HomeMy WebLinkAboutItem 4.5 Storm Drain Cleanor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL December 4, 2012 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 SUBJECT: Acceptance of Work - Contract No. 12 -07, 2012 Storm Drain Cleaning and CCTV Project, CIP No. 960017 Prepared by Mark Lander, City Engineer EXECUTIVE SUMMARY: On June 19, 2012 the City Council awarded Contract No. 12 -07, 2012 Storm Drain Cleaning and CCTV Project (CIP No. 960017), to Sanact , Inc (DBA — Roto Rooter). The project included storm drain cleaning and closed- circuit television inspection for thirteen pipe segments identified in the Citywide Storm Drain Assessment Phase 2 Report. During the work, an additional location was identified which needed to be addressed to avoid future back -ups and remove debris. All of the work, including the added location, is complete and ready for acceptance. FINANCIAL IMPACT: Capital Improvement Project #960017 is a multi -year phased project to assess storm drain conditions, and address prioritized repairs as identified. The project is funded by the General Fund. In Fiscal Year 2012/2013 additional appropriations were made. The work completed under the contract with Sanact, Inc. occurred in Fiscal Year 2012/2013. The total Project Budget is $222,066 and includes $36,543 appropriated for condition assessment, design, inspection, administration and related costs, with the remaining $185,523 is appropriated for improvements (repairs). The amount of the base contract awarded on June 19, 2012, including contingencies, was $37,084. The final costs for the project ($48,124.70) exceeded this amount due to additional effort needed to clean the Las Palmas Way pipe and additional cleaning work required on Houston Place which was not part of the original contract scope of work. Although a Change Order is required for this agreement, the final cost is below the amount available for contract repairs and improvements over the two years of appropriations. Staff will take into account the remaining balance available in recommending additional work to be undertaken in a future contract in the current year. Page 1 of 2 ITEM NO. 4.5 Amount of Award W Sanact, Funding Source Inc,. (Jurte 19, 2012) Actual General Fund( #1001) TOTAL: Improvements $24,723.00 $48,124.70 Page 1 of 2 ITEM NO. 4.5 RECOMMENDATION: Staff recommends that the City Council accept the improvements under Contract No. 12 -07, 2012 Storm Drain Cleaning and CCTV Project, authorize execution of a change order in the amount of $23,401.70 to Sanact, Inc., authorize staff to file a Notice of Completion, and authorize the release of retention after 35 days if there are no subcontractor claims. x Submit ed By Public Works Director DESCRIPTION: Submitted By Administrative Services Director -YY G// Reviewed y Assistant City Manager The 2012 - -2017 Capital Improvement Program allocated General Fund appropriations to the Citywide Storm Drain Assessment. This project involves a phased program to inspect the City's storm drain system, identify the need for cleaning or repairs, and implement repairs and cleaning as needed. On June 19, 2012, the City Council awarded Contract No. 12 -07, 2012 Storm Drain Cleaning and CCTV Project (CIP No. 960017) to Sanact, Inc. (doing business as — Roto Rooter). The project included storm drain cleaning and closed- circuit television inspection for thirteen pipe segments on Las Palmas Way, Las Palmas Court, Bloomington Way, Brittany Drive, Champagne Court, Fenwick Way, Rolling Hills Drive, Solana Drive, and Tamarack Drive, identified in the Citywide Storm Drain Assessment Phase 2 report as needing cleaning due to build -up of debris, roots, calcium carbonate, and other material. The amount of the base contract awarded on June 19, 2012 was $24,723.00, with an additional amount for contingencies in the amount of 50% or $12,361, for a total of $37,084. The final costs for the project exceeded this amount due to additional effort needed to clean the Las Palmas Way pipe of heavy calcium carbonate deposits. In addition, Staff requested that the contractor inspect and clean a section of pipe on Houston Place outside the original contract scope of work. The work was performed in response to a