HomeMy WebLinkAboutReso 166-15 Jordan Ranch SDR RESOLUTION NO. 166-15
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
* * * * * * * * * * *
APPROVING A SITE DEVELOPMENT REVIEW PERMIT AND
VESTING TENTATIVE MAPS 8267
(PARCEL H) AND 8269 (NEIGHBORHOOD 7) FOR THE JORDAN RANCH PROJECT
PLPA 2015-00045
WHEREAS, the Applicant, Mission Valley Properties, proposes to develop 45 homes on a 4.6
acre site known as Parcel H. In addition, Neighborhood 7 is a 9.2 acre Medium Density Residential
site proposed for development of 105 detached units. The proposed Parcel H and Neighborhood 7
development and related applications are collectively known as the "Jordan Ranch Project"; and
WHEREAS, the application for the Jordan Ranch project includes General Plan/Eastern Dublin
Specific Plan Amendments to change the land use designation of the 4.6 acre Parcel H site located at
4233 Fallon Road (APN 985-0098-006) between Central Parkway and Jordan Ranch Drive from
Mixed Use (MU) to Medium Density Residential (6.1 to 14.0 units per acre); and
WHEREAS, the related applications for the Jordan Ranch project also include General
Plan/Eastern Dublin Specific Plan Amendments and proposed Planned Development rezoning for a
3.7-acre school site, a 10.4-acre property within Dublin Ranch Subarea 3 (Irongate) and a 1.9-acre
property within Wallis Ranch. None of these three land use amendment sites is part of the Site
Development Review or Vesting Tentative Map applications; and
WHEREAS, the application for all properties referenced within Jordan Ranch also includes a
Planned Development rezoning with related Stage 1, and Stage 2 Development Plan, Site
Development Review, Vesting Tentative Subdivision Maps 8267 and 8269, and Development
Agreement amendment for Parcel H and Neighborhood 7; and
WHEREAS, the California Environmental Quality Act (CEQA), together with the State
guidelines and City environmental regulations, require that certain projects be reviewed for
environmental impacts and that environmental documents be prepared. To comply with CEQA, the
City prepared and circulated a draft Mitigated Negative Declarations (MND) for the Project; and
WHEREAS, a Staff Report, dated September 22, 2015 and incorporated herein by reference,
analyzed the MND and the Project for the Planning Commission. Following a duly noticed public
hearing on the Project on September 22, 2015, the Planning Commission adopted Resolution 15-08
recommending that the City Council not adopt the MND, and not adopt the related General Plan and
Eastern Dublin Specific Plan amendments, Planned Development rezone with related Development
Plans, Site Development Review Permit and Vesting Tentative Maps 8267 (Parcel H) and 8269
(Neighborhood 7), which resolutions are incorporated herein by reference; and
WHEREAS, following a duly noticed public hearing on October 6, 2015, the City Council
adopted Resolution 164-15 adopting a Mitigated Negative Declaration, Mitigation Monitoring and
Reporting Program and Statement of Overriding Considerations, Resolution 165-15 approving the
General Plan/Eastern Dublin Specific Plan Amendments for the Project (including Parcel H), which
Page 1 of 38
resolutions are incorporated herein by reference and available for review at City Hall during normal
business hours; and
WHEREAS, following the public hearing on October 6, 2015, the City Council also adopted
Ordinance XX-15 approving the requested Planned Development rezoning with related Stage 1 and
Stage 2 Development Plan amendment for the Project, which ordinance is incorporated herein by
reference; and
WHEREAS, a Staff Report for the City Council, dated October 6, 2015 and incorporated herein
by reference, described and analyzed the Project, including the Site Development Review permit and
Vesting Tentative Maps 8267 and 8269 for Parcel H and Neighborhood 7; and
WHEREAS, on October 6, 2015, the City Council held a properly noticed public hearing on the
Project, including the proposed Site Development Review permit and Vesting Tentative Maps 8267
and 8269, at which time all interested parties had the opportunity to be heard; and
WHEREAS, the City Council considered the MND, and all above referenced reports,
recommendations and testimony before approving the Site Development Review Permit and Vesting
Tentative Maps for Parcel H and Neighborhood 7.
NOW, THEREFORE, BE IT RESOLVED that the above recitals are true and correct and made
a part of this resolution.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin hereby makes the
following findings and determinations regarding the proposed Site Development Review for a
development of 45 homes on 4.6 acre site (Parcel H) and 105 3-story detached units on a 9.2-acre
site (Neighborhood 7) within Jordan Ranch:
Site Development Review:
A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance,
with the General Plan and any applicable Specific Plans and design guidelines because: 1)
the project will be consistent with the architectural character and scale of development in
the area; 2) the project will provide a needed and attractive housing opportunity; 3) the
project is consistent with the General Plan and Eastern Dublin Specific Plan land use
designations of Medium Density Residential; and 4) the project complies with the
development standards established in the Planned Development ordinance for the Project.
B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the
project contributes to orderly, attractive, and harmonious site and structural development
compatible with the intended use, proposed subdivision, and the surrounding properties;
and 2) the project complies with the development regulations set forth in the Zoning
Ordinance where applicable and in the adopted PD Ordinance for the Project.
C. The design of the project is appropriate to the City, the vicinity, surrounding properties, and
the lot in which the project is proposed because: 1) the size and mass of the proposed
houses is consistent with other existing and approved residential development in the
surrounding area; 2) the project will contribute to housing opportunities as a complement to
the surrounding neighborhoods; and 3) the project will serve the current buyer profile and
market segment anticipated for this area.
Page 2 of 38
D. The subject sites are suitable for the type and intensity of the approved development
because: 1) the Project development respects the natural drainage and avoids steeper
slopes, which are designated for open space; 2) the Project will implement all applicable
prior adopted mitigation measures; 3) the project sites are or will be fully served by public
services and existing roadways; 4) the project sites have adequate vehicular access to
transportation arterials.
E. Impacts to existing slopes and topographic features are addressed because: 1) the Project
is required to comply with all previously adopted mitigation measures designed to ensure
slope stability; 2) grading on the site will ensure that the site drains away from any
structures and complies with the Regional Water Quality Control Board requirements; 3)
most of the steeper areas of the site are in designated open space; and 4) retaining walls
will be constructed as required to support grade differentials between building envelopes,
and setback or right-of-way areas.
F. Architectural considerations including the character, scale and quality of the design, site
layout, the architectural relationship with the site and other buildings, screening of unsightly
uses, lighting, building materials and colors and similar elements result in a project that is
harmonious with its surroundings and compatible with other developments in the vicinity
because: 1) the Project provides a high degree of design and landscaping to complement
existing uses in the area; 2) the structures reflect the architectural styles and development
standards in the Eastern Dublin Specific Plan for residential buildings in the area and
previously adopted for Jordan Ranch; and 3) the color and materials proposed will be
consistent with the requirements of the Eastern Dublin Specific Plan and Jordan Ranch
Stage 2 Development Plan.
G. Landscape considerations, including the location, type, size, color, texture and coverage of
plant materials, and similar elements have been incorporated into the project to ensure
visual relief, adequate screening and an attractive environment for the public because: 1)
generous landscaping is proposed within setback from major roads; 2) landscaping in
common areas and among the neighborhoods is coordinated through a system of
connecting trails; 3) in addition to the internal trail system, common area open space has
been provided in the form of small parks, seating areas, and paseos; and 4) the project will
conform to the requirements of the Stage 2 Development Plan and the Water Efficient
Landscape Ordinance.
H. The site has been adequately designed to ensure the proper circulation for bicyclist,
pedestrians, and automobiles because: 1) the project site provides opportunities for
pedestrian and bicycle circulation; and 2) the project will provide a system of
interconnecting trails among the neighborhoods within Jordan Ranch and adjacent
neighborhoods and public recreation areas.
BE IT FURTHER RESOLVED that the City Council of the City of Dublin hereby makes the
following findings and determinations regarding Vesting Tentative Maps 8267 and 8269:
Vesting Tentative Tract Maps 8267 and 8269
A. The proposed Vesting Tentative Maps 8267 and 8269 are consistent with the intent of
applicable subdivision regulations and with the General Plan and Eastern Dublin Specific Plan.
Page 3 of 38
B. The design and improvements of the proposed Vesting Tentative Maps 8267 and 8269 are
consistent with the General Plan and the Eastern Dublin Specific Plan, as amended, in that the
developments design and infrastructure are consistent with adjacent residential neighborhoods
designated for this type of development.
C. The proposed Vesting Tentative Maps 8267 and 8269 are consistent with the Planned
Development zoning approved for Project in Ordinance , and therefore consistent with
the City of Dublin Zoning Ordinance.
D. The properties created by the proposed Vesting Tentative Maps 8267 and 8269 will have
adequate access to major constructed or planned improvements as part of the Eastern Dublin
Specific Plan.
E. Project design, architecture, and concept have been integrated with topography of the project
site created by Vesting Tentative Maps 8267 and 8269 to incorporate water quality measures
and minimize overgrading and extensive use of retaining walls. Therefore, the proposed
subdivision is physically suitable for the type and intensity of development proposed.
F. The proposed Vesting Tentative Maps 8267 and 8269 will not result in environmental damage
or substantially injure fish or wildlife or their habitat or cause public health concerns subject to
Mitigation Measures and Conditions of Approval.
G. The design of the subdivisions will not conflict with easements, acquired by the public at large,
or access through or use of property within the proposed subdivision. The City Engineer has
reviewed the map and title report and has not found any conflicting easements of this nature.
BE IT FURTHER RESOLVED that the Mitigation Measures adopted with the MND and prior
EIRs continue to apply to the Project Site Development Review and Vesting Tentative Maps for
Parcel H and Neighborhood 7.
