HomeMy WebLinkAboutItem 4.09 Sidewalk & Curb Rampor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL July 17, 2012 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 SUBJECT: Acceptance of Work — Contract No. 12 -02, Fiscal Year 2011 -2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation Prepared by Ananthan Kanagasundaram, Associate Civil Engineer EXECUTIVE SUMMARY: On April 3, 2012, the City Council approved an award of contract to AJW for Contract No. 12 -02, Fiscal Year 2011 -2012 Annual Sidewalk Safety Repair Program and Americans Disabilities Act Implementation (Curb Ramp Installation). The Contract was proposed to complete improvements identified in two Capital Improvement Projects. The Annual Sidewalk Safety Repair Program (CIP No. 949103) removed and replaced approximately 4,900 square feet of sidewalk with offsets of 3/4 -inch or more that posed a tripping hazard. The Americans with Disabilities Act (ADA) Transition Plan (CIP No. 939103) completed the installation of 10 new curb ramps. FINANCIAL IMPACT: The amount authorized for expenditure under the contract awarded April 3, 2012 was $100,106. The funding for the projects included both City General Funds and Congestion Management Agency Funds. The General Fund Sidewalk project exceeded the authorized amount by $1,650.75. There are funds remaining in the project budget to accommodate this additional amount. The following table displays the expenditures compared to the CONTRACT FUNDING AND EXPENDITURES Project Funding Contract Final Additional Source Award Improvement Change Including Cost Order Contingencies Amount Sidewalk Safety Repair (949103) General Fund $48,506 $50,156.75 $1,650.75 Annual Sidewalk Repair Sierra Ct Gap Closure — Authorized Congestion Change order at time of bid award. Mgmt. Funds $30,000 $29,883.75 None Required ADA Transition Plan / Curb General Fund $ 21,600 $19,500.00 None Ramps (939103) Required GRAND TOTAL $100,106 $99,540.50 $1,650.75 Page 1 of 2 ITEM NO. 4.9 RECOMMENDATION: Staff recommends that the City Council: 1) Accept the improvements under Contract No. 12 -02, Fiscal Year 2011 -2012 Annual Sidewalk Safety Repair Program and Curb Ramp Installation; 2) Approve an additional change order in the amount of $1,650.75 for General Fund Sidewalk Repairs; and 3) Authorize the release of retention after 35 days if there are no subcontractor claims. x Submit ed By Public Works Director DESCRIPTION: Submitted By Administrative Services Director Reviewed by Assistant City Manager The Annual Sidewalk Safety Repair Program (remove and replace) repairs sidewalk offsets of 3/4 -inch or more that may pose a tripping hazard. The remove and replace process is used in locations where the offset is more significant or where tree roots are causing the offset. This procedure requires the removal of the existing sidewalk and, in the case of root problems, removal of the tree roots, and then replacement of the concrete sidewalk. While maintenance of sidewalks and other frontage improvements is legally the responsibility of the adjacent private property owner, the City Council has adopted a City- funded sidewalk repair program on a year -by -year basis since 1983. The City Council extended funding for the City - paid repair program for an additional year in the Fiscal Year 2011 -12 budget. This year's Sidewalk Safety Repair Program removed and replaced approximately 4,900 SF (Square Feet) of sidewalk with offsets of 3/4 -inch or more that were unsafe or posed a tripping hazard. In addition, Congestion Management Agency Traffic Improvement Program (CMATIP) grant funds were used to construct missing sidewalk on Sierra Court just north of Dublin Boulevard. Although an amount was included for contingencies at the time of the bid award, the number of locations requiring repair exceeded the contingency by $1,650.75. As part of the acceptance of the work, the City Council is also requested to authorize an additional change order in this amount. Funding is available in the project budget to accommodate this change. ADA Curb Ramp Project (CIP #939103) included the construction of approximately ten (10) pedestrian curb ramps. The ramps are funded by General Fund as identified in the ADA Transition Plan. Staff has reviewed the work performed under this contract and has determined that the work is satisfactory and complete. NOTICING REQUIREMENTS /PUBLIC OUTREACH: None ATTACHMENTS: 1. Sierra Court Gap Closure Project (Before & After Pictures) Page 2 of 2 Before After Sierra Court Gap Closure Project (Before & After Pictures)