HomeMy WebLinkAboutReso 054-93 EncroachOversizeFee RESOLUTION NO. 54-93
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING REVISIONS TO THE FEE AND BOND SCHEDULES
FOR ENCROACHMENT PERMITS
AND OVERSIZE VEHICLE PERMITS
WHEREAS, the fees for encroachment permits were previously revised in
June of 1990; and
WHEREAS, the City's cost for issuing encroachment permits and inspecting
the work is greater than the revenue received from fees in the June, 1990, fee schedule; and
WHEREAS, revisions to the fee and bond schedules are proposed; and
WHEREAS, the proposed fees will not exceed the City' s cost for performing
the services.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Dublin does hereby approve the revised fee and bond schedules for encroachment permits
attached as "Exhibit A."
PASSED, APPROVED, AND ADOPTED this 10th day of May, 1993.
AYES: Councilmembers Burton, Houston, Howard, Moffatt
and Mayor Snyder
NOES: None
ABSENT: None
ATTES ·
C
a: (9293) lapril Iresoefee
CITY OF DUBLIN
FEE SCHEDULE - ENCROACHMENT PERMITS
AND OVERSIZE VEHICLE PERMITS
(Adopted May 10, 1993, City Council Resolution No. 54-93)
ENCROACHMENT PERMITS:
BASIC PERMIT FEE:
PLAN CHECKING FEE:
RESURFACING SURCHARGE:
$10.00
Actual cost of checking plans (time and materials
plus overhead). Deposit required.
$50.00 for first 50 square feet of trench; $1.00 per
square foot thereafter.
INSPECTION FEES:
Transverse and longitudinal trenches,
road cuts, and other street excavation
work, including surface restoration:
1 linear foot to 100 linear feet:
Over 100 linear feet:
Constructing concrete sidewalk, curb,
and gutter:
$80.00 minimum
$80.00 plus $0.50 per linear foot
in excess of 100 linear feet.
1 linear foot to 50 linear feet: $80.00 minimum
Over 50 linear feet: $80.00 plus $0.10 per linear foot
in excess of 50 linear feet.
(Where both sidewalk and curb and gutter are being constructed, inspection fees will
be charged for each item.)
Constructing concrete driveways:
Residential:
Commercial:
Constructing drain inlets, manholes,
and connections to same:
$50.0O
$100.00
$80.00each
ENCROACHMENT FEES, cont'd
5
Asphalt concrete paving, curb and gutter
tie-in, etc.
1 square foot to 100 square feet:
$80.00 minimum
Over 100 square feet:
$80.00 plus $0.10 per square foot
in excess of 100 square feet.
6. Temporary street or lane closures:
$25.00
Miscellaneous work:
$80.00 minimum. (Actual cost of
inspection on basis of time and
materials plus overhead. )
Where work will include more than one operation (e. g., pavement cut plus sidewalk replacement), the
minimum inspection fee shall apply to the first item and one-half the minimum inspection fee shall be
applied to each of the other items.
AH encroachment work shah be limited to the hours of 8:00 a.m. to 5:00 p.m. weekdays unless
otherwise specified on the permit.
Overtime and/or weekend inspection charges will be billed at actual cost (labor and vehicle) plus
overhead. A deposit will be required based on the number of overtime/weekend hours
estimated for the work being performed.
The above fees may be reduced or waived with approval of the City Manager.
OVERSIZE VEHICLE PERMITS
BASIC FEES:
Single Trip Permits
Annual Permits
$16.00
$90.00
LOADS OR MOVES REQUIRING ENGINEERING OR TRAFFIC CONTROL:
Oversize vehicles or building moves of a dimension requiting prior engineering,
lane closures, traffic control, or other inspection time shall be charged the
actual cost of the service provided by the City. A $250.00 minimum deposit shall
be required.
The above fees may be reduced or waived with approval of the City Manager.
SAN RAMON ROAD BANNER POLES
BASIC FEE FOR USE: $50.00
The fee for use of the San Ramon Road banner poles may not be reduced or waived.
CITY OF DUBLIN
CASH BOND SCHEDULE - ENCROACHMENT PERMITS
(Adopted May 10, 1993, City Council Resolution No. 54-93)
Transverse and longitudinal trenches,
road cuts, and other street excavation work:
1 square foot to 50 square feet:
Over 50 square feet:
Constructing concrete sidewalk:
Less than 50 square feet:
Over 50 square feet:
Constructing concrete curb and/or gutter:
Less than 30 linear feet:
Over 30 linear feet:
Constructing concrete driveway:
Residential:
Commercial:
Constructing drop inlets, manholes,
and connections to same:
Temporary street or lane closures:
Miscellaneous work:
$500 minimum
$500 plus $5.00 per square foot
in excess of 50 square feet.
$500 minimum
$500 plus $5.00 per square foot
in excess of 50 square feet.
$500 minimum
$500 plus $20.00 per linear foot
in excess of 30 linear feet.
$500 minimum
$1,000 minimum
$1,000 minimum per each
No bond is required.
Amount to be determined by the
City in accordance with the nature
and scope of work to be performed.
Conditions for Release: Bonds shall be released six months after the work has been accepted by the
City, provided there are no defects in the work.
Surety Bonds: Where surety bonds are deposited for a permit in lieu of cash bonds, the amount of
the bond shall be double the amount specified for cash bond.
Annual Bonds: A minimum annual cash deposit of $2,000 or surety bond of $5,000 may be posted
in lieu of a cash or surety bond for each permit. The City may require additional bonds or cash
deposits when the nature of the work is such that the amounts hereinbefore provided are insufficient to
cover expenses that may be incurred in restoring the fight-of-way to its former condition.
All bonds accepted by the City of Dublin or its officers pursuant to the requirements of the Municipal
Code covering the permitted work and previously established schedules, if any, adopted by the City
Council shall remain in effect until the expiration date of said bond.