BE IT FURTHER RESOLVED that the Dublin City Council hereby approves the Site
Development Review for a development of 45 homes on a 4.6 acre site known as Parcel H and of
105 3-story detached units on a 9.2 acre site known as Neighborhood 7 within Jordan Ranch as
shown on plans prepared by Dahlin Group-Architecture Planning, Ruggeri Jensen Azar-Engineering
Planners Surveyors, and Gates + Associates received September 14, 2015 and subject to the
conditions included below.
BE IT FURTHER RESOLVED that the Dublin City Council hereby approves Vesting Tentative
Maps 8267 and 8269 prepared by Dahlin Group-Architecture Planning, Ruggeri Jensen Azar-
Engineering Planners Surveyors, and Gates + Associates received September 14, 2015 and subject
to the conditions included below.
CONDITIONS OF APPROVAL
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance
of building permits or establishment of use, and shall be subject to Planning Department review
and approval. The following codes represent those departments/agencies responsible for
monitoring compliance of the conditions of approval. [PL.1 Planning, [61 Building, [Pm Polices
JPW1 Public Works [P&CS1 Parks & Community Services, [ADM] Administration/City Attorney,
Page 4 of 38
IFIN1 Finance, [F1 Alameda County Fire Department, [DSRI Dublin San Ramon Services District
rC01 Alameda County Department of Environmental Health, [Z71 Zone 7.
II i"
PLANNING GENERAL CONDITIONS
1. Approval. This Site Development o m
ent Revi
ew approval al P
L
Ongoing g Planning
shall be as generally depicted and indicated on the
project plans prepared by Dahlin Group-
Architecture Planning, Ruggeri Jensen Azar-
Engineering Planners Surveyors, and Gates +
Associates received September 14, 2015, on file in
the Community Development Department, and
other plans, text, and diagrams relating to this Site
Development Review, and as specified as the
following Conditions of Approval for this project.
This approval is subject to adopting the Mitigated
Negative Declaration, and companion General Plan
and Specific Plan Amendments and related
Planned Development Zoning.
2. Permit Expiration. Construction or use shall PL One Year DMC
commence within one (1) year of Site Development After Effective 8.96.020.
Review Permit approval or the Permit shall lapse Date D
and become null and void. If there is a dispute as to
whether the Permit has expired, the City may hold a
noticed public hearing to determine the matter.
Such a determination may be processed
concurrently with revocation proceedings in
appropriate circumstances. If a Permit expires, a
new application must be made and processed
according to the requirements of this Ordinance.
3. Time Extension. The original approving decision- PL Prior to DMC
maker may, upon the Applicant's written request for Expiration 8.96.020.
an extension of approval prior to expiration, upon Date E
the determination that all Conditions of Approval
remain adequate and all applicable findings of
approval will continue to be met, grant an extension
of the approval for a period not to exceed six (6)
months. All time extension requests shall be
noticed and a public hearing shall be held before
the original hearing body.
4. Compliance. The Applicant/Property Owner shall PL Ongoing DMC
operate this use in compliance with the Conditions 8.96.020.
of Approval of this Site Development Review F
Permit, the approved plans and the regulations
established in the Zoning Ordinance. Any violation
of the terms or conditions specified may be subject
to enforcement action.
5. Revocation of Permit. The Site Development PL Ongoing DMC
Review approval shall be revocable for cause in 8.96.020.1
Page 5 of 38
accordance with Section 8.96.020.1 of the Dublin
Zoning Ordinance. Any violation of the terms or
conditions of this permit shall be subject to citation.
6. Requirements and Standard Conditions. The Various Building Standard
Applicant/ Developer shall comply with applicable Permit
City of Dublin Fire Prevention Bureau, Dublin Public Issuance
Works Department, Dublin Building Department,
Dublin Police Services, Alameda County Flood
Control District Zone 7, Livermore Amador Valley
Transit Authority, Alameda County Public and
Environmental Health, Dublin San Ramon Services
District and the California Department of Health
Services requirements and standard conditions.
Prior to issuance of building permits or the
installation of any improvements related to this
project, the Developer shall supply written
statements from each such agency or department
to the Planning Department, indicating that all
applicable conditions required have been or will be
met.
7. Required Permits. Developer shall obtain all PW Building Standard
permits required by other agencies including, but Permit
not limited to Alameda County Flood Control and Issuance
Water Conservation District Zone 7, California
Department of Fish and Game, Army Corps of
Engineers, Regional Water Quality Control Board,
Caltrans and provide copies of the permits to the
Public Works Department.
8. Fees. Applicant/Developer shall pay all applicable Various Building Various
fees in effect at the time of building permit issuance, Permit
including, but not limited to, Planning fees, Building Issuance
fees, Traffic Impact Fees, MC fees, Dublin San
Ramon Services District fees, Public Facilities fees,
Dublin Unified School District School Impact fees,
Fire Facilities Impact fees, Alameda County Flood
and Water Conservation District (Zone 7) Drainage
and Water Connection fees; or any other fee that
may be adopted and applicable.
9. Indemnification. The Developer shall defend, ADM Ongoing Administra
indemnify, and hold harmless the City of Dublin and tion/City
its agents, officers, and employees from any claim, Attorney
action, or proceeding against the City of Dublin or
its agents, officers, or employees to attack, set
aside, void, or annul an approval of the City of
Dublin or its advisory agency, appeal board,
Planning Commission, City Council, Community
Development Director, Zoning Administrator, or any
Page 6 of 38
other department, committee, or agency of the City
to the extent such actions are brought within the
time period required by Government Code Section
66499.37 or other applicable law; provided,
however, that the Developer's duty to so defend,
indemnify, and hold harmless shall be subject to the
City's promptly notifying the Developer of any said
claim, action, or proceeding and the City's full
cooperation in the defense of such actions or
proceedings.
10. Clarification of Conditions. In the event that there PW Ongoing Public
needs to be clarification to the Conditions of Works
Approval, the Director of Community Development
and the City Engineer have the authority to clarify
the intent of these Conditions of Approval to the
Developer without going to a public hearing. The
Director of Community Development and the City
Engineer also have the authority to make minor
modifications to these conditions without going to a
public hearing in order for the Developer to fulfill
needed improvements or mitigations resulting from
impacts to this project.
11. Clean-up. The Applicant/Developer shall be PL Ongoing Planning
responsible for clean-up & disposal of project
related trash to maintain a safe, clean and litter-free
site.
12. Modifications. Modifications or changes to this PL Ongoing DMC
Site Development Review approval may be 8.104.100
considered by the Community Development
Director if the modifications or changes proposed
comply with Section 8.104.100 of the Zoning
Ordinance.
13. Lighting. Lighting is required over exterior PL, PW Building Municipal
entrances/doors. Exterior lighting used after daylight Permit Code
hours shall be adequate to provide for security Issuance
needs.
PLANNING—PROJECT SPECIFIC
14. Public Art Contribution. Developer shall fulfill the PL Prior to first Project
Public Art Contribution through the provision of in- occupancy Specific
lieu fees. Prior to the recordation of the final map for
the project, Developer shall obtain the total building
valuation of the project from the Building Official,
and the value of the applicant's required public art
project shall be determined by the Community
Development Director .
15. Inclusionary Housing: The proposed project will PL Recordation Project
create an additional affordable housing requirement of the first specific
of 15 units. The developer proposed to satisfy its final map
Page 7 of 38
obligation under the Inclusionary Zoning
Regulations through the use of affordable unit
credits. It will purchase these credits from either the
City or Eden Housing created in the Veterans
Project under development in Downtown
Dublin. The purchase will either provide an
additional funding stream for the Veterans Housing
project or result in the City receiving additional
affordable housing funds for use in other projects.
16. Street Lights. Street lights selected for this PL In conjunction Project
subdivision shall have the ability to accept cut-off with approval Specific
shielding to the satisfaction of the City Engineer. of
improvement
plans
17. Satellite Dishes: The Developer's Architect shall PL Prior to the DMC
prepare a plan for review and approval by the issuance of 8.96.020.
Director of Community Development and the Chief Building D
Building Official that provides a consistent and Permits
unobtrusive location for the placement of individual
satellite dishes. Individual conduit will be run from
the individual residential unit to the location on the
building to limit the amount of exposed cable
required to activate any satellite dish. It is preferred
that where chimneys exist, that the mounting of the
dish be incorporated into the chimney. In instances
where the buildings have mechanical wells
(Neighborhoods 4 and 6) that those buildings
provide locations within the well for individual unit
connections. In instances where neither chimneys
nor mechanical wells exist, then the plan shall show
a common and consistent location for satellite dish
placement to eliminate the over proliferation,
haphazard and irregular placement.
LANDSCAPING
18. Final Landscape Construction Documents. The PL Issuance of Standard
final planting and irrigation design shall: building
permits
a. Utilize plant material that will be capable of
healthy growth within the given range of soil
and climate.
b. Provide landscape screening that is of a
height and density so that it provides a
positive visual impact within three years from
the time of planting.
c. Provide that 75% of the proposed trees on
the site are a minimum of 15 gallons in size,
and at least 50% of the proposed shrubs on
Page 8 of 38
the site are a minimum of 5 gallons in size.
d. Provide concrete curbing at the edges of all
planters and paving surfaces where
applicable.
Final landscape construction documents shall:
a. Provide specific landscape and irrigation
plans for non-typical and corner lots. This
requirement includes any lot that varies more
than five feet in width from the typical plan.
b. Specify that all cut and fill slopes graded and
not constructed by September 1, of any
given year, are hydroseeded with perennial
or native grasses and flowers, and that
stockpiles of loose soil existing on that date
are hydroseeded in a similar manner.
c. Specify that the area under the drip line of all
existing oaks, walnuts, etc., which are to be
saved are fenced during construction and
grading operations and no activity is
permitted under them that will cause soil
compaction or damage to the tree, if
applicable.
d. Include a warranty from the owners and/or
contractors to warrant all trees, shrubs and
ground cover and the irrigation system for
one year from the date of project acceptance
by the City.
