Loading...
HomeMy WebLinkAboutReso 22-04 Amend#4HQEAgmt RESOLUTION NO. 22 - 04 A RESOLUTION OF THE CiTY COUNCIL OF THE CITY OF DUBLIN APPROV-ING AMENDMENT NO. 4 TO THE AGREEMENT WITH HQE, INC., FOR ENGINEERING SERVICES WHEREAS, the City Council of the City of Dublin approved an agreement for engineering services with HQE, Inc. (HQE), for the preparation of a Project Study Report (PSR) for the 1-580/ San Ramon Road-Foothill Road Interchange Improvement project on February 1, 2000; and WHEREAS, the PSR was completed and the City Council of the City of Dublin approved Amendments Nos. 1, 2 and 3 to HQE's contract for the preparation of the Project RePort/Environmental Documentation (PR/ED) and Plans, Specifications and Estimates (PS&E), and providing .construction support services; and WHEREAS, in order to eliminate the need to close the westbound off-ramp lane continuously for 60 hours work during a weekend, the traffic handling plan needs to be revised in order to conform to Caltrans requirements; and ~WHEREAS, HQE's Scope of Work is proposed to be expanded to include revision to the.traffic handling plan, and the not-to-exceed amount to perform this task shall be $13,800. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment No. 4 to the agreement with HQE, Inc., attached hereto as "Exhibit A". BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment. ~ PASSED, APPROVED AND ADOPTED this 3rd day of February, 2004. AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None .~.~/ .~~j~ ATTEST: ~ Mayor ' City Clerk G:\CC-MTGSk2004-qtrl~Feb\02-03-04kreso-HQE amend 4.doc (Item 8.5) 'EXHIBIT "A" OF RESOLUTION ~..~% -04 AMENDMENT NO. 4 TO AGREEMENT BETWEEN CITY OF DUBLIN AND HQE, INC. FOR ENGINEERING SERVICES WHEREAS, the City of Dublin (hereinafter-referred to as "CITY") and HQE, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on February 1, 2000, to prepare a Project Study Report for the 1-580/San Ramon Road/Foothill Road Interchange Improvement; and WHEREAS, the City Council of the City of Dublin approved Amendments Nos. 1, 2, and 3 to the Consultant agreement to include additional services, and WHEREAS, the City desires to amend the consultant contract to include additional services, and the not-to-exceed contract mount is proposed to be increased tO cover the cost of the additional work; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work Th.e Scope of Work shall be extended to include additional scope of work as described in Consultant's letter (attached hereto) dated December 17, 2003, for the 1-580/San Ramon Road/Foothill Road Interchange Improvement Project. Extension of Fees The total cost for time-and-materials work under this amendment shall not exceed an additional $13,800. OF CIT~ DUBLIN ATTEST: ~// Mayor Heidi Ouren Date: ,.~,,q'A'. 2.7/ 7-00 ~ G:XEn gr-contract~qeXAmendment #4.DOC Oakland, CA 94612 Tek 510-763-4895 FAX: 510-763-6215 December 17, 2003 JAN 7 200 Mr. Ferd Del Rosario ~.~ City of Dublin 100 Civic Plaza Dublin, CA 94568 · Subject: I-5$0/San Ramon Road Interchange Improvements Stage ConstrUction/Traffic ~Iandling Change Order Dear Ferd: The total estimated design cost to prepare a.change Order for the staging detour revision proposed by DeSilva.Gates is $13,8'00. The key assumptions include: 1. No Design Exception Fact Sheet preparation/approval is required 2.' No extensive Caltrans coordination or meetings 3. Revisions to SC-2, 3, 5, 6 and CS -2 only (no other sheets will be revised). 4.. No revised TMP is required 5. NO weave'or other traffic analysis 6. No Cross Sections will be-required Per our telephone discussion on December 10, the ~Stimated cost to perform the preliminary layout and "fatal flaw" ana!ysis for.the horizontal geometry is $3,920. We should Consider this Task 1 of our total effort tO investigate the x~iability of the. contract0r's proposal.' The area we are most concerned about is the short 'deceleration length exiting from the 1;580 mainline (g4 lane & auxiliary lane) in combination with the CUrve radii/superelevati0n rate. As you know, these are - potential safety issues that may cause this detour proposal to be unacceptable. Please call me if you have any questions,or need additional infoimation. We will not proceed with the woi-k until we receive written authorization from you. SincTly, __ ,,.~(',... · pl~ He,21i M. Ouren,..~. Project'Manager · C: Garrett Low t