Loading...
HomeMy WebLinkAboutItem 4.4 Sidewalk Safety Repair~~~~ Off' nU~~~ /ii ~ 111 L~~ - ~ ~~~ DATE: TO: FROM: STAFF REPORT CITY COUNCIL CITY CLERK File #600-35 April 3, 2012 Honorable Mayor and City Councilmembers ~~ Joni Pattillo, City Manager ° ~' SUBJECT: Award of Bid -Contract No. 12-02, Fiscal Year 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation Prepared by Ananthan Kanagasundaram, Assistant Civil Engineer EXECUTIVE SUMMARY: On February 21, 2012, the City Council authorized Staff to solicit bids for Contract No. 12-02, Fiscal Year 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation. Contract No Contract No. 12-02 is proposed to complete improvements identified in two Capital Improvement Projects. The Annual Sidewalk Safety Repair Program (CIP No. 949103) will remove and replace approximately 3,900 square feet of sidewalk with offsets of 3/4-inch or more that may pose a tripping hazard. The Americans with Disabilities Act (ADA) Transition Plan (CIP No. 939103) will complete the installation of 10 curb ramps. FINANCIAL IMPACT: The total budgeted for the two projects is $103,740 ($84,090 for the Annual Sidewalk Repair Program and $19,650 for the Americans with Disabilities Act (ADA) Transition Plan). The project budgets include a total of $20,890 allocated for design, inspection, and project coordination. The remaining $82,850 was budgeted for improvements. The quantities used for the Engineers estimate were based on initial surveys, with the expectation that additional locations may be identified in the field. As shown below the following two budget adjustments are recommended based on the recommended award of a contract: 1) A transfer of $3,750 from the Sidewalk Project (CIP#949103) to the ADA Ramp Project (CIP# 939103). This transfer is possible as, based on the bids received, excess funds are available in the Sidewalk Project. 2) Use of Congestion Management Agency TIP (CMATIP) funding to construct the missing sidewalk on Sierra Court just north of Dublin Boulevard. Anticipated construction cost of this improvement is approximately $30,000 including 10% contingency. This additional work will be negotiated after the award of the bid. Page 1 of 3 ITEM NO. 4.4 COMBINED PROJECT FUNDING AND PROPOSED ADJUSTMENTS BASED ON RECOMMENDED BIDDER Project Funding Budget For Expense With Source Improvements Contingency Sidewalk Safety Repair (949103) General $ 65,000 Low Bid -Base Quantity Fund $40,422 Contingency 20% (additional locations) 8,084 $48,506 Transfer To Project 939103 (General General Fund) Fund ($3 750) Congestion Additional Appropriation Mgt Funds 30 000 Sierra Ct Gap Closure -Change Order (Estimated Cost with Contingency) 30 000 $91,250 $78,506 Sub-Total All Funds Sidewalk Project ADA Transition Plan /Curb Ramps General $ 17,850 (939103) Fund $19,500 Contingency 10 % 1, 950 Transfer From Project 949103 (General + 3 750 Fund) General Fund $21,600 $21,600 Sub-Total All Funds -Curb Ramps GRAND TOTAL 2 PROJECTS $112,850 $100,106 RECOMMENDATION: Staff recommends that the City Council: (1) Adopt the Resolution Awarding Contract No. 12-02, Fiscal Year 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation to AJW Construction; (2) Authorize the City Manager to approve a negotiated Change Order in an amount not to exceed $30,000 CMATIP Funds for Sierra Court sidewalk gap closure project, as well as contract changes based on quantities not to exceed $8,084 for Project 949103 and not to exceed $1,950 for Project 939103; and (3) Approve the budget change. u .