19. Maintenance Agreement. A permanent PL Issuance of Standard
maintenance agreement on all common area the building
landscaping will be required from the owner insuring permit
regular irrigation, fertilization and weed abatement.
20. Tree Preservation. Tree preservation techniques, PL Issuance of Standard
and guarantees, if applicable, shall be reviewed and the building
approved by the Dublin Planning Division prior to permit
the issuance of the building permit.
21. Street Trees and Accent Trees. Street trees shall PL Issuance of Standard
be spaced between 30 and 50 feet on center or the building
approximately one per typical lot. Corner lots shall permit
provide a minimum of two trees and a maximum of
three street trees per lot. Generally, each lot will
provide one accent tree, space permitting.
22. Water Efficient Landscaping Regulations. The PL Issuance of Standard
Applicant shall meet all requirements of the City of the building
Dublin's Water-Efficient Landscaping Regulations, permit
Section 8.88 of the Dublin Municipal Code.
23. Bio-Retention Areas. The designed bio-retention PL Issuance of Standard
areas shall be enhanced to create an open space the building
Page 9 of 38
landscape that is landscape attractive, conserves permit
water, and requires minimal maintenance.
24. Plant Clearances. All trees planted shall meet the PL Issuance of Standard
following clearances: the building
a. 6' from the face of building walls or roof eaves permit
b. 7' from fire hydrants, storm drains, sanitary
sewers and/or gas lines
c. 5' from top of wing of driveways, mailboxes,
water, telephone and/or electrical mains
d. 15' from stop signs, street or curb sign returns
e. 20' from either side of a streetlight
25. Irrigation System Warranty. The Applicant shall PL Issuance of Standard
warranty the irrigation system and planting for a the building
period of one year from the date of installation. The permit
Applicant shall submit for the Dublin Community
Development Department approval, a landscape
maintenance plan for the Common Area landscape
including a reasonable estimate of expenses for the
first five years.
26. Walls, Fences and Mailboxes. Applicant shall PL Issuance of Standard
work with staff to prepare a final wall, fencing and the building
mailbox plan that is consistent with Dublin Municipal permit
Code and the design character of the architecture.
The design of the mailbox station shall be upgraded
to provide an enclosure or housing for the gang
mailboxes so that they are integrated into the
structure. Mailbox locations shall be integrated
within the landscape and shall comply with USPS
requirements.
27. Sustainable Landscape Practices. The PL Issuance of Standard
landscape design shall demonstrate compliance the building
with sustainable landscape practices as detailed in permit
the Bay-Friendly Landscape Guidelines by earning
a minimum of 60 points or more on the Bay-Friendly
scorecard, meeting 9 of the 9 required practices
and specifying that 75% of the non-turf planting only
requires occasional, little or no shearing or summer
water once established. Final selection and
placement of trees, shrubs and ground cover plants
shall ensure compliance with this requirement.
Herbaceous plants shall be used along walks to
reduce maintenance and the visibility of the sheared
branches of woody ground cover plants. Planters
for medium sized trees shall be a minimum of six
feet wide. Small trees or shrubs shall be selected
for planting areas less than six feet wide.
28. Copies of Approved Plans. The Applicant shall PL Construction Standard
provide the City with one full size copy, one reduced
(1/2 sized) copy and one electronic copy of the
Page 10 of 38
approved landscape plans prior to construction.
BUILDING
29. Building Codes and Ordinances. All project B Through Standard
construction shall conform to all building codes and Completion
ordinances in effect at the time of building permit.
30. Retaining Walls. All retaining walls over 30 inches B Through Standard
in height and in a walkway shall be provided with Completion
guardrails. All retaining walls over 24 inches with a
surcharge or 36 inches without a surcharge shall
obtain permits and inspections from the Building &
Safety Division.
31. Phased Occupancy Plan. If occupancy is B Occupancy of Standard
requested to occur in phases, then all physical any affected
improvements within each phase shall be required building
to be completed prior to occupancy of any buildings
within that phase except for items specifically
excluded in an approved Phased Occupancy Plan,
or minor handwork items, approved by the
Department of Community Development. The
Phased Occupancy Plan shall be submitted to the
Directors of Community Development and Public
Works for review and approval a minimum of 45
days prior to the request for occupancy of any
building covered by said Phased Occupancy Plan.
Any phasing shall provide for adequate vehicular
access to all parcels in each phase, and shall
substantially conform to the intent and purpose of
the subdivision approval. No individual building
shall be occupied until the adjoining area is finished,
safe, accessible, and provided with all reasonable
expected services and amenities, and separated
from remaining additional construction activity.
Subject to approval of the Director of Community
Development, the completion of landscaping may
be deferred due to inclement weather with the
posting of a bond for the value of the deferred
landscaping and associated improvements.
32. Building Permits. To apply for building permits, B Issuance of Standard
Applicant/Developer shall submit five (5) sets of Building
construction plans to the Building & Safety Division Permits
for plan check. Each set of plans shall have
attached an annotated copy of these Conditions of
Approval. The notations shall clearly indicate how
all Conditions of Approval will or have been
complied with. Construction plans will not be
accepted without the annotated resolutions attached
to each set of plans. Applicant/Developer will be
responsible for obtaining the approvals of all
participation non-City agencies prior to the issuance
Page 11 of 38
of building permits.
33. Construction Drawings. Construction plans shall B Issuance of Standard
be fully dimensioned (including building elevations) building
accurately drawn (depicting all existing and permits
proposed conditions on site), and prepared and
signed by a California licensed Architect or
Engineer. All structural calculations shall be
prepared and signed by a California licensed
Architect or Engineer. The site plan, landscape
plan and details shall be consistent with each other.
34. Air Conditioning Units. Air conditioning units and B, PL Occupancy of Standard
ventilation ducts shall be screened from public view Unit
with materials compatible to the main building and
shall not be roof mounted. Units shall be
permanently installed on concrete pads or other
non-movable materials approved by the Chief
Building Official and Director of Community
Development. Air conditioning units shall be
located such that each dwelling unit has one side
yard with an unobstructed width of not less than 36
inches. Air conditioning units shall be located in
accordance with the PD text. Air conditioning units
shall comply with Section 8.36.060,C,3 of the
Zoning Ordinance.
35. Temporary Fencing. Temporary Construction B Through Standard
fencing shall be installed along the perimeter of all Completion
work under construction.
36. Addressing B Standard
a) Provide a site plan with the City of Dublin's
address grid overlaid on the plans (1 to 30 Prior to
scale). Highlight all exterior door openings release of
on plans (front, rear, garage, etc.). The site addresses
plan shall include a single large format page
showing the entire project and individual
sheets for each neighborhood. 3 copies on
full size sheets and 5 copies reduced sheets.
b) Provide plan for display of addresses. The
Building Official shall approve plan prior to Prior to
issuance of the first building permit. (Prior to permitting
permitting)
c) Addresses will be required on the front of the
dwellings. Addresses are also required near Prior to
the garage door opening if the opening is not permitting
on the same side of the dwelling as the front
door.
d) Address signage shall be provided as per the Occupancy
Dublin Residential Security Code. of any Unit
e) Exterior address numbers shall be backlight
Page 12 of 38
and be posted in such a way that they may Occupancy
be seen from the street. of any Unit
f) Driveways servicing more than one (1)
individual dwelling unit shall have a minimum Prior to
of 4 inch high identification numbers, noting permit
the range of unit numbers placed at the issuance,
entrance to each driveway at a height and through
between 36 and 42 inches above grade. The completion
light source shall be provided with an
uninterruptible AC power source or controlled
only by photoelectric device.
37. Engineer Observation. The Engineer of record B Scheduling Standard
shall be retained to provide observation services for the final
all components of the lateral and vertical design of frame
the building, including nailing, hold-downs, straps, inspection
shear, roof diaphragm and structural frame of
building. A written report shall be submitted to the
City Inspector prior to scheduling the final frame
inspection.
38. Foundation. Geotechnical Engineer for the soils B Permit Standard
report shall review and approve the foundation issuance
design. A letter shall be submitted to the Building
Division on the approval.
39. Green Building B Standard
Green Building measures as detailed in the SDR Through
package may be adjusted prior to master plan Completion
check application submittal with prior approval from
the City's Green Building Official provided that the
design of the project complies with the City of
Dublin's Green Building Ordinance and State Law
as applicable. In addition, all changes shall be
reflected in the Master Plans. (Through
Completion)
The Green Building checklist shall be included in Prior to first
the master plans. The checklist shall detail what permit
Green Points are being obtained and where the
information is found within the master plans. (Prior
to first permit).
Prior to each unit final, the project shall submit a Through
completed checklist with appropriate verification that Completion
all Green Points required by 7.94 of the Dublin
Municipal Code have been incorporated. (Through
Completion)
Homeowner Manual — if Applicant takes advantage Prior to first
Page 13 of 38
of this point the Manual shall be submitted to the permit
Green Building Official for review or a third party
reviewer with the results submitted to the City.
(Project) Prior to
approval of
Landscape plans shall be submitted to the Green the
Building Official for review. (Prior to approval of the landscape
landscape plans by the City of Dublin) plans by the
City of Dublin
Developer may choose self-certification or
certification by a third party as permitted by the Prior to
Dublin Municipal Code. Applicant shall inform the approval of
Green Building Official of method of certification the plans by
prior to release of the first permit in each subdivision the City of
/ neighborhood. Dublin
40. Copies of Approved Plans. Applicant shall B 30 days after Standard
provide City with 2 reduced (1/2 size) copies of the permit and
City of Dublin stamped approved plan. each revision
issuance
41. Cool Roofs. Flat roof areas shall have their roofing B Through
material coated with light colored gravel or painted Completion
with light colored or reflective material designed for
Cool Roofs.
