Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4.07 AlamoCanalBikePath
CI'TY CLERK FILE # 600-35 AGENDA STATEMENT CZTY COUNCZL MEETZNG DATE: March 6, 2001 SUBJECT: Award of Bid - Contract No. 00-14, Alamo Canal Bike Path Project from Amador Valley Boulevard to Iron Horse Trail Junction Report Prepared by: Lee S. Thompson, Public VForks Director ATTACHMENTS: 1) Resolution 2) Budget Change Form 3) Bid Results 1) RECOMMENDATION~ 2) Adopt resolution awarding bid to Carone & Son, Inc. Approve Budget Change in the amount of $27,833.50 FINANCIAL STATEMENT: Budgeted for improvements (including survey): $264,395.00 Low bid received: Plus 10% contingency: TOTAL: $265,662.50 $ 26,566.00 $292,228.50 Budget shortfall: $ 27,833.50 An additional appropriation from General Fund Unallocated Reserves (001 ) will be required. DESCRIPTION: On December 19, 2000, the City Council authorized Staff to solicit bids for Contract No. 00-14 Alamo Canal Bike Path Project from Amador Valley Boulevard south to the Iron Horse Trail Junction. This project will extend the Iron Horse Trail south to Dougherty Road by constructing the section between Amad0r Valley Boulevard and the portion of the Trail built by the developer of the Park Sierra Apartment complex. A total of 9 bids were received. The low bidder is Carone & Son, Inc., with a bid of $265,662.50. The bid received for Top Grade Construction was lower but was determined to be nonresponsive. Staff has reviewed the bids, called references and determined that Carone & Son, Inc., has satisfactorily performed similar projects for other cities. Staff recommends that the City Council adopt the resolution awarding Contract No. 00-14 to Carone & Son, Inc., and approve the Budget Change in the amount of $27,833.50. g:xaniscproj\alamo bikd AVB-IHXagstawrd COPIES TO: Bidders ITEM NO. RESOLUTION NO. - 01 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 00-14 ALAMO CANAL BIKE PATH PROJECT FROM AMADOR VALLEY BOULEVARD TO IRON HORSE TRAIL JUNCTION WHEREAS, the City of Dublin did, on February 22, 2001, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 00-14, Alamo Canal Bike Path Project from Amador Valley Boulevard Iron Horse Trail Junction, authorized by the City Council on December 19, 2000, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars. relative to the proceedings under the request for bids; and to WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 00-14 to the lowest responsible bidder therefor, to wit, Carone & Son, Inc., at a bid of Two Hundred Sixty-Five Thousand Six Hundred Sixty-Two Dollars and Fifty Cents ($265,662.50), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 6th day of March, 2001. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g.'miscprojXalamo bike A VB-IHlresoawrd CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): From Unappropfiated Reserves (If Other than General Fund, Fund No - ) From New Revenues DECREASE BUDGET ACCOIJNT Name: AMOUNT Account #: Name: Budget Transfers: CHANGE FORM # From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) ....... Other ...... - ._ INCREASE BUIJ(~ET ACCOUNT ANIOI. JN'I' Name: Alamo Canal Bike Path - AVB to Iron $27,833 Horse Trail Junction (Improvements) Account #: 001-96770-750-050 Name:_ , AccOunt #: Account #: Name: Name: Account #: ~' Account #: Name: Name: Account #: Account #: Name: Name: ' Account #: Account #: City Manager: Date: sig. ASD/FinMgr ~,}r'7~& z REASON FOR BUDGET CHANGE ENTRY: The low bid for street related improvements, including a 10% contingency, exceeded the budgeted amount for improvements. Mayor: Date: Signature Posted By: : r~o,~- Signature G.'tniscprojXalamo bik A VB-lHXbudget chg BID RESULTS: ALAMO CANAL BIKE PATH - AMADOR VALLEY BLVD. TO IRON HORSE TRAIL, CONTRACT 0044 BID OPENING DATE - FEBRUARY 22, 2001 I I ENGINEER'S ESTIMATE CARONE & SONS BID UNIT TOTAL TOTAL ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE PRICE UNIT PRICE PRICE 1. Construction Staking LS 1 5,000.00 5,000.00 12,100.00 .12,100.00 2. Clearing / Demolition LS 1 5,000.00 5,000.00 12,600.00 12,600.00 3. Grading / Subgrade Preparation LS 1 10,000.00 10,000.00 17,000.00 17,000.00 4. Traffic Control LS 1 2,000.00 2,000.00 1,900,00 1,900.00 5. Driller Pier / Soldier Beam Wall LF 101 125.00 12,625.00 176.00 17,776.00 6. Wooden Retaining Wall LF 36 50.00 1,800.00 66.00 2,376.00 7. 15" Reinforced Concrete Pipe, Class V LF 162 75.00 12,150.00 56.00 9,072.00 8. 12" Reinforced Concrete Pipe, Class V LF 76 75.00 5,700.00 39.00 2,964.00 9. 15" Corrugated Metal Pipe, 16 Ga. LF 8 125.00 1,000.00 142.00 1,136.00 10. 6" Polyvinyl Chloride Pipe, Sch. 80 LF 4 50.00 200.00 42.00 168.00 GORDON N. BALL TOTAL UNIT PRICE PRICE 10,000.00 10,000.00 18,000.00 18,000.00 35,000.00 35,000.00 5,000.00 5,000.00 235.00 23,735.00 90.00 3,240.00 60.00 9,720.00 55.00 4,180.00 65.00 520.00 60.00 240.00 11. Reinforced Concrete Pipe Collar EA 12. Field Inlet, Type CD-403 EA 13, Field Inlet, Type 1KR EA 14. Inlet, Type CD-400 EA 15. Earth Ditch LF 16. Concrete Ditch (2' Wide) LF 17. Modified Concrete Curb and Gutter LF 18. Concrete Curb / Gutter LF 19. 43' Wide Concrete Driveway LS 20. Concrete Sidewalk SF 21. Median Curb LF 22. Aggregate Base TON 23. Asphalt concrete TON 24. 6' Galvanized Chain Link Gate LF 25. Galvanized Chain Link Gate EA 26. 4' VinyI-Clad Chain Link Fence LF 27. Wooden Trail Entry Structure LS 28. Stop Bar and Legend EA 29, Crosswalk LS 30. Object Markers (Types L-1 and K-4) EA 31. Streetlight Conduit Relocation LS 32. Hydroseeding / Erosion Control LS 33, Traffic Signal Improvements LS 34. Irrigation System LS 35. Landscape Improvements LS 3~6. Landscape Maintenance - 90 Days LS TOTAL BID: I 750.00 750.00 378.00 4 1,500.00 6,000.00 2,100.00 1 1,500.00 1,500.00 1,100.00 1 2,000.00 2,000.00 2,100.00 90 20.00 1,800.00 4.50 935 13.00 12,155.00 15.00 52 20.00 1,040.00 33.00 31 20.00 620.00 38.00 1 1,400.00 1,400.00 2,950.00 85 4.00 340.00 12.50 28 25.00 700.00 28.00 425 25.00 10,625.00 31.50 525 60.00 31,500.00 56.50 378.00 700.00 700.00 8,400.00 700.00 2,800.00 1,100.00 800.00 800.00 2,100.00 800.00 800.00 405.00 7.00 630.00 14,025.00 14.00 13,090.00 1,716.00 17.00 884.00 1,178,00 30.00 930.00 2,950.00 2,000.00 2,000.00 1,062.50 6.00 510.00 784.00 30.00 840.00 13,387.50 30.00 12,750.00 29,662.50 75.00 39,375.00 119 15.00 1,785.00 26.00 3,094.00 25.00 2,975.00 2 2,000.00 4,000.00 891.00 1,782.00 500.00 1,000.00 208 25.00 5,200.00 21.00 4,368.00 20.00 4,160.00 I 3,000.00 3,000.00 3,062.00 3,062.00 