Loading...
HomeMy WebLinkAbout4.09 Bicycle & Ped Master Planor 19 82 /ii � 111 DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL June 3, 2014 Honorable Mayor and City Councilmembers CITY CLERK File #600 -30 Christopher L. Foss, City Manager �?14 " Approval to Expand Fehr & Peers' Scope of Work for the Update of the City of Dublin Bicycle and Pedestrian Master Plan Prepared by Ferd Del Rosario, Senior Civil Engineer EXECUTIVE SUMMARY: The City's on -call consultant, Fehr & Peers, is currently finalizing the City's Bicycle and Pedestrian Master Plan under a scope of work approved by the City Council in June 2012. It has become necessary to expand the original scope of work, due to additional outreach, analysis and revisions that were not initially anticipated. The final draft of the Plan and CEQA Initial Study are nearing completion and will soon be released for public review and comment. FINANCIAL IMPACT: Fehr & Peers' original scope of work to update the City's Bicycle and Pedestrian Master Plan was approved for $146,970. Fehr & Peers has submitted an expanded scope of work that is inclusive of work conducted in the past year related to City Council direction to review a proposal to reduce travel lanes on Dublin Blvd., as well as additional work relating to the completion of the Plan draft. The extra work to complete the Plan is a not -to- exceed amount of $21,875. The project is being funded with Measure B Bicycle /Pedestrian Program funds and adequate funds are available for the extra work. RECOMMENDATION: Staff recommends that the City Council approve an expansion of Fehr & Peers' Scope of Work in the not -to- exceed amount of $21,875 for the update of the City of Dublin Bicycle and Pedestrian Master Plan and authorize the City Manager to sign Purchase Order. ubmitte° BlcByy Public Works Director '\ Reviewed By Assistant City Manager Page 1 of 2 ITEM NO. 4.9 DESCRIPTION: On July 17, 2012, the City Council approved the procurement of consulting services with Fehr & Peers in the amount of $146,970 for the update of the 2007 Bikeways Master Plan and development of a Pedestrian Plan with emphasis on the Downtown area. The focus of the update was to reflect the current status of the Plan and to achieve consistency with the most current regional transportation plans and bicycle design guidelines. In addition, a Pedestrian Plan is being developed to implement the policy items identified in the Downtown Dublin Specific Plan. The City hosted two public workshops over the course of the plan process which focused on citywide bicycle and pedestrian issues. The City also hosted a community meeting and met with the Dublin Chamber of Commerce with a focus on Downtown connectivity along the Dublin Boulevard corridor. In October 2013, Staff and the consultant presented the Downtown Connectivity proposals to the City Council for input. A draft of the Bicycle and Pedestrian Master Plan along with the design guidelines and the project CEQA Initial Study are currently being reviewed by Staff. Due to additional work associated with the proposal to remove travel lanes on Dublin Blvd. and the associated Downtown Connectivity Study, the Dublin Boulevard Feasibility Analysis, additional stakeholder meetings with the public and associated draft Plan revisions, it is necessary to expand the consultant's original scope of work. The added scope of work includes the preparations of and revisions to the Feasibility Analysis, preparation of meeting materials, extra meeting attendance, and additional revisions to the Plan. The cost of the extra work is a not -to- exceed amount of $21,875. The final draft of the Plan and CEQA Initial Study will soon be released for public review and comment. The Plan will then be presented to the Parks & Community Services Commission, the Planning Commission, and to the City Council. Based on the current schedule, the Draft Bicycle and Pedestrian Master Plan and project environmental document should be ready for City Council consideration and action in September 2014. NOTICING REQUIREMENTS /PUBLIC OUTREACH: A copy of the Staff Report was sent to Fehr & Peers. ATTACHMENTS: 1. July 17, 2012 City Council Agenda Item approving Fehr & Peers' Scope of Work to Update the Bicycle and Pedestrian Master Plan 2. Expanded Scope of Work Page 2 of 2 or 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL July 17, 2012 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -30 