HomeMy WebLinkAboutItem 4.08 PG&E AgrmntUndgrdUtlyCITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: February 24, 1986
SUBJECT:
Dublin Blvd. Underground Utility
Agreement with P. G. & E.
EXHIBITS ATTACHED:
P. G. & E. letter of February 12, 1986;
Agreement for Undergrounding Work;
Agenda Statement of December 10, 1984.
RECOMMENDATION: ~ Approve agreement an'd authorize payment.
FINANCIAL STATEMENT:
Underground electric cost of $262,433.00
DESCRIPTION:
At their meeting of December 10, 1984, the City Council
authorized an appropriation of $405,000 for the City's Share of
undergrounding of utilities along Dublin Blvd. between 1-680 and
San Ramon Road. At that time, the utility companies had
estimated that the City's portion of the project cost would be in
the range of $195,000 to $405,000.
P. G. & E.'s letter of February 12, 1986, requests that the
City execute an agreement for doing the underground work and
return the agreement to them with a check for $262,433.00 for the
electric portion of the work.
The total electrical cost will be $657,433.00, based on
P. G. & E.'s advancing $395,000 in Rule 20A funds and the City's
paying $262,433.00.
Pacific Telephone costs were originally estimated at $15,000
for the City's portion of the work. We will not have a figure on
this until the telephone company completes their work and the
City is billed for 41% of the total, actual costs.
Additional charges are being made to this account based on
City Staff time for coordination and inspection (permit fees have
been waived as all additional costs are being billed back to the
City).
The City has also incurred costs in moving two traffic
signal services from P. G. & E. poles onto the City's traffic
signal controllers.
COPIES TO:
GAS AND ELECTt%IC COMPiNY
998 MU~R~SIA 80UhSVARO t~VERM0~5. CA~F0~N~A 94550
February 12, 1986
Mr. Richard Ambrose
City of Dublin
P. O. Box 2340
Dublin, CA 94568
Re: City of Dublin
Resolution No. 127-84
Dear Mr. Ambrose:
I have attached the necessary agreement for the undergrounding of overhead
extension at Dublin Blvd. from San Ramon Road east to 1-680.
Please sign and date all copies of the agreement and return them with a
check for $262,433.00 to my attention. Upon execution, one copy will be
returned to you for your files.
These costs are valid for a period not to exceed 90 days. Thereafter, all
contracts should be promptly returned for revision.
If you have any questions, please call me at 447-1890.
Sincerely,
Ri chard J. Fetro
District Representative
RJF:hme
enc
D&C 2288744
COPIES:
O DIVISION
[] CUSTOMER
[] ACCT. DEPT.
[] DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
AGREEMENT TO INSTALL FACILITIES
OR PERFORM OTHER WORK
REFERENCE:
0143E77065
GM 4498056
D&C 2288744
Cit.y. of Dublin, a Munici~.al Corp. oration .......................
i~reinafte~' called Customer, has requested Pacific Gas and Electric Company, hereinafter called Pacific,
to perform the hereinafter-described work at~..~..u...b..?J..n....B.].y..d.......~..r..~.m...:.s..a..n....~a...m..~..n.....R..~...a..d....[~.~.t...t~...I.~.~.
State of California.'
Pacific will perform said work and furnish all necessary labor, appliances, materials and facilities re-
quired therefor, subject to th~ following conditions:
1. Said work shall be as follows:
(Describe hereunder in detail the materials and facilities to be furnished and/or work to be done. For each facility installed,
specifically indicate whether ownership shall vest in Pacific or Customer upon completion of work. If more space is
required use other side and attach any necessary drawings.)
NONREFUNDABLE CHARGES
Rule 20A/20B
Undergrounding of overhead extension
$262,433.00
These costs are valid for a period not to exceed 90 days. Thereafter, all
contracts should be promptly returned for revision.
Ownership of facilities to vest in Pacific 6pon completion.
2. Whenever part or all of said work is to be furnished or performed upon property other than that
of Customer, Customer shall first procure from the owners thereof all rights-of-way and/or permits necessary
therefor in form satisfactory to Pacific and without cost to it.
3. Customer shall immediately, upon demand by Pacific, pay to Pacific as the complete contract
price hereunder the sum ~f~T3¥.~hu~dr.~e.d~s~ix~:y~.tw.~t~.usand~f~ur~hundr.ed~ir~t~thr~ .........
..d..9..]].~.S....~.O..d...B.O../.1..O.O.-..-...-..-..-...-..'- ..................................................................... dollars ($.262,433_0g-).
Executed this ................................ day of ..................................................... 19 ...........
.£i.t.~...o.f...Duh 1.f n ..................................................
Customer
-"r ss' p' O. Box 2340
Mail ^oo e "'5~FT~7'~'~"~'$~ ....................
Attn: Richard Ambrose
' a ¥fi'fi6 ....... ...........................................
