the future CNEL 60 contour to show how interior noise levels will be reduced to 45 riB. Applicants/Planning Department. Verify the preparation of an acoustical study for all residential projects located within the future CNEL 60 noise contour, and confirm the incorporation of mitigation measures into the proposed plan. Prior to tentative map approval. Prior to final map approval. Planning Department. Impact 3.10/B Exposure of Existing Residences to Future Roadway Noise Mitigation Measure 3.10/2.0: Provision of Noise Control Measures Why: To require that all development projects in the Project area provide noise barriers or berms near existing residences to control noise in outdoor use spaces. Who: Applicants/Planning Department. What: Verify that proposed plans provide noise abatement for existing residences or that such mitigation is not necessary. When: Prior to tentative map approval. Completion: Prior to Final map approval. Verification: Planning Department. Mitigation Measure 3.10/7.0: Noise Mitigation Fee Why: Who: What: When: Completion: Verification: To provide for the establishment of a noise mitigation fee to pay for on- and off-site noise mitigations, including but not limited to, noise barriers, earthen berms, or retrofitting structures with sound-rated windows. Applicants/Planning Department. Prepare an ordinance permitting the levying of a noise mitigation fee. During processing of prezoning and annexation applications. Prior to tentative map approval for projects along Tassajara Road, Hacienda Road, or Fallon Road. Planning Department. Impact 3.10/D Exposure of Proposed Residential Development to Noise from Future Military Training Activities at Parks Reserve Forces Training Area (Camp Parks RFTA) and the County Jail Mitigation Measure 3.10/3.0: Perform Acoustical Studies Why: To require acoustical studies prior to future development in the Foothill 64 City of Dublin May 7, 1993 Eas~ Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Who: What: When: Completion: Verification: Residential, Tassajara Village Center, County Center, and Hacienda Gateway subareas to determine whether future noise impacts from Camp Parks and the county jail will be within acceptable limits. Applicants/Planning Department. Verify that acoustical studies have been prepared for projects proposed in identified subareas, and incorporate recommended mitigations as conditions of project approval. Prior to tentative map approval. Prior to final map approval. Planning Department. Impact 3.10/E Exposure of Existing and Proposed Residences to Construction Noise Miti~,ation Measure 3.10/4.0: Construction Noise Mana~,ernent Program Why: Who: What: When: Completion: Verification: To require development projects in the Project area to submit a Construction Noise Management Program that identifies measures proposed to minimize construction noise impacts on existing residents. Applicants/Planning Department. Review Construction Noise Management Program to ensure that adequate measures have been taken to protect existing residents. Prior to tentative map approval. Prior to final map approval. Planning Department. Miti~,ation Measure 3.10/5.0: Compliance with Local Noise Standards Why: Who: What: When: Completion: Verification: To minimize construction noise 'impacts, all operations should comply with local noise standards and be limited to normal daytime hours, and stationary equipment should be adequately muffled and located away from sensitive receptors. Applicants/Planning Department. Ensure that noise mitigation measures have been included as conditions of project approval. During construction. Following construction. Planning Department. Impact 3.10/F Noise Conflicts due to the Adjacency of Diverse Land uses Permitted by Plan Policies Supporting Mixed-Use Development Mitigation Measure 3.10/6.0: Noise Management Plans Why: Who: What: To require the preparation of noise management plans for all mixed-use projects in which residential units would be combined with commercial, office, or other urban non-residential uses. Applicants/Planning Department. Verify the preparation of a noise management plan for mixed-used projects, and review plans for mitigation that should be incorporated as a condition 65 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan When: Completion: Verification: of approval. Prior to tentative map approval. Prior to final map approval. Planning Department. SECTION 3.11 AIR OUALITY 1. Imnacts Reauirin2 Miti2ation This section identifies the following impacts requiring mitigation: IM 3.11/A Dust Deposition Soiling Nuisance From Construction Activity IM 3.11/B Construction Equipment/Vehicle Emissions IM 3.11/C Mobile Source Emissions: ROG or NOx IM 3.11/D Mobile Source Emissions: CO IM 3.11/E Stationary Source Emissions 2. Mitigation Implementation and Monitorin2 Pro2ram Impact 3.11/A Dust Deposition Soiling Nuisance From Construction Activity Mitigation Measure 3.11/1.0: Construction-Related Dust Abatement Measures Why: Who: What: When: Completion: Verification: To require development projects to implement dust control measures to reduce project dust deposition to acceptable levels. Developers/Public Works Department. 1) Require dust abatement measures to be outlined as conditions in the grading plan. 2) Monitor implementation of measures during construction. 1 ) Ensure inclusion of abatement measures in grading plan. 2) Monitor implementation of measures during grading and early phases of construction. Following construction. Planning Department/Public Works Department. Impact 3.11/B Construction Equipment/Vehicle Emissions Miti~,ation Measure 3.11/2.0: Minimization of Interference of Construction Traffic with Regional Non-Pro iect Traffic Movement Why: Who: What: When: Completion: To minimize construction interference with regional non-project traffic movement. Developers/Public Works Department. Routing and scheduling of construction-related traffic to avoid interference with non-project traffic movement. Prior to approval of building and/or grading permits. Following completion of construction. 66 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: Public Works. Mitigation Measure 3.11/3.0: Emissions Control Why: Who: What: When: Completion: Verification: To require emissions control from on-site equipment through a routine mandatory program of low-emissions tune-ups. Developers/Planning Department/Public Works Department. 1) Verify the incorporation of this emissions control measure in the conditions of approval. 2) Monitor construction to verify implementation of control measure. 1 ) Prior to final map approval. 2) During construction. Following completion of construction. Planning Department/Public Works Department. Mitieation Measure 3.11/4.0: Construction Im pact Reduction Plan Why: Who: What: When: Completion: Verification: To require preparation of a construction impact reduction plan that incorporates all proposed air quality mitigation strategies. Planning Department/Public Works Department/Applicants. Ensure that the construction impact reduction plan incorporate all proposed air quality mitigation strategies, and clearly defines responsibilities for implementation and supervision. 1 ) Preparation of plan prior to development review approval. 2) Monitoring of implementation during construction. Following completion of construction. Planning Department/Public Works Department. Impact 3.11/C Mobile Source Emissions:ROG or NOx Mitigation Measure 3.11/5.0: Regional Intera~encv Cooveration Why: Who: What: When: Completion: Verification: To encourage cooperation to integrate air quality planning efforts on a regional basis. Planning Department/Tri-Valley and Regional Agencies. Coordinate interagency cooperation to integrate air quality planning with transportation, transit and other infrastructure plans. Establish liaisons and begin coordination concurrent with plan adoption. On-going. Planning Department. Mitigation Measure 3.11/6.0: Planning, Consistency Why: Who: What: To maintain consistency among specific development plans and regional transportation and growth management plans. Planning Department/Tri-Valley and Regional Agencies. Review plans to ensure consistency between specific development plans for the Project site and regional transportation and growth management plans. 67 Earn ~ublin Specific Plan & GPA EIR Mitigation Monitoring Plan City of Dublin May 7, 1993 When: Completion: Verification: Prior to approval of tentative map. Prior to final map approval. Planning Department. Miti~,ation Measure 3.11/7.0: Transportation Demand Mana~,ement (TDM ) Why: Who: What: When: Completion: Verification: To implement transportation demand management techniques to reduce mobile source emissions. Public Works Department. Review plans for inclusion of TDM techniques to reduce mobile source emissions. Prior to tentative map approval. Prior to final map approval. Public Works. Mitigation Measure 3.11/8.0: Otgtimization of Existin~ Transportation System Why: Who: What: When: Completion: Verification: To optimize the existing transportation system to reduce congestion and shift travel to non-peak travel periods. Planning Department/Public Works Department. Work with LAVTA to development public information programs to encourage use of public transit, and encourage large employers to implement measures to shift travel to non-peak travel periods. Ongoing. On-going. Planning'Department/Public Works Department. Miti~,ation Measure 3.11/9.0: Coordination o [ Develo t~ment with Roadwav Imt~rovements Why: Who: What: When: Completion: Verification: To coordinate levels of growth with roadway transportation facilities improvements to accommodate travel demand without inducing demand by providing excess system capacity. Public Works Department. Phase roadway improvements so that they accommodate growth, but avoid "over-building" facility improvements. Review schedule of roadway improvements concurrent with submittal of tentative map. Prior to final map approval. Public Works Department. Miti~,ation Measure 3.11/10.0: Mixed-Use Develot;ment Why: Who: What: When: To encourage mixed-use development that provides housing, jobs, goods and services in close proximity. Planning Department. Encourage developers to consider mixed-use development in their projects as a means to reduce discretionary vehicle trips. During pre-application discussions and application process. 68 City of Dublin May 7, 1993 Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Completion: Verification: Tentative map approval. Planning Department. Miti~,ation Measure 3.11/11.0: Jobs/Housing Linkage Why: To require linkage between growth of housing and job opportunities consistent with a positive sub-regional contribution to jobs/housing ratio balances. Who: Planning Department. What: Keep Planning Commission and City Council aware of sub-regional jobs/houSing status and the implications of project approvals on that balance. When: Ongoing as part of individual development review process. Completion: Ongoing. Verification: Planning Department. Impact 3.11/E Stationary Source Emissions Mitigation Measure 3.11/12.0: Conservation Target Level for Stationary Source Emissions Why: Who: What: When: Completion: Verification: To minimize stationary source emissions associated with Project development wherever feasible. Planning Department. 