SUBJECT: Approval to Procure Transportation Consulting Services for the Update of the Citywide Bikeways Master Plan and Development of a Pedestrian Plan Prepared by Ferd Del Rosario, Senior Civil Engineer EXECUTIVE SUMMARY: The 2007 Citywide Bikeways Master Plan is being updated to reflect the current status of the Plan and to achieve consistency with recently updated regional transportation plans. Staff is also proposing the development of a Pedestrian Plan with emphasis on the Downtown area. The City Council will consider the procurement of transportation consulting services to update the Bikeways Master Plan and develop the Pedestrian Plan. The two master plans will be combined together to create Dublin Bikeways and Pedestrian Master Plan. FINANCIAL IMPACT: The total cost to update /develop the Bikeways /Pedestrian plan is $146,970. The project will be funded with Measure B Bicycle /Pedestrian Program funds and adequate funds have been budgeted for this project. RECOMMENDATION: Staff recommends that the City Council Authorize the City Manager to procure consulting services with Fehr and Peers for the update of the Citywide Bikeways Master Plan /development of Pedestrian Plan for an amount not to exceed $146,970. Submitted By Director of Public Works DESCRIPTION: �?14 Reviewed By Assistant City Manager The Bikeways Master Plan was originally developed in 2007 to help the City implement a bikeway system that could provide a viable transportation alternative to the automobile, improve safety for bicyclists and provide residents with access to open space, trails and other recreational amenities. The Plan included an evaluation of existing conditions, a prioritized list of Page 1 of 2 ITEM NO. 4.14 recommended improvements for both on and off - street facilities, and recommendations pertaining to bicycle parking, safety, education and enforcement. To reflect the current status of the Plan and to achieve consistency with recently updated regional transportation plans prepared by Metropolitan Transportation Commission (MTC), Association of Bay Area Governments (ABAG) and Alameda County Transportation Commission (ACTC), Staff has included the update of the Bikeways Master Plan in the City's Budget and Financial Plan for FY 12 -13 and 13 -14. Similarly Staff will update the bicycle design guidelines of the existing Plan as well as possible inclusion of state -of- the - practice solutions included in the National Association of City Transportation Officials ( NACTO) Design Guide. The NACTO Design Guide provides cities with solutions that can help create complete streets that are safe and enjoyable to bicyclists. Also being proposed is the development of a Pedestrian Plan which will include adoption of a pedestrian policy framework and implementation strategy with emphasis on the Downtown area. The two master plans will be combined together to create a single Bikeways and Pedestrian Master Plan document. In scoping the work to update the Plan, Staff had asked participants in the bi- annual Bikeways workshop conducted in May 2012 for feedback on the scope of work. Based on the feedback and suggestions received from the East Bay Bicycle Coalition, the scope of work will include a corridor study of Dublin Boulevard from San Ramon Road to the Alamo Canal Trail through Downtown, as recommended in the existing Bikeways Master Plan. The consultant will develop up to three design alternatives and prepare a technical memorandum identifying the pros and cons of the alternatives including conceptual design level cost estimates. The results and recommendations of the study will be presented to the stakeholders and the most viable alternative will be incorporated into the Plan. The scope includes conducting a community workshop to discuss existing conditions and needs, and a follow up workshop to discuss priority projects including the results of the Dublin Boulevard corridor study. Stakeholders and the public will be invited to the workshops which will be advertised and open to the public for input. The Draft Plan will be presented to the Planning and Parks & Community Services Commissions for input and comment, and eventually to the City Council for review and approval. The City has an existing on -call consultant services agreement with Fehr & Peers Transportation Consultants, who developed the first Citywide Bikeways Master Plan and is very familiar with