~ . .. ... „~. Submit ed By Public Works Director .. ., r ~ f ~ ~~ ~ }~ ~ ~~~.,k ~, a , . Submitted By Administrative Services Director C~ _ .. Reviewed y Assistant City Manager Page 2 of 3 DESCRIPTION: The Annual Sidewalk Safety Repair Program (remove and replace) repairs sidewalk offsets of 3/4-inch or more that may pose a tripping hazard. The remove and replace process is used in locations where the offset is more significant or where tree roots are causing the offset. This procedure requires the removal of the existing sidewalk and, in the case of root problems, removal of the tree roots, and then replacement of the concrete sidewalk. While maintenance of sidewalks and other frontage improvements is legally the responsibility of the adjacent private property owner, the City Council has adopted aCity-funded sidewalk repair program on a year-by-year basis since 1983. The City Council extended funding for the City- paid repair program for an additional year in the Fiscal Year 2011-12 budget. The bidder specifications for the Sidewalk Repair Project (CIP#949103) requested costs for removal and installation of approximately 3,900 square feet of sidewalk and curb and gutter at locations to be designated by the City. The bids received were below the amount budgeted for improvements and Staff requests approval to modify the final expense by 20% to account for additional locations. As part of approved grant funds from the Congestion Management Agency Traffic Improvement Program (CMATIP), funding is available to construct the missing sidewalk on Sierra Court just north of Dublin Boulevard (Attachment 1). Staff is requesting that the City Council authorize the City Manager to execute a change order not to exceed $30,000 to complete this work. ADA Curb Ramp Project (CIP#939103) includes the construction of approximately ten (10) pedestrian curb ramps. The ramps are funded by General Fund as identified in the ADA Transition Plan. This work is proposed to be completed by the same Contractor since the work is similar type work and combining the projects will be acost-savings due to economy of scale. Based on the bids (plus contingency) received for this work, additional funds would be required, or there would need to be a reduction in the number of ramp locations. Staff recommends that the City Council authorize a transfer of $3,750 from the Sidewalk Project (CIP#949103) to the ADA Ramp Project (CIP# 939103). This transfer is possible as, based on the bids received, excess funds are available in the Sidewalk Project. Bids Received A total of 8 bids were received for this project (Attachment 2). The low bid of $59,922.00 was submitted by AJW Construction. Staff has reviewed the bid results, checked references, necessary licenses, and recommends that the City Council adopt the Resolution awarding Contract No. 12-02, Fiscal Year 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation to AJW Construction as the lowest responsive bidder (Attachment 3). A Budget change (Attachment 4) is required to address full funding for the Curb Ramp project and account for the special grant funds to complete additional sidewalk work. NOTICING REQUIREMENTS/PUBLIC OUTREACH: None. ATTACHMENTS: 1. Vicinity Map of Sierra Court (CMATIP Project) 2. Bid Results 3. Resolution of Award -Contract No. 12-02 4. Budget Change Page 3 of 3 Vicinity Map of Sierra Court (CMATIP Project) ~ ~ ~ ~ ~ It) a a a a 1.0 Z ..... N a to a en c C> C'! a ~ a ~ N LC:! ..... 