1 ) Establish and implement a conservation target level for stationary source emissions at 10 percent above the Title 24 standards. 2) Review individual projects to verify attempts to meet conservation target. 1 ) Prior to rezoning and annexation approval. 2) Prior to final map approval. Final project approval. Planning Department. Mitigation Measure 3.11/13.0: Solid Waste Recycling Why: Who: What: When: Completion: Verification: To incorporate solid waste re-cycling in all development planning. Planning Department. Develop a strategy for integrating solid waste recycling into planning for all new development, and work with developers to implement this strategy. Prior to rezoning and annexation approval. Ongoing. Planning Department. 69 City of Dublin May 7, 1993 Eas, Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan SECTION 3.12: FISCAL CONSIDERATIONS 1. Imvacts ReauirinR Mitieation This section identifies the following impact requiring mitigation: IM 3.12/B Fiscal Impacts Related to the Cost and Provision of Project-Related Infrastructure Improvements 2. Mitigation ImVlementation and Monitoring Program Impacts 3.12/B Impacts Related to the Cost and Provision of Project-Related Infrastructure Improvements Miti~,ation Measure 3.12/1.0: Develot~ment A~,reements Why: Who: What: When: Completion: Verification: To provide for the preparation and adoption of a development agreement for each project that spells out the precise financial responsibilities of the developer. City Manager's Office/Developers. Prepare and adopt a development agreement or the appropriate agreements for each development project that sets forth the precise financial responsibilities of the applicants. Prior to prezoning and annexation approval. Condition of final project approval. City Manager. Mitigation Measure 3.12/2.0: Area of Benefit Ordinance Why: Who: What: When: Completion: Verification: To adopt an Area of Benefit Ordinance and form an Area of Benefit for those properties benefiting from construction of public improvements described in the Specific Plan. City Manager's Office. Prepare and adopt an Area of Benefit Ordinance, and define the Area(s) of Benefit. Prior to prezoning and annexation approval. Prior to final approval of any development in the Project area. City Manager. Mitigation Measure 3.12/3.0: Special Assessment District or Mello-Roos CFD Why: Who: What: When: Completion: To create one or more Mello-Roos CFD or Special Assessment Districts to finance construction of the infrastructure to serve the Area of Benefit. City Manager's Office. Prepare and adopt one or more Mello-Roos CFD or Special Assessment Districts to finance infrastructure for Areas of Benefit. Prior to prezoning and annexation approval. Prior to any final project approval. 7O City of Dublin May 7, 1993 East Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Verification: City Manager. Mitigation Measure 3.12/4.0: Marks-Roos Bond Poolin~ Why: Who: What: When: Completion: Verification: To have bond counsel evaluate the benefit to the City, in terms of savings of money and avoidance of undue risk, of pooling bonds under the Marks- Roos Bond Pooling Act. City Manager's Office. Evaluate options related to bond pooling for Eastern Dublin pursuant to the provisions of the Marks-Roos Bond Pooling Act. Prior to prezoning and annexation approval. Prior to any final project approval. City Manager. Mitigation Measure 3.12/5.0: City-Wide Develover and Builder Imvact Fee Systems Why: Who: What: When: Completion: Verification: To analyze city-wide infrastructure needs to assess the usefulness of implementing an impact fee program, in compliance with AB 1600, that could draw some funding from new development when final map or building permits are issued. City Manager's Office. Evaluate efficacy of implementing of an impact fee system, as provided by AB 1600. If found to be useful, draft and adopt an ordinance to implement. Prior to prezoning and annexation approval. Prior to any final project approval. City Manager. Mitigation Measure 3.12/6.0: School Imvact Fees Why: Who: What: When: Completion: Verification: To coordinate City and School District efforts to fund necessary school facilities and collect payable fees. City Manager/DUSD/LVJUSD. Meet with school district(s) to coordinate efforts to fund school facilities. Prior to prezoning and annexation approval. Prior to any final project approval. City Manager. Mitigation Measure 3.12/7.0: Highway Interchange Fundin~ Why: Who: What: When: Completion: Verification: To coordinate City and Caltrans efforts to fund necessary freeway improvements and collect developers' share of costs. City Manager's Office/Public Works/Caltrans. Meet with Caltrans to coordinate efforts to fund freeway improvements and collect proportionate share of costs from developers. Prior to prezoning and annexation approval. Prior to any final project approval. City Manager. 71 City of Dublin May 7, 1993 East Dublin Specific Plan & GPA EIR Mitigation Monitoring Plan Mitigation Measure 3.12/8.0: Utilities lmvact Fees Why: Who: What: When: Completion: Verification: To coordinate City and DSRSD efforts to fund utilities services and collect developers' share of costs. City Manager's Office/Public Works/DSRSD. Meet with DSRSD to coordinate efforts to fund utilities services and collect proportionate share of costs from developers. Prior to prezoning and annexation approval. Prior to any final project approval. City Manager. 72