the local bicycle and pedestrian network. The cost of the effort is estimated at $146,970 and will be funded with Measure B Bicycle /Pedestrian program funds. Staff recommends that the City Council authorize the City Manager to procure consulting services with Fehr & Peers for the update and development of the Bikeways /Pedestrian Master Plan. NOTICING REQUIREMENTS /PUBLIC OUTREACH: Copy to Fehr & Peers Transportation Consultants ATTACHMENTS: 1. Consultant Scope of Services to update and develop the Citywide Bikeways Master Plan /Pedestrian Plan Page 2 of 2 City of Dublin Bicycle Plan Update and Pedestrian Plan Scope of Work, Schedule and Fee The following scope of work includes the necessary elements for Dublin to update their 2007 Bicycle Transportation Plan and develop a Pedestrian Plan as discussed with Fehr & Peers. This plan update is intended to comply with the California Bicycle Transportation Account (BTA) guidelines as well as achieve consistency with recently updated regional transportation plans prepared by the Metropolitan Transportation Commission (MTC), Association of Bay Area Governments (ABAG), and the Alameda County Transportation Commission (ACTC). 190=111P ' ! ! C 1 < 0 Fehr & Peers will meet with the City project manager to review the scope of work, schedule and key project milestones. We will identify roles and responsibilities, obtain relevant available data, and identify key meeting dates for the TAC, commission meetings and community engagement. Fehr & Peers will work with the City project manager to identify a project Technical Advisory Committee (TAC) to ensure that each relevant City and partner agency is engaged in the project and can provide appropriate review of interim deliverables and recommendations prior to presentation of draft plan elements to relevant commissions. The TAC will include representatives from Public Works & Engineering, Community Development, and Parks & Community Services. The TAC may invite outside agencies such as East Bay Regional Park District, BART or Alameda County Transportation Commission to participate in individual meetings if appropriate. Generally the TAC will meet to review major deliverables at key project milestones. Proposed TAC meetings are identified as subtasks below. FT1 The 2007 Bicycle Transportation Plan has served as an effective policy guide and capital projects list for the past five years and requires a strategic update to ensure that the document continues to provide the Dublin community and city staff with appropriate guidance. Bicycle and pedestrian plans must be periodically updated to respond to changing land use, demographics, travel behavior, transportation infrastructure, design standards, funding availability, and other factors that influence bicycling and walking. The baseline update to the 2007 Plan would include the following elements in response to BTA requirements and City of Dublin needs: • Review and update most recent bicycle mode share and count data • Identify built projects and bikeway expenditures since adoption of the 2007 Plan • Identify land use changes • Examine most recent available collision history and community input on safety; map collision locations and summarize incident reports This task will also serve to document baseline conditions for walking in Dublin including: • Pedestrian mode share • Identify build project and pedestrian- focused expenditures in the last five years • Examine most recent collision history and community input on safety • Assemble baseline GIS inventory of existing pedestrian infrastructure including sidewalk network, marked crossings, pedestrian signal information and key pedestrian trip generator /attractors 2,2 .. ...... i Fehr & Peers will facilitate a meeting with the TAC to review existing conditions, ensure accuracy of findings, and plan for the community workshop and discuss complete streets policy development. We will provide an agenda, facilitate the meeting, and prepare follow up documentation. MWz � ....0 U J Y t w I P C S Fehr & Peers will conduct a community workshop to discuss City of Dublin investments and accomplishments related to bicycle and pedestrian infrastructure and programs and to identify bicycling and walking needs in the community. We will provide and introductory presentation emphasizing the quality of existing infrastructure, identifying the local opportunities to increase walking and bicycling