00 ..... a 1.0 c:i 0 ...J r....: cx:i g) 0 Z ...Jw ..... 0> a a a t= W It) I"- ..... ~ <(0 to I"- to V a '<t <(0 00 v 0> ..... It) en t= 1-- (") v_ (") N It) ~ 0 1-- to_ I"- 00 0> It) I"- .!!'! 0 00:: v v N .... ::l 00:: 00 N ..... (") r-: ::s ~ 1-0.. (") N CD 0:: 1-0.. 0> to CD CJ I- .... 'ii I- ~ ~ ~ ~ ~ ~ tJ) ~ ~ ~ ~ ~ ~ CJ .... Z Z 0 0 It) a a a a 0 (") v It) (") a c 0 I-W I"- a a a a 0 I-W ..... 00 ..... 0> 00 0 W -0 00 (") a c:i c:i :3: -0 ..0 ..... 00 It) It) ~ ::E Z- (") N It) Z- N It) I"- It) Cll ::l0:: C'!. tJ) ::l0:: ..... (") CJ <( a.. N it:: a.. cD ;;:: ~ ~ ~ ~ ~ - ~ ~ ~ ~ ~ 'i: Q) > a a a a a 0 a a a a a 0 ... (") It) a a a OC) Z It) It) a a a 0 Q) tJ) ...JW a N a a a N 0 ...JW l"- v N to a c:i ;:: 0:: <(0 It) (") a v a N t= <(0 00 a I"- 00 a 1.0 Cll 1-- 0> I"- C'!. 00 a .... 1-- a I"- 0> V It) .... " W 00:: 0 0 00:: N~ .s a v (") ..... a 0> 0> N 1-0.. (") N CD ::l 1-0.. v (") en CJ ...J 0:: :5 ~ ~ ~ Q) ~ ~ ~ ~ ~ I- ~ ~ ~ ~ ... tJ) ... III 0 ::E a a a a a Z a a a a a CJ I-W 0> It) a a a 0 I-W It) It) a It) a ... ~ -0 00 N a c:i c:i 0 -0 N to ..... a a c Z- a I"- a 0:: Z- ..... 00 V It) ::s III ::l0:: ..... a ::l0:: N 0 .., E a.. N .., a.. (") ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ <( ~ ~ .. Z (") to a a a en a a a a a 0 0 Z ~ It) a a a .... a:: a a a a a C! ~ 0 ...JW It) to a a c:i N ...Jw v 0> a 00 c:i .... ~~ N to a a a en I- <(0 N l"- N a 0> N t= ..... 00 N 00 a en tJ) 1-- ..... v_ v ..... 0> .... 0 00:: v N ..... ..... a Q) Z 00:: l"- v 0> N ...J ::l 1-0.. 0 1-0.. <( (") N 1.0 v ..... .... I- 0:: ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ - tJ) - I- Z U) Z Z 0> N a a a 0 a a a a a a.. 0 I-W ~ 0> a a a 0 I-W a a a a a ::E 0 -0 00 ..... a a a Z -0 N (") It) 0> 0> Z- a It) a W Z- ..... (") 0> ~ a.. ::l0:: ..... ..... a a.. ::l0:: 0> :3: a.. N tJ) a.. ..... III ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - 0:: ::l a a a a a 0 It) a a a a 1.0 0 a a a a a 0 tJ) I"- It) a a a N a ...Jw (") 0> c:i c:i a N 0:: ...Jw ..... N a a a ..,; <(0 v l"- N 00 a N W <(0 It) (") 00 N a OC) Z 1-- (") v_ v ..... It) en 1-- N l"- v ..... a 1.0 <( 00:: It) v 0> Q) :3: 00:: 6 (") 6 ~ :i: Z 1-0.. (") ..... 1.0 I- 1-0.. v N CD 0 0 ~ t= ~ ~ ~ ~ ~ ~ 0:: ~ ~ ~ ~ ~ ~ - - 0 III C> ::l a a a a a tJ) It) a a a a 0 0:: I-w a a a a a <( I-w N It) a a a 0:: I- -0 0> (") It) It) a tJ) -0 c:i N c:i a a a.. U) Z- (") ..... It) 0 Z- ....... v ..... a ::l0:: 0> ::l0:: a 0:: Z 0:: 0 a.. ..... a.. N ::i( U ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ - a.. - W 3: I"- (") N N a I"- (") N N a 0:: .., > N 0> ....... ....... ..... > N 0> ..... ..... ..... ~ <( I- 0> v_ I- 0> v_ a c-ri ....... a c-ri ..... N W LL LL LL .... <( Ou) 0 u) 0 N tJ) 1-<( LL LL LL LL <t: t: <( LL LL LL LL <t: Q) ~ -w en ...;J ...J ...J LU W en ...J ...J ...J LU ...J z:i: Z :i: .... ~ ::l ::l ..c . CJ .:.i .:.i ... W Q) Q) Cll <( <( ::E a CJ I I- 0 I l- e;; Z ro 0 0 Z ro 0 0 I 0.. ~ 0.. ~ tJ) N 0 Q) I- 0 Q) l- I- .... t= 0:: ~ ~ a. t= a::: ~ ~ a. ...J 0 a.. ~ Q) E a.. ~ Q) E ::l N > Q) > Q) I it:: ro it:: ro tJ) .... Q) 0 > a::: Q) 0 > 0:: 0 > E 0 0 > E 0 W .... 0 Q) E .0 0 Q) E 0:: 0 tJ) - Q) tJ) G) Q) .0 N. E ~ a::: Q) .... E ~ Q) .... W ~ ::I W .... ~ ::I a N a Q) 0 '-' U a Q) u U m ~ c: .... a::: c: .... 