2,000.00 2,000.00 3 500.00 1,500.00 53.00 159.00 200.00 600.00 1 1,250.00 1,250,00 525.00 525.00 750.00 750.00 7 100.00 700,00 61.00 427.00 75.00 525.00 1 2,000.00 2,000.00 2,147.00 2,147.00 3,000.00 3,000.00 1 6,000,00 6,000.00 2,900.00 2,900,00 1,000.00 1,000.00 1 79,500.00 79,500.00 74,283.00 74,283.00 68,000.00 68,000.00 1 16,500.00 16,500.00 5,900.00 5,900.00 7,000.00 7,000.00 1 7,500.00 7,500.00 11,200.00 11,200.00 9,000.00 9,000.00 1 1,000.00 1,000.00 1,575.00 1,575.00 300;00 300.00 $ 255,840.00 $ 265,662.50 $ 286,054.00 BELLICITTI & PELLICCIOTTI TOTAL UNIT PRICE PRICE 3,000.00 3,000.00 7,000.00 7,000.00 26,120.00 26,120,00 2,500.00 2,500.00 125.00 12,625.00 100.00 3,600.00 71.50 11,583.00 106.00 8,056.00 150.00 1,200.00 250.00 1,000.00 400.00 400.00 1,540.00 6,160.00 1,540.00 1,540.00 1,540.00 1,540.00 16.50 1,485.00 22.60 21,131.00 17.00 884.00 18.00 558.00 1,716.00 1,716.00 6.00 510.00 18.00 504.00 29.60 12,580.00 82.00 ' 43,050.00 24.00 2,856.00 1,375.00 2,750.00 23.65 4,919.20 3,450.00 3,450.00 55.00 165.00 550.00 550.00 65.00 455.00 2,250.00 2,250.00 5,070.00 5,070.00 77,820.00 77,820.00 8,250.00 8,250.00 10,170.00 10,170.00 330.00 330.00 $ 287,777.20 MCKSERVICES UNIT TOTAL PRICE PRICE 1,500.00 1,500.00 19,250.00 19,250.00 19,500.00 19,500.00 4,000.00 4,000.00 247.55 25,002.55 197.25 7,101.00 90.00 14,580.00 136.30 10,358.80 62.50 500.00 100.00 400.00 400.00 400.00 1,600.00 6,400.00 1,900.00 1,900.00 1,600.00 1,600.00 9.00 810.00 17.75 16,596.25 40.00 2,080.00 58.00 1,798.00 3,060.00 3,060,00 12.30 1,045.50 53.00 1,484.00 37.00 15,725.00 72.00 37,800.00 25.00 2,975.00 300.00 600.00 28.50 5,928.00 6,700.00 6,700.00 150.00 450.00 500.00 500.00 125.00 875.00 2,045.00 2,045.00 3,000.00 3,000.00 70,745.00 70,745.00 8,500.00 8,500.00 10,500.00 10,500.00 300.00 300.00 $306,009.10 Pg. 2 BID RESULTS - ALAMO CANAL BIKE PATH BID UNIT ITEM ITEM DESCRIPTION MEAS. 1. Construction Staking _ LS 2. Clearing / Demolition LS 3. Grading / Subgrade Preparation LS 4. Traffic Control LS 5. Ddller Pier / Soldier Beam Wall LF 6. Wooden Retaining Wall LF 7. 15" Reinforced Concrete Pipe, Cla~'s V LF 8. 12" Reinforced Concrete Pipe, Class V 'LF 9. 15" Corrugated Metal Pipe, 16 Ga. LF 10. 6" Polyvinyl Chloride Pipe, Sch. 80 LF 11. Reinforced Concrete Pipe Collar EA 12. Field Inlet, Type CD-403 EA '13. Field Inlet, Type 1KR EA 14. Inlet, Type CD-400 EA 15. Earth Ditch LF 16. Concrete Ditch (2' Wide) LF 17. Modified Concrete Curb and Gutter LF 18. Concrete Curb / Gutter ~.F 19. 43' Wide Concrete Driveway LS 20. Concrete Sidewalk SF 21. Median Curb LF 22. Aggregate Base TON 23. Aspha_It concrete TON 24. 6' Galvanized Chain Link Gate LF 25. Galvanized Chain Link Gate ~A 26, 4' VinyI-Clad Chain Link Fence LF "27. Wooden Trail Entry Structure 'LS 28. Stop Bar and Legend EA 29. Crosswalk LS 30. Object Markers (Types L-1 and K-4) EA 31. Streetiight Conduit Relocation LS 32. Hydroseeding / Erosion Control LS 33. Traffic Signal Improvements_ LS 34. Irrigation System _ LS 35. Landscape Improvements LS 36. Landscape Maintenance - 90 Days LS TOTAL BID: QTY 1 '1 1 1 101 36 162 76 8 4 4 '1 1 90 935 52 31 1 85 28 425 525 119 2 208 1 3 1 7 1 1 1 1 1 REDGWICK CONSTR. TOTAL UNIT PRICE 10,500.00 16,000.00 11,000.00 5,000.00 250.00 200.00 