trips, and soliciting input from attendees on specific opportunities. This input will aid the consultant and City team in updating the recommended bicycle network map, strategies for improving walkability in the Downtown area, updating the recommended bicycle design standards, and creating additional pedestrian design and project guidance for the City. In addition, it is necessary to community through the presentation that the Plan will focus on strategic corridors for bicyclists and on the Downtown for pedestrians. We will include specific interactive exercises in the workshop format to facilitate focus on these areas. Fehr & Peers will document the outcomes of this workshop to identify recommended areas for geographic focus and to generate lists of candidate capital improvements for integration into the updated plan recommendations. Fehr & Peers will conduct an assessment of the City of Dublin's existing pedestrian and bicycle programs including education, encouragement, enforcement and evaluation. We will document the existing program staffing, focus, budget, sources of past /current /future funding, and city -owned resources and staffing. The City of Dublin departments responsible for existing programs will provide Fehr & Peers with standard information in response to a questionnaire /data solicitation. Existing programs includes: Bike to Work Month, bicycle safety classes, 'Bike to Market' activities, adult safety classes, trail maps, City team bike challenge, and the Flat Tire Repair Clinic and Bike Donation Drive. Based on the data obtained and staff interviews, we will identify capacity to continue the identified programs. In addition to the assessment of existing programs, we will work with staff to identify programs gaps for further exploration in the recommendations phase of work below. Fehr & Peers will use the recommendations provided by the League of American Bicyclists in response to the City of Dublin's Bicycle Friendly Community Application to support this task. FT3 �. a P l F ���.f I ' I I �� . ° x,w l l 11 111 �Y' Fehr & Peers will coordinate with City of Dublin staff to review the City developed Complete Street Policy in preparation for the development of more detailed bicycle and pedestrian design guidelines. Fehr & Peers will update the 2007 Plan bikeway design standards recommendations to conform with current state -of- the - practice and relevant design manuals and identify where modifications to City of Dublin street design standards may be necessary and should be considered by staff for recommendation to commissions and Council. Fehr & Peers will develop design guidance that addresses recent changes in the 2012 California MUTCD, updated AASHTO Bikeway Design Guide (2012 release), NACTO Urban Bikeway Design Guide and Caltrans Highway Design Manual (2012 Complete Streets). Collectively these manuals have been significantly changed in recent years and include a much larger toolkit for urban bikeways. We summarize current standards, prepare a table reference linking to existing published materials, and prepare guidance to Dublin staff encompassing basic quantitative and qualitative measures for implementation of new bikeway design practices. The expanded guidance will address on- street bicycle facilities, bicycle parking, and off - street bicycle facilities. 'ZI ICI S f la�l,� l j Cl 1 f Y S � GI J, G U Dublin has the opportunity to build on the General Plan and Downtown Specific Plan to provide detailed guidance on pedestrian facility design standards and appropriate level of pedestrian accommodation associated with all future Downtown and TOD area development. In addition to the focus area policy and design standards development, there is an opportunity to review citywide development standards to ensure community walkability. This review will include development of policy and design recommendations for pedestrian walkway connectivity, sidewalk dimensions, crossing design standards, and other facilities impacting pedestrian access and mobility. Fehr & Peers will review existing adopted policy, standard design details, and street design standards to ensure that local pedestrian infrastructure standards are consistent with current national state -of- the - practice for both safety and walkability. Based on this review, we will prepare a memorandum summarizing recommendations and options for staff, commission, and Council consideration. RV4 