0 ::E 0 Q) Cl c: :E '-' 0 Q) Cl c: I - - LL N W ~ 0 -- c: ro W ~ u -S"Q) c: ro .... ~ - ::I Q) os: .C (ij os: oc 0 t: ~ u 1i) t: - ~ u - I- ::I ro ~ ::I ro III > U -ro 0- Q) ~ _ ro 0- Q) 0 Q) ~ .0 - Q) .0 - .... a. u .... a. u 0:: ~ u ro ::I Q) U Q) u ro ::I Q) U Q) <( u; en UO:: <t: 0- u; en UO:: <t: 0- ::E I- ::E a:E :E Z a ::l 0 m W ..... N (") V It) -w ....... N (") V It) tJ) 0 t: lIlt: RESOLUTION NO. - 12 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 12-02, 2011-2012 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM AND CURB RAMP INSTALLATION TO AJW CONSTRUCTION WHEREAS, the City of Dublin did on March 19, 2012, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 12-02, 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, authorized by the City Council on February 21, 2012, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 12-02, 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, to the lowest responsible bidder therefor, to wit, AJW Construction, at a bid of Fifty-Nine Thousand, Nine Hundred, Twenty Two Dollars ($59,922), the particulars of which bid are on file in the office of the Public Works Director. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 3rd day of April, 2012, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: City Clerk Mayor G:\CIP\SIDEWALK\2011-2012\Resolution of Award.doc CITY OF DUBLIN BUDGET CHANGE FORM FISCAL YEAR 2011/2012 New Appropriations (City Council Approval Required) X From Un-Appropriated Reserves ($30,000 from Congestion Management Fund) From New Revenues CHANGE FORM # Budget Transfers: From Budgeted Contingent Reserve (Approval Req'd) Within Same Department Activity) Between Departments (Approval Req'd) X Other Between CIP (Approval Reg'd) DECREASE BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT AMOUNT Name: EXPENDITURE : Name: EXPENDITURE General Fund/Sidewalk Safety Repair General Fund/ADA Transition Plan CIP Project #: 949103.9400.9401.1001 Project #: 939103.9400.9401.1001 GL Account #: 3400.9401.73103 $3,750 GL Account #: 3300.9301.73103 $3,750 Name: TRANSFERS IN: Name: TRANSFERS IN: General Fun to Sidewalk Safety Repair General Fund/ADA Transition Plan CIP Project #: 949103.9301 Project #: 939103.9301 GL Account #: 3400.9401.49999 $3,750 GL Account #: 3300.9301.49999 $3,750 Name: EXPENDITURE General Fund/Sidewalk Safety Repair Project #: 949103.9400.9401.2208 GL Account #: 3400.9401.73103 $30,000 Name: TRANSFERS IN: Congestion Management Agency Fund to Sidewalk Safety Repair CIP Project #: 949103.9404 $30,000 GL Account #: 3400.9401.49999 Name: TRANSFERS OUT: Congestion Management Agency Fund to Sidewalk Safety Repair CIP $30,000 GL Account #: 2208.9401.89101 REASON FOR BUDGET CHANGE ENTRY: On April 3, 2012, the City Council adopted the Resolution awarding Contract No. 12-02 Fiscal Year 2011-2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation to AJW Construction. The City Council also authorized the City Manager to proceed with a change order and a use of the Un-Appropriated Reserve from the Congestion Management Agency Fund in the amount of $30,000 to construct the missing sidewalk on Sierra Court. A transfer in the amount of $3,750 from the Sidewalk Safety Repair Improvements CIP#949103 to the ADA Curb Ramp Improvements CIP #939103 was also recommended by Staff and approved by Council. This change was necessary based on the low bid received and excess funds are available in Sidewalk Safety Repair Improvement CIP. As Presented at the City Council Meeting on: Date 4/3/2012 #################(Finance Use Only)################### Posted By: Date City Council Minutes Excerpt Attached G:IBudget Changesl4_2011_12128_4_3_12_Sidev/alk_&_Curb Ramp.doc Reviewed By: ATTACHMENT 4