42. Solar Zone— CA Energy Code B In Standard
Show the location of the Solar Zone on the site conjunction
plan. Detail the orientation of the Solar Zone. This with Master
information shall be shown in the master plan check Plan check,
on the overall site plan, the individual roof plans and prior to
the plot plans. This condition of approval will be issuance of
waived if the project meets the exceptions provided Building
in the CA Energy Code. Permits
43. Wildfire Management. Provide in the master B Prior to Standard
drawing set, a sheet detailing which lots are issuance of
adjacent to open space and subject to the Wildfire Building
Management provisions of the code. Permits
44. Recreation Centers. Building permits are B Through Standard
required for all recreation centers, swimming pools, Completion
spas, park structures and associated amenities and
are required to meet the accessibility and building
codes. Recreation area shall be considered
conceptual in nature only, items such as
accessibility and permit requirements shall be
reviewed during the permitting process.
45. Options. Selected options that affect the square B Through Standard
footage of the dwellings shall be listed on the Completion
building permit application. Selected options that
affect the footprint of the dwelling shall be shown on
the plot plan
Page 14 of 38
46. Roof Plans. Detail Solar Zones on a plan type B Through Standard
basis, show for each orientation as defined by Completion
section 110.10.2 Energy Code (SDR)
47' Floor Plans. Show location of water heater (SDR) Through Standard
Completion
48. Universal Design Ordinance. ALL units shall B Through Standard
meet or exceed the requirements for Universal Completion
Design (UDO). If an exemption is granted for the
entry to the primary entrance, this will NOT release
the unit from the remaining UDO requirements.
[Can they do this?]
49. Household Waste Materials. Removal of existing B Prior to Project
household waste materials on the site shall be issuance of Specific
monitored by a qualified professional and that Grading
normal and customary testing be performed for lead Permits and
based paint and asbestos building materials prior to issuance of
demolition of existing on-site buildings. Compliance demolition
with this condition shall be demonstrated to the permit
Building Official prior to obtaining a demolition
permit.
50. ET Adjustment Factor. The Building Standards
Commission has recently amended the ET
Adjustment Factor to 0.55. Landscape Architect of
record shall verify that the submitted plans meet
these new requirements.
51. Accessibility. Play areas shall meet the
requirements of the CA Building Code for
Accessibility to the play equipment and dining
tables.
FIRE
52. Site Plan. The site plan needs to show sufficient
detail to reflect an accurate and detailed layout of
the site for review and record purposes. The site
plan will need a scale that will allow sufficient details
for review purposes and include, but not be limited
to the following:
• The site parking and circulation layout
including fences, gates, fire land locations
and turnarounds.
• Location of all fire appliances including fire
hydrants, fire connections, fire sprinkler risers
and fire control valves.
• The location of all building openings including
the exit discharge pathway for building exits.
Note the location of exit lighting for these
pathways as well.
• The location of any overhead obstructions
and their clearances.
53. New Fire Sprinkler System Requirements. In F Prior to CA
Page 15 of 38
accordance with The Dublin Fire Code, fire issuance of Building /
sprinklers shall be installed in all buildings. The Building Residential
system shall be in accordance with the NFPA 13D, Permits Code
the CA Fire Code and CA Building / Residential
Code.
54. Fire apparatus. Roadways shall have a minimum F In CA
unobstructed width of 20 feet and an unobstructed conjunction Building /
vertical clearance of not less than 13 feet 6 inches. with Site Residential
Roadways under 36 feet wide shall be posted with Improvement Code
signs on one side; roadways under 28 feet wide Drawings
shall be posted with signs both sides of the street as
follows: "NO STOPPING FIRE LANE - CVC
22500.1".
1. Fire apparatus roadways must extend to
within 150 ft. of the most remote first floor
exterior wall of any building.
2. The maximum grade for a fire apparatus
roadway is 12%.
3. Fire apparatus roadways in excess of 150
feet in length must make provisions for
approved apparatus turnarounds.
4. Where the vertical distance between grade
plane and the highest roof surface exceeds
30 feet, aerial fire apparatus access roads
shall be provided. Having a minimum 26'
unobstructed width in the immediate vicinity
of the building.
55. Gate Approvals. Fencing and gates that cross F Prior to CA
pedestrian access and exit paths, as well as vehicle issuance of Building /
entrance and exit roads and Emergency Vehicle Building Residential
Access ways, need to be approved for fire Permits Code
department access and egress as well as exiting
provisions where such is applicable. Plans need to
be submitted that clearly show the fencing and
gates and details of such. This should be clearly
incorporated as part of the site plan with details
provided as necessary.
56. Hydrants & Fire Flows. Show the location of any F Prior to CA
on-site fire hydrants and any fire hydrants that are issuance of Building /
along the property frontage as well as the closest Building Residential
hydrants to each side of the property that are Permits Code
located along the access roads that serves this
property. Provide a letter from the water company
indicating what the available fire flow is to this
property.
DSRSD
57. Complete improvement plans shall be submitted to DSRSD Issuance of Standard
DSRSD that conform to the requirements of the any building
Page 16 of 38
Dublin San Ramon Services District Code, the permit
DSRSD "Standard Procedures, Specifications and
Drawings for Design and Installation of Water and
Wastewater Facilities", all applicable DSRSD
Master Plans and all DSRSD policies.
58. All mains shall be sized to provide sufficient DSRSD Issuance of Standard
capacity to accommodate future flow demands in any building
addition to each development project's demand. permit
Layout and sizing of mains shall be in conformance
with DSRSD utility master planning.
59. Sewers shall be designed to operate by gravity DSRSD Issuance of Standard
flow to DSRSD's existing sanitary sewer system. any building
Pumping of sewage is discouraged and may only be permit
allowed under extreme circumstances following a
case by case review with DSRSD staff. Any
pumping station will require specific review and
approval by DSRSD of preliminary design reports,
design criteria, and final plans and specifications.
The DSRSD reserves the right to require payment
of present worth 20 year maintenance costs as well
as other conditions within a separate agreement
with the applicant for any project that requires a
pumping station.
60. Domestic and fire protection waterline systems for DSRSD Issuance of Standard
Tracts or Commercial Developments shall be any building
designed to be looped or interconnected to avoid permit
dead end sections in accordance with requirements
of the DSRSD Standard Specifications and sound
engineering practice.
61. DSRSD policy requires public water and sewer lines DSRSD Issuance of Standard
to be located in public streets rather than in off- any building
street locations to the fullest extent possible. If permit
unavoidable, then public sewer or water easements
must be established over the alignment of each
public sewer or water line in an off-street or private
street location to provide access for future
maintenance and/or replacement.
62. Prior to approval by the City of a grading permit or a DSRSD Issuance of Standard
site development permit, the locations and widths of any building
all proposed easement dedications for water and permit
sewer lines shall be submitted to and approved by
DSRSD.
63. All easement dedications for DSRSD facilities shall DSRSD Issuance of Standard
be by separate instrument irrevocably offered to any building
DSRSD or by offer of dedication on the Final Map. permit
64. Prior to approval by the City for Recordation, the DSRSD Issuance of Standard
Final Map shall be submitted to and approved by any building
DSRSD for easement locations, widths, and permit
restrictions.
Page 17 of 38
65. Prior to issuance by the City of any Building Permit DSRSD Issuance of Standard
or Construction Permit by the Dublin San Ramon any building
Services District, whichever comes first, all utility permit
connection fees including DSRSD and Zone 7, plan
checking fees, inspection fees, connection fees, and
fees associated with a wastewater discharge permit
shall be paid to DSRSD in accordance with the
rates and schedules established in the DSRSD
Code.
66. Prior to issuance by the City of any Building Permit DSRSD Issuance of Standard
or Construction Permit by the Dublin San Ramon any building
Services District, whichever comes first, all permit
improvement plans for DSRSD facilities shall be
signed by the District Engineer. Each drawing
of improvement plans shall contain a signature
block for the District Engineer indicating approval of
the sanitary sewer or water facilities shown. Prior to
approval by the District Engineer, the applicant shall
pay all required DSRSD fees, and provide an
engineer's estimate of construction costs for the
sewer and water systems, a performance bond, a
one-year maintenance bond, and a comprehensive
general liability insurance policy in the amounts and
forms that are acceptable to DSRSD. The applicant
shall allow at least 15 working days for final
improvement drawing review by DSRSD before
signature by the District Engineer.
67. No sewer line or waterline construction shall be DSRSD Issuance of Standard
permitted unless the proper utility construction any building
permit has been issued by DSRSD. A construction permit
permit will only be issued after all of the items in
Condition No. 66 have been satisfied.
68. The applicant shall hold DSRSD, its Board of DSRSD Issuance of Standard
Directors, commissions, employees, and agents of any building
DSRSD harmless and indemnify and defend the permit
same from any litigation, claims, or fines resulting
from the construction and completion of the project.
69. Improvement plans shall include recycled water DSRSD Issuance of Standard
improvements as required by DSRSD. Services for any building
landscape irrigation shall connect to recycled water permit
mains. Applicant must obtain a copy of the DSRSD
Recycled Water Use Guidelines and conform to the
requirements therein.
70. DSRSD has no objections to this proposed alternate DSRSD Issuance of Project
site plan should such a site plan be permissible with any building Specific
the revised Tassajara Road right of way and under permit
Dublin Zoning regulations.
