HomeMy WebLinkAboutReso 156-14 Dougherty Rd Improvements RESOLUTION NO. 156 - 14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING TASK ORDER#1 WITH S&C ENGINEERS, INC. FOR CONSTRUCTION MANAGEMENT SERVICES — PHASE 1 FOR THE DOUGHERTY ROAD IMPROVEMENTS PROJECT WHEREAS, on June 4, 2013, the City Council of the City of Dublin directed staff to proceed with final design of the Dougherty Road Improvements project from Sierra Lane to North City Limit to get the entire project ready for construction; and WHEREAS, the City has since advanced the design of the entire project and the contract documents are nearing completion; and WHEREAS, the City desires to hire a consultant qualified and experienced in performing constructability review of contract documents and other preconstruction services; and WHEREAS, the City received five proposals for construction management services and selected S&C Engineers, Inc. to perform the Phase 1 preconstruction services for the Dougherty Road Improvements project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby approves Task Order#1 with S&C Engineers, Inc. for Construction Management Services — Phase 1 for the Dougherty Road Improvements project, with a not-to-exceed amount of $73,246.80, attached hereto as Exhibit A. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Purchase Order for said Task Order. PASSED, APPROVED AND ADOPTED this 16th of September, 2014, by the following vote: AYES: Councilmembers Biddle, Gupta, Hart, Haubert, and Mayor Sbranti NOES: None ABSENT: None ABSTAIN: None jA(... ILL Mayor ATTEST: City Clerk Reso No. 156-14,Adopted 9-16-14, Item 4.8 Page 1 of 1 EXHIBIT A TO CITY COUNCIL RESOLUTION TASK ORDER#1: Construction Management Services—Phase 1 for the Dougherty Road Improvements Project To provide construction engineering services per the attached S&C Engineers' Proposal dated August 29, 2014,which includes constructability review, construction schedule analysis and assistance to City with advertisement and award of construction contract for the Dougherty Road Improvements project. August 29, 2014 tin fit Mr. Ferdinand Del Rosario Sa4C ENGINEERS,INC. Senior Civil Engineer City of Dublin 100 Civic Plaza P.O. Box 2340 Dublin,CA 94568 • RE: Cost Proposal and Scope of Services Dougherty Road Improvemtients(Sierra Lane to North City Limits) Phase 1 Construction Engineering Services Dear Mr. Del Rosario S&C Engineers,Inc. is pleased to submit the attached cost proposal and scope of services to provide constructibility review services,and assistance to the City of Dublin with advertising and awarding the construction contract for the Dougherty Road Improvements project. I will be on vacation from September 8,2014 until September 19,2014. If you have any questions while I am away,please contact Thom Fresquez al(510)774-5985. We appreciate the opportunity to assist the City of Dublin on this important project. Sincerely, games E. Scott President Enclosures 1 1814 FRANKLIN Si 1 SUITE 600 • OAKLAND.CM IFORNIA 94612 • TEl 519.272 2970 fAX 510.272.2972 EXHIBIT A DOUGHERTY ROAD IMPROVEMENTS (Sierra Lane to North City Limit) SCOPE OF SERVICES Provide construction engineering services Including constructibility review;construction schedule analysis and assistance to City with advertisement, bid and award of construction contract for the Dougherty Road (Sierra Lane to North City Limits) Improvements Project Phase I - Preconstruction Services 1. CONSTRUCTIBILITY REVIEW CONSULTANT shall perform a detailed constructibility review of the 95% contract plans, specifications, and engineer's estimate prepared by Kimley-Hom for the project taking into account the Caltrans 2010 Standard Specifications CONSULTANT will develop and analyze a potential baseline construction schedule CONSULTANT shall provide written comments,findings and recommendations. CONSULTANT shall meet with Kimley-Hom, City, DSRSD and other appropriate parties to discuss findings and potential changes to contract documents. Constructibility review entails an analysis of efficient construction sequence, traffic handling, potential cost/schedule impacts and third party constraints. Prior to bid, CONSULTANT shall perform a final review of the 100% PSE documents to be provided by Kimley-Horn for the project. A constructibility review should not be considered a QC check of the design documents 2. ADVERTISE, BID AND AWARD CONSULTANT will assist City with advertising, bid inquiries, bid review and award of construction contract CONSULTANT shall establish document control for the bidding process for the project. CONSULTANT shall assist the City with collection and distribution of bidder's questions for the project. CONSULTANT shall assist the City with the development and distribution of addendums, if any for the project. CONSULTANT shall assist the CITY in evaluating bids received for the project. Evaluation will include the low bidder's bonds and insurance submittals, compliance with City, State and ACTC requirements as applicable. CONSULTANT shall make recommendations to the CITY concerning the acceptance or rejection of bids and the award of the Construction Contract. c 8 g g p8 g 2 °4. id N N N S co in H N N N N 1A 31 2 v i 8 8 $ S $ m - 1 . g it �. , 1- m V► VF p U 8 8 g g' OOo g 8 8 0gQ ry I § N W 2 2 M '� M t0 4 us er1 O 8 +n1 AA'4 N 1 u v CO = N 1, WV 1/ J C Q 1 O a = 0up a 3 N b up a E 5 $ N m O cc Is c li a CO u° P O 0 a. Q .f coo O O X a' V 'C i4.0 u d E t M v, o cw o . N ' c c d 2 g N co g a e in N f0 a 7 CL I .0 IX .0 to _ E LL 2 r. 0 it 2.O 3 G � E E N ` C 1 — y' a+ N L t b 2 2 „ a h d c °: c c 0. a c �v °'�+ fs d a m 0 U H u° u U to > -0 , N 2 Q in m * co iii i N Y C c O liC I 1