f I 2 I. , � Fehr& Peers will facilitate a meeting with the TAC to review the Bikeway Design Guidelines, pedestrian facility design guidelines, and application of the revised design guidelines to the recommended bikeway network and Downtown area. This meeting is an important step to ensure that staff is comfortable with the facility type recommendations prior to Fehr & Peers preparing the draft updated facility recommendations map. We will discuss the findings coming out of the community workshop and specific bikeway design approaches for the primary corridors where major investments are needed. U I,�,' f L. I I x „�I III °���II I J,Im��l I � I��ll'I %V f` �ll l.f 11 Based on the above findings, Fehr & Peers will prepare an update to the recommended bikeways and bicycle support facilities from the 2007 Plan. This update will reflect changes in facility location, changes in recommended facility type, and changes in supporting bicycle infrastructure including signal detection, bicycle parking, other end of trip facilities and related recommendations. Fehr & Peers anticipates that much of the recommended network will remain and that the substantive changes in the plan will relate to the type and quality of recommended bikeways and supporting infrastructure. Fehr & Peers will prepare this draft update to the Recommended Bikeways in GIS and incorporate findings from staff, community input and field review. We will prepare updated Recommended Bikeways figures including an existing and proposed bicycle network /facility map and existing and recommended bicycle parking map. Fehr & Peers will prepare an infrastructure map and framework for the Downtown pedestrian recommendations that provides for continuous access, transit accessibility, safe crossings and increased pedestrian prioritization within the Priority Development Area established by MTC /ABAG. The Downtown Pedestrian Network recommendations will draw from the pedestrian design guidelines developed above and apply these standards to specific candidate capital projects. MW5 1 I V I V/I Fehr & Peers will develop recommendations for continuing existing 'A E's" programs — education, encouragement, enforcement and evaluation — as well as creating and delivering new needed programs as identified in Task 3.1 above. These recommendations will include a program description, program intent or objective, planning level staffing and budget suggestions, potential sources of funding and /or revenue, as well as recommendations for the appropriate lead agency and partnerships. Programs recommendations will include opportunities for City programs, public - private partnerships, and City encouragement of private initiatives to encourage /incentive walking and bicycling. Fehr & Peers will aid staff in identifying bicycle priority project design feasibility, planning and capital costs, grant funding opportunities and development conditions strategies for project implementation, and next steps in design and operations analysis to move the identified projects forward. Generally these priority project conceptual design efforts will include supplemental field work, scaled drawing development (preliminary engineering), and cost estimating. The result is a reasonably detailed understanding of specific projects such that key design issues, community outreach needs, detailed planning level costs and implementation strategies are well documented. Fehr & Peers will develop conceptual design and feasibility analysis for two project corridors, as identified below. Based on staff guidance and recent community input, we have selected Dublin Boulevard and San Ramon Boulevard. If through the Plan update process it is necessary and appropriate to substitute or add priority bikeway projects under this task; Fehr & Peers will prepare a memorandum documenting the required changes in the scope of work. .,,J io „ . . �, � . ' .... .. .� ' ... V V"" rt � rt Fehr & Peers will develop conceptual bikeway design for Dublin Boulevard through Downtown along the three lane section. Project limits are from the intersection with San Ramon Road to the intersection with the Alamo Canal Trail. MW6 We will develop up to three design alternatives for the corridor in typical cross section and conceptual design plan layout. As a supplement to the conceptual design development, we will prepare a summary technical memorandum identifying the pros and cons associated with each of the alternatives including conceptual design level cost estimates. 