complaint by an adjoining resident of a strong odor in the pipe. Inspection of the Houston Place pipe showed high levels of sediment, construction debris, and decomposing vegetation, which was subsequently removed. The work is complete and ready for acceptance. The total final cost of work was $48,124.70, including $9,256.56 for the work on Houston Place. The Fiscal Year 2012/2013 Capital Project Budget included a total of $185,523 for contract improvements and repairs. This budget is to address the completion of this work as well as address a future project later in the year. The final cost is below the budgeted amount. The City Council approval is needed to approve a change order covering the cost of work above the original amount authorized at the time of contract award and to accept the project as complete. NOTICING REQUIREMENTS /PUBLIC OUTREACH: None. ATTACHMENTS: 1. Location Map Page 2 of 2 CITY OF DUBLIN ALAMEDA COUNTY, CALIFORNIA YEAR 2012 STORM DRAIN CLEANING AND CCTV PROJECT INDEX OF SHEETS SHEET N DRAWING k DRAWING NAME 1 T -1 TITLE SHEET AND VICINITY MAP 2 L -1 PLAN sun Ra610 bay Crockett Helculez Bemcie ea Meranez ego Bay P -mm Pittsburg �texe Beyrlew- Manakin Plnole AntlOGI Oal El SObrente Pacnaa C.—W B4cA DiamoM San Pablo ♦Minn Regonrl Pl—M Hill C � Preserve grpe Riahmbntl 5rsonw Clsylon Regtnrrel Pen * Wen Br[ El Cesrila Walnut Harney Creek Mt olebla Plbany Ori- Infryetle ' 0 51ale Park Rared V 111 esleerl Belkeley ♦ Rea,oml Par4 u Alama ♦ Emeryville Moraae pieElo PlM mertl Danville Temrory ,. .;I ,; San Oakland RMSrgan glerml Preserve r -,i T anciscc San Ramon ®sere Alameda D re _ gatl I, PNe a,mm PROJECT SITE) � ® L6aaa R gioral Pare rtd eSI 0 Vane. Du bn 'iOLlh$arl Fren. aCO Say San Lorenzo Fairviev Fs -u L,,,— `rantlata Hayward' pleesanlon an BraRO o Mr Faaa moo R, a, Reginrwl PnM1 Burlingame Ed-L oMina ttll- City pgm" sunsl. Dal V i6lteta R glaal eveation Aiee emrrtaan San Mateo ReseNe Cm Fasterary Fremom araneRaya� Newafk WMemna Belmvnl ♦ • LOCATION MAP is h� 4 i g O W Kolb Park Opalan Park a n 0. Dn cer 0'` u g Dubli l Y k O � oaban Blvd �G�— - 3T Ilk W Arth ur H, 5Teed' or es, VICINITY MAP O = SITE NUMBER ,io g �y Harris &Associates CITY OF DUBLIN 100 CIVIC PLAZA YEAR ZOO CLEANING / los/03 DUBLIµ CA 94588 TITLE SHE or es, DI ,0,, TO sDMH —13 $ G t FRDM DI 6D9 K,y zo. 15. EM SLNG 502 ROOT O B OCN GE4 }'t FROM SD 026 C; h /JQQ. BLOOMINGTON WY AT SOUTHWICK DR NOT TO SCALE h ^� BLOCKAGE 4'3 FROM .,fig e° %6 28 01 568° 0I t1�zT NI CLEAN OI 560 TO GI 41 REMOVE EXISTING CCNCRETE BLOCKAGE FROM FIRENGTH ,6 t FRISTING CONCRETE BLOCK- 14'± FROM DI 547,F CLEAN 36' LFm 12' SD DI 4944 TO DI 4913 7, _...� SEINF�T�r1_�,:_- A � -1, A �`. •� . 8147. EXISTN 802 ROCT KI FROM DI 43 ° ^� ^ N m 0- A� 8131 � 41 ROLLING HILLS DR, CHAMPAGNE CT, BRITTANY DR NOT TO SCALE LEGEND REMOVE HARDENED DEPOSITS FROM ENTIR — — — — — — OF STORM DRAIN SEGMENT CLEAN —R. O A LINE NOTABLE BLOCKAGE SEE CALLOUT DESCR PT ON ENISTING STORM DRAIN OKN E%I$TNG DRAINAGE INLETANHOLE HAR E % *ING OSITS 1 DEPOSITS J/ FR NOO PIPE REEMOME E%ISTNG 861, H ARDENE D DEPOSITS FR 53 1 T sDI 533. DEPTH 8632 3t, LENGTH 4Gt MAR w1�,. 0623 �FENWICK WY NOT TO SCALE TAT CLEAN 300 LFt 18'SD ty DI 3 }q TO DI 1598 N NG BOE FROM 11 311 ExISiIN AP PIPE G t FRDM DI 6D9 ° h ^� REMOVE EXISTING HARDENED DEPOSITS FROM rvNj V 3G 6 9G GI 09 TD DI 111, ^ I/�y 71 >• ^ ^ - DEPTH 6't, LENGTH 44'± 71• / 3 1 TAMARACK zDR NOT TO SCALE REMOVE EXISTING HEPTHEN3 t DLEPNGTo D - G °1 `EXISTING 502 HARDENED DEPOSITS AT DI 2722 ff SOLANA DR NOT TO SCALE ROLLING HILLS DR a 4190 _ of 1111T Ill HAR*N NOT TO SCALE z',y, DEPOS TS FROM 15' SD D OJ TO O SD GHO DEPOS TS T10' Q. '.d T1R0 G O T PPE DEPT Q zgiZ vzz Hof III. FROM � lHR0UGH0UT PIPE UEP VARIE ' ,A IVVVVVV 10' -18'. ENGT1 1)8'tSTH Op. �` 179' 7436 I EXISTING HARDENED' D I DEPOSIT BLOCKAGE 802 t2^ .1St FROM MH _ PEAIOVE EXISTING N 18 HARDENED DEPOSITS FROM I MHN,830 TO SOMH SO 94 EIN / I ETr DEPTH 2Gt, LENGTH 1 t J ' A , °,RTMwS aa7g oIF PIPE D GEPOL SFROM h z,. 7402 7403 >�2 DEPTH VARIES '.�H FW46' K Q� LENGTH 90't LAS PALMAS NOT TO SCALE nCfij Poos03 ,,o iiii� CITY OF DUBLN YEAR 2012 STORM DRAIN L_7 Harris 8 Associates 100 CIVIC PLAZA CLEANING AND CCTV PROJECT 1 DUBLIN, CA 94568 PLAN SHEET 2 OF