HomeMy WebLinkAbout4.05 Streambed Corridor Improvments or
19 82 STAFF REPORT CITY CLERK
CITY COUNCIL File #660-60
DATE: October 21, 2014
TO: Honorable Mayor and City Councilmembers
FROM: Christopher L. Foss, City Manager "
SUBJECT: Acceptance of Streambed Corridor Improvements for Tract 7982 constructed with
Tract 7652, Neighborhood 6, Sorrento East (Standard Pacific Corporation)
Prepared by Jayson Imai, Senior Civil Engineer
EXECUTIVE SUMMARY:
Standard Pacific Corporation, a Delaware Corporation, has constructed the Streambed Corridor
Improvements for Tract 7982 Sorrento East in accordance with the Tract Improvement
Agreement for Tract 7652, Neighborhood 6. It is now appropriate for the City to accept these
improvements.
FINANCIAL IMPACT:
Standard Pacific Corporation, a Delaware Corporation, has provided the following Warranty
Bonds issued by Safeco Insurance Company of America to guarantee the referenced
streambed corridor improvements for one year:
• Warranty Bond in the amount of $7,750.00 (Bond No. 6753805) for the Tract 7982
Streambed Corridor Pathway Improvements along Gleason Drive from Lockhart Street to
Fallon Road
• Warranty Bond in the amount of $7,750.00 (Bond No. 6753806) for the Tract 7982
Streambed Corridor Pathway Improvements along Lockhart Street from Gleason Drive to
Palermo Way
• Warranty Bond in the amount of $17,250.00 (Bond No. 6753807) for the Tract 7982
Streambed Corridor Pathway Improvements along Lockhart Street from Palermo Way to
Central Parkway
• Warranty Bond in the amount of $8,250.00 (Bond No. 6444643) for the Tract 7982
Landscape Improvements along Lockhart Street eastern frontage from Palermo Way to
Central Parkway
The Streambed Corridor pathway, landscape, and irrigation improvements will be maintained by
the Sorrento East Master Homeowner's Association. The City will not incur annualized
maintenance costs for these improvements.
Page 1 of 3 ITEM NO. 4.5
RECOMMENDATION:
Staff recommends that the City Council adopt the Resolution Accepting the Streambed
Corridor Improvements for Tract 7982 Constructed with Tract 7652 — Sorrento East,
Neighborhood 6.
"ubmitted By '�� Reviewed By
Public Works Director Assistant City Manager
DESCRIPTION:
Standard Pacific Corporation, a Delaware Corporation, entered into a Tract Improvement
Agreement with the City of Dublin on July 19, 2011, for the construction of street and other tract
improvements associated with Tract 7982 and Tract 7652 within the Sorrento East development
(City Council Resolution No. 122-11). These improvements included construction of Streambed
Corridor improvements along the eastern side of Lockhart Street between Central Parkway and
Gleason Drive and along the southern side of Gleason Drive between Lockhart Street and
Fallon Road. Standard Pacific provided Faithful Performance Bonds and Labor & Materials
Bonds to guarantee construction of these improvements. The Streambed Corridor
Improvements are now complete, and the developer is requesting that the bonds for this work
be released.
ORIGINAL AMOUNTS
IMPROVEMENTS Faithful Performance Labor & Materials STATUS
Bond Bond
(Bond No.) (Bond No.)
Tract 7982 Streambed Corridor
Pathway Improvements along $31,000.00 $31,000.00 To Be
Gleason Drive from Lockhart (6753805) (6753805) Released
Street to Fallon Road
Tract 7982 Streambed Corridor
Pathway Improvements along $31,000.00 $31,000.00 To Be
Lockhart Street from Gleason (6753806) (6753806) Released
Drive to Palermo Way
Tract 7982 Streambed Corridor
Pathway Improvements along $69,000.00 $69,000.00 To Be
Lockhart Street from Palermo (6753807) (6753807) Released
Way to Central Parkway
Tract 7982 Landscape
Improvements along Lockhart $33,000.00 $33,000.00 To Be
Street eastern frontage from (6444643) (6444643) Released
Palermo Way to Central Parkway
Standard Pacific Corporation has provided Warranty Bonds, issued by Safeco Insurance
Company of America, in the amounts of $7,750.00 (Bond No. 6753805), $7,750.00 (Bond No.
6753806), $17,250.00 (Bond No. 6753807), and $8,250.00 (Bond No. 6444643). The Warranty
Bond amounts are equal to twenty five percent (25%) of the full cost to construct the respective
improvements.
Page 2 of 3
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
A copy of this staff report has been sent to Standard Pacific Corporation.
ATTACHMENTS: 1. Vicinity Map
2. Resolution Accepting the Streambed Corridor Improvements for
Tract 7982 Constructed with Tract 7652 — Sorrento East,
Neighborhood 6
Page 3 of 3
T �COoiY
COS `
T
co 1`1 HA CO
ALAM�D
DUBLIN RANCH DRIVE
�
.9 DUBLIN
c7 x q w
o ������� I
ca � STREAM BED
o CORRIDOR
~
CENTRAL
pARR AY'�...........
........
DUBLIN
BOULEVARD I . ..........
1-580 .. ..... .... ....
PLEASANTON w
STREAM BED
CORRIDOR
VICINITY MAP
NTS I NUT&SIMPS
ENGINEERS PLANNERS SORYEYORS
PLEASANTON,CA (975)175-0890
10-08-2014 2:06pm Amanda Karchefski C:\USERS\AKARCHEFSKI\DESKTOP\VICINITY MAP—CREEK CORRIDOR.DWG
RESOLUTION NO. - 14
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
ACCEPTING THE STREAMBED CORRIDOR IMPROVEMENTS FOR TRACT 7982
CONSTRUCTED WITH TRACT 7652 — SORRENTO EAST, NEIGHBORHOOD 6
WHEREAS, Standard Pacific Corporation, a Delaware Corporation, the developer of
Tract 7652, previously entered into a Tract Improvement Agreement dated July 19, 2011,
Resolution No. 122-11, with the City of Dublin, to construct certain improvements for Tract
7982 with Tract 7652; and
WHEREAS, the required improvements included streambed corridor pathway and
landscaping improvements along the eastern side of Lockhart Street from Central Parkway to
Gleason Drive, and the southern side of Gleason Drive from Lockhart Street to Fallon Road in
accordance with plans and specifications on file with the City Engineer; and
WHEREAS, the developer provided Faithful Performance and Labor & Materials Bonds
for the amounts and scope of work listed below to guarantee these improvements; and
• $31,000.00 for Tract 7982 Streambed Pathway Improvements on Gleason Drive
from Lockhart Street to Fallon Road
• $31,000.00 for Tract 7982 Streambed Pathway Improvements on Lockhart Street
from Gleason Drive to Palermo Way
• $69,000.00 for Tract 7982 Streambed Pathway Improvements on Lockhart Street
from Palermo Way to Central Parkway
• $33,000.00 for Tract 7982 Landscape Improvements along eastern frontage of
Lockhart Street from Palermo Way to Central Parkway
WHEREAS, the improvements at the Streambed Corridor are complete in accordance
with said plans and specifications, and any modifications thereto, to the satisfaction of the City
Engineer; and
WHEREAS, the Faithful Performance and Labor & Materials bonds for the
improvements at the Streambed Corridor can be released, in accordance with the authority
contained in Section 66499.7 of the Government Code of the State of California and replaced
with a Warranty Bonds to guarantee the completed work for a one-year period following
acceptance; and
WHEREAS, Standard Pacific Corporation has provided Warranty Bonds issued by
Safeco Insurance Company of America for the amounts and scope of work listed below to
guarantee these improvements against defects for a one year period;
1
• $7,750.00 (Bond No. 6753805), to guarantee the improvements at Tract 7982
Streambed Corridor Pathway along Gleason Drive from Lockhart Street to Fallon
Road
• $7,750.00 (Bond No. 6753806), to guarantee the improvements at Tract 7982
Streambed Corridor Pathway along Lockhart Street from Gleason Drive to Palermo
Way
• $17,250.00 (Bond No. 6753807), to guarantee the improvements at Tract 7982
Streambed Corridor Pathway along Lockhart Street from Palermo Way to Central
Parkway
• $8,250.00 (Bond No. 6444643), to guarantee the landscape improvements at Tract
7982 along Lockhart Street eastern frontage from Palermo Way to Central Parkway
NOW, THEREFORE, BE IT RESOLVED that-
1. The following improvements are hereby approved and accepted subject to a
one-year guarantee period
• "Tract 7982 Streambed Corridor Pathway Improvements along Gleason
Drive from Lockhart Street to Fallon Road"
• "Tract 7982 Streambed Corridor Pathway Improvements along Lockhart
Street from Gleason Drive to Palermo Way"
• "Tract 7982 Streambed Corridor Pathway Improvements along Lockhart
Street from Palermo Way to Central Parkway"
• "Tract 7982 Landscape Improvements along Lockhart Street eastern
frontage from Palermo Way to Central Parkway"
2. The following Warranty Bonds issued by Safeco Insurance Company of America
for the amounts and scope of work listed below be accepted as security for the
aforesaid one-year warranty period, said period to commence on this date and
terminate on the 21st day of October, 2015
• $7,750.00 (Bond No. 6753805), for the "Tract 7982 Streambed Corridor
Pathway Improvements along Gleason Drive from Lockhart Street to
Fallon Road"
• $7,750.00 (Bond No. 6753806), for the "Tract 7982 Streambed Corridor
Pathway Improvements along Lockhart Street from Gleason Drive to
Palermo Way"
• $17,250.00 (Bond No. 6753807), for the "Tract 7982 Streambed Corridor
Pathway Improvements along Lockhart Street from Palermo Way to
Central Parkway"
• $8,250.00 (Bond No. 6444643), for the "Tract 7982 Landscape
Improvements along Lockhart Street eastern frontage from Palermo Way
to Central Parkway"
2
3. The following original Faithful Performance and Labor & Materials Bonds issued
by Safeco Insurance Company of America for the amounts and scope of work
listed below be released
• $31,000.00 (Bond No. 6753805), for the said "Tract 7982 Streambed
Corridor Pathway Improvements along Gleason Drive from Lockhart
Street to Fallon Road"
• $31,000.00 (Bond No. 6753806), for the said "Tract 7982 Streambed
Corridor Pathway Improvements along Lockhart Street from Gleason
Drive to Palermo Way"
• $69,000.00 (Bond No. 6753807), for the said "Tract 7982 Streambed
Corridor Pathway Improvements along Lockhart Street from Palermo Way
to Central Parkway"
• $33,000.00 (Bond No. 6753807), for the said "Tract 7982 Landscape
Improvements along Lockhart Street eastern frontage from Palermo Way
to Central Parkway"
PASSED, APPROVED AND ADOPTED this 21st day of October, 2014, by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: Mayor
City Clerk
3