5.1.2 OPERATIONS ANALYSIS Fehr & Peers will conduct an operations test of the design alternatives based on current City of Dublin traffic operations standards and complete streets standards. City of Dublin will provide existing data on signal timing, traffic volumes and speeds, bicycle and pedestrian volumes and roadway layout. The City will also provide data and analysis from the Downtown Dublin Specific Plan that will inform this corridor analysis. We will prepare spot intersection and segment analysis to identify where any required changes in lane configuration and intersection operations may result in significant impacts. We will prepare a technical memorandum that presents findings from the testing described above. Fehr & Peers will meet with the TAC to review the findings on the priority bikeway projects and facilitate staff level decision making on recommendations for the preferred alternative for each of the priority projects. Based on the findings and outcomes from this meeting, Fehr & Peers will refine the analysis and prepare recommendations to incorporate in the Draft plan. 0 y (' ,0j � ...... I. 0 P Dublin is a recently developed community with continuous sidewalks and current signalized intersection equipment and overall high quality pedestrian infrastructure consistent with the rate of walking among Dublin residents. The pedestrian priority areas however will benefit from strategic or programmatic improvements in order to upgrade the quality of pedestrian infrastructure, improve pedestrian safety, or improve pedestrian mobility between specific locations -- such as the Downtown, planned TOD area, and school areas. Under this task Fehr & Peers would define pedestrian projects for individual corridor projects, intersection crossing projects and /or groups of projects relevant to a specific area such as Downtown or a school zone. MW7 Fehr & Peers assumes that up to three (3) pedestrian priority projects will be identified and that we will develop conceptual improvements plans, cost estimates and basic operational analysis for associated crossing and intersection improvements. We have assumed that projects are corridor - focused; however they could also be area focused and include several intersections in a given area in contrast to corridor segments. As a part of this effort, Fehr & Peers would assemble the priority project materials such that they are ready for inclusion in grant program submittals such as Safe Routes to Transit, CMAQ, ACTC Measure B competitive share funds, as well as other relevant programs. Fehr & Peers will meet with the TAC to review the findings on the priority pedestrian projects and facilitate staff level decision making on recommendations for the preferred alternative for each of the priority projects. Based on the findings and outcomes from this meeting, Fehr & Peers will refine the analysis and prepare recommendations to incorporate in the Draft plan. At this TAC meeting we will also prepare for the community workshop focusing on priority project recommendations and design standards. Fehr & Peers will provide input to staff on appropriate timing and sequencing of the community workshop in relationship to commission and Council briefings, depending on the policy and traffic operations implications of the priority projects. Fehr & Peers will conduct a community workshop to discuss the overall plan structure and recommendations and emphasize the priority project design recommendations and operations analysis. We will provide and introductory presentation covering the work complete and prepare a project presentation materials conducive to an open house discussion format. Fehr & Peers and City staff will be stationed at presentation boards and posters graphically summarizing the design and technical considerations. Fehr & Peers will document the outcomes of this workshop to identify refinements to the priority projects and design recommendations. We will prepare a memorandum and summary presentation to enable staff to update the City Council on the findings from this workshop and overall project direction at this stage of the project such that Council members are aware of status prior to preparation of the Draft Plan. FT8 l, 0U IIUL�: Fehr & Peers will prepare a Draft Plan outline inclusive of findings from each of the above tasks. We