90.00 80.00 75.00 80.00 1,000.00 1,600.00 2,800.00 1,600.00 7.00 18.00 32.00 33.00 2,400.00 20.00 32.00 33.00 68.00 25.00 1,500.00 24.00 3,500.00 225.00 850.00 95.00 2,000.00 13,000.00 76,245.00 9,000.00 16,000.06' 300.00 CONTRA COSTA LDS~CP NORMAN B. HOUGE MCH Ei "'TOTAL TOTAL PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNITPRICE 10,500.00 3,364.900 3,364.90 7,500.00 7,500.00 11,000.00 16,000.00 ' 18,286.520 18,286.52 12,500.00 12,5lj0.00 lo,ood. oo 11,000.00 42,933.410 42,933.41 50,375,00 50,375.00 38,000.00 5,000.00 3,016.940 3,016.94 4,000.00 4,000.00 5,000.00 25,250.b0 151.164 15,267.56 170.00 17,170.00 320.00 7,200.00 '81.933 2,949.59 * 110.00 3,960.00 170.00 14,580.00 78.854 12,774.35 * 65.00 10,530.00 75.00 6,080.00 103.674 7,87~.22 * 75.00 5,700.00 72.00 600.00 39.654 317.23 125.00 1,000.00 90.00 320.00 128.718 514~'87 75.00 300.00 40.00 1,000.00 796.200 796.20 500,00 500.00 1,000.00 6,400.00 1,454.507 5,818.03 2,500.00 10,000.00 1,600.00 2,800.00 1,026.170 1,026.17 2,200.00 2,200.00 1,200.00 1,600.00 91~.190 919.19' 3,500.00 3,500.00 ' 3,000.00 630.00 4.828 434.52 * 14.00 1,2~0.00 11.00 1~,830.00 15.523 14,514.01 * 30.00 28,050.00 32.00 1,664.00 18.157 944.16 * 75.00 3,900.00 4~.00 1,023.00 19.344 599.66 * 50.00 1,550.00 45.00 2,400.00 1,899.780 1,899.78 5,000.00 5,000.00 7,500.00 1,700.00 6.732 572.22 "'20.00 1,760.00 18.00 896.00 20.437 572.24 * 75.00 2,100.00 50.00 14,025.00 47.939 ~20,374.08 * 36.00 15,300.00 44.00 35,700.00 68.832 36,136.80 * 85.00 44,625.00 85.00 2,975.00 '25.683 3,056.28 * 20.00 2,380.00 3d.oo 3,000.00 864~120 1,728.24 1,200.00 2,400.00 800.00 4,992.00 25.178 5,237.02 * 14.00 2,912.00 27.00 ' 3,500.00 2~190.270 2,190.27 5,500.00 5,500.00 6,500.00 675~00 57.223 171.67 200.00 600.00 70.00 850.00 572.220 572.22 750.00 750.00 680.00 665.00 66.378 464.65 * 85.00 595.00 100.00 2,000.00 2,500.000 2,500.00 2,045.00 2,045.00 5,000.00 13,000.00 1,190.220 1,190.22 5,500.00 5,500.00 4,500.00 76,245.00 84,545.000 84,545.00 7:~,790.00 72,790.00 93,000.00 9,000.00 12,663.010 12,663.01 9,500.00 9,500.00 9,000.00 16,000.00 10,635.900 10,635.90 20,000.00 20,000.00 9,700.00 300.00 500.000 500.00 6,500.00 6,500.00 500.00 316,400.00 $ ;j17,366.13 * $364,192.00 * Amounts adjusted after verification. EERING GRADE TECH ** T~TAL tINIT TOTAL PRICE PRICE PRICE 11,000.00 5,000.00 5,000.00 10,600.00 2,000~00 2,000.00 38,000.00 37,600.00 37,600.00 5,000.00 2,000,00 2,000.00 32,320.00 110.00 11,110.00 6,120.00 80.00 2,880.00 12,150.00 4d.00 7,290.00 5,472.00 40.00 3,040.00 720.00 30.00 ~. 240.00 :oooo 1 160.00 _ 3 1,000.00 _ 300.00 6,400.00 t ~0000 7,600.00 1,200.00 1,905.00 - 3,000.00 1,900.00 1,900.00 990.00 2.60 180.00 29,920.00 15.00 14,025.00 2,340.00 16.00 832.00 1,395.00 18.00 558,00 7,500.00 2,000.00 2,000.00 1,530.00 10.00 8d"0.00 1,400.00 18.00 504.00 18,700.00 32.00 13,600.00 44,625.00 ~5~00 23,6j5.00 3,570.00 22.00 2,618.00 1,600.00 1,300.00 2,600.00 5,616.00 22.00 4,576.00 6,500.00 4,000.00 4,000.00 210.00 250.00 750.00 680.00 750,00 750.00 700.00 80.00 560.00 5,000.00 1,500.00 1,500.00 4,500.00 5,000.00 5,000.00 93,000.00 75,000.00 75,000.00 9,000.00 10,000.00 10,000.00 ~ 9,700.00 6,000.00 6,000.00 500.00 300,00 300.0J ~ ;381,518.00 ~ $~52,848.00 ** Bid was non-responsive