71. Development plans will not be approved until DSRSD Issuance of Project
Page 18 of 38
landscape plans are submitted and approved. any building Specific
permit
72. Grading for construction shall be done with recycled DSRSD Issuance of Project
water. any building Specific
permit
73. Temporary potable irrigation meters in areas with DSRSD Issuance of Project
recycled water service shall only be allowed for any building Specific
cross-connection and coverage testing for a permit
maximum of 14 calendar days.
74. Where the narrow width of a proposed alley or cul- DSRSD Issuance of Project
de-sac would make the standard spacing between any building Specific
water mains and sewer mains unworkable, the permit
developer shall design water mains and sewer
mains to meet DSRSD requirements and California
Division of Drinking Water requirements.
75. This project is within the area where the Department DSRSD Issuance of Project
of Public Health has permitted DSRSD to use any building Specific
recycled water within the front yards of SFRs which permit
are managed by HOA. Should the developer
choose to employ recycled water for this use, all
front yards in the development will be irrigated with
recycled water.
76. DSRSD Code Section 3.20.110, Duty to Connect — DSRSD Issuance of Project
Recycled Water, requires the use of recycled water any building Specific
for irrigation uses within the DSRSD water service permit
area. Unless exempted by the District Engineer, the
developer shall install a recycled water distribution
system and use recycled water for approved
landscape irrigation demands. Recycled water will
be available as described in the DSRSD Water
Master Plan Update, December 2005. Applicant
must submit landscape irrigation plans to DSRSD.
All irrigation facilities shall be in compliance with
District's "Recycled Water Use Guidelines" and
Department of Health Services requirements for
recycled water irrigation design.
PUBLIC WORittS,',GENERM. CONDITIONS'
77. General Conditions of Approval. Developer shall PW On going Standard
comply with the following General Conditions of
Approval for Vesting Tentative Tract Maps 8267 and
8269.
78. Street Lighting Maintenance Assessment PW First final map Public
District. The Developer shall petition to have the Works
project area annexed into the Citywide Lighting
Maintenance Assessment District and shall provide
any exhibits required for the annexation. In
addition, Developer shall pay all administrative
costs associated with processing the annexation.
79. Ownership and Maintenance of Improvements. PW First Final Public
Page 19 of 38
Ownership and maintenance of street right-of-ways, map and on Works
common area parcels, GHAD parcels and open going
space areas and improvements shall be by the
GHAD, City of Dublin and the Homeowner's
Association. Prior to acceptance of the final map for
processing, the applicant shall supply an
"Ownership and Maintenance Exhibit" for review
and approval. Exhibit shall detail which areas are to
be owned and maintained by the GHAD, the City of
Dublin, and the Homeowners Association. City of
Dublin shall maintain public streets (pavement and
curb & gutter). HOA shall maintain all common area
landscaping and irrigation, all landscaping and
irrigation in parkway strips, adjacent to private
streets and drives and within public right-of-way, all
public sidewalks adjacent to the project and
common walkways. GHAD to maintain
improvements within the GHAD parcels.
80. Covenants, Conditions and Restrictions PW First Final Public
(CC&Rs). A Homeowners Association(s) shall be Map; modify Works
formed by recordation of a declaration of with
Covenants, Conditions, and Restrictions to govern successive
use and maintenance of the landscape, decorative Final Maps
pavement and other features within the public right-
of-way contained in the Agreement for Long Term
Encroachments; all private road improvements; all
open space and common area landscaping; all
stormwater treatment measures; and all trail
improvements. Said declaration shall set forth the
Association name, bylaws, rules and regulations.
The CC&Rs shall also contain a provision that
prohibits the amendment of those provisions of the
CC&Rs requested by City without the City's
approval. The CC&Rs shall ensure that there is
adequate provision for the maintenance, in good
repair and on a regular basis, of the private roads,
landscaping & irrigation, stormwater treatment
measures, public trail, decorative pavements,
fences, walls, drainage, lighting, signs and other
related improvements. The Developer shall submit a
copy of the CC&R document to the City for review
and approval relative to these conditions of
approval.
81. Phased Improvements. Right-of-way dedication PW First Final Public
and installation of public and private improvements Map Works
may be done in phases as indicated on the
Tentative Map and Site Development Review,
subject to the review and approval of the City
Engineer. With each phased Final Map, the City
Engineer shall identify all improvements necessary
Page 20 of 38
to serve and access the phased lots created,
including stormwater treatment measures required
to meet the provisions of the Regional Water Quality
Control Board (RWQCB) Municipal Regional Permit
(MRP). All rights-of-way and improvements,
including utilities and traffic signal installation and
modifications, identified by the City Engineer for
construction within the boundaries of each phase of
the development shall be required with the Final
Map for that phase. In addition, the City Engineer
may require the Developer to perform off-site
grading in order to conform site grading to the
adjacent grade outside of the phase proposed for
development.
82. Private street and common area subdivision PW Final Map Standard
improvements. Common area improvements,
private streets, private drives and all other
subdivision improvements owned or maintained by
the homeowners' owners association are subject to
review and approval by the City Engineer prior to
Final Map approval and shall be included in the
Tract Improvement Agreement for each respective
tract. Such improvements include, but are not
limited to: curb & gutter, pavement areas,
sidewalks, access ramps & driveways; enhanced
street paving; parking spaces; street lights (wired
underground) and appurtenances; drainage
facilities; utilities; landscape and irrigation facilities;
open space landscaping; stormwater treatment
facilities; striping and signage; and fire hydrants.
83. Private Street Easements. Public Utility PW Final Map Standard
Easements (PUE), Sanitary Sewer Easements
(SSE) and Water Line Easements (WLE) shall be
established over the entire private street right-of-
ways within all subdivisions. The PUE, SSE and
WLE dedication statements on each Final Map are
to recite that the easements are available for, but
not limited to, the installation, access and
maintenance of sanitary and storm sewers, water,
electrical and communication facilities. Project
entry monument signs and walls shall not be
located within these easements.
84. Private Street Easements. The Developer shall PW Final Map Standard
dedicate Emergency Vehicle Access Easements
(EVAE) over the clear pavement width of all private
streets and drives. Easement geometry shall be
subject to the approval of the City Engineer and Fire
Marshall.
85. _ Intersections: The design of the intersections shall PW Final Map or Public
Page 21 of 38
be generally as shown on the Tentative Map and improvement Works
the Site Development Review. The Developer shall plans
submit details of the typical intersection layout
showing the design for the ramps, sidewalks, entry
walls, stop signs, landscape planters, street trees,
crosswalk locations and decorative pavement to be
approved by the City Engineer prior to the submittal
of the Improvement Plans. Decorative pavement
shall not be installed within crosswalks. Final design
details shall be subject to review and approval by
the City Engineer.
86. Monuments. Final Maps shall include private street PW Monuments Public
monuments to be set in all private streets. Private to be shown Works
street monuments shall be set at all intersections on Final Map
and as determined by the City Engineer. and installed
prior to
acceptance of
improvements
87. Stormwater Source Control. "No Dumping Drains PW Grading/Appr Standard
to Bay" storm drain medallions per City Standard oval of
Detail CD-704 shall be placed on all public and improvement
private storm drain inlets. plans
88. Trash Capture. The project Stormwater PW Approval of Standard
Management Plan shall incorporate trash capture Grading
measures such as screens, filters or CDSNortex Improvement
units to address the requirements of Provision C.10 Plans
of the Regional Water Quality Control Board
(RWQCB) Municipal Regional Permit (MRP) to the
satisfaction of the City Engineer.
89. Grading. The toe of any slope shall be one foot PW Approval of Standard
back of sidewalk. The top of any slope shall be Grading
three feet back of walkway. Minor exceptions may Plans or
be made in the above slope design criteria to meet issuance of
unforeseen design constraints subject to the grading
approval of the City Engineer. permit and on
going
90. Front and Grading: Finish PW Approval of Standard
y g: grading for all front Grading
yards shall be of variable slope with a maximum of Plans or
3:1 between hinge points located a minimum of issuance of
fifteen feet (15') behind back-of-walk (10 feet if there
is a building encroachment) and three feet (3') grading
behind back of walk. permit and on
going
91. Curb Ramps: Curb ramp layouts are not approved PW Approval of Standard
at this time. The number, location and layout of all improvement
curb ramps shall be reviewed and approved by the plans or start
City Engineer with the Improvement Plans of
associated with each Final Map. All pedestrian construction
ramps shall be designed and constructed to provide On going
Page 22 of 38
direct access to marked or unmarked crosswalks.
Each pedestrian ramp shall be oriented such that it
is aligned and parallel to the marked or unmarked
crosswalk it is intended to serve. Pedestrian ramps
serving more than one marked or unmarked
crosswalk shall not be provided, unless specifically
approved by the City Engineer.
92. Utilities. All new utility service connections, PW Approval of Standard
including electrical and communications, shall be Improvement
installed underground. Electrical transformers shall Plans or start
be installed in underground vaults within an of
appropriate utility easement or public service construction
easement. On going
93. Landscape Plans. Developer shall submit design PW 1st submittal Standard
development Landscape Plans with the first plan or
check for the street improvement plans and final improvement
map for each respective tract. The Landscape plans and
Plans shall show details, sections and supplemental approved with
information as necessary for design coordination of Final Map
the various civil design features and elements
including utility location to the satisfaction of the City
Engineer. Complete Landscape Plans shall be
concurrently approved with the Tract Improvement
Agreement and Final Map.
94. Street Light and Joint Trench Plans. Streetlight PW 1st submittal Standard
Plans and Joint Trench Plans shall be submitted or
with the first plan check for the street improvement improvement
plans and final map for each respective tract. The plans and
final streetlight plan and joint trench plan shall be approved
completed prior to Final Map approval for each prior to Final
respective subdivision. Map
95. Geotechnical Investigation. The Developer shall PW 1st submittal Standard
submit a design level geotechnical investigation of grading
report defining and delineating any seismic hazard. plans and on
The report shall be prepared in accordance with going
guidelines published by the State of California. The
report is subject to review and approval by a City
selected peer review consultant prior to the
acceptance of each Final map. The applicant shall
pay all costs related to the required peer review.
The recommendations of those geotechnical reports
shall be incorporated into the project plans subject
to the approval of the City Engineer.
96. Grading. The disposal site and haul truck route for PW Approval of Public
any off-haul dirt materials shall be subject to the grading plans, Works
review and approval by the City Engineer prior to or start of
the approval the improvement plans or issuance of construction
a Grading Permit. If the Developer does not own or issuance of
Page 23 of 38
the parcel on which the proposed disposal site is grading
located, the Developer shall provide the City with a permit
Letter of Consent, signed by the current owner,
approving the placement of off-haul material on their
parcel. A grading plan may be required for the
placement of the off-haul material.
97. Dust Control/Street Sweeping. The Developer PW Start of Public
shall provide adequate dust control measures at all construction Works
times during the grading and hauling operations. All On going
trucks hauling export and import materials shall be
provided with tarp cover at all times. Spillage of
haul materials and mud-tracking on the haul routes
shall be prevented at all times. Developer shall be
responsible for sweeping of streets within,
surrounding and adjacent to the project if it is
determined that the tracking or accumulation of
material on the streets is due to its construction
activities.
98. Underground Obstructions. Prior to demolition, PW Prior to Standard
excavation and grading on any portion of the project grading and
site, all underground obstructions (i.e., debris, septic construction
tanks, fuel tanks, barrels, chemical waste) shall be
identified and removed pursuant to Federal, State
and local regulations and subject to the review and
approval by the City. Excavations shall be properly
backfilled using structural fill, subject to the review
and approval of the City Engineer.
99. Central Parkway Improvements. The Developer PW Final map Public
shall modify Central Parkway improvements east of and Works
Panorama Way and west of Tract 8100 boundary improvement
line to provide: plans for
• permanent sidewalk improvements along the Tract 8267 or
north side of Central Parkway Tract 8269,
• remove eastbound left turn pocket whichever is
• provide adequate area for vehicular turn- first
around movements at eastbound Central
Parkway
Improvements shall be to the satisfaction of the City
En•ineer.
100. Revised Tentative Map. Prior to acceptance of the Prior to First
final map for processing, the applicant shall submit Final Map
a revised Vesting Tentative Map that includes all and prior to
parcel and lot dimensions, a list of parcel uses, a first submittal
map indicating ownership and maintenance of Grading
responsibilities, easements, typical lot drainage, Plan
typical lot utility layout and all standard items
required on a tentative tract map.
101. Noise Study. A site-specific Noise Study for Parcel P Prior to Planning
Page 24 of 38
H development shall be submitted. Building
Permit
Issuance
102. Landscape Features within Public Right of Way. PW Final Map Standard
The Developer shall enter into an "Agreement for
Long Term Encroachments" with the City for
maintaining the landscape features within public
Right of Way including frontage landscaping,
decorative pavements and special features (i.e.
walls, monuments, fences, etc.), and landscaping
and sidewalks along the east side of Fallon Road,
and along the north side of Central Parkway as
generally shown on Site Development Review
exhibits. The Agreement shall identify the ownership
of the special features and maintenance
responsibilities. The Developer will be responsible
for maintaining all decorative pavements including
restoration required as the result of utility repairs.
103. Private Streets: The owner shall dedicate private PW Approval of Public
street and drive right-of-way and install complete final map and Works
street improvements for the proposed private improvement
streets within the development as shown on the plans
Tentative Map as Street A, Street B, Street C,
Street D, Street E, Drive A, Drive B and Drive C).
104. Master Drainage Plan: The Developer shall PW Final Map for Public
provide a Master Drainage Plan for the proposed tract 8267 or Works
development within the Tract 8267 area to the issuance of
satisfaction of the City Engineer. grading
permit,
approval of
grading plans
105. Drainage Release Easements: The Developer PW Final Map Public
shall dedicate to the City of Dublin drainage release Works
easements on any privately owned parcels (HOA or
GHAD) that accept storm drainage from public
owned streets or parcels.
106. Storm Drain Easements. The Developer shall PW Final Map Public
dedicate to the City of Dublin storm drain Works
easements on any privately owned parcels (HOA or
CHAD) that contain storm drain systems which
convey storm drainage from public owned streets or
parcels.
107. Stormwater Management. The provided PW Prior to Public
Stormwater Management Plan included with the approval of Works
Tentative Map is approved in concept only. The grading,
final Stormwater Management Plan is subject to improvement
City Engineer approval prior to approval of the Tract plans
Improvement Plans. Approval is subject to the
Page 25 of 38
developer providing the necessary plans, details,
and calculations that demonstrate the plan complies
with the standards outlined in the Water Quality
Certification and Waste Discharge Requirements for
Jordan Ranch Project, issued by the San Francisco
Bay Regional Water Quality Control Board.
108. Stormwater Management. If the project is PW Grading, Public
developed in phases, suitable stormwater treatment improvement Works
and hydromodification measures shall be installed plans for each
with each phase such that the stormwater runoff phase
from the impervious areas created or replaced
within the boundaries of each phase shall be
properly treated and metered with stormwater
treatment and hydromodification measures
constructed with that phase or in previous phases.
109. Storm Water Treatment Measures Maintenance PW Final Map Standard
Agreement. Developer shall enter into an
Agreement with the City of Dublin that guarantees
the property owner's perpetual maintenance
obligation for all stormwater treatment measures
installed as part of the project. Said Agreement is
required pursuant to Provision C.3 of the Municipal
Regional Stormwater NPDES Permit, Order No. R2-
2009-0074. Said permit requires the City to provide
verification and assurance that all treatment devices
will be properly operated and maintained. The
Agreement shall be recorded against the property
and shall run with the land.
110. Landscape Improvements: All landscape PW Final Map Public
plantings, irrigation, decorative pavements, and and Works
structures as approved with the Site Development improvement
Review within the public right of way, along all plans for
private streets and drives dedicated with Tract Tract 8267
8267, along the regional trail corridor, within all On going
common area parcels dedicated with Tract 8267
shall be approved concurrently with the
Improvement Plans, Tract Improvement Agreement
and Final Map for Tract 8267.
TRACT 2 g'
:001' ite,-Parcel A Tract 8100)
111. Revised Tentative Map. Prior to acceptance of the Prior to First
final map for processing, the applicant shall submit Final Map
a revised Tentative Map that includes all parcel and and prior to
lot dimensions, a list of parcel uses, a map first submittal
indicating ownership and maintenance of Grading
responsibilities, easements, typical lot drainage, Plan
typical lot utility layout and all standard items
required on a tentative tract map.
112. Landscape Features within Public Right of Way. PW Final Map Standard
The Developer shall enter into an "Agreement for
Page 26 of 38
Long Term Encroachments" with the City for
maintaining the landscape features within public
Right of Way including frontage landscaping,
decorative pavements and special features (i.e.
walls, monuments, fences, etc.), and landscaping
and sidewalks along the east side of Panorama
Way, and along Street J, Street K and Street L, as
generally shown on Site Development Review
exhibits. The Agreement shall identify the ownership
of the special features and maintenance
responsibilities. The Developer will be responsible
for maintaining all decorative pavements including
restoration required as the result of utility repairs.
113. The project Applicant shall submit the following PW Prior to Project
plans to Public Works for approval: issuance of Specific
a. Signing and striping plan the building
b. Detailed street cross-sections permit
c. Location of pedestrian ramps.
d. Intersections of K Street and J Street with
Panorama Drive shall be designed to
accommodate existing street infrastructure on
Panorama Drive, to the satisfaction of the
Public Works Department.
e. Intersection visibility triangles for all
intersections. Intersection visibility shall be
determined by Safe Stopping Sight Distance
(SSSD) Criteria as outlined in the current
Caltrans Highway Design Manual. Assume 30
MPH for all streets. Landscaping features,
architectural structures, or any similar
elements taller than 30 inches shall not be
installed within the SSSD triangles.
114. PW Prior to Project
All internal streets ( J, K, L, etc.) shall be private issuance of Specific
streets. the building
permit
115. On-street parking on any Public Street shall not be PW Prior to Project
allowed within an intersection including T- issuance of Specific
intersection. the building
permit
116. PW Prior to Project
On-street parking on any street shall be restricted issuance of Specific
within 15 feet of any fire hydrant. the building
permit
117. Private Streets: The owner shall dedicate private PW Approval of Public
street and drive right-of-way and install complete final map and Works
street improvements for the proposed private improvement
streets within the development as shown on the plans
Tentative Map as Street J, Street K and Street L,
Page 27 of 38
Drive A, Drive B and Drive C, Drive D, Drive E,
Drive F, Drive G, Drive H, Drive I, Drive J, Drive K
and Drive L.
118. Offsite Grading Easement. Prior to issuance of a PW Issuance of Public
grading permit for Tract 8269 — School Site, a Grading Works
grading easement shall be obtained from the Pemit
owners of the adjoining Neighborhood 5 property.
119. Master Drainage Plan: The Developer shall PW Final Map for Public
provide a Master Drainage Plan for the proposed Tract 8269 or Works
development within the Tract 8269 area to the issuance of
satisfaction of the City Engineer. grading
permit,
approval of
grading plans
120. Drainage Release Easements: The Developer PW Final Map Public
shall dedicate to the City of Dublin drainage release Works
easements on any privately owned parcels (HOA or
GHAD) that accept storm drainage from public
owned streets or parcels.
121. Storm Drain Easements. The Developer shall PW Final Map Public
dedicate to the City of Dublin storm drain Works
easements on any privately owned parcels (HOA or
GHAD) that contain storm drain systems which
convey storm drainage from public owned streets or
parcels.
122. Stormwater Management. The provided PW Prior to Public
Stormwater Management Plan included with the approval of Works
Tentative Map is approved in concept only. The grading,
final Stormwater Management Plan is subject to improvement
City Engineer approval prior to approval of the Tract plans
Improvement Plans. Approval is subject to the
developer providing the necessary plans, details,
and calculations that demonstrate the plan complies
with the standards outlined in the Water Quality
Certification and Waste Discharge Requirements
("Order"), for Jordan Ranch Project, issued by the
San Francisco Bay Regional Water Quality Control
Board.
123. Stormwater Management. If the project is PW Grading, Public
developed in phases, suitable stormwater treatment improvement Works
and hydromodification measures shall be installed plans for each
with each phase such that the stormwater runoff phase
from the impervious areas created or replaced
within the boundaries of each phase shall be
properly treated and metered with stormwater
treatment and hydromodification measures
constructed with that phase or in previous phases.
124. Storm Water Treatment Measures Maintenance PW Final Map Standard
Agreement. Developer shall enter into an
Page 28 of 38
Agreement with the City of Dublin that guarantees
the property owner's perpetual maintenance
obligation for all stormwater treatment measures
installed as part of the project. Said Agreement is
required pursuant to Provision C.3 of the Municipal
Regional Stormwater NPDES Permit, Order No. R2-
2009-0074. Said permit requires the City to provide
verification and assurance that all treatment devices
will be properly operated and maintained. The
Agreement shall be recorded against the property
and shall run with the land.
125. Landscape Improvements: All landscape PW Improvement Public
plantings, irrigation and other improvements as Plans Works
shown in the Site Development Review package
within and with Tract 8269 shall be completed with
Tract 8269. Landscape Plans for these
improvements shall be approved concurrently with
the Improvement Plans, Tract Improvement
Agreement and Final Map for Tract 8269.
PUBLIC WORKS STANDARD CONDITION :, GENERAL
126. Developer shall comply with the following City of PW On going Standard
Dublin Public Works Standard Conditions of
Approval ("Standard Condition") unless specifically
modified by Project Specific Conditions of Approval
above. Standard Conditions shall apply to Vesting
Tentative Tract Maps 8267 and 8269.
127. The Developer shall comply with the Subdivision PW On going Standard
Map Act, the City of Dublin Subdivision, and
Grading Ordinances, the City of Dublin Public
Works Standards and Policies, the most current
requirements of the State Code Title 24 and the
Americans with Disabilities Act with regard to
accessibility, and all building and fire codes and
ordinances in effect at the time of building permit.
All public improvements constructed by Developer
and to be dedicated to the City are hereby identified
as "public works" under Labor Code section 1771.
Accordingly, Developer, in constructing such
improvements, shall comply with the Prevailing
Wage Law (Labor Code. Sects. 1720 and following).
128. The Developer shall defend, indemnify, and hold PW On going Standard
harmless the City of Dublin and its agents, officers,
and employees from any claim, action, or
proceeding against the City of Dublin or its agents,
officers, or employees to attack, set aside, void, or
annul an approval of the City of Dublin or its
advisory agency, appeal board, Planning
Commission, City Council, Community
Development Director, Zoning Administrator, or any
Page 29 of 38
other department, committee, or agency of the City
related to this project to the extent such actions are
brought within the time period required by
Government Code Section 66499.37 or other
applicable law; provided, however, that The
Developer's duty to so defend, indemnify, and hold
harmless shall be subject to the City's promptly
notifying The Developer of any said claim, action, or
proceeding and the City's full cooperation in the
defense of such actions or proceedings.
129. If there are conflicts between the Tentative Map PW On going Standard
approval and the SDR approval pertaining to
mapping or public improvements the Tentative Map
shall take precedent.
Agreements and Benda
130. The Developer shall enter into a Tract Improvement PW First Final Standard
Agreement with the City for all public improvements Map &
including any required offsite storm drainage or Successive
roadway improvements that are needed to serve the Maps
Tract that have not been bonded with another Tract
Improvement Agreement.
131. The Developer shall provide performance (100%), PW First Final Standard
and labor & material (100%) securities to guarantee Map &
the tract improvements, approved by the City Successive
Engineer, prior to execution of the Tract Maps
Improvement Agreement and approval of the Final
Map. (Note: Upon acceptance of the improvements,
the performance security may be replaced with a
maintenance bond that is 25% of the value of the
performance security.)
Fees
132. The Developer shall pay all applicable fees in effect PW Zone 7 and Standard
at the time of building permit issuance including, but Parkland In-
not limited to, Planning fees, Building fees, Dublin Lieu Fees
San Ramon Services District fees, Public Facilities due prior to
fees, Dublin Unified School District School Impact filing each
fees, Public Works Traffic Impact fees, Alameda Final Map,
County Fire Services fees, Noise Mitigation fees, other fees
Inclusionary Housing In-Lieu fees, Alameda County required with
Flood and Water Conservation District (Zone 7) issuance of
Drainage and Water Connection fees and any other building
fees as noted in the Development Agreement. permits
133. Traffic Impact Fees. The Developer shall be PW Issuance of Standard
responsible for payment of the Eastern Dublin Building
Traffic Impact Fee (Sections 1 and 2), the Eastern Permits
Dublin 1-580 Interchange Fee, and the Tri-Valley
Transportation Development Fee. Fees will be
Page 30 of 38
payable at issuance of building permits.
134. Eastern Dublin Traffic Impact Fee Minimum PW Issuance of Standard
Payment. The Developer shall be responsible for Building
payment of a minimum portion of the Eastern Dublin Permits
Impact Fee in cash (11% Category 1 and 25% of
category 2), as specified in the resolution
establishing the Eastern Dublin Traffic Impact Fee.
These minimum cash payments shall be in addition
to any other payment noted in these conditions and
may not be offset by fee credits.
135. Dublin Ranch Eastside Storm Drain Benefit PW Prior to First Standard
District (G-3 Culvert). In accordance with Dublin Final Map or Project
Municipal Code Section 7.74.290, the Developer First Building Specific
shall pay the applicable benefit charges for the Permit,
property. whichever is
earlier
136. The Developer shall dedicate parkland or pay in-lieu PW Prior to filing Standard
fees in the amounts and at the times set forth in City final map
of Dublin Resolution No. 60-99, or in any resolution
revising these amounts and as implemented by the
Administrative Guidelines adopted by Resolution
195-99.
Perm
137. Developer shall obtain an Encroachment Permit PW Start of work Standard
from the Public Works Department for all
construction activity within the public right-of-way of
any street where the City has accepted the
improvements. The encroachment permit may
require surety for slurry seal and restriping. At the
discretion of the City Engineer an encroachment for
work specifically included in an Improvement
Agreement may not be required.
138. Developer shall obtain a Grading/Sitework Permit PW Start of work Standard
from the Public Works Department for all grading
and private site improvements that serves more
than one lot or residential condominium unit.
139. Developer shall obtain all permits required by other PW Start of work Standard
agencies including, but not limited to Alameda
County Flood Control and Water Conservation
District Zone 7, California Department of Fish and
Wildlife, Army Corps of Engineers, Regional Water
Quality Control Board, Caltrans and provide copies
of the permits to the Public Works Department.
Subi .
140. All submittals of plans and Final Maps shall comply PW Approval of Standard
with the requirements of the "City of Dublin Public improvement
Works Department Improvement Plan Submittal plans or final
Requirements", and the "City of Dublin Improvement map
Plan Review Check List".
Page 31 of 38
141. The Developer will be responsible for submittals PW Approval of Standard
and reviews to obtain the approvals of all improvement
participating non-City agencies. The Alameda plans or final
County Fire Department and the Dublin San Ramon map
Services District shall approve and sign the
Improvement Plans.
142. Developer shall submit a Geotechnical Report, PW Approval of Standard
which includes street pavement sections and improvement
grading recommendations. plans, grading
plans or final
map
143. Developer shall provide the Public Works PW Acceptance Standard
Department a digital vectorized file of the "master" of
CAD files for the project when the Final Map has improvements
been approved. Digital raster copies are not and release
acceptable. The digital vectorized files shall be in of bonds
AutoCAD 14 or higher drawing format. Drawing
units shall be decimal with the precision of the Final
Map. All objects and entities in layers shall be
colored by layer and named in English. All
submitted drawings shall use the Global Coordinate
System of USA, California, NAD 83 California State
Plane, Zone Ill, and U.S. foot.
Final Map
144. All Final Maps shall be substantially in accordance PW Approval of Standard
with the Tentative Maps approved with this Final Map
application, unless otherwise modified by these
conditions. Multiple final maps may be filed in
phases, provided that each phase is consistent with
the tentative map, that phasing progresses in an
orderly and logical manner and adequate
infrastructure is installed with each phase to serve
that phase as a stand-alone project that is not
dependent upon future phasing for infrastructure.
145. All rights-of-way and easement dedications required PW Approval of Standard
by the Tentative Map shall be shown on the Final Final Map
Map.
146. Any phasing of the final mapping or improvements PW Approval of Standard
of a Tentative Map is subject to the approval and Final Map
conditions of the City Engineer.
147. Street names shall be assigned to each PW Approval of Standard
public/private street pursuant to Municipal Code Final Map
Chapter 7.08. The approved street names shall be
indicated on the Final Map.
148. All Final Maps shall include street monuments to be PW Monuments Standard
set in all public streets. to be shown
on final map
and installed
prior to
Page 32 of 38
acceptance of
improvements
Easements
149. PW Approval of Standard
The Developer shall obtain abandonment from all improvement
applicable public agencies of existing easements plans or
and right of ways that will no longer be used. appropriate
final map
150. The Developer shall acquire easements, and/or PW Approval of Standard
obtain rights-of-entry from the adjacent property improvement
owners for any improvements on their property. The plans or
easements and/or rights-of-entry shall be in writing appropriate
and copies furnished to the City Engineer. final map
Grading
151. The Grading Plan shall be in conformance with the PW Approval of Standard
recommendations of the Geotechnical Report, the grading plans
approved Tentative Map and/or Site Development or issuance of
Review, and the City design standards & grading
ordinances. In case of conflict between the soil permits.
engineer's recommendations and City ordinances, On going
the City Engineer shall determine which shall apply.
152. Remedial Grading. The grading plan shall include PW First Final Standard
a remedial grading plan prepared by the project Map or
geotechnical consultant, outlining areas of slide Issuance of
repair, benches, keyways, over-excavation at cut-fill Grading
transitions, subdrains, and other recommendations Permits
of the consultant. The remedial grading plan will be
subject to review and approval by the City's own
geotechnical consultant.
153. A detailed Erosion Control Plan shall be included PW Approval of Standard
with the Grading Plan approval. The plan shall grading plans
include detailed design, location, and maintenance or issuance of
criteria of all erosion and sedimentation control grading
measures. permits.
On going
154. Tiebacks or structural fabric for retaining walls shall PW Approval of Standard
not cross property lines, or shall be located a grading plans
minimum of 2' below the finished grade of the upper or issuance of
lot. grading
permits.
On going
155. Resource Agency Permits. Prior to the filing of PW Prior to First Standard
the first final map, and prior to start of any grading Final Map or
of the site as necessary, permits shall be obtained Issuance of
from the US Army Corps of Engineers, the San Grading
Francisco Bay Regional Water Quality Control Permit
Board, the State California Department of Fish and
Game, and the US Fish and Wildlife Service for the
grading or alternation of wetland areas within the
Page 33 of 38
site. The project shall be modified as needed to
respond to the conditions of the permits. In the
event that permits require the creation of permanent
habitat or other mitigation measures within the
project limits, the Developer shall provide (1)
conservation easements or other land use
restrictions over the project as required by the
resource agencies, and (2) provide funding for
ongoing maintenance of habitat areas in the form of
an endowment (to the City or third party) or ongoing
assessments (through the GHAD). The City
reserves the right to modify or add conditions of
approval as needed in response to the final permit
conditions from the resource agencies.
Improvements
156. The public improvements shall be constructed PW Approval of Standard
generally as shown on the Tentative Map and/or grading plans
Site Development Review. However, the approval or issuance of
of the Tentative Map and/or Site Development grading
Review is not an approval of the specific design of permits.
the drainage, sanitary sewer, water, and street On going
improvements.
157. All public improvements shall conform to the City of PW Approval of Standard
Dublin Standard Plans and design requirements improvement
and as approved by the City Engineer. plans or start
of
construction.
On going
158. Public streets shall be at a minimum 1% slope with PW Approval of Standard
minimum gutter flow of 0.7% around bump-outs. improvement
Private streets and alleys shall be at minimum 0.5% plans or start
slope. of
construction.
On going
159. Curb Returns on arterial and collector streets shall PW Approval of Standard
be 40-foot radius, all internal public streets curb improvement
returns shall be minimum 30-foot radius (36-foot plans or start
with bump outs) and private streets/alleys shall be a of
minimum 20-foot radius, or as approved by the City construction.
Engineer. Curb ramp locations and design shall On going
conform to the most current Title 24 and Americans
with Disabilities Act requirements and as approved
by the City Traffic Engineer.
160. Any decorative pavers/paving installed within City PW Approval of Standard
right-of-way shall be done to the satisfaction of the improvement
City Engineer. Where decorative paving is installed plans or start
at signalized intersections, pre-formed traffic signal of
loops shall be put under the decorative pavement. construction.
Decorative pavements shall not interfere with the On going
Page 34 of 38
placement of traffic control devices, including
pavement markings. All turn lane stripes, stop bars
and crosswalks shall be delineated with concrete
bands or color pavers to the satisfaction of the City
Engineer. Maintenance costs of the decorative
paving shall be the responsibility of the
Homeowners Association.
161. The Developer shall install all traffic signs and PW Occupancy of Standard
pavement marking as required by the City Engineer. units or
acceptance of
improvements
162. Street light standards and luminaries shall be PW Occupancy of Standard
designed and installed units or
g per approval of the City acceptance of
Engineer. The maximum voltage drop for
streetlights is 5%. improvements
163. The Developer shall construct bus stops and PW Occupancy of Standard
shelters at the locations designated and approved units or
by the LAVTA and the City Engineer. The acceptance of
Developer shall pay the cost of procuring and improvements
installing these improvements.
164. Developer shall construct all potable and recycled PW Occupancy of Standard
water and sanitary sewer facilities required to serve units or
the project in accordance with DSRSD master acceptance of
plans, standards, specifications and requirements. improvements
165. Fire hydrant locations shall be approved by the PW Occupancy of Standard
Alameda County Fire Department. A raised reflector units or
blue traffic marker shall be installed in the street acceptance of
opposite each hydrant. improvements
166. PW Occupancy of Standard
The Developer shall furnish and install street name units or
signs for the project to the satisfaction of the City acceptance of
Engineer. improvements
167. Developer shall construct gas, electric, cable TV PW Occupancy of Standard
and communication improvements within the units or
fronting streets and as necessary to serve the acceptance of
project and the future adjacent parcels as approved improvements
by the City Engineer and the various Public Utility
agencies.
168. All electrical, gas, telephone, and Cable TV utilities, PW Occupancy of Standard
shall be underground in accordance with the City units or
policies and ordinances. All utilities shall be located acceptance of
and provided within public utility easements and improvements
sized to meet utility company standards.
169. All utility vaults, boxes and structures, unless PW Occupancy of Standard
Page 35 of 38
specifically approved otherwise by the City units or
Engineer, shall be underground and placed in acceptance of
landscape areas and screened from public view. improvements
Prior to Joint Trench Plan approval, landscape
drawings shall be submitted to the City showing the
location of all utility vaults, boxes and structures and
adjacent landscape features and plantings. The
Joint Trench Plans shall be signed by the City
Engineer prior to construction of the joint trench
improvements.
Construction
170. The Erosion Control Plan shall be implemented PW On-going as Standard
between October 15th and April 15th unless needed
otherwise allowed in writing by the City Engineer.
The Developer will be responsible for maintaining
erosion and sediment control measures for one year
following the City's acceptance of the subdivision
improvements.
171. If archaeological materials are encountered during PW On-going as 1993
construction, construction within 100 feet of these needed EDEIR
materials shall be halted until a professional MM
Archaeologist who is certified by the Society of
California Archaeology (SCA) or the Society of
Professional Archaeology (SOPA) has had an
opportunity to evaluate the significance of the find
and suggest appropriate mitigation measures.
172. Construction activities, including the maintenance PW On-going as Standard
and warming of equipment, shall be limited to needed
Monday through Friday, and non-City holidays,
between the hours of 7:30 a.m. and 5:30 p.m.
except as otherwise approved by the City Engineer.
Extended hours or Saturday work will be considered
by the City Engineer on a case-by-case basis.
173. Developer shall prepare a construction noise PW Start of Standard
management plan that identifies measures to be construction
taken to minimize construction noise on surrounding implementatio
developed properties. The plan shall include hours n and on-
of construction operation, use of mufflers on going as
construction equipment, speed limit for construction needed
traffic, haul routes and identify a noise monitor.
Specific noise management measures shall be
provided prior to project construction.
174. Developer shall prepare a plan for construction PW Start of Standard
traffic interface with public traffic on any existing construction
public street. Construction traffic and parking may implementatio
be subject to specific requirements by the City nand on-
Engineer. going as
needed
Page 36 of 38
175. The Developer shall be responsible for controlling PW On-going Standard
any rodent, mosquito, or other pest problem due to
construction activities.
176. The Developer shall be responsible for watering or PW On-going Standard
other dust-palliative measures to control dust as
conditions warrant or as directed by the City
Engineer.
177. The Developer shall provide the Public Works PW Issuance of Standard
Department with a letter from a registered civil Building
engineer or surveyor stating that the building pads permits or
have been graded to within 0.1 feet of the grades acceptance of
shown on the approved Grading Plans, and that the improvements
top & toe of banks and retaining walls are at the
locations shown on the approved Grading Plans.
Storm Water Quality(NPDES)
178. Prior to any clearing or grading, the Developer shall PW Start of any Standard
provide the City evidence that a Notice of Intent construction
(NOI) has been sent to the California State Water activities
Resources Control Board per the requirements of
the NPDES. A copy of the Storm Water Pollution
Prevention Plan (SWPPP) shall be provided to the
Public Works Department and be kept at the
construction site.
179. The Storm Water Pollution Prevention Plan PW SWPPP to be Standard
(SWPPP) shall identify the Best Management prepared
Practices (BMPs) appropriate to the prior to
( ) project approval of
construction activities. The SWPPP shall include the improvement
erosion control measures in accordance with the
regulations outlined in the most current version of plans,
the ABAG Erosion and Sediment Control Handbook implementatio
or State Construction Best Management Practices n prior to start
Handbook. The Developer is responsible for of
ensuring that all contractors implement all storm construction
water pollution prevention measures in the SWPPP. and on-going
as needed.
Page 37 of 38
PASSED, APPROVED, AND ADOPTED this 6th day of October, 2015, by the following vote:
AYES: Councilmembers Biddle, Hart, Wehrenberg, and Mayor Haubert
NOES: Councilmember Gupta
ABSENT: None
ABSTAIN: None
Mayor
ATTEST:
afro
City Clerk
Reso No. 166-15,Adopted 10-6-15, Item 6.1
Page 38 of 38