recommend creation of a seamless 'Active Transportation Plan' with elements addressing complete streets policy, bicycle network and projects, pedestrian network and projects, and supporting design guidelines and specific code changes to guide future projects. In addition to these sections we will develop guidance to provide for ongoing future performance monitoring. We will review this outline with the City project manager (with TAC input) and formalize for development of the Draft Plan. � ` L�. �� �i �° I j t m C l. C �i S> I F Cities throughout the SF Bay Area and nationally are increasingly gathering pedestrian and bicycle data as a part of a performance monitoring and measurement program. Ongoing performance monitoring can demonstrate the value of specific capital improvements and overall programmatic investments in walking and bicycling. Under this task, Fehr & Peers will work with the City of Dublin to: • Identify existing sources of pedestrian and bicycle data (ACTC, EBRPD, US Census, etc.) • identify needs for supplemental data collection necessary to document baseline rates of walking and bicycling • Identify data collection technology and strategies (automated counters, use of existing signal technology, manual counts, etc.). • Identify other relevant performance measures and data sources (Special event participation, collisions, walking and bicycling rates, etc.) • review and consider League of American Bicyclists recommendations from honorable mention selection from Bicycle Friendly Community application RV9 Fehr & Peers will also develop a streamlined template that will enable staff to easily report to Council, funding agencies, and other interested parties on annual capital expenditures for pedestrian and bicycle infrastructure, on each identified performance measure. 63 I'� Fehr & Peers will prepare an Administrative Draft of the comprehensive draft plan based on the agreed upon outline and incorporating the additional performance monitoring material. We will provide the administrative draft to staff and respond to one set of consolidated internally consistent comments to prepare the Draft Plan. As a part of the Draft Plan, Fehr & Peers will prepare guidance for staff to complete the required amendment to the General Plan maps and policies. Fehr & Peers will prepare a memorandum to staff identifying required policy modifications and map changes. Fehr & Peers will prepare for and attend up to two (2) commission hearings to present the Draft Plan. These hearings will include one (1) presentation at the Planning Commission and one (1) presentation at the Parks & Recreation Commission. We will respond to staff direction from the commission hearings and make required modifications to the plan in order to carry it forward for Council review and approval. y 1' x ;� I J, I �/1 � I J, f ,''� I I I 1 I �" City of Dublin staff or contractors will prepare the necessary CEQA environmental clearance documents for approval and adoption of the Draft Plan. Fehr & Peers has included hours for one meeting with City staff and /or CEQA contractors to facilitate transfer of data and previously conduced analysis for integration into the environmental review process. Fehr & Peers is available to provide additional support staff in this analysis for an additional scope and fee. MW 10 VA t l„ x C ' Y t0 U I J, xom Fehr & Peers will present the Draft Plan at one (1) City Council meeting for review and approval. We will work with the TAC to identify required changes to create the Final Plan in response to City Council comments. We will prepare the final plan in electronic format and package supporting design, analysis and mapping materials for future use by City staff. RV 11 VA NOMMISM Task Hourly Rate 1 PROJECT INITIATION 1.1 KICK OFF MEETING 1.2 ITECHNICAL ADVISORY COMMITTEE 2 EXISTING CONDITIONS UPDATE 2.1 2.2 2.3 3 POLICY DEVELOPMENT 3.1 PROGRAMS ASSESSMENT 3.2 COMPLETE STREETS POLICY 3.3 BICYCLE FACILITY DESIGN GUIDELINES 3.4 PEDESTRIAN FACILITY DESIGN GUIDELINES 3.5 TAC MEETING 2 4 RECOMMENDED NETWORK 4.1 4.2 4.3 5 PRIORITY PROJECTS CONCEPTUAL DESIGN 5.1 DUBLIN BOULEVARD BIKEWAY FEASIBILITY 5.1.1 DESIGN ALTERNATIVES DEVELOPMENT 5.1.2 OPERATIONS ANALYSIS 5.3 TACMEETING4. PRIORITY BIKEWAY PROJECTS 5.4 PEDESTRIAN PRIORITY PROJECTS CONCEPT DEVELOPMENT 5.5 TAC MEETING 5. PEDESTRIAN PROJECTS 5.6 COMMUNITY WORKSHOP - PRIORITYPROJECTS 6 DRAFT &FINAL PLAN 6.1 PLAN OUTLINE 6.2 PERFORMANCE MEASURES 6.3 DRAFT PLAN 6.4 COMMISSION MEETINGS 6.5 ENVIRONMENTAL REVIEW 6.6 COUNCIL HEARING 6.7 FINAL PLAN Key Staff Person Labor Fehr & Peers Matthew Ian Moore Ryan Carne Ridgway McClain Nielson Irincipal Associat / in- a -in- E Project ngineer PlProject anner Admin Total Total Cost Charge Charge j 14 $ 2,440.00 4 $ 660.00 UPDATE EXISTING DATA 1 4 8 24 8 45 $ 6,300.00 TAC MEETING 1 1 4 4 4 8 9 $ 1,580.00 COMMUNITY WORKSHOP - EXISTINGCONDITIONS &NEEDS 1 11 8 8 24 16 56 $ 7,760.00 48 $ 7,960.00 3 $ 460.00 32 80 $ 11,060.00 32 72 $ 10,020.00 4 14 $ 2,300.00 UPDATE RECOMMENDED BIKEWAYS &FACILITIES 2 8 4 16 8 38 $ 5,720.00 RECOMMENDED DOWNTOWN PEDESTRIAN NETWORK 2 8 4 16 8 38 $ 5,720.00 PROGRAM RECOMMENDATIONS 1 11 41 1 121 61 23 $ 3,310.00 Total Hours Tota I Labor Costs OTHER DIRECT COSTS 2 4 4 10 $ 1,920.00 2 16 24 24 12 78 $ 11,820.00 2 8 24 16 4 54 $ 8,260.00 2 8 4 8 4 26 $ 4,220.00 1 8 16 24 12 61 $ 8,760.00 4 4 8 4 20 $ 2,900.00 8 8 24 16 56 $ 7,760.00 2 4 2 8 16 $ 2,660.00 4 12 16 $ 2,360.00 1 10 8 32 24 75 $ 10,380.00 8 8 4 20 $ 3,260.00 1 2 3 $ 660.00 1 4 4 8 17 $ 2,580.00 1 4 2 16 16 39 $ 5,280.00 34 179 144 360 218 935 $8,840 $35,800 $21,600 $46,800 $25,070 $ 138,110.00 Bicycle /Pedestrian Counts @ $175 per intersection Mileage @ 55 cents per mile Communications & Reproduction 'AL DIRECT COST TOTAL 10 $ 1,750.00 200 $ 110.00 $7,000.00 $ 8,860.00 12 13 2012 2013 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 1 PROJECT INITIATION 1.1 KICK OFF MEETING 1.2 ITECHN ICA L ADVISORY COMMITTEE 2 EXISTING CONDITIONS UPDATE II 2.1 UPDATE EXISTING DATA IIIIIIIIIIIII 2.2 ITAC MEETING 1 2.3 ICOMMUN ITY WORKSHOP- EXISTING CON DITIONS & NEEDS 3 POLICY DEVELOPMENT 3.1 PROGRAMS ASSESSMENT 3.2 COMPLETE STREETS POLICY 3.3 BICYCLE FACILITY DESIGN GUIDELINES 3.4 PEDESTRIAN FACILITY DESIGN GUIDELINES 3.5 TAC MEETING 4 RECOMMENDED NETWORK 4.1 UPDATE RECOMMENDED BIKEWAYS & FACILITIES IIIIIIIIIIIIII 4.2 1 RECOMMENDED DOWNTOWN PEDESTRIAN NETWORK II�IIIIIIIIIIIIIIN ry �IIIIIII�INIII�IIIIN 4.3 IPROGRAM RECOMMENDATIONS 5 PRIORITY PROJECTS CONCEPTUAL DESIGN 5.1 DUBLI N BOULEVARD BI KEWAY FEASIBILITY IIIIIIIIIIIIIIIIIIII� 5.1.1 DESIGN ALTERNATIVES DEVELOPMENT IIIRIIUIIAIIIW1141PIIIRIIM111111YlIINIOIVIIIIRIII�II�IIWI4IIIPIIIININI1lIIlYllll 5.1.2 OPERATIONS ANALYSIS 5.3 TACMEETING3. PRIORITY BIKEWAY PROJECTS 5.4 PEDESTRIAN PRIORITY PROJECTS CONCEPT DEVELOPMENTRNmllllllll� MOM pp�j �j �j 5.5 TAC MEETING 4. PEDESTRIAN PROJECTS II II ��II II II II IIM 5.6 COMMUNITY WORKSHOP- PRIORITY PROJECTS Aug 14 ADDITIONAL SCOPE OF WORK FOR THE UPDATE OF THE BICYCLE AND PEDESTRIAN MASTER PLAN The following scope represents an additional scope of work to the original Dublin Bicycle and Pedestrian Master Plan scope (dated June 15, 2012). Tasks 1 -4 were performed as cart of the Dublin Boulevard Feasibilitv Analvsis Task 1 — Prepare Draft & Final Executive Summary ............................ .........................$1,670 Deliverables: Draft and final executive summary Task 2 — Prepare Draft & Final Photo Simulations and Presentation Materials ...............$4,330 Deliverables: Draft and final meeting presentation; draft and final photo simulations Task 3 — Attend July 12, 2013 City Council Meeting ........................... .........................$2,240 Deliverables: Attendance at one Council meeting Task 4 — Revise Final Dublin Boulevard Bikeway Feasibility Analysis Memo ..................$1,545 Total of Tasks 1 -4 performed: $9,785 Tasks 5 & 6 - Revisions and Final Draft Bicycle and Pedestrian Master Plan Task 5 — Revisions and Final Draft Bicycle and Pedestrian Master Plan .........................$6,040 Deliverable: Red -lined Master Plan revision with responses to comments; one conference call Task 6 — Draft Bicycle and Pedestrian Design Guidelines & Revisions .. .........................$2,635 Deliverables: 1) Red -lined revision; one in- person meeting 2) Draft Bicycle and Pedestrian Design Guidelines (Word and PDF versions) Total of Tasks 5 & 6...........$8,675 Optional Task 7 — Final Plan and Guidelines Revisions (if needed) ....... .........................$3,325 An additional 24 hours of consulting time is being budgeted as an optional task to complete further revisions of the draft Plan and Design Guidelines documents. This task is optional and shall require City approval before commencement of work. The total fee for this scope (Tasks 1- 7)......$21,785