Loading...
HomeMy WebLinkAboutReso 057-91 MCE MaintenSvcs RESOLUTION NO. 57-91 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OP DUBLIN APPROVING AMENDMENT TO AGREEMENT FOR MAINTENANCE SERVICES WITH M.C.E. CORPORATION AND IDENTIFYING THE SCHEDULE OF WORK AND SCHEDULE OF RATES FOR FISCAL YEAR 1991-92 WHEREAS, the City of Dublin and M.C.E. Corporation entered into an agreement for provision of maintenance services as of July 1, 1990; and WHEREAS, the term of the agreement covers a three-year period expiring on June 30, 1993; and WHEREAS, the CIty has the ability to terminate the agreement in the event that the performance by M.C.E. Corporation has been unsatisfactory; and WHEREAS, M.C.E. Corporation has submitted a request for adjustment of rates which is in accordance with the provisions of the agreement; and WHEREAS, the City of Dublin wishes to have M.C.E. Corporation cont=inue providing services during the upcoming Fiscal Year; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with M.C.E. Corporation which is attached hereto as "Exhibit A," to become effective as of July 1, 1991. Said amendment establishes a Schedule of Work for Fiscal Year 1991-92 and an adjustment to the rates charged pursuant to the agreement. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment to the agreement. PASSED, APPROVED, AND ADOPTED this 24th day of June, 1991. AYES: NOES: None ABSENT: Mayor Snyder ATTEST: Councilmembers Burton, Howard, Jeffery, and Moffatt AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND MCE CORPORATION FOR ANNUAL PUBLIC WORKS/MAINTENANCE SERVICES WHEREAS, on June 26, 1990 the City of Dublin (hereinafter referred to as "CITY"), MCE Corporation (hereinafter referred to as "CONTRACTOR"), entered into an Agreement to provide Public Works/Maintenance Services to the City of Dublin; and WHEREAS, that Agreement provided for the extension of the term of the Agreement for two consecutive one-year terms subject to the satisfactory performance by the CONTRACTOR as determined by the CITY; and WHEREAS, the CITY has reviewed the performance of the CONTRACTOR and has determined that the CONTRACTOR has performed satisfactorily; and WHEREAS, an adjustment of fees for services is desired by both the CITY and the CONTRACTOR. NOW, THEREFORE, the parties hereto agree as follows: Section 1: Extension of Contract: The City of Dublin extends the Annual Public Works/Maintenance Contract with CONTRACTOR for a period of one year commencing on July 1, 1991 and ending on June 30, 1992. Section 2: Schedule of Work and Adjustment of Rates: The CONTRACTOR will perform the Schedule of Work as identified in Attachment 1 and as. modified by the CITY for Fiscal Year 1991-92. The CITY also authorizes a change in the rates charged by CONTRACTOR to the CITY as indicated in Attachment 1. CITY OF DUBLIN ATTEST: MCE CORPORATION ATTEST: President Secretary ATTACHMENT 1 - SCHEDULE OF WORK PRELIMINARY CITY BUDGET FISCAL YEAR 1991-92 FINAL PRELIMINARY BUDGET JUNE 18, 1991 A. SCOPE OF WORK The following breakdown identifies tasks which are anticipated to be conducted as part of the Annual Public Works Maintenance Agreement for the Fiscal Year 1991-92. Annual estimated costs include management fees as provided in Section C. Contractor shall schedule work to adhere to these expenditure levels as provided for in this Agreement. ACTIVITY/SUB-ACTIVITY 1991-92 ESTIMATED ANNUAL EXPENDITURE SPILL CLEAN UP $ 6,800 STREET MAINTENANCE o Street Repair 6,600 o Drainage Maintenance 13,200 o Storm Patrol/Clean Up 8,300 o Curb & Gutter/Sidewalks 6,100 o Sig~ ~epair/Maintenance 23,600 o Striping/Marking 13,400 o Guardrail Repair 1,300 o Chemical Weed Abatement 6,000 o Bike Path Maintenance 3,900 Activity Total $ 82,400 MAINTENANCE SUPERVISION $ 80,400 STREET TREE MAINTENANCE o In-House Tree Maintenance $ 44,700 o Contract Tree Pruning 6,600 o Contract Tree Trimming 8,700 o Contract Tree Removal 2,200 o Contract Tree Fungus Spraying 4,300 o Stagecoach Assessment District 5,200 o Dougherty Assessment District 7,900 Activity Total $ 79,600 NEIGHBORHOOD WATCH SIGNS $ 400 STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION) o Existing Streets Including San Ramon $ 185,000 Road Phase IV (7 Months) o Stagecoach Assessment District 33,300 o Dougherty Assessment District 42,700 Activity Total $ 261,000 PARKS MAINTENANCE o o o o o o o o o o o o Stagecoach Park Kolb Park Dolan Park Alamo Creek Park Dougherty Hills Dublin Sports Ground Mape Park Shannon Park Valley Swim Center Civic Center Dublin High School Senior Center BUILDING MANAGEMENT Activity Total Total 1991-92 Estimated Annual Expenditure 16,300 43,150 36,300 37,150 9,900 111,000 16,800 51,100 23,800 72,400 18,800 500 $ 437,200 $ 76,800 $ 1,024,600 B. UNIT PRICES The following activities shall be completed at the Unit Prices indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and management fees. ACTIVITY 1991-92 UNIT PRICE RIGHT OF WAY MAINTENANCE o Chemical Weed Control TURF MAINTENANCE o Fertilize/Weed Control o Aeration BEDDING MAINTENANCE o Fertilization o Chemical Weed Control TREE MAINTENANCE 127.65 per Acre 116.85 per Acre 148.50 per Acre 121.85 per Acre 123.65 per Acre Street Trees o Pruning City Median Trees o Trim for Clearance Only (Under 30') o Trim for Clearance & Balance (Under 30') o Trim for Clearance Only (Over 30') o Trim for Clerance & Balance (Over 30') o Fungus Spraying Park Trees o Prune and Shape (Over 20') o Fungus Spraying 8.52 per Tree 20.95 per Tree 41.90 per Tree 38.50 per Tree 77.00 per Tree 4.70 per Tree 54.40 per Tree 4.70 per Tree C. TIME AND MATERIALS RATES The following rates shall be applied to work performed by the Contractor which is not specified in Section B (Unit Prices). At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees will be applied as indicated. DESCRIPTION OVERTIME HOLIDAY HOURLY HOURLY HOURLY RATES RATES RATES LABOR RATES Dublin Crew Maintenance Superintendent Landscape Foreman Landscape Laborer I Landscape Laborer II Landscape Laborer III MCE Crew Superintendent Loader/Backhoe Operator Asphalt Paver Roller Operator Truck Driver 8-12 C.Y. Truck Driver 4-6 C.Y. Truck Driver 3 C.Y. Transit Cement Finisher Laborer Foreman Laborer 1 Laborer 2 Laborer 3 $ 32.50 $ 48.75 $ 65.00 22.80 34.20 45.60 19.20 28.80 38.40 16.20 24.30 32.40 13.00 19.50 26.00 47.4o $ 71.10 $ 94.8o 46.40 69.60 92.80 44.85 67.27 89.70 44.85 67.27 89.70 38.30 57.45 76.60 37.80 56.70 75.60 37.80 56.70 75.60 36.50 54.75 73.00 34.65 51.97 69.30 33.65 50.47 67.30 33.45 50.17 66.90 33.30 49.95 66.60 DESCRIPTION EQUIP. COST HOURLY RATE EQUIPMENT RATES Dublin Crew' · Flatbed Dump , Pickup Mower (21") Mower (36") Mower (72") Chain Saw Brush Cutter $ 6.50 5.00 2.00 3.00 10.00 4.00 3.50 DESCRIPTION EQUIP. COST HOURLY RATE EQUIPMENT RATES (CONTINUED) Power Blower Power Edger Power Hedge Trimmer Power Vacuum (30") Trailer - Large (18') Trailer - Small (8') Power Washer MCE Crew Asphalt Paver Backhoe Loader Roller-Vibratory 3-5 Tons Roller-Vibratory 1-3 Tons Dump Truck 8-12 Yd. Dump Truck 4-6 Yd. Transit Truck 3 Yd. Pickup Crew Cab Pickup Concrete Saw-Self Propelled Concrete Saw - Small Compressor Bitumal Pot Vibra Plate Wacker Power Berm Machine $ 1.50 1.50 2.50 5.00 2.50 1.80 9.00 $ 37.50 32.50 31.25 18.75 15.00 25.00 22.50 22.50 8.50 7.50 12.50 8.00 12.50 6.25 6.50 6.50 12.50 OVERHEAD AND MANAGEMENT FEES Applied to MCE Operations Applied to Subcontract Work 17 percent 10 percent , NOTE: Dublin Flatbed and Pickup rates include cost of two way radios and hand tools.