STAFF REPORT
CITY COUNCIL
June 5, 2012
Honorable Mayor and City Councilmembers
Joni Pattillo City Manager""'
CITY CLERK
File #600 -35
SUBJECT: Acceptance of Work- Contract No. 11 -03, Dublin Traffic Signal Improvements,
(Columbia Electric, Inc. — CIP No. 960022)
Prepared by Ferd Del Rosario, Senior Civil Engineer
EXECUTIVE SUMMARY:
A contract was awarded by the City Council on June 7, 2011 to Columbia Electric, Inc. for the
Dublin Traffic Signal Improvements (CIP #960022) which included the installation of a new
traffic signal at the intersection of Amador Valley Boulevard and Brighton Drive and upgrade an
existing traffic signal at the intersection of San Ramon Road and Shannon Avenue. The Public
Works Department has determined that the work under this contract is now complete and ready
for acceptance.
FINANCIAL IMPACT:
The total project budget for CIP #960022 is $684,492. This includes all design, inspection and
the work performed under the agreement with Columbia Electric, Inc, which was performed over
two fiscal years. The total estimated final project cost is $ 522,356. The final cost of the
improvements performed under the agreement with Columbia Electric, Inc. is shown below:
Dublin Traffic Signal Improvements: Improvements (Columbia Electric, Inc.)
Task
Approved Contract Amount
Including Contingency
Actual
Contract
Cost
AVB /Brighton Drive
Traffic Signal - (Traffic
Impact Fee Fund)
$ 259,000
$ 228,977
San Ramon Rd /Shannon
Avenue Traffic Signal -
(Measure B Bike /Ped
$ 147,920
$ 147,050
Fund
TOTAL
$ 406,920
$376,027
Page 1 of 2 ITEM NO. 4.10
RECOMMENDATION:
Staff recommends that the City Council accept the improvements under Contract No. 11 -03,
Dublin Traffic Signal Improvements, with Columbia Electric, Inc., and authorize the release of
retention after 35 days if there are no subcontractor claims.
x
Submit ed By
Public Works Director
DESCRIPTION:
Submitted By
Administrative Services
Director
Reviewed By
Assistant City Manager
On June 7, 2011, the City Council awarded a contract to Columbia Electric, Inc. to construct the
Dublin Traffic Signal Improvements project. The project included the installation of a new traffic
signal at the intersection of Amador Valley Boulevard and Brighton Drive. This was the result of
a traffic signal warrant analysis of said intersection which concluded that installation of a traffic
signal was justified. In addition, the project included upgrading of the existing traffic signal at the
intersection of San Ramon Road and Shannon Avenue to improve pedestrian safety for school
children crossing San Ramon Road at Shannon Avenue. The projects are identified on the
location map (Attachment 1).
Staff has determined that the work under this contract is now complete and ready for
acceptance. The new traffic signal installed at the intersection of Amador Valley Boulevard and
Brighton Avenue has significantly reduced the queuing of cars at said intersection particularly
during school drop -off and pick -up periods, and pedestrian safety has been increased with the
installation of signalized crosswalks. Furthermore, the upgraded signal at the intersection of
San Ramon Road and Shannon Avenue has provided safer pedestrian access across Ramon
Road.
NOTICING REQUIREMENTS /PUBLIC OUTREACH:
Copy to Columbia Electric, Inc.
ATTACHMENTS: 1. Location Map
Page 2 of 2
m umenck pWe
uunan b�mm
Genter
�{
�K• '~ * Co {{ Can
e sr
3°" ,Psaa Cardiq Dub r
Daugherty 5 011'
G,r
-4 drd {{
r)ubin High
*
Stagecaa�h
Hills Park
111h s1
10th St
4l
J77q.7 Or
$ehooa `
Park
o
�p
m
J
- Brighton [}r
Ly��'� 1
1.1�4t�p9� Pie •:� �� r➢n� �ayr�,�
m
3 Kolb Park
pet5a
pt�
W
a �D
Bth $t
cs
&Ln
¢
'8 `
I Komandorski
=111111-
`,,fiord Way
° G
Golan Park t
Park s
sPe 3
Village
Warmsley $t:
� �fiirc�
°MCr $ 'famardcrt or y {3,
fiord Way m m
c St
.n
ey FFF"""
sqP`
Valley CanYPr
a ;Yat wing : prier e mat ey
Call Google
g e.'" st
m
oTim her Wolf i
a � O J.
j� a der Rrvtr -Rai
wSth St -4-
�#
01 A n7
41 "Pcy
;Aap data .1201 fGoogle
New Traffic Signal at Amador Valley Boulevard /Brighton Drive
{hro golana ❑r o- °her r Hnnr'Y� D gh4�lplr
d sr+ter
�4
ON
a�eDr
3
�` 8hamruCk llrage hiap di �2Q11 GoIC
X201 1 Goggle a _ cw r. n rammr I
Upgrade of Existing Traffic Signal At San Ramon Road /Shannon Avenue
LOCATION MAP
e sr
3°" ,Psaa Cardiq Dub r
Or
h wav y
y v
vorr" a Kolb Park
�� L
Ly��'� 1
1.1�4t�p9� Pie •:� �� r➢n� �ayr�,�
A �y
erg b
µollan� &
&Ln
' '
'8 `
Shannon m
`,,fiord Way
° G
Golan Park t
Park s
sPe 3
M
OrfkryC� Y �
m
yy rx y
y N o
o Valley
Upgrade of Existing Traffic Signal At San Ramon Road /Shannon Avenue
LOCATION MAP