PACIFIC GAS AND ELECTRIC COMPANY
For: Manager East Bay Region
62-4527 REV. 1-62
COPIES:
F'I DIVISION
t'l CUSTOMER
r-J ACCT. DEPT.
r) DISTRICT
PaCIFiC Gas aND ELECTRIC CoMPaNY
AGREEMENT TO INSTALL FACILITIES
or PERFORM OTHER WORK
REFERENCE:
0143E77065
GM 4498056
D&C 2288744
Cit5 of Dublin, a Municipal Corp. oration .
to perform the hereinafter-described work at-p..u...b..~-.i...n.~.B.]~y..d.~..~.f.r..q.m..~.s..a..n..~.R..a.~.m..~..n..~.R..~...a..d.~-~.E..a..~.g~.~.~.6B.~
State of California.
Pacific will perform said work and furnish all necessary labor, appliances, materials and facilities re-
quired therefor, subject to th6 following conditions:
1. Said work shall be as follows:
(Describe hereunder in detail the materials and facilities to be furnished and/or work to be done. For each facility installed,
specifically indicate whether ownership shall vest in Pacific or Customer upon completion of work. If more space is
required use other side and attach any necessary drawihgs.)
NONREFUNDABLE CHARGES
Rule 20A/20B
Undergroundin9 of overhead ~xtension
$262,433.00
These costs are valid for a period not to exceed 90 days. Thereafter,
contracts should be promptly returned for revision.
Ownership of facilities to vest in Pacific upon completion.
al'l
'2. Whenever part or all of said work is to be furnished or performed upon property other than that
of Customer, Customer shall first procure from the owners thereof all rights-of-way and/or permits necessary
therefor in form satisfactory to Pacific and without cost to it.
3. Customer shall immediately, upon demand by Pacific, pay to Pacific as the complete c(~ntract
price hereunder the sum ~T.W~hu~r~dr~e~d~.s~ixty.~.tw.o~:h.~u$and~f~r~kunr~red..thir.ty...thre~ .........
...d..o. ]. ] ..a..r..$....a.._n..d ...n...o./.!.O Q.-..-. ................................................................................ dollars ($.26Z~433_011.).
Executed this ................................ day of ..................................................... 19 ...........
..C i t.y.., o.f... D-b 1.i n ..................................................
Customer
Address' P' O. Box 2340 ~
Mall "-6 ....................
Attn: Richard Ambrose
....... ...........................................
PACIFIC GAS AND ELECTRIC COMPANY
For: Manager ~ast Bay Region
COPt[S:
[] DIVISION
[] CUSTOMER
F3 ACCT. DEPT.
[] DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
AGREEMENT TO INSTALL FACILITIES
or PERFORM OTHER WORK
REFERENCE:
0143E77065
GM 4498056
D&C 2288744
~o p~rform ~he h~r~er-d~scr~bed wor~
State of California.
Pacific will perform said work and furnish all necessa~ labor, appliances, materials and facilities re-
quired therefor, subject to th~ following conditions:
1. Said work shall be as follows:
(Describe hereunder in detail the materials and facilities to be furnished and/or work to be done. For each facility installS,
specifically indicate whether ownership shall vest in Pacific or Customer upon completion of work. If more space is
required use other side and attach any nece~ry drawings.)
NONREFUNDABLE CHARGES
Rule 20A/20B
Undergrounding of overhead ~xtension
$262,433.00
These costs are valid for a period not to exceed 90 days. Thereafter, all
contracts should be promptly returned for revision.
Ownership of facilities to vest in Pacific upon completion.
2. Whenever part or all of said work is to be furnished or performed upon property other than that
of Customer, Customer shall first procure from the owners thereof all rights-of-way and/or permits necessary
therefor in form satisfactory to Pacific and without cost to it.
3. Customer shall immediately, upon demand by Pacific, pay to Pacific as the complete cc~ntract
price hereunder the sum ~f~w.~..~h.un~r~e~d~s.1xty~.tw~.~.th~usand~f.~ur.~undr.ed~t-~x~r..ty~..thr.ee .........
...d..o.J. J ..a. ?...s....a..n...d....n...o./.!..0..0. ................................................................................... dollars ($.26Z~.433_0g.).
Executed this ................................ day of ..................................................... 19 ...........
..Ci_t.y... o.f...D, b 1.i n ..................................................
Customer
ss P 0 Box 2340
Mail ~a~re : .....~ ...... : ..............................................
Dublin, CA 94568
Attn: Richard Ambrose
'~F?~66 ....... ~7i~?~ ...........................................
PACIFIC GAS AND ELECTRIC COMPANY
Fo~;"~i'~';ger East Bay Region
DIVISION
ACCT. DEPT.
PACIFIC GAS AND ELECTRIC COMPANY
AGREEMENT TO iNSTALL FACILITIES
OR PERFORM OTHER WORK
REFERENCE:
0143E77065
GM 4498056
D&C 2288744
Cit~ of Dublin, a Municip. al Corp. oration .....
i~ere~nafter ........................................................................................................................................................................................ caUed Customer, has requested Padfic Oas and E~ectric Company, hereinafter caUed Pacificl
to perform the hereinafter-described work
.........................................................................................................................................................................................
State of California.
Pacific will perform said work and furnish all necessary labor, appliances, materials and facilities re-
quired therefor, subject to th6 following conditions:
1. Said work shall be as follows:
(Describe hereunder in detail the materials and facilities to be furnished and/or work to be done. For each facility installed,
specifically indicate whether ownership shall vest .in Pacific or Customer upon completion of work. If more space is
required use other side and attach any necessary drawings.)
NONREFUNDABLE CHARGES
Rule 20A/20B
Undergrounding of overhead extension
$262,433.00
These costs are valid for a period not to exceed 90 days. Thereafter; all
contracts should be promptly returned for revision.
Ownership of facilities to vest in Pacific upon completion.
2. Whenever part or all of said work is to be furnished or performed upon property other than that
of Customer, Customer shall first procure from the owners thereof all rights-of-way and/or permits necessary
therefor in form satisfactory to Pacific and without cost to it.
3. Customer shall immediately, upon demand by Pacific, pay to Pacific as the complete cSntract
price hereunder the sum ~f..T.~.~...hu.[td.r..e.d~.~s.1xty....t~..j:~.usand...f.~i~r...~-undr.ed..~:~ir..~y..~hr.~ .........
~.d..q.l.~]~.a..r.~s..~..a..~...d.~.r~.~../.1.~...Q~..-.~.~-..~-..-..~.~.~n~.~.~.v.~.~.~ ..... dollars ($.26Z,..433_OQ.).
Executed this ................................ day of ..................................................... 19 ...........
..Ci.t.y... o.f...Dub 1.i n ..................................................
Customer
Dublin, CA 94568
Attn: Richard Ambrose
....... ...........................................
PACIFIC GAS AND ELECTRIC COMPANY
Fo~'~i'~'~'~ger ~ast Bay Region l~t(~t~ilt}iX
62-4527 REV. 1-62
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: December 10, 1984
SUBJECT:
Public Hearing - Dublin Boulevard
Underground Utility District, No. 1
EXHIBITS ATTACHED:
1)
2)
3)
4)
5)
Resolution establishing the Dublin
Boulevard Underground Utility
District, No. 1
Location Map
Notice of Intention
Adopted Policy of Undergrounding of
Existing Overhead Utilities
Procedure for Undergrounding
Overhead Utilities
· RECOMMENDATION:
Open Public Hearing and hear staff
presentation
Take testimony from public
Close Public Hearing and deliberate
Adopt Resolution Establishing the
Dublin Boulevard Underground
Utility District, No. 1
Authorize additional appropriation
of $405,000.00 from Street
Improvement Reserve
FINANCIAL STATEMENT:
Total Project cost estimated - $590,000
- $800,000
Cost Financed under Rule 20A - $395,000
Cost required from City funds - $195~000
- $405,000
· Additional Appropriation is required.
DESCRIPTION: At its meeting of November 26, 1984, the
City Council agreed in concept to contributing City funds to
the Dublin Boulevard Underground Utility District, No. 1 and
authorized staff to contact PG&E regarding the City's
position. The staff has been in contact with PG&E officials
who confirmed that PG&E has approved this project.
PG&E would advance the City $395,000 in Rule 20A funds for
this underground utility project on Dublin Boulevard from
San Ramon Road to 1-680. These Rule 20A funds would
represent an advance of funds using the City's allocation
through 1994. PG&E's estimated cost of this project is
$695,000 +.15% ($590,000 - $800,000). The cost to the City
has been ~stimated at $300,000 but could vary with the cost
of the project ($195,000 - $405,000). The City's share of
this project would be financed from the General Fund Street
Improvement Reserve.
This project would not conflict with the City's street
rehabilitation project which is presently underway. The
undergrounding of utilities would be accomplished on the
back half of the sidewalk on the north side of Dublin
Boulevard. This project would require the acquisition of
some minor right-of-way to a~commodate two switch boxes
behind the sidewalk.
Those property owners within the Project boundaries which do
not yet have underground service lines, would have to pay
the cost necessary to underground those lines. Those
ITEM NO.
COPIES TO:
properites that would have to assume this cost are
Assessor's Parcels 941-1550-1-7, 941-1550-!-2, 941-1500-28,
and 941-305-6-3.
The property owners have been notified of the public
hearing.
PG&E representatives have indicated that the construction of
this project could begin as early as June 1985.
RECOMMENDATION
It is the staff's recommendation that: 1) the City Council
adopt the attached Resolution to Establish the Dublin
Boulevard Underground Utility District, No. 1, and ordering
the removal of aboveground utilities in the area designated
as the Dublin Boulevard Underground Utility District No. 1;
2) the City Council authorize an additional appropriation
from the General Fund Street Improvement Reserve in the
amount of $405,000.00.