Loading...
HomeMy WebLinkAbout4.11 Slurry Seal Accept Work or 19 82 STAFF REPORT CITY CLERK ` CITY COUNCIL File #600-35 DATE: February 17, 2015 TO: Honorable Mayor and City Councilmembers FROM: Christopher L. Foss, City Manager " SUBJECT: Acceptance of Work— Contract No. 14-09, 2014 Annual Slurry Seal Program Prepared by Ananthan Kanagasundaram, Associate Civil Engineer EXECUTIVE SUMMARY: The City Council will consider accepting the improvements under Contract No. 14-09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction. The Annual Slurry Seal Program (CIP No ST5114) resurfaced several City streets and the Civic Center parking lot with a slurry seal that prolongs the life of the existing pavement surface. FINANCIAL IMPACT: The adopted Fiscal Year 2013-2014 Budget included $664,259 in Gas Tax and Measure B Bicycle and Pedestrian funding for the 2013-2014 Slurry Seal Maintenance Project (CIP No. ST5114). In addition to the streets, $60,716.95 of slurry seal and pavement striping improvements for the Civic Center parking lot was funded from the Civic Center Modification Design & Construction Project (CIP No. G14099). During the project, additional roadway repair work was identified and staff solicited quotes from the contractor. The additional work included pavement repair on San Ramon Road, north of Dublin Boulevard; pavement repair on Tassajara Road, south of the city limit; and adjustment of manholes on Positano Parkway and Central Parkway. The additional roadway repair work requires a change order to Contract No. 14-09 in the amount of $122,939.75, increasing the total cost for the Slurry Seal Project to $767,244. A budget change for $102,985 from unappropriated State Gas Tax reserve fund is proposed to pay the difference between the actual cost and the current project budget. CIP" Funding,Source's Project Budget Actual Cost Budget Change Gas Tax 2201 & Measure B Bike and Ped Fund 2205 Improvements (Slurry Seal; $6647259 $7677244 $102,985 Traffic Striping) General Fund 1001 G14099 — Civic Center $1007000 $607716.95 N/A Modification Design & Construction Page 1 of 2 ITEM NO. 4.11 RECOMMENDATION: Staff recommends that that the City Council adopt the Resolution Accepting Improvements under Contract No. 14-09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction; Approve the Budget Change; Authorize the City Manager or his designee to approve Change Order for the project and Release retention after 35 days if there are no subcontractor claims. �-•°-ate ,..,. ,A �ubmitteb By ' � Reviewed By Public Works Director Assistant City Manager DESCRIPTION: On July 15, 2014, a contract was awarded to Graham Contractors, Inc. to perform the 2014 Annual Slurry Seal Program. Slurry seal is a preventative maintenance technique used to prolong the life of asphalt concrete surfacing. As streets begin showing wear and stress cracking, it is important to seal the cracks to keep water from getting under the roadway pavement. Slurry consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. Village Parkway, Amador Valley Boulevard, Stagecoach Road, Wildwood Road, and the Civic Center parking lot were slurry sealed as part of the 2014 Annual Slurry Seal Program. Additionally, during project construction, additional roadway repair work on San Ramon Road and Tassajara Road, and adjustment of manholes on Positano Parkway and Central Parkway were added to the project. The additional cost of this work necessitated a change order in the amount of $122,939.75, which was partially funded by the difference between the budgeted amount and the actual project costs, but still requires a budget change in the amount of $102,985 proposed to come from the State Gas Tax reserve fund. The project included restoration of existing bike lanes on Amador Valley Boulevard and Stagecoach Road. The bike lanes on Village Parkway were upgraded to buffered bike lanes as part of the project. Buffered bike lanes are wider than typical bike lanes and include a two- to four-foot striped buffer between the motor vehicle lane and the area for bicycles. This upgrade was consistent with the Complete Streets Policy and the Bicycle and Pedestrian Master Plan. Staff has reviewed the work as part of Contract No. 14-09, 2014 Annual Slurry Seal Program, and determined the work is complete. Staff recommends that the City Council authorize the City Manager to release the retention within 35 days from the recordation of the Notice of Completion provided there are no subcontractor claims. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Budget Change 2. Change Order 3. Resolution Accepting Improvements under Contract No. 14-09, 2014 Annual Slurry Seal Program Page 2 of 2 CITY OF DUBLIN FISCAL YEAR 2014-15 BUDGET CHANGE FORM Budget Change Reference#: City Council's Approval Required,,,, From Un-Appropriated Reserves X Budget Transfer Between Funds From Designated Reserves Other DECREASE,EASE BUDGET AMOUNT,, , INCREASE BUDGET AMOUNT- Account Amount Account Amount GAS TAX FUND -Street CIP-2014 Slurry Seal Program 2201.9601.89101 (Transfer Out) $102,985.00 3600.9601.49999 (Transfer In) $1027985.00 st5114.9400.9401 (Improvements- Not Bldgs) $1027985.00 REASON,FOR,BUDGET CHANGE Budget adjustment for CIP-2014 Slurry Seal Program, change due to additional scope and emergency road repairs on San Ramon Road &Tassajara Road along with adjustments of manholes on Positano Parkway&Central Parkway As Presented at the City Council Meeting 2/17/2015 • Posted By: Date: C:\Users\agenda\Desktop\4.11 attch 14.11 attch 1 CITY OF DUBLIN 100 Civic Plaza ORDER NO. 1 Dublin, CA 94568 DATE: February 5,2015 CONTRACT CHANGE ORDER STATE: California CONTRACT FOR: 2014 Annual Slurry Seal Program COUNTY: CONTRACT NO: 14-09 Alameda OWNER: City of Dublin CONTRACTOR: Graham Contractors Inc. CURRENT CONTRACT PRICE: $647,013.25 CURRENT CONTRACT TIME OF COMPLETION: January 13,2015 CURRENT NO.WORKING DAYS: 50 days TO: Graham Contractors,Inc. (Contractor) You are hereby requested to comply with the following changes from to the contract plans,specifications,or other contract documents: Description of Changes DECREASE INCREASE (Supplemental Plans and Specifications Attached in Contract Price In Contract Price Furnish all materials, equipment and labor to do base repair and resurface 8,850 SF of asphalt concrete (AC)on San Ramon Road at a unit price of$6.56/SF. $ 58,056.00 Furnish all materials, equipment and labor to do base repair and resurface 3,875 SF of asphalt concrete (AC)on Tassalara Road at a unit price of$6.56/SF. $ 25,420.00 Furnish all materials, equipment and labor to adjust 10 manholes to grade @ $1,942.50/ea. on Positano Parkway and Central Parkway. $ 19,425.00 Furnish all materials, equipment and labor to patch pave 2,357.50 SF of asphalt concrete around the manholes @$8.50/SF on Positano Parkway and Central Parkway. $ 20,038.75 TOTALS $ 122,939.75 NET CHANGE IN CONTRACT PRICE $122,939.75 JUSTIFICATION: Modifications requested by the City to do this repair based on complaints that the City received from the residents. C:AUsers\agenda\Desktop\4.11 attch 2.doc The Contract Total Including this and previous Change Orders Will Be: $765,664.72 The Contract Period Provided for Completion Will Be Increased: 15 Working-Days Upon execution by representatives authorized to bind the parties, this Change Order will become a part of the contract. The consideration specified in this Change Order (whether an adjustment of the contract price, an adjustment of time, and/or other consideration) is the full and sole compensation owed to the contractor as a result of the changes and issues described in this Change Order. Such consideration includes, but is not limited to,any and all direct and indirect costs incurred by the contractor as a result of the changes and issues described in this Change Order for any labor, equipment, materials, overhead (additional, extended, field and home office), profit, or time adjustments. By signing this Change Order the contractor waives and releases the owner from any and all claims for additional compensation concerning any of the changes and issues specified in this Change Order. The undersigned, being the (Title) of the Contractor, by signing this Changer Order declares under penalty of perjury under the laws of the State of California, and does personally certify and attest that: the undersigned has thoroughly reviewed the attached request for change order and knows its contents, and said request for change order is made in good faith;that it is supported by truthful and accurate data; that the amount requested and the additional time requested accurately reflect the allowable expenses that would be incurred, and the time necessary, to perform the change order; and further, that the undersigned is familiar with California Penal Code Section 72 and California Government Code Section 12650 et seq., pertaining to false claims, and further knows and understands that the submission or certification of a false claim may lead to fines, imprisonment,or other severe legal consequences. Requested (City) (Date) Recommended (Public Works Director) (Date) Accepted (Contractor) (Date) Approved by Agency (Christopher L. Foss, City Manager) (Date) C:AUsers\agenda\Desktop\4.11 attch 2.doc RESOLUTION NO. - 15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTANCE OF WORK CONTRACT NO. 14-09, 2014 ANNUAL SLURRY SEAL PROGRAM AND G14099 — CIVIC CENTER MODIFICATION DESIGN & CONSTRUCTION WHEREAS, on July 15, 2014, The City of Dublin entered into a contract with Graham Contractors, Inc. to perform the 2014 Annual Slurry Seal Program; and WHEREAS, said improvements have been completed in accordance with plans and specification, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the improvements, Contract No. 14-09, 2014 Annual Slurry Seal Program, and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby approve the Budget Change and authorize City Manager or his designee to approve the Change Order and to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. PASSED, APPROVED AND ADOPTED this 17th day of February, 2015, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk