HomeMy WebLinkAboutItem 4.1 GHAD FY 2015-16 Budget STAFF REPORT
GEOLOGIC HAZARD DISTRICT CLERK
ABATEMENT DISTRICT File #360-20/360-30
DATE: June 2, 2015
TO: Honorable President and Board of Directors
FROM: Christopher L. Foss, GHAD District Manager "
SUBJECT: Proposed Fiscal Year 2015-16 Budget for the Geologic Hazard Abatement
Districts
Prepared by Andrew Russell, District Engineer
EXECUTIVE SUMMARY:
The Geologic Hazard Abatement District (CHAD) Boards of Directors will consider approval of a
resolution adopting a Fiscal Year 2015-16 Budget for each of the three existing GHADs in the
City of Dublin.
FINANCIAL IMPACT:
Proposed expenditures for FY 2015-16 total $652,771, $574,416, and $127,378 in the Fallon
Village CHAD, Schaefer Ranch CHAD, and Fallon Crossing CHAD, respectively, funded
through a special assessment on associated properties. Activities undertaken will support the
prevention, mitigation, abatement, and control of identified or potential geologic hazards within
each GHAD boundary.
RECOMMENDATION:
Staff recommends that the Geologic Hazard Abatement District Boards adopt the following: 1)
Resolution Adopting a Budget for the Fallon Village Geologic Hazard Abatement District for
Fiscal Year 2015-16; 2) Resolution Adopting a Budget for the Schaefer Ranch Geologic
Hazard Abatement District for Fiscal Year 2015-16; and 3) Resolution Adopting a Budget for
the Fallon Crossing Geologic Hazard Abatement District for Fiscal Year 2015-16.
r i�
/ r
Submitted By Reviewed By t
District Engineer District Treasurer
DESCRIPTION:
A Geologic Hazard Abatement District (CHAD) is a special entity which is established
separately from the City of Dublin and applies to a specific defined area within the City. The
GHAD is formed under provisions in the California Public Resources Code which, in Section
Page 1 of 3 ITEM NO. 4.1
26570, establishes that a GHAD is a political subdivision of the State and is not an agency or
instrumentality of a local agency.
The City's role is limited to providing support to the CHAD, coordinating activities undertaken for
the CHAD, administering the GHAD funds and coordinating the payment of expenses
associated with the CHAD. GHAD funding is collected as part of property tax bills. The GHAD
can perform maintenance on defined areas and can also accumulate reserves to address major
or extraordinary work such as a landslide repair.
The Public Resources Code defines a "geologic hazard" as an actual or threatened landslide,
land subsidence, soil erosion, earthquake, fault movement, or any other natural or unnatural
movement of land or earth. The purpose of establishing a GHAD is intended as a means to
address both prevention and any corrections resulting from a geologic hazard. State law
identifies the purpose of a GHAD as addressing: (a) Prevention, mitigation, abatement, or
control of a geologic hazard; and (b) Mitigation or abatement of structural hazards that are partly
or wholly caused by geologic hazards (Public Resources Code 26525).
The City of Dublin has established three separate GHADs: Fallon Village GHAD (which includes
the Jordan Ranch development), Schaefer Ranch CHAD, and Fallon Crossing CHAD. These
GHADs are managed by a Board of Directors, which currently comprises the members of the
Dublin City Council. Assessments are levied in accordance with an Engineer's Report prepared
for each District and adopted at a public meeting.
Adopting a budget for a GHAD is not a requirement, but the City, as the administrator of the
GHAD funds, believes that the formal adoption of a financial plan is in keeping with best
practices of local agency operations.
Fiscal Year 2015-16 Budget
The proposed Fiscal Year 2015-16 Budget for each GHAD is provided in Exhibit A of the
Resolutions (Attachments 1, 2, and 3) and can also be found in the Fiduciary Funds section of
the City of Dublin's budget document. The following table summarizes revenues, expenditures,
and estimated fund balance in each CHAD:
Estimated Beginning Proposed 2015-16 Proposed 2015-16 Ending
GHAD Fund Balance* Revenues Expenditures Fund Balance
Fallon Village $1,057,550 $741,653 ($652,771) $1,146,432
Schaefer Ranch $1,275,526 $610,598 ($574,416) $1,311,708
Fallon Crossing $68,178 $116,889 ($127,378) $57,689
* estimated using FY 2014-15 Amended Budget
Expenditures include contracted service costs for administration, slope stabilization and erosion
protection, monitoring, maintenance, and on-site conservation easement activities. Also
included are salaries and benefits costs associated with City of Dublin Staff that have been
allocated to oversee GHAD operations.
Page 2 of 3
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
None.
ATTACHMENTS: 1. Resolution Adopting a Budget for the Fallon Village Geological
Hazard Abatement District for Fiscal Year 2015-16
2. Resolution Adopting a Budget for the Schaefer Ranch Geological
Hazard Abatement District for Fiscal Year 2015-16
3. Resolution Adopting a Budget for the Fallon Crossing Geological
Hazard Abatement District for Fiscal Year 2015-16
Page 3 of 3
FALLON VILLAGE GHAD RESOLUTION NO. -15
A RESOLUTION OF THE BOARD OF THE
FALLON VILLAGE GEOLOGIC HAZARD ABATEMENT DISTRICT
***************************
ADOPTING A BUDGET FOR THE
FALLON VILLAGE GEOLOGIC HAZARD ABATEMENT DISTRICT
FOR FISCAL YEAR 2015-16
WHEREAS, the Board of the Fallon Village Geologic Hazard Abatement District (Board)
desires to establish a Budget and Financial Plan for Fiscal Year 2015-16; and
WHEREAS, the Board has reviewed and considered the Budget documents and has
received input from the public; and
WHEREAS, the Fallon Village Geologic Hazard Abatement District Fund Summary
(Exhibit A) attached hereto and made part of this Resolution, reflects the Fiscal Year 2015-16
Budget for the Fallon Village Geologic Hazard Abatement District (CHAD) which includes the
Fallon Village and Jordan Ranch developments; and
WHEREAS, the action taken by this resolution shall approve the appropriation; and
NOW, THEREFORE, BE IT RESOLVED that the Board of the Fallon Village Geologic
Hazard Abatement District does hereby:
1. Adopt the Fiscal Year 2015-16 Budget Appropriation and Financial Plan for the Fallon
Village Geologic Hazard Abatement District, as outlined in Exhibit A.
2. Authorize the GHAD Manager to make expenditure appropriations in accordance with the
Budget as adopted.
3. Authorize the GHAD Manager to transfer budgeted amounts between line items, provided
that the transfer is within the same fund.
4. Authorize the GHAD Manager to increase revenue and expenditure budget for CHAD,
when corresponding revenues comes in over budget.
5. Authorize the GHAD Manager to increase the appropriations for Fiscal Year 2015-16
expenditures in an amount not to exceed the amount of funds encumbered or designated
by the GHAD Manager as needed for expenses that did not occur prior to the year-end,
but are expected to be expended in Fiscal Year 2015-16 consistent with the original
purpose.
PASSED, APPROVED AND ADOPTED this 2nd day of June, 2015, by the following vote:
AYES-
NOES-
ABSENT
ABSTAIN:
Board President
ATTEST:
District Clerk
EXHIBIT A
FISCAL YEAR 2015-16
FALLON VILLAGE GEOLOGIC HAZARD ABATEMENT DISTRICT
FUND SUMMARY
Adopted Amended
Actual Budget Budget Update
2013-14 2014-15 2014-15 2015-16
Assessments $494,906 $546,466 $546,466 $735,613
ppy $a ¢;Y4'4':':' }tstesi'iiiiiii �nasrtai 'liiiiiii dmusi
Salaries &
Wages $114,277 $114,277 $50,428
Benefits $21,739 $21,739 $23,068
Services &
Supplies $798 $798 $798
Contracted Services $7,869 7
kzm�a�AUnas 8,eee�' $Alh ue ����; {wsx ���p fesxmii
II
SCHAEFER RANCH GHAD RESOLUTION NO. -15
A RESOLUTION OF THE BOARD OF THE
SCHAEFER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT
***************************
ADOPTING A BUDGET FOR THE
SCHAEFER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT
FOR FISCAL YEAR 2015-16
WHEREAS, the Board of the Schaefer Ranch Geologic Hazard Abatement District
(Board) desires to establish a Budget and Financial Plan for Fiscal Year 2015-16; and
WHEREAS, the Board has reviewed and considered the Budget documents and has
received input from the public; and
WHEREAS, the Schaefer Ranch Geologic Hazard Abatement District Fund Summary
(Exhibit A) attached hereto and made part of this Resolution, reflects the Fiscal Year 2015-16
Budget for the Schaefer Ranch Geologic Hazard Abatement District (CHAD); and
WHEREAS, the action taken by this resolution shall approve the appropriation.
NOW, THEREFORE, BE IT RESOLVED that the Board of the Schaefer Ranch Geologic
Hazard Abatement District does hereby:
1. Adopt the Fiscal Year 2015-16 Budget Appropriation and Financial Plan for the Schaefer
Ranch Geologic Hazard Abatement District, as outlined in Exhibit A.
2. Authorize the GHAD Manager to make expenditures appropriations in accordance with
the Budget as adopted.
3. Authorize the GHAD Manager to transfer budgeted amounts between line items, provided
that the transfer is within the same fund.
4. Authorize the GHAD Manager to increase revenue and expenditure budget for CHAD,
when corresponding revenues comes in over budget.
5. Authorize the GHAD Manager to increase the appropriations for Fiscal Year 2015-16
expenditures in an amount not to exceed the amount of funds encumbered or designated
by the GHAD Manager as needed for expenses that did not occur prior to the year-end,
but are expected to be expended in Fiscal Year 2015-16 consistent with the original
purpose.
PASSED, APPROVED AND ADOPTED this 2nd day of June, 2015, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Board President
ATTEST:
District Clerk
EXHIBIT A
FISCAL YEAR 2015-16
SCHAEFER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT
FUND SUMMARY
Adopted Amended
Actual Budget Budget Update
2013-14 2014-15 2014-15 2015-16
11 J J l
! J J
1 J J I
JJ 1
1 !
J JJ
J
I
I JJ II �
I
/, r)r)r) I 111111l J J
f , 1 III 111111 Ji f
1,
i
I
. 11 .1 111 I >� IJI III I IJI III I I . 11
I
� 1 11 11 1
J J IJJ
, J
J
11 r�f� J 1 ll lJ.
I
� I
ll. I
� l
J I
, JJ
J
1
t
1
II l
���,�u u u w G u l»h u J J V u w,1�,,,,,,,,,,<<,,�����J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J OEM J
Assessments $438,425 $502,007 $502,007 $603,779
Interest $5,451 $5,333 $5,333 $6,819
II J uU I J y 1 Jl 11 i
I � I�
J J J
IJ J i J
J
r,
i
Salaries &Wages $74,119 $74,119 $28,816
Benefits $12,422 $12,422 $13,061
Services & Supplies $456 $456 $456
Contracted Services $10,560 $475,340 $475,340 $532,083
,, ° I°'" III VIII J II III I III I II J I IJ I IIII I J IIII
JJ JJ �
J J JJ
J J
ll
J I
I �
111 111 I
1 �IJ11 I 1 JI JI I IIII . IJI I IIII . IJI II I . IJI
1 I IJI I I I I I I I I 11 I II
J
I J
J J
1 1
FALLON CROSSING GHAD RESOLUTION NO. -15
A RESOLUTION OF THE BOARD OF THE
FALLON CROSSING GEOLOGIC HAZARD ABATEMENT DISTRICT
***************************
ADOPTING A BUDGET FOR THE
FALLON CROSSING GEOLOGIC HAZARD ABATEMENT DISTRICT
FOR FISCAL YEAR 2015-16
WHEREAS, the Board of the Fallon Crossing Geologic Hazard Abatement District
(Board) desires to establish a Budget and Financial Plan for Fiscal Year 2015-16; and
WHEREAS, the Board has reviewed and considered the Budget documents and has
received input from the public; and
WHEREAS, the Fallon Crossing Geologic Hazard Abatement District Fund Summary
(Exhibit A) attached hereto and made part of this Resolution, reflects the Fiscal Year 2015-16
Budget for the Fallon Crossing Geologic Hazard Abatement District (CHAD); and
WHEREAS, the action taken by this resolution shall approve the appropriation.
