Loading...
HomeMy WebLinkAboutReso 008-91 DUSD BaseballField RESOLUTION NO. 8 - 91 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AND AUTHORIZING EXECUTION OF AGREEMENT WiTH DUBLIN UNIFIED SCHOOL DISTRICT FOR DUBLIN HIGH SCHOOL BASEBALL FIELD AND GIRLS ATHLETIC FIELD RENOVATION WHEREAS, the City Council of the City of Dublin and the Board of Directors of the Dublin Unified School District desire to work cooperatively on the renovation of the Dublin High School Baseball Field and Girls Athletic Field; and WHEREAS, it is necessary to establish site specific duties and obligations for the renovation. NOW THEREFORE, BE IT RESOLVED THAT THE City Council of the City of Dublin does hereby find that: 1. The agreement attached hereto in Exhibit A is hereby approved and ratified and the Mayor is authorized and directed to sign it. PASSED, APPROVEDANDADOPTED this 28th day of January, 1991. AYES: Councilmembers Burton, Howard, Jeffery, Moffatt a~nd Mayor Snyder NOES: None ABSENT: None ATTEST: AGREEMENT THIS AGREEMENT, made and entered into this ~ day of~f~/~a~, 1991, by and between the CITY OF DUBLIN, a municipal corporation, hereinafter called "CITY," and the DUBLIN UNIFIED SCHOOL DISTRICT, hereinafter called "DISTRICT". WITNESSETH WHEREAS, the CITY and the DISTRICT have entered into an agreement for joint use of DISTRICT facilities and improvement thereto entitled "Agreement Between City of Dublin and Dublin Unified School District Regarding Use of Facilities" (referred to as "Master Agreement"); and WHEREAS, it is necessary to establish site specific duties and obligations for the improvement of each DISTRICT facility; and WHEREAS, the CITY and the DISTRICT'have agreed to proceed on the project entitled "Dublin High School Baseball Field and Girls Athletic Field Renovation". NOW, THEREFORE, in consideration of the promises herein and in the Master Agreement dated September 25, 1989, the CITY and the DISTRICT agree as follows: 1) The scope of Project No. 3 entitled "Dublin High School Baseball and Girls Athletic Field Renovation" shall be based on the design approved by the City Council on December 18, 1990 and shall include the following elements: a) Baseball Fields Turf Area - to include "Cambridge" sand drain system, aeration and overseed of entire area, added turf and irrigation adjacent to tennis and basketball courts, and quarry waste path. b) Varsity Infield and Bleacher Area - to include grading, bleachers (170-seat capacity), backstop, decomposed granite paving, sand clay infield and infield turf and irrigation, fencing and batting cage. c) d) Junior Varsity Infield and Bleacher Area - to include grading, bleachers (60-seat capacity), backstop, decomposed granite paving, sand clay infield and infield turf-and irrigation, and fencing. Girls Softball Fields - to include "Cambridge" sand drain system, aeration and overseed of entire area, added turf and irrigation to the South, portable bleachers (60-seat capacity), backstops, decomposed granite paving, and sand clay infields. e) Irrigation Upgrade - to include a new controller and valve wiring at baseball fields and a booster pump. -1- 2) 3) 4) The preliminary budget estimate for the project is $549,500 itemized as follows: Improvements: Design/Inspection~ $496,250 $ 53,250 In the event that the contract for the project exceeds the sum of $549,500, the CITY reserves the right to reduce the scope of work. The area to be eliminated or reduced'shall be determined by common agreement between the CITY and the DISTRICT. In the event that the contract for the $549,500, the CITY reserves the right alternates shown in priority order: project to. add is less than the following a) Replace Existing Sprinkler Heads b) Additional Landscaping c) Scorers Booth d) High Net Fencing Along Canal The CITY shall be the project coordinator, and its responsibility for this project shall be as follows: a) Selection of Architect/Engineer; b) Review of the Architect's plans, specifications, and estimates, with input from the DISTRICT; c) Advertising and award of bid to the Contractor; d) Inspection of the Contractor's work, DISTRICT; with input from the e) Payment of monies due for architectural services, contract work, and CITY Staff assigned to the project; f) Acceptance of Contractor's work as complete. The DISTRICT's responsibility for this project shall be as follows: a) Review of Architect's plans and specifications and provision of comments to CITY; b) Periodic field reviews with CITY Staff during construction and provision of comments to CITY relating to construction progress and quality; c) Payment of all DISTRICT Staff costs relating to this project; d) Payment of all utility costs for this project during construction. -2- 5) The CITY and the DISTRICT shall work together to schedule the actual construction work to be done between May 13, 1991 and September 13, 1991 in order that the fields will be playable for the 1991 season. The DISTRICT will not schedule'any other events on the fields during this time period without prior written approval from the CITY. 6) Upon completion of the improvements under this agreement, maintenance responsibilities shall be apportioned as follows: a) CITY shall provide at its sole cost and expense, maintenance to the infields, turf areas and landscaped areas. This includes mowing, fertilization, and irrigation repair. b) DISTRICT shall provide at its sole cost and expense, maintenance to bleachers, backstops, decomposed granite paving, quarry waste path, fencing and batting cage. DISTRICT shall be responsible for payment of all utilities including gas, electricity, water, and sewer. DISTRICT agrees to provide regularly scheduled school maintenance responsibilities. CITY with access to grounds during hours in order to carry out IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their respective officers and duly authorized by the CITY the day and year first above written. ATTEST: ATTEST': CITY OF LIN, ' DUBLIN UNIFIED SCHOOL DISTRICT Clerk of the Board President, Board of Trustees -3-