NOW, THEREFORE, BE IT RESOLVED that the Board of the Fallon Crossing Geologic
Hazard Abatement District does hereby:
1. Adopt the Fiscal Year 2015-16 Budget Appropriation and Financial Plan for the Fallon
Crossing Geologic Hazard Abatement District, as outlined in Exhibit A.
2. Authorize the GHAD Manager to make expenditures appropriations in accordance with
the Budget as adopted.
3. Authorize the GHAD Manager to transfer budgeted amounts between line items, provided
that the transfer is within the same fund.
4. Authorize the GHAD Manager to increase revenue and expenditure budget for CHAD,
when corresponding revenues comes in over budget.
5. Authorize the GHAD Manager to increase the appropriations for Fiscal Year 2015-16
expenditures in an amount not to exceed the amount of funds encumbered or designated
by the GHAD Manager as needed for expenses that did not occur prior to the year-end,
but are expected to be expended in Fiscal Year 2015-16 consistent with the original
purpose.
PASSED, APPROVED AND ADOPTED this 2nd day of June, 2015, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Board President
ATTEST:
District Clerk
EXHIBIT A
FISCAL YEAR 2015-16
FALLON CROSSING GEOLOGIC HAZARD ABATEMENT DISTRICT
FUND SUMMARY
Adopted Amended
Actual Budget Budget Updated
2013-14 2014-15 2014-15 2015-16
I r
uuul luuulu i I uuuluu»11111111 1111 »»i»i »i »i»iii 1111»
11 J J l
! J J
1 J J I
JJ 1
1 !
J JJ
J
I
JJJ II �
I
/, r)r)r) JJ I ,111111l i J
f , 1 III 111111 ii f
1,
i
I
� fl 11 111. . . 111, . . 11111 1
1
� J
1
I I
1
I
II»I III»»»»»
� I
III
J
1
t
1
II t
Assessments $51,799 $73,862 $73,862 $116,545
Interest $147 $394 $394 $344
III U III 1 li i I ii ii lu 11i 1 )� �1 J li 111 II Ili i» f11 N f>> li li )»�» J>»
I � I�
I I I
IIIIIIII�»�1111»,1111»»�»»I» »»111»»»11111»»»»»l,»I IIIIIII III III II »I»»»»111»»11 I I 1 11»1»1 III
III I 1 1 1 111 1 1 � 1 1
J J J
J J ,
I 1
r,
i
I
������������������������������������������������������������������������������������������������������������������������������������������������������1
Salaries &Wages $8,947 $8,947 $7,204
Benefits $3,105 $3,105 $3,265
Services & Supplies $114 $114 $114
Contracted Services $1,533 $50,483 $50,483 $116,795
IN
,,", '°'" III IIIO ;III III I IIIIIII I I0 IIIIIII I IO II001 I II
11
IIIIIIII�»��,»»», 1111»1.�»»1111 1111 1.111 1111111111111
1 1 , 11 . 1
1 111
> f J J
J J J J J
J J JJ
J J
I JJJ 111111 i J
f uu 1 uu 111111 ii f
1,
I
I
I III��»»�»,1»111 1 J»» 1t tttttt 11111111111th t>I>1>I 111 >I>1>1>1>1>I>1 ,11111 ttt 1111111 11>I>1>1>11111111111
11 JI 1h >1h>� 1t 111111 1h 111,11 lh 1�1 1>1>1.
11 1 1 1 1
1 1 1 11 1 11 1 . 1 1
� 1 I 11 